- 659 - DIVISION 800 -- ROADSIDE DEVELOPMENT AND EROSION CONTROL
734.03Precompressed Polyurethane Foam (PPF) Joint
- 662 -
- 663 - SECTION 801 -- PERMANENT SEEDING
801.01Description
fertilizer at locations shown in the contract.
801.02Material Requirements
with a seed order list and acres to be seeded.
analysis of each type and lot of seed proposed for use. The analysis shall be furnished to the Engineer.
the seed as required by State and Federal laws.
the analysis is satisfactory.
after the Engineer appr oves the analysis and gives the seed company written authorization to mix the seed for each project. Seed shall be bagged separately when specif ied in the contract.
each bag of seed.
the bags. The seed shall not be used unt il the Engineer collects the tags from the bag immediately prior to use.
shall comply with the applicable requirements of Section 804.
801.03Construction Methods
comply with the contract.
16 feet (5 m) adjacent to the edge of the pavement or surfaced shoulder of the roadways and ramps and in the me dian areas. Type "A" seeding work shall be performed on all other areas with in the limits of the project, except areas designated with specialty mixtures.
shall be permanent seeded within seven days, or as directed by the Engineer.
March 1 to June 15 and August 1 to December 1.
frozen, wet or otherwise untillable, or when even distribution of materials cannot be obtained.