AND HEADWALLS
615.01 Description
The work is constructing irrigation facilities and headwalls.
615.02 Materials
Furnish material in accordance with the following section requirements: Concrete, Class General ......................................... 551
615.03 Construction Requirements
Construct irrigation facilities and headwalls in accordance with the following: Excavate in accordance with the applicable Section 209. Construct and install concrete structures in accordance with Section 552. Place reinforcing steel as shown in the contract. Moisten all surfaces where concrete is to be placed before the concrete is placed.
615.04 Method of Measurement
Concrete is measured in accordance with Subsection 552.04. Reinforcing steel and excavation are incidental to concrete and not measured for payment.
615.05 Basis of Payment
Payment for the completed and accepted quantities is made under the following: Pay Item Pay Unit Concrete See Subsection 552.05