B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Estimate & calculate
CalculatorsChecklists
PricingLog in
General Provisions (00100-00999)

651EVERGREEN TREES

NH · 2016 Standard Specifications✓ Full text on BuildSpecBook pages 443–445 Save this section

Ask about Section 651

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

New Hampshire Department of Transportation Standard Specifications – 2016 Description

1.1This work shall consist of furnishing and planting evergreen trees of the specified size and type at the locations shown or as

ordered. Materials

2.1Materials shall conform to the requirements of 650.2.

Construction Requirements

3.1Construction requirements shall be as prescribed in 650.3.

Method of Measurement

4.1Evergreen trees will be measured as prescribed in 650.4.

Basis of Payment

5.1The accepted quantities of evergreen trees will be paid for at the Contract unit price per each for trees of the specified sizes

and species complete in place. Pay item and unit: 651. (Specific Evergreen Tree) Each

SECTIONS 652 & 653

New Hampshire Department of Transportation Standard Specifications – 2016 SECTIONS 652 AND 653 -- DECIDUOUS TREES Description

This work shall consist of furnishing and planting deciduous trees of the specified size and type at the locations shown or as

ordered. Materials

Materials shall conform to the requirements of 650.2.

Construction Requirements

Construction requirements shall be as prescribed in 650.3.

Method of Measurement

Deciduous trees will be measured as prescribed in 650.4.

Basis of Payment

The accepted quantities of deciduous trees will be paid for at the Contract unit price per each for trees of the specified si zes

and species complete in place. Pay items and units: 652. (a) (Specific Deciduous Tree) Each 653. (a) (Specific Deciduous Tree) Each

(a)These pay item numbers have been assigned to this section in order to accommodate the many varieties of deciduous

trees on the landscape list used by the Department.

SECTIONS 654

New Hampshire Department of Transportation Standard Specifications – 2016

SECTION 654 — - EVERGREEN SHRUBS

(Needle and Broadleaf) Description

This work shall consist of furnishing and planting evergreen shrubs (needle and broadleaf) of the specified size and type at

the locations shown or as ordered. Materials

Materials shall conform to the requirements of 650.2.

Construction Requirements

Construction requirements shall be as prescribed in 650.3 and when directed, shrubs shall be guyed in the same manner as

trees, as prescribed in 650.3.9.1. Method of Measurement

Evergreen shrubs will be measured as prescribed in 650.4.

Basis of Payment

The accepted quantities of evergreen shrubs will be paid for at the Contract unit price per each for shru bs of the specified

sizes and species complete in place. Pay item and unit: 654. (Specific Evergreen Shrub) Each

Referenced in this section
Sections that cite this one

Get an email when 651 changes

New Hampshire revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: New Hampshire Standard Specifications for Road and Bridge Construction, 2016 Edition. Pages 443–445 of 502. View official source ↗

Ask about this section

Scoped to New Hampshire Standard Specifications for Road & Bridge Construction, Section 651 — EVERGREEN TREES. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.