New Hampshire Department of Transportation (NHDOT) · Standard Specifications for Road & Bridge Construction

Section 585 — STONE FILL

New Hampshire Standard Specifications for Road & Bridge Construction, Section 585. Full text, cross-references and related pay items on BuildSpec.

SECTION 585 New Hampshire Department of Transportation Standard Specifications – 2016 5-154 SECTION 585 -- STONE FILL Description 1.1 This work shall consist of furnishing and placing a dense stone fill at the locations shown on the plans or ordered. Stone Fill is typically required for stability of embankment fill and soil cut slopes steeper than 2 horizontal to 1 vertical, although slopes at a flatter grade with water seepage or subject to submergence, such as in water quality treatment basins, could require stone fill. Stone fill is also used for erosion protection at pipe outlets, in…

The rest of Section 585 — STONE FILL is for members

You're reading the opening of Section 585 — STONE FILL. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 585 — STONE FILL — free for 14 daysSign in