CONCRETE MEDIAN, MEDIAN STRIP, SIDEWALK, CURB RAMPS, STEPS AND PAVED APPROACHES
608.1 Description. This work shall consist of constructing concrete medians, median strips, sidewalks, curb
ramps, steps and paved approaches as shown on the plans or as directed by the engineer. Concrete medians shall consist of a paved median constructed on a prepared subgrade. Concrete median strips shall consist of paved median strips laid over and tied to a previously constructed pavement.
608.2 Material. All material shall be in accordance with Division 1000, Material Details, and specifically as
follows: Item Section Reinforcing Steel for Concrete Structures 1036 Steel Welded Wire Reinforcement for Concrete Pavement 1036 Epoxy Resin Material 1039 Red Concrete Tinting Material 1056 Material for Joints 1057 Truncated Domes 1067
608.2.1 Concrete sidewalks, curb ramps, and steps shall be constructed of Pavement concrete or Class B-1
concrete.
608.2.2 Concrete medians, median strips and paved approaches 6 inches thick or greater shall be constructed of
Pavement concrete. Concrete medians, median strips and paved approaches less than 6 inches thick shall be constructed of either Class B-1 concrete or Pavement concrete.
608.2.3 Material, proportioning, air entraining, mixing, slump and transporting of concrete shall be in
accordance with Sec 501.
608.3 Construction Requirements.
608.3.1 Placement, finishing and curing of concrete shall be in accordance with Sec 502 When items are
constructed on a subgrade, the subgrade shall be compacted to the specified density of the applicable subgrade material in accordance with Sec 209. The subgrade shall have a sufficient moisture content such that moisture is not drawn out of the concrete. Transparent membrane shall be used in lieu of pigmented membrane for curing concrete median strips, sidewalks, curb ramps and steps.
608.3.2 Where tinted concrete is specified, the colored pigment shall be applied in accordance with the
manufacturer’s recommendations. The final concrete surface coloration shall be medium to dark red, as approved by the engineer. If membrane curing is allowed by the manufacturer’s recommendations, the membrane shall be a clear or transparent type.
608.3.3 Required reinforcement and tie bars shall be positioned by bar chairs or other approved devices during
the placing of concrete.
608.3.4 Concrete median strips shall be attached to the pavement with tie bars as shown on the plans. Tie bars
shall be adjusted to a minimum of 6 inches from any transverse joint.
608.3.5 Joints for all items shall be constructed at such intervals and locations as shown on the plans or as
directed by the engineer.
608.3.5 1 Longitudinal joints between the median and curb, or median and adjacent concrete pavement shall be
constructed of either non-extruding preformed joint material, or one layer of commercially available 55-pound roll roofing. Sawed joints shall be sealed in accordance with Sec 502.5.4.
608.3.5 2 Transverse joints in concrete median strips shall be constructed as shown on the plans and as directed
by the engineer.
608.3.6 After form removal, the area adjacent to the concrete shall be backfilled with suitable material,
compacted and finished to the satisfaction of the engineer.
608.3.7 Concrete strength and air content shall be tested at the required QC and QA frequencies. Concrete
strength shall be tested with either cylinders or the maturity method. Concrete shall have a minimum 28-day strength of 4000 psi. Air content shall be in accordance with Sec 501.10.2.
608.3.7 1 The contractor shall measure concrete strength at a frequency of one test per 100 cubic yards. The
contractor shall measure air content from the first truckload and thereafter at a frequency of one test per 100 cubic yards. The engineer shall measure concrete strength and air content at a frequency of one test per 500 cubic yards.
608.3.7 2 No concrete strength and air content testing will be required on any day when the total volume of
concrete placed in a day is less than 3 cubic yards.
608.3.8 During cold weather, the limitations and protection in accordance with Secs 502.4.1 and 502.4.2 will
apply to this work.
608.3.9 Transitions from curb ramps to sidewalks, gutters or streets shall be flush and free of abrupt changes. All
curb ramps at streets, signalized commercial entrances, and railroad crossings shall include truncated domes that contrast visually with the adjoining surface light on dark or dark on light.
608.3.9 1 Truncated domes shall be aligned on a square or radial grid pattern, 24 inches deep in the direction of
travel, and the full width of curb ramp, landings or blended transition, exclusive of flares.
608.3.9 2 Truncated domes shall be installed as per manufacturer's specifications.
608.4 Method of Measurement.
608.4.1 Measurement of concrete median and of concrete median strip will be made to the nearest 1/10 square
yard.
608.4.2 Concrete sidewalk and curb ramps will be measured to the nearest 1/10 square yard.
608.4.3 Truncated domes will be measured to the nearest 0.5 square foot.
608.4.4 Paved approaches will be measured from the beginning of the return on one side of the approach to the
end of the return on the other side of the approach, to the nearest 1/10 square yard. Integral curb constructed on paved approaches will not be measured or paid for separately but will be included in the contract unit price for paved approaches.
608.4.5 Final measurement of any of the above items will not be made except for authorized changes during
construction, or where appreciable errors are found in the contract quantity. The revision or correction will be computed and added to or deducted from the contract quantity for that item.
608.5 Basis of Payment.
608.5.1 The accepted quantities of concrete median, median strip, sidewalk curb ramps, truncated domes and
paved approach, complete in place, will be paid for at the contract unit price for each of the pay items included in the contract.
608.5.2 The accepted quantities of concrete steps will be paid for in the following manner:
608.5.3 No direct payment will be made for the following:
Get an email when 608 changes
Missouri revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.