New Hampshire Department of Transportation (NHDOT) · Standard Specifications for Road & Bridge Construction
Section 502 — REMOVAL OF EXISTING BRIDGE STRUCTURE
New Hampshire Standard Specifications for Road & Bridge Construction, Section 502. Full text, cross-references and related pay items on BuildSpec.
SECTION 502 New Hampshire Department of Transportation Standard Specifications – 2016 5-3 SECTION 502 -- REMOVAL OF EXISTING BRIDGE STRUCTURE Description 1.1 This work shall consist of the removal and satisfactory disposal of the existing bridge structure as shown on the plans, except such portions thereof as may be required or permitted to be left in place, or portions designated for salvage. Construction Requirements 3.1 The Contractor shall dismantle the existing structure in any manner that will not cause damage to persons or prope rty. Removal of those portions of the existing bridge…
The rest of Section 502 — REMOVAL OF EXISTING BRIDGE STRUCTURE is for members
You're reading the opening of Section 502 — REMOVAL OF EXISTING BRIDGE STRUCTURE. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations