719.01 Description
1.This work shall consist of fu rnishing and installing new corrugated metal pipe, helical corrugated metal pipe, slotted pipe, pipe-arches, high density polyethylene (corrugated interior), high density polyethylene (smooth interior), and polyvinyl chloride pipe, and the relaying of existing corrugated metal pipe, helical corrugated metal pipe, slotted pipe, pipe-arches, high density polyethylene (corrugated interior), high density polyethylene (smooth interior), and polyvinyl chloride pipe at the locations shown in the contract or ordered by the Engineer in accordance with the requirements of these Specifications.
719.03 Construction Methods
1.Excavation and backfilling shall be performed by the Contractor in accordance with the requirements of Section 702 and the contract. 2.The Contractor shall lay the pipe true to the lines and grades shown in the contract or as directed by the Engineer. Any pipe which is not true in alignment or to the established grade or which shows any settlement after laying shall be taken up and relaid by t he Contractor at no additional cost to the Department.
3.Deflection Testing: a. When plastic pipe is used or when corrugated metal pipe 48 inch (1200 mm) or larger is used, the Contractor shall periodically check for pipe deflection during pipe installa tion and again not less than 30 days following completion of the roadway embankment. The internal diameter of plastic pipe shall not be reduced by more than 5% of its design diameter. The internal diameter of corrugated me tal pipe shall not be reduced by more than 7.5% of its design diameter. If t he installation does not meet these requirements, the pipe shall be remo ved and replaced at no additional cost to the Department.
719.03 Flexible Pipe Culverts (Corrugated Metal and Plastic)
- 628 - b. During the required 30-day reinspection of the culverts, the Contractor must treat the culvert as a “confined space”. Appropriate safety procedures shall be followed. The Cont ractor shall provide the appropriate safety equipment.
c.Optional devices for deflection testing include electronic deflectometers, calibrated television or video cameras, or properly sized "go, no-go" mandrel. Deflection measurements can be made directly with extension rulers or tape measures at 10 feet (3 m) increments in pipes that allow safe entry. To ensure accurate measurements, the pipe should be cleaned before testing.
d.Deflection testing will not be required on corrugated metal pipe extensions of less than 25 feet (7.6 m).
4.Pipe Joints: a. All flexible pipe installed under the roadway prism shall be connected with an approved water-tight joint. All flexible pipe installed outside of the roadway prism shall be connected with an approved soil-tight joint.
b.If the contract calls for the extension of a corrugated metal pipe culvert, the pipes shall be connected with an approved water-tight connecting band. In all cases where an existing concrete headwall is in place, the old concrete shall be completely removed.
5.The Contractor shall clean accumulations of soil and debris, haul, and relay all culvert pipe designated to be relaid in accordance with the methods herein described for installing new pipe. The Contractor shall carefully remove the pipe from its existing location, transport it to and install it in the new location in accordance with the methods herein described for installing new pipe. Pipe damaged by the Contractor shall be replaced with pipe of similar type by the Contractor without additional compensation. New metal bands or joint material shall be supplied and installed when necessary.
6.The Contractor shall strut or take other action recommended by the manufacturer for all corrugated metal culverts with diameters greater than 48 inches (1200 mm) to insure that the pipe’s final shape is properly aligned.
7.Instead of strutting corrugated metal pipe 48 inches (1200 mm) or larger in diameter, the Contractor may furnish corrugated metal pipe with the vertical axis fabricated out of round 5% of the normal diameter from end to end of the pipe. The elongation shall be made by approved shop methods, and any coating damaged or destroyed shall be repaired or replaced. If helical metal pipe 48 in ches (1200 mm) or larger in diameter is furnished with the vertical axis fabricated out of round instead of strutting, then field connections shall be made with match-marked connecting pipe to assure that the helical sections match when the ve rtical axis of the pipe sections are brought together.
8.All flexible pipe installed under the roadway prism shall be bedded and backfilled as shown in the contract. Granular bedding and backfill will not be required for corrugated metal pipe extensions unless called for in the contract. Flexible Pipe Culverts (Corrugated Metal and Plastic) 719.05 - 629 - 9. Plastic pipe shall be installed by the Contractor in accordance with the contract, ASTM D 2321, and the manufacturer’s recommendations.
10.When polymer pre-coated pipe is used, in order to protect the coated pipe, the Contractor shall us e padded or nonmetallic slings and padded straps when handling the pipe. This includes unloading, moving and installation.
Source: Nebraska Standard Specifications for Highway Construction, 2017 Edition. Pages 661–663 of 1,048.
View official source ↗