New Hampshire Department of Transportation (NHDOT) · Standard Specifications for Road & Bridge Construction

Section 658 — TRANSPLANTING PLANT MATERIAL

New Hampshire Standard Specifications for Road & Bridge Construction, Section 658. Full text, cross-references and related pay items on BuildSpec.

SECTIONS 650 New Hampshire Department of Transportation Standard Specifications – 2016 6-121 SECTION 658 -- TRANSPLANTING PLANT MATERIAL Description 1.1 This work shall consist of digging up plant material consisting of trees, shrubs, and vines, and tra nsplanting such at the locations shown or ordered. If temporary storage is necessary, care shall be taken to heel -in or plant the material where it can receive proper care until the permanent site is ready. Materials 2.1 Materials shall conform to the req uirements of 650.2, except that the plant material shall consist of the existing plants…

The rest of Section 658 — TRANSPLANTING PLANT MATERIAL is for members

You're reading the opening of Section 658 — TRANSPLANTING PLANT MATERIAL. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 658 — TRANSPLANTING PLANT MATERIAL — free for 14 daysSign in