- 101 - SECTION 111 -- PLANS AND SPECIFICATIONS
111.01 Distribution of Plans and Specifications
1.The Department will place review copies of the plans and specifications on file in the offices of:
a.All NDOT District Engineers. b. Central Headquarters, Nebraska Department of Transportation, Lincoln, Nebraska.
c.NDOT website. 2. The plans and specifications may be in electronic format. 3. Plans and Proposals are available for purchase on the NDOT Storefront website. - 102 - SECTION 112 -- MOBILIZATION
112.01 Description
1.This work shall consist of preparatory work and operations, including, but not limited to, those nece ssary for the movement of personnel, equipment, supplies, and incidentals to the project site; for the establishment of offices, buildings and other facilities necessary for work on the project; and for all other work and operations which must be performed or costs incurred before beginning work at the project site. It shall also include pre- construction costs which are necessary direct costs to the project and are of a general nature rather than directly a ttributable to other pay items under the Contract.
2.The Contractor must include a ll costs that he/she expects to incur for all movements of his/her equipment and personnel. Additional payments will not be made should the Contractor elect to move his/her equipment and/or crew to another project site befor e the contracted work is complete or if the Contractor fails to adequately as sess the actual cost of Mobilization for the contracted work.
112.02 Method of Measurement and Basis of Payment
1.No measurement is required.
2.a. The partial payment for any Mobilization item will be limited to an amount not to exceed 10% of the tota l amount bid, including Mobilization, for the group in which the Mobilization occurs. In the event the lump sum bid for "Mobilization" exceeds 10% of the total group amount, the amount in excess of 10% of the total group amount will not be paid until the Engineer has made tentative acceptance of the work included in the proposal.
b.When it is necessary to de lay tentative acce ptance because of a required observation period, the entire amount for “Mobilization” may be paid upon tentative acceptan ce of the other work.
3.Subject to the limitat ions stated in Paragraph 2. of this Subsection, partial payments will be made as follows:
a.Following contract executi on, the Department will pay up to 25% of the total amount bid for "Mobiliz ation". This payment is limited to the Contractor's documented costs of obt aining Contract Bond and Railroad Protective Liability Insurance premiums. These costs must exceed $200.00.
b.Upon completion of 5% of a group's originally contracted work, excluding Mobilization, the Departm ent will pay 50% of that group's Mobilization amount.
c.Upon completion of 10% of a group's originally contracted work, excluding Mobilization, the Depar tment will pay 100% of that group's Mobilization amount.
4.When "Mobilization" is not sh own as a separate pay item for a group in the proposal, the work described in this Section will be considered subsidiary to other pay items in the group.