New Hampshire Department of Transportation (NHDOT) · Standard Specifications for Road & Bridge Construction

Section 207 — CHANNEL EXCAVATION

New Hampshire Standard Specifications for Road & Bridge Construction, Section 207. Full text, cross-references and related pay items on BuildSpec.

SECTION 207 New Hampshire Department of Transportation Standard Specifications – 2016 2-27 SECTION 207 -- CHANNEL EXCAVATION Description 1.1 This item shall consist of the excavation and disposal of all materials encountered in the construction of channels hav ing a bottom width of 10 ft. or more, except inlet and outlet ditches for multiple pipe culverts, as shown on the plans or as o rdered. Classification of Materials 2.1 Common channel excavation shall consist of all excavation described above that is not classified as rock channel excavation. Glacial till or boulder clay will be…

The rest of Section 207 — CHANNEL EXCAVATION is for members

You're reading the opening of Section 207 — CHANNEL EXCAVATION. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 207 — CHANNEL EXCAVATION — free for 14 daysSign in