Division 200 — Grading and Removals

205Modified Subgrade

MO · 2026 (Oct) Standard Specifications✓ Full text on BuildSpecBook pages 131–132 Save this section

Ask about Section 205

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

205.1 Description. This work shall consist of modifying a subgrade to improve stability. This work shall be

performed as specified in the contract, at the contractor’s option with concurrence from the engineer or at the direction of the engineer.

205.2 Material. All material shall be in accordance with Division 1000, Material Details, and specifically as

follows.

205.2.1 The modifying material shall be hydrated lime or other chemical material, a geogrid, a geotextile, or

other material approved by the engineer.

205.2.1 1 If hydrated lime is used, the contractor shall furnish or require the supplier to furnish with each load

certification that the product is in accordance with AASHTO M 216.

205.2.1 2 If chemical modifying material other than hydrated lime is used, the material and application plan

shall be approved by the engineer prior to use.

205.2.2 If a geogrid or geotextile is used the product type and layout plan shall be approved by the engineer

prior to use.

205.3 Construction Requirements.

205.3.1 Application.

205.3.1 1 If not directed by the engineer or specified in the contract, the contractor may determine the locations,

amount of modifying material and depth of application, within the limits of this specification and subject to concurrence from the engineer.

205.3.1 2 Where performed, subgrade modification shall be done to all areas uniformly and laterally between

outside shoulder points plus 18 inches on each side. When the chemically modified areas are stopped and started, there shall be a longitudinal transition zone at the rate of 30 feet per 6 inches of modified depth. The transition may be made by reducing modifying material or by mixing depth.

205.3.1 3 Chemical modifying material shall be spread in uniform and regular patterns. No material shall be

applied if the material is being blown from the work area.

205.3.1 4 The application rate of the chemical modifying material shall be approved by the engineer.

205.3.2 Compaction. When chemically modified, the subgrade shall be uniformly mixed with the modifying

material. Mixing and compaction shall continue until the subgrade is shown to have suitable compaction as demonstrated by the roller equipment. Density and moisture testing will ordinarily be waived for subgrade chemically modified under this specification, except that should compaction not be demonstrated to the engineer's satisfaction, the engineer reserves the right to run such tests as necessary to ensure density. When stabilized with a geogrid or geotextile, the subgrade will require recompaction to the specified density and moisture content only of it is disturbed by the goegrid or geotextile placement.

205.4 Method of Measurement. Measurement of modified subgrade will be made to the nearest square yard,

including transition areas. Subgrade meeting all other requirements, suitable for the placing of base material and having modifying material incorporated as specified herein, will be paid for at the contract unit price per square yard except as noted herein.

205.5 Basis of Payment.

205.5.1 If included in the contract, payment for modified subgrade will be made per square yard of modified

subgrade at the contract unit price. No direct payment will be made for the required modifying material.

205.5.2 If performed at the option of the contractor, payment for modified subgrade will be made at the invoiced

material cost from the supplier, and no reimbursement will be made for incorporation or for processing.

205.5.3 If modified subgrade is not included in the contract and is directed by the engineer, payment will be

made in accordance with Sec 104.3.

205.5.4 Reimbursement for transition areas will be made at the contract unit price per square yard for 1/2 the

area of the transition.

205.5.5 Reimbursement will be limited to modified areas, the width of the pavement and shoulders, plus 18

inches on each side.

205.5.6 Only one payment for modified subgrade will be made for any area, regardless of the depth of stabilized

material, number of applications or other circumstances.

Referenced in this section

Get an email when 205 changes

Missouri revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Missouri Standard Specifications for Highway Construction, 2026 (Oct) Edition. Pages 131–132 of 874. View official source ↗

Ask about this section

Scoped to Missouri Missouri Standard Specifications for Highway Construction, Section 205 — Modified Subgrade. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.