507.1 Description. This specification covers the maturity method as a non-destructive means of determining in-
place concrete strength for pavement or structural applications. The concept of the maturity method is based on the combined effects of concrete age and temperature, during hydration, on the rate of strength gain for a specific concrete mix. This method requires the establishment of a relationship between compressive strength and calculated maturity indices for a specific concrete mixture prior to placement of the mixture in the field. The contractor may use the maturity method in accordance with this specification to estimate the compressive strength of the in-place concrete.
507.2 Procedure. In-place concrete strength determined by the maturity method shall be in accordance with
ASTM C 1074, except as noted herein.
507.2.1 Maturity Meter. The maturity meter shall have a secure means of collecting data that is unalterable.
507.2.2 Maturity Function Values. In lieu of determining values for datum temperature, To, or activation
energy divided by the gas constant, Q, values of 14° F or 5,000 Kelvin may be used, respectively.
507.2.3 Standardization. The calibration of systems used for monitoring the maturity of concrete shall be
verified every seven working days in accordance with AASHTO T 325, Sec 9.1 and ASTM C 1074, Sec 7.1.
507.2.4 Development of the Strength-Maturity Relationship. The contractor shall develop the strength-
maturity relationship prior to placing any concrete on the project, and shall notify the engineer prior to development of the maturity curve. The development of the strength-maturity relationship shall be done in the field using project equipment and materials.
507.2.4 1 Preparing Test Specimens. When the strength-maturity relationship is developed, compressive
strength specimens shall be fabricated, cured and tested at the plant site and fabricated from a minimum 3 cubic yard batch of concrete. Temperature of the fresh concrete shall be measured and recorded. All field specimens shall be fabricated and cured in accordance with AASHTO T 23, with the following exceptions. Specimens shall be cured for the first 24 hours under similar or like temperature conditions anticipated during construction, and specimens, including the cylinder used to monitor temperature, shall be de-molded at approximately 24 hours and cured in accordance with AASHTO T 23. The concrete mixture shall meet the specification requirements in order to determine the strength-maturity relationship. The concrete mixture shall be at or above the target air content established by the contractor.
507.2.4 2 Required Documentation. The contractor shall provide the engineer with the following information
prior to placing any concrete on the project:
507.2.5 Compressive Strength Testing. At a minimum, compressive strength tests shall be performed on three
specimens, and the average strength computed at 1, 3, 7, 14 and 28 days. Production may start after the seven- day compressive strengths have been determined with approval from the engineer.
507.2.6 Placement of Temperature Sensors. For pavement and pavement repairs, temperature sensors shall be
embedded at approximately mid-depth and 18 inches from the edge of pavement. For other applications, temperature sensors shall be embedded in locations considered critical in terms of exposure conditions and structural requirements. Temperature sensors shall be placed at the following frequency: Structure Component Frequency Pavement 1 sensor per 3750 sq. yd., with a minimum of one in the last 50 feet of pavement Pavement Repairs1 sensor per 10 patches, with a minimum of one sensor in the last patch Structural A minimum of one sensor at the end of the pour, with three others sensors available to be placed as directed by the engineer
507.3 Proportioning, Mixing, Placing and Curing Field Placed Concrete. The maturity method does not
account for variations in strength due to proportioning, mixing, placing and curing of concrete. Proper methods shall be followed at all times during proportioning, mixing, placing and curing the field placed concrete.
507.3.1 Field Placed Concrete Mix Requirements. Mix constituents of the field placed concrete shall not
change, and mix proportions of the field placed concrete shall not vary more than 5.0 percent from the concrete mix used to develop the strength-maturity relationship. The water cement ratio shall not vary by more than 0.02.
507.3.2 Requiring Immediate Validation of Strength-Maturity Relationship. If the mix constituents a
change more than 5.0 percent, the water cement ratio changes more than 0.02, the material sources change or the mixing operation changes, an immediate validation of the strength-maturity curve shall be done in accordance with Sec 507.4.
507.4 Validation of Strength-Maturity Relationship. At a minimum, every seventh day of concrete placement
a validation test shall be conducted to verify that in-place concrete strength is accurately represented by the strength maturity relationship. The engineer shall be notified at least one business day in advance of when and where the validation test will be done.
507.4.1 Documentation for Validation. The contractor shall document the air, slump, and water content from
the batch of concrete tested and any deviations from the original job mix.
507.4.2 Specimens for Validation. During placement of the field placed concrete, a minimum of four
compressive strength cylinders shall be fabricated and cured as specified in Sec 507.2.4.1.
507.4.3 Sensor Location for Validation. A temperature sensor shall be embedded to within 1/2 inch of the
center of one cylinder for computing the maturity index from the measured temperature history as specified in Sec 507.2.
507.4.4 Test Specimens for Validation. Once the maturity index, according to the temperature monitored
cylinder, is achieved which corresponds to the maturity index desired for the first critical action such as opening pavement to traffic or removing formwork, three cylinders shall be tested for compressive strength.
507.4.5 Strength-Maturity Relationship Validated. The average compressive strength of the three cylinders
shall be compared to the compressive strength as determined by the strength-maturity relationship. If the predicted strength is within 10 percent or 200 psi, whichever is less, of the actual compressive strength, then the strength-maturity relationship will be considered validated.
507.4.6 Strength-Maturity Relationship Acceptable. If the actual compressive strength is more than 10
percent or 200 psi above the compressive strength as determined by the strength-maturity relationship, then a new strength-maturity relationship may be developed.
507.4.7 Strength-Maturity Relationship Not Validated. If the actual compressive strength is more than 10
percent or 200 psi, whichever is less, below the compressive strength as determined by the strength-maturity relationship, the contractor shall make cylinders to determine compressive strengths until a new strength- maturity relationship has been developed.
507.5 Field Documentation. The contractor shall provide the engineer with the following information prior to
taking any field action based on the strength-maturity strengths:
507.5.1 Calibration and Verification Records. The contractor shall record all test results for equipment
calibration and verification, and shall maintain all results in an organized format.
507.5.2 Availability of Test Results. Test results shall be available to the engineer at all times.
507.6 Basis of Payment. No additional payment will be made for compliance with this specification.