General Provisions (00100-00999)

800ROADSIDE DEVELOPMENT AND EROSION CONTROL

NE · 2017 Standard SpecificationsBook pages 693696View official source ↗

- 659 - DIVISION 800 -- ROADSIDE DEVELOPMENT AND EROSION CONTROL 801 -- PERMANENT SEEDIN G ................................................................ 663

801.01 Description ........................................................................... 663

801.02 Material Requirements ........................................................ 663

801.03 Construction Methods ......................................................... 663

801.04 Method of Measurement ...................................................... 665

801.05 Basis of Payment .................................................................. 665

802 -- COVER CRO P SEEDIN G ............................................................... 666

802.01 Description ........................................................................... 666

802.02 Material Requirements ........................................................ 666

802.03 Construciton Methods ......................................................... 666

802.04 Method of Measurement ...................................................... 667

802.05 Basis of Payment .................................................................. 667

803 -- TEMPORAR Y SEEDIN G ................................................................ 668

803.01 Description ........................................................................... 668

803.02 Material Requirements ........................................................ 668

803.03 Construction Methods ......................................................... 668

803.04 Method of Measurement ...................................................... 669

803.05 Basis of Payment .................................................................. 669

804 -- FERTIL IZING .................................................................................. 670

804.01 Description ........................................................................... 670

804.02 Material Requirements ........................................................ 670

804.03 Construction Methods ......................................................... 670

804.04 Method of Measurement and Basis of Payment .................. 670

805 -- SOIL AM ENDMEN T ....................................................................... 671

805.01 Description ........................................................................... 671

805.02 Material Requirements ........................................................ 671

805.03 Construction Methods ......................................................... 671

805.04 Method of Measurement ...................................................... 671

805.05 Basis of Payment .................................................................. 671

806 -- MULCHI NG ..................................................................................... 673

806.01 Description ........................................................................... 673

806.02 Material Requirements ........................................................ 673

806.03 Construction Methods ......................................................... 673

806.04 Method of Measurement ...................................................... 674

806.05 Basis of Payment .................................................................. 674

807 -- HYDROMUL CHING ........................................................................ 675

807.01 Description ........................................................................... 675

807.02 Material Requirements ........................................................ 675

807.03 Construction Methods ......................................................... 675

807.04 Method of Measurement ...................................................... 675

807.05 Basis of Payment .................................................................. 676

808 -- SLOPE PROT ECTION ................................................................... 677

808.01 Description ........................................................................... 677

808.02 Material Requirements ........................................................ 677

808.03 Construction Methods ......................................................... 677

808.04 Method of Measurement ...................................................... 678

808.05 Basis of Pyament .................................................................. 678

809 -- SODDI NG ....................................................................................... 679

809.01 Description ........................................................................... 679

809.02 Material Requirements ........................................................ 679

734.03 Precompressed Polyurethane Foam (PPF) Joint

- 660 - 809.03 -- CONSTRUCTION METHODS ......................................................... 679

809.04 Method of Measurement ...................................................... 681

809.05 Basis of Payment .................................................................. 681

810 -- EROSION CONTRO L ..................................................................... 682

810.01 Description ........................................................................... 682

810.02 Material Requirements ........................................................ 682

810.03 Construction Methods ......................................................... 682

810.04 Method of Measurement ...................................................... 684

810.05 Basis of Payment .................................................................. 684

811 -- TRANSIT ION MAT ......................................................................... 685

811.01 Description ........................................................................... 685

811.02 Material Requirerments ...................................................... 685

811.03 Construction Methods ......................................................... 685

811.04 Method of Measurement ...................................................... 685

811.05 Basis of Payment .................................................................. 685

812 -- SILT CHE CKS ................................................................................ 686

812.01 Description ........................................................................... 686

812.02 Material Requirements ........................................................ 686

812.03 Construction Methods ......................................................... 686

812.04 Method of Measurement ...................................................... 687

812.05 Basis of Payment .................................................................. 687

812 -- MULCH PERIMET ER CONT ROL................................................... 688

813.01 Description ........................................................................... 688

813.02 Material Requirements ........................................................ 688

813.03 Construction Methods ......................................................... 688

813.04 Method of Measurement ...................................................... 688

813.05 Basis of Payment .................................................................. 688

814 -- EARTH AND RO CK CHECKS ....................................................... 690

814.01 Description ........................................................................... 690

814.02 Material Requirements ........................................................ 690

814.03 Construction Methods ......................................................... 690

814.04 Method of Measurement ...................................................... 691

814.05 Basis of Payment .................................................................. 691

815 -- SILT TR AP ..................................................................................... 692

815.01 Description ........................................................................... 692

815.02 Construction Methods ......................................................... 692

815.03 Method of Measurement ...................................................... 692

815.04 Basis of Payment .................................................................. 692

816 -- SILT FE NCE ................................................................................... 693

816.01 Description ........................................................................... 693

816.02 Material Requirements ........................................................ 693

816.03 Construction Methods ......................................................... 693

816.04 Method of Measurement ...................................................... 694

816.05 Basis of Payment .................................................................. 694

817 -- SLOPE TR ACKING ........................................................................ 696

817.01 Description ........................................................................... 696

817.02 Construction Methods ......................................................... 696

817.03 Method of Measurement ...................................................... 696

817.04 Basis of Payment .................................................................. 696

818 -- SOIL ROUG HENING ...................................................................... 697

818.01 Description ........................................................................... 697

818.02 Construction Methods ......................................................... 697

- 661 - 818.03 -- METHOD OF MEASUREMENT ...................................................... 697

818.04 Basis of Payment .................................................................. 697

819 -- INLET PROT ECTION ..................................................................... 698

819.01 Description ........................................................................... 698

819.02 Material Requirements ........................................................ 698

819.03 Construction Methods ......................................................... 698

819.04 Method of Measurement ...................................................... 698

819.05 Basis of Payment .................................................................. 799

820 -- TURBIDITY BARRIER .................................................................... 700

820.01 Description ........................................................................... 700

820.02 Material Requirements ........................................................ 700

820.03 Construction Methods ......................................................... 700

820.04 Method of Measurement ...................................................... 700

820.05 Basis of Payment .................................................................. 700

821 -- TEMPORARY SL OPE DRAI N ........................................................ 701

821.01 Description ........................................................................... 701

821.02 Construction Methods ......................................................... 701

821.03 Method of Measurement ...................................................... 701

821.04 Basis of Payment .................................................................. 701

822 -- DUST CONTROL ............................................................................ 702

822.01 Description ........................................................................... 702

822.02 Material Requirements ........................................................ 702

822.03 Equipment .............................................................................. 702

822.04 Construction Methods ......................................................... 702

822.05 Method of Measurement ...................................................... 702

822.06 Basis of Payment .................................................................. 702

823 -- STABILIZED CO NSTRUCTION EXIT ............................................ 703

823.01 Description ........................................................................... 703

823.02 Material Requirements ........................................................ 703

823.03 Construction Methods ......................................................... 703

823.04 Method of Measurement ...................................................... 704

823.05 Basis of Payment .................................................................. 704

824 -- CONCRETE WASHOUT ................................................................ 705

824.01 Description ........................................................................... 705

824.02 Material Requirements ........................................................ 705

824.03 Construction Methods ......................................................... 705

824.04 Method of Measurement and Basis of Payment .................. 706

825 -- FURNISHING AND PLANTING OF PLANT MATERIALS ............. 707

825.01 Description ........................................................................... 707

825.02 Material Requirements ........................................................ 707

825.03 Construction Methods ......................................................... 709

825.04 Method of Measurement ...................................................... 713

825.05 Basis of Payment .................................................................. 714

- 662 - - 663 - SECTION 801 -- PERMANENT SEEDING

801.01 Description

1.Permanent seeding consists of furnishing and placing the seed and fertilizer at locations shown in the contract.

801.02 Material Requirements

1.No seed shall be mixed until t he Engineer provides the Contractor with a seed order list and acres to be seeded.
a.The Contractor shall obtain from the seed dealer, a laboratory analysis of each type and lot of seed proposed for use. The analysis shall be furnished to the Engineer.
b.The analysis shall contain complete information pertaining to the seed as required by State and Federal laws.
c.The Engineer will approve use of the seed if the information on the analysis is satisfactory.
2.The seed shall be mixed, bagged, and tagged at the seed company after the Engineer appr oves the analysis and gives the seed company written authorization to mix the seed for each project. Seed shall be bagged separately when specif ied in the contract.
a.The Engineer will furnish tags to be attached by the supplier to each bag of seed.
b.The Contractor is not allowe d to attach the tags to the bags.
c.The seed shall be delivered to the project with tags attached to the bags. The seed shall not be used unt il the Engineer collects the tags from the bag immediately prior to use.
3.Fertilizer type and quantity sha ll be specified in the contract and shall comply with the applicable requirements of Section 804.
4.Mulch shall be as described in Section 806.

801.03 Construction Methods

1.Seeding methods, rates of applic ation, and seed mixtures shall comply with the contract.
2.Type "B" seeding work shall be performed for a width of up to 16 feet (5 m) adjacent to the edge of the pavement or surfaced shoulder of the roadways and ramps and in the me dian areas. Type "A" seeding work shall be performed on all other areas with in the limits of the project, except areas designated with specialty mixtures.
3.Areas not seeded with cover cr op or that have been slope tracked shall be permanent seeded within seven days, or as directed by the Engineer.
4.Planting Season:
a.Seeding operations shall be performed only during the periods March 1 to June 15 and August 1 to December 1.
b.No seeding operations shall be performed when the ground is frozen, wet or otherwise untillable, or when even distribution of materials cannot be obtained.
Source: Nebraska Standard Specifications for Highway Construction, 2017 Edition. Pages 693696 of 1,048.