617Concrete Traffic Control

MO · 2026 (Oct) Standard Specifications✓ Full text on BuildSpecBook pages 368–370 Save this section

Ask about Section 617

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

CONCRETE TRAFFIC BARRIER SECTION 617.10 PERMANENT CONCRETE TRAFFIC BARRIER.

617.10.1 Description. This work shall consist of constructing permanent concrete traffic barrier as shown on the

plans or as directed by the engineer. For purposes of this specification, permanent concrete traffic barrier will be defined as Type A, B, C, D, E or any modification of these types.

617.10.2 Material. All reinforcing steel shall be Grade 60 deformed bar, and all reinforcing steel and dowels

shall be epoxy coated. All material shall be in accordance with Division 1000, Material Details, and specifically as follows: Item Section/Specification Reinforcing Steel for Concrete 1036 Concrete Curing Material 1055 Dowel Bars 1057 Preformed Fiber Expansion Joint Material 1057 Joint Sealer 1057 Joint Filler 1057 Prestressing Strands AASHTO M 203

617.10.3 Construction Requirements.

617.10.3 1 Permanent concrete traffic barrier shall be constructed of pavement concrete or Class B-1 concrete.

Concrete shall be air-entrained with 28-day compressive strength of 4,000 psi. Material, proportioning, air- entraining, mixing, slump and transporting shall be in accordance with Sec 501. Concrete shall be placed and finished in accordance with Sec 703. Permanent concrete traffic barrier shall be cured in accordance with Sec 502.

617.10.3 2 Permanent concrete traffic barrier shall be constructed using an extrusion machine or forms

specifically designed for constructing cast-in-place reinforced concrete traffic barrier. Precast units will not be permitted. Barriers that do not exhibit a consistent surface shall be corrected to the satisfaction of the engineer.

617.10.3 3 For retrofit installation, dowels shall be installed in accordance with Sec 1039.30.

617.10.4 Method of Measurement. Final measurement will not be made except for authorized changes during

construction, or where appreciable errors are found in the contract quantity. The revision or correction will be computed and added to or deducted from the contract quantity. Where required, measurement for each type of permanent concrete traffic barrier, including barrier height transitions, will be made to the nearest 1/2 linear foot for each continuous length and totaled to the nearest linear foot for the sum of the lengths.

617.10.5 Basis of Payment. Accepted permanent concrete traffic barrier will be paid for at the contract unit

price for each of the types specified in the contract. No direct payment will be made for reinforcing steel, dowels, joint filler material, and sawed joints. SECTION 617.20 TEMPORARY TRAFFIC BARRIER.

617.20.1 Description. This work shall consist of furnishing, installing, relocating and removing temporary

traffic barrier as shown on the plans or as directed by the engineer. For purposes of this specification, temporary concrete traffic barrier will be defined as Type F three-loop concrete traffic barrier or approved alternate barrier system that meets NCHRP 350 or MASH 2016 criteria.

617.20.2 Material. All material shall be in accordance with Division 1000 Materials Details and Sec 1064.2.2.1.

617.20.2 1 All Type F temporary barrier shall be in a serviceable condition during installation and relocation as

determined by the engineer. Reference the Missouri Quality Standards for Temporary Traffic Control Devices for evaluation criteria on serviceable condition.

617.20.2 2 Use of two-loop temporary Type F concrete traffic barrier shall not be allowed after January 1, 2023.

617.20.2 3 Other types of temporary traffic barrier will be allowed if the barrier has been approved in

accordance with Sec 1064 and meets the project specific need as approved by the engineer.

617.20.3 Certification. Prior to use the contractor shall submit to the engineer a manufacturer's certification of

crashworthiness per NCHRP 350 or MASH 2016 for portable concrete barrier or other approved temporary barrier. Type F three-loop temporary concrete barrier is required to meet NCHRP 350 requirements regardless of manufacturing date and may be used until January 1, 2030. All other temporary barriers manufactured prior to January 1, 2023 may be used until January 1, 2030. All other temporary barriers manufactured after January 1, 2023 shall meet MASH 2016 crash test requirements.

617.20.4 Construction Requirements.

617.20.4 1 As directed by the engineer, damaged units shall be immediately replaced and removed from the

right of way at the contractor's expense.

617.20.4 2 All barrier sections shall remain the property of the contractor unless specified otherwise in the

contract.

617.20.4 3 Equipment or material shall not be stored near temporary barriers within the limits shown on the

plans or as approved by the engineer.

617.20.4 4 Anchoring of Type F temporary concrete traffic barrier shall be as shown on the plans. Other types of

temporary traffic barrier shall be anchored in accordance with the manufacturer’s recommendations.

617.20.5 Method of Measurement. Measurement of temporary traffic barrier and relocated temporary traffic

barrier will be made to the nearest 1/2 linear foot for each continuous length and totaled to the nearest linear foot for the sum of the lengths. Measurement of temporary traffic barrier height transitions and relocated temporary traffic barrier height transitions will be made per each.

617.20.6 Basis of Payment. Accepted temporary concrete traffic barrier and temporary concrete traffic barrier

height transitions will be paid for at the contract unit price for each of the pay items included in the contract. Accepted relocated temporary concrete traffic barrier and relocated temporary concrete traffic barrier height transitions will be paid for at the contract unit price for each of the pay items included in the contract. SECTION 617.30 TRAFFIC BARRIER DELINEATORS.

617.30.1 Description. This work shall include furnishing, installing and maintaining retroreflectorized traffic

barrier delineators as shown on the plans or as designated by the engineer.

617.30.2 Material. All material shall be in accordance with Division 1000, Material Details, and specifically as

follows: Item Section Delineators 1065

617.30.3 Construction Requirements.

617.30.3 1 Delineators shall be placed on all traffic barrier spaced at 50-foot intervals.

617.30.3 2 Delineator reflector colors shall correspond with pavement marking. Delineators shall be sheeted on

one side, facing oncoming traffic, unless otherwise specified. Where permanent concrete traffic barrier divides opposing lanes of travel, the delineators shall have retroreflective sheeting on both sides corresponding to adjacent pavement marking.

617.30.3 2.1 Delineators mounted on permanent concrete traffic barrier shall be anchored with galvanized

mechanical fasteners that prevent movement in accordance with the manufacturer’s recommendations.

617.30.3 2.2 Delineators mounted on temporary concrete traffic barriers shall be mounted to the traffic barrier in

accordance with the manufacturer's recommendations.

617.30.3 3 Any damaged or missing delineators shall be replaced by the contractor at the contractor's expense.

617.30.4 Basis of Payment. No direct payment will be made for traffic barrier delineators provided on new

permanent concrete traffic barrier or temporary traffic barrier. Delineators specified for installation on existing permanent concrete traffic barrier will be measured and paid for per each.

Sections that cite this one

Get an email when 617 changes

Missouri revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Missouri Standard Specifications for Highway Construction, 2026 (Oct) Edition. Pages 368–370 of 874. View official source ↗

Ask about this section

Scoped to Missouri Missouri Standard Specifications for Highway Construction, Section 617 — Concrete Traffic Control. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.