Montana Department of Transportation (MDT) · 2020 Standard Specifications for Road & Bridge Construction

Section 561 — Bridge Deck Milling

Montana 2020 Standard Specifications for Road & Bridge Construction, Section 561. Full text, cross-references and related pay items on BuildSpec.

SECTION 561 BRIDGE DECK MILLING 561.01 DESCRIPTION This work involves milling of deck concrete using hydrodemolition or mechanical scarification. 561.02 RESERVED 561.03 CONSTRUCTION REQUIREMENTS 561.03.1 Submittals Submit for approval the following: 1. A written plan detailing the methods, materials, equipment, and personnel to be used. 2. The method and materials used to contain, collect, and dispose of all debris generated by the removal, cleaning, and surface preparation process. Ensure adequate capacity to handle the amount of wastewater generated. Do not begin concrete removal until…

The rest of Section 561 — Bridge Deck Milling is for members

You're reading the opening of Section 561 — Bridge Deck Milling. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 561 — Bridge Deck Milling — free for 14 daysSign in