1.1Description. Retroreflective sheeting shall consist of a retroreflective microprismatic system having a smooth outer surface.
When adhesive backing is used, the sheeting shall have a pre- coated adhesive on the back side protected by an easily removable liner.
2.2Detail Requirements. Reflective sheeting and overlay film shall be selected from the Qualified Products List (QPL).
Reflective sheeting and overlay film products will be included on the QPL after the Department determines conformance to the specifications and the manufacturer has supplied written information indicating conformance to the warranty requirements as noted under the acceptance criteria of the QPL. Determination of conformance will include, but will not be limited to, the evaluation of test data from AASHTO’s National Transportation Product Evaluation Program (NTPEP) or other Department approved facilities except when otherwise indicated. Retroreflective sheeting shall conform to the requirements of ASTM D 4956 including supplementary requirement and any exceptions and/or additions included herein.
3.1Retroreflective sheeting used on all Type A, AA, B, BB, C and CC signs, shall conform to the requirements of Type IV
material except those specifically indicated otherwise herein. 3.1.1 Retroreflective sheeting for the copy, border, and shields on overhead structures including bridge mounts shall conform to Type IV, VIII, IX, or XI material unless otherwise noted in the plans.
3.2Blank.
3.3Fluorescent Retroreflective sheeting for the following signs shall conform to Type VIII, IX, or XI material.
• Fluorescent yellow sheeting shall be used for all Horizontal Alignment Warning signs as defined by the MUTCD. • Fluorescent orange sheeting shall be used on permanent orange construction and maintenance activity signs as prescribed under Section 619.
3.5Overlay films shall consist of highly durable, transparent, acrylic colored films coated with a transparent pressure sensitiv e
adhesive protected by a removable translucent, synthetic, release liner. 3.5.1 Test Methods: Testing conditions and panels for the following test shall follow ASTM D 4956. 3.5.1.1 Color Requirements. When electronic cuttable film is applied to retroreflective sheeting, the resulting color of the composite sheeting will conform to Federal Specification FP-92, Section 718.01 and ASTM D 4956. 3.5.1.2 Coefficient of Retroreflection, R A. When transparent colored electronic cuttable film is applied per the manufacturer’s recommendations over white retroreflective sheeting, the colored compo site will conform to the percentage specified in Table 1. The coefficient of retroreflection shall be determined in accordance with ASTM E -810. Table 1 Coefficient of Retroreflection RA * for applied Overlay Films (expressed as % of white retroreflective sheeting background ) Transparent Color Minimum Maximum Green 13.0 20 Blue 6.5 20 Red 14 24 Yellow 60.0 80 Orange 30 - Brown 5.0 - RA (cd/lux/m2) measurements shall be made at 0.2º observation angle, - 4º entrance angle, and 0º rotation, per ASTM E - 810. The ratio of the R A (color) to R A (white) shall be calculated and converted to a percentage to determine the film transmission values.
New Hampshire Department of Transportation Standard Specifications – 2016 3.5.1.5 The following ASTM D 4956 requirements shall meet the specific color of overlay film: Daytime Color • Accelerated Outdoor Weathering • Color Fastness • Shrinkage • Flexibility • Liner Removal • Adhesion • Impact Resistance • Specular Gloss
3.6Adhesive Liner. The protective lay flat liner shall be a synthetic film liner resistant to moisture absorption and curl. The
liner shall be printed with an indelible mark indicating the name of the film manufacturer.
INDEX
New Hampshire Department of Transportation Standard Specifications – 2016 i AASHTO Specifications .................................................... 1-24, 1-33 Abbreviations .............................................................................1-1 Acceptance accept ........................................................................ 1-2 Final ........................................................................... 1-2 Final Payment .......................................................... 1-68 Partial .......................................................................1-28 Project ......................................................................1-29 Adjustment, Claims for ............................................................. 1-29 Admixtures for Cement ............................................................ 5-29 Aggregate(s) Stockpiles ................................................................... 3-3 Agreement Disposal .................................................................... 1-41 Air Pollution ............................................................................. 1-44 Altered Quantities, Compensation for ..................................... 1-63 Approval of Working Drawings ................................................ 1-22 Assigning of Contract ............................................................... 1-50 Attachment, Exemption from ................................................. 1-46 Authority of Engineer ................................................................... 1-22 Representatives of the Engineer ............................. 1-26 Award Cancellation of ......................................................... 1-11 Of Contract .............................................................. 1-11 Bankruptcy ............................................................................... 1-58 Barricades and Warning Signs ......................................... 1-47, 6-69 Barrier Membrane ................................................................... 5-80 Peel and Stick ........................................................... 5-80 Base Courses .............................................................................. 3-1 Beneficiary, No Third Party ...................................................... 1-50 Bid Proposal, Quantities in ......................................................... 1-6 Bid(s) Opening of ................................................................. 1-9 Opening of, Time Limit for Award After ................... 1-11 Bidders Disqualification of ...................................................... 1-9 Prequalification of...................................................... 1-6 Bidding Requirements and Conditions ....................................... 1-6 Bituminous Materials, Measurement ......................................... 1-61 Blasting Care in ...................................................................... 1-47 Blotter Material ........................................................................ 4-34 Bond, Contract ......................................................................... 1-11 Borings ....................................................................................... 1-7 Borrow Free ........................................................................ 5-155 Measurement in Vehicles ........................................ 1-61 Bounds ..................................................................................... 6-74 Bridge Approach Rail ......................................................... 5-141 Backfill ........................................................................ 5-6 Deck Repairs, Preparation ....................................... 5-22 Excavation .................................................................. 5-6 Opening to Traffic .................................................... 1-27 Railing .................................................................... 5-138 Removal of Existing .................................................... 5-3 Temporary ................................................................. 5-1 Buildings, Demolishing ............................................................... 2-4 Catch Basins .............................................................................. 6-13 Cement Mortar ........................................................................ 7-3 Storage of ................................................................. 5-30 Certificate Insurance .................................................................. 1-48 Of Compliance .......................................................... 1-39 Channel Excavation .................................................................. 2-27 Character of Workers ............................................................... 1-54 Civil Rights ................................................................................ 1-50 Claim Resolution ................................................................ 1-31 Claims For Adjustment ........................................................ 1-29 For Extension of Time ............................................... 1-55 On Final Estimate ..................................................... 1-68 Responsibility for Damage ........................................ 1-48 Time Limit for ........................................................... 1-68 Cleaning Up, Final ..................................................................... 1-18 Clearing ....................................................................................... 2-1 Cofferdams .......................................................................... 5-4, 5-7 Collusion Among Bidders ............................................................ 1-9 Combination Proposals ............................................................... 1-9 Common Excavation ................................................................... 2-8 Compensation for Altered Quantities....................................... 1-63 Complete on Time, Failure to ................................................... 1-58 Completion ................................................................................. 1-3 Completion Date........................................................................ 1-3 Compliance, Certificate of ........................................................ 1-39 Computing Volumes ................................................................. 1-61 Concrete Masonry Classification ............................................................ 5-26 Cold Weather ........................................................... 5-44 Forms and Falsework, Construction of ..................... 5-39 Forms and Falsework, Removal of ........................... 5-48 Hot Weather ............................................................. 5-45 Repairs, Bridge Deck, Preparation ............................ 5-22 Slope Paving ........................................................... 5-150 Under Water ............................................................ 5-42 Waterproofing Surfaces ........................................... 5-76 Conduit, Electrical ..................................................................... 6-42 Conformity with Plans and Specifications ................................ 1-23 Conservation of Gravel ....................................................................... 1-41 Growth, Roadside Trees and Shrubs .......................... 2-8 Construction Equipment ................................................................ 1-54 Maintenance During ................................................. 1-28 Over or Adjacent to Navigable Waters ..................... 1-18 Signs and Warning Devices ....................................... 6-69 Stakes, Lines, and Grades ......................................... 1-25 Zone(s)...................................................................... 1-27 Contract ...................................................................................... 1-3 Acceptance and Final Payment of ............................ 1-68 Assigning of .............................................................. 1-50 Award of ................................................................... 1-11 Bond, Requirement of .............................................. 1-11 Concurrence by Governor and Council .................... 1-11 INDEX
New Hampshire Department of Transportation Standard Specifications – 2016 ii Default of.................................................................. 1-58 Execution and Approval of ....................................... 1-13 Failure to Complete on Time .................................... 1-58 Failure to Execute ..................................................... 1-13 Intent of.................................................................... 1-14 Partial Payments ...................................................... 1-67 Revision ................................................... 1-4, 1-14, 1-23 Subletting of ............................................................. 1-51 Termination of .......................................................... 1-59 Time, Determination and Extension of ..................... 1-55 Contractor Cooperation by ......................................................... 1-24 To Furnish Labor, etc. to Complete Contract Items.. 1-14 Contractor’s Responsibility For Work................................................................... 1-18 Taxes ........................................................................ 1-44 Termination of .......................................................... 1-60 To Public ................................................................... 1-42 Contractors, Cooperation Between .......................................... 1-25 Control of Materials .................................................................. 1-32 Work ......................................................................... 1-22 Cooperation Between Contractors ............................................... 1-25 By Contractor ........................................................... 1-24 With Utilities ............................................................ 1-24 Coordination of Specifications .................................................. 1-23 Critical Path Method Progress Schedule .................................................... 1-52 Requirements ........................................................... 1-52 Crushed Gravel ........................................................................... 3-1 Culverts and Storm Drains .......................................................... 6-1 Curbs ......................................................................................... 6-38 Damage Claims, Responsibility for ........................................... 1-48 Damages, Liquidated ................................................................ 1-58 Default of Contract ................................................................... 1-58 Defective Materials ......................................................... 1-27, 1-41 Definitions .................................................................................. 1-1 Delay ........................................................................................... 1-4 Delineators ...................................................................... 6-22, 6-72 Demolishing Buildings ................................................................ 2-4 Density Requirements .............................................................. 2-20 Determination of Contract Time............................................... 1-55 Detours ............................................................................ 1-16, 1-22 Differing Site Conditions ........................................................... 1-14 Disadvantaged Business Enterprise Program ........................... 1-11 Discrepancies ............................................................................ 1-23 Disposal Of Surplus and Waste Materials ...................... 1-41, 2-21 Disputed Work .............................................. 1-29, 1-68, See Claims Disqualification of Bidders .......................................................... 1-9 Drawings, Working or Shop 1-22, 5-4, 5-39, 5-100, 5-129, 5-134, 5- 139 Dredging .................................................................................. 1-43 Drop Inlets ................................................................................ 6-13 Dust Control Roadway .......................................................... 6-67, 6-68 Earthwork ................................................................................... 2-1 Electrical Conduit ...................................................................... 6-42 Embankments ...........................................................2-8, 2-20, 2-21 Employees, Character of ........................................................... 1-54 Engineer Authority and Duties of Representatives of............. 1-26 Authority of ............................................................. 1-22 Field Facilities for ................................................... 6-125 Term Implied.............................................................. 1-5 Environmental Protection ........................................................ 1-19 Epoxy Coating .......................................................................... 5-78 Equipment Other than Specified ................................................ 1-55 Publicly-Owned ........................................................ 1-62 Size and Condition ................................................... 1-54 Sufficient .................................................................. 1-58 Erosion Control ........................................................................ 6-94 Errors, Inaccuracies ......................................................... 1-23, 1-26 Examination of Plans and Work Site .......................................... 1-7 Excavation And Embankment ...................................................... 2-8 Bridge ......................................................................... 5-6 Channel .................................................................... 2-27 Structure .................................................................. 2-25 Exploratory Trench ................................................................... 2-26 Explosives Insurance ................................................................. 1-49 Use of ....................................................................... 1-47 Extension of Contract Time ......................................................................... 1-55 Extra Work ............................................................................... 1-15 fabric geotextile ............................................................... 5-160 Failure to Begin the Work ........................................................ 1-58 Complete Work on Time .......................................... 1-58 Maintain Roadway or Structure ............................... 1-28 Restore Property ...................................................... 1-48 Falsework ...................................................................... 5-39, 5-118 Federal Participation ................................................................ 1-46 Fences ...................................................................................... 6-31 Fertilizer ........................................................................ 6-88, 6-107 Final Acceptance .............................................................. 1-29 Cleaning Up .............................................................. 1-18 Payment ................................................................... 1-68 Final Pay Quantity .................................................................... 1-69 Fine Grading ............................................................................. 2-31 Fire Control .............................................................................. 1-48 Force Account .......................................................................... 1-62 Forest Protection ..................................................................... 1-48 General Provisions ..................................................................... 1-1 GEOTEXTILES .......................................................................... 5-160 Grades, Construction ............................................................... 1-25 Grading, Fine ............................................................................ 2-31 Granular Backfill ....................................................................... 2-28 Grass Seed ................................................................................ 6-90 Gravel ......................................................................................... 3-1 Conservation of........................................................ 1-41 Pits Adjoining Highways ........................................... 1-32 Grubbing .................................................................................... 2-1 Guaranty Bid 1-8 Return of Bid ............................................................ 1-11 Guardrail .................................................................................. 6-21 INDEX
New Hampshire Department of Transportation Standard Specifications – 2016 iii Hazardous Materials ................................................................ 1-50 Health Provisions ..................................................................... 1-46 Highways Closed to Traffic ....................................................... 1-47 Hot Bituminous Pavement ................................................................. 4-30 Humus .................................................................................... 6-103 impact attenuators .................................................................. 6-22 Incidental Construction .............................................................. 6-1 Insolvency ................................................................................ 1-58 Inspection Of Welds, Nondestructive ...................................... 5-105 Of Work.................................................................... 1-26 Plant ......................................................................... 1-40 Inspectors .............................. See Representatives of the Engineer Insurance Certificates ............................................................... 1-48 Explosives ................................................................. 1-49 Public Liability and Property Damage ...................... 1-48 Worker’s Compensation .......................................... 1-49 Intent of Contract ..................................................................... 1-14 Irregular Bids .............................................................................. 1-8 Item Numbers ............................................................................ 1-2 Items, Eliminated ..................................................................... 1-15 joint sealant silicone ................................................................... 5-137 Laboratory, Physical Testing (Field) ........................................ 6-125 Laws Familiarity with .......................................................... 1-7 Observance of .......................................................... 1-42 Legal Relations .................................................................. 1-42 Rights, No Waiver of ................................................ 1-50 Liability For Subcontractors, Contractor’s .............................1-42 Insurance ................................................................. 1-48 Of Public Officials, Personal ..................................... 1-50 Licenses, Permits, and Taxes .................................................... 1-44 Light Pole Bases ........................................................................ 6-77 Limestone ................................................................................. 6-87 Limitation of Operations .......................................................... 1-54 Lines and Grades ...................................................................... 1-25 Liquidated Damages ................................................................. 1-58 Load Restrictions ...................................................................... 1-27 Loam ........................................................................................ 6-86 Local Material Sources ............................................................. 1-32 Lump Sum Work ....................................................................... 1-62 Maintain Roadway or Structure, Failure to .............................. 1-28 Maintenance During Closure ......................................................... 1-47 During Construction ........................................ 1-17, 1-28 During Suspension ................................................... 1-54 Of Traffic ......................................................... 1-16, 6-67 Manholes ................................................................................. 6-13 Markers Witness .................................................................... 6-74 Material(s) Control of ................................................................. 1-32 Department-Furnished ............................................ 1-41 Found on the Work, Rights and Use of ............. 1-17, 2-8 Handling ................................................................... 1-41 Hazardous ................................ See Hazardous Materials Inspected, Sampled and Tested ............................... 1-32 Local Sources of ........................................................ 1-32 Not on Hand, Payment for ....................................... 1-67 On Hand, Payment for .............................................. 1-67 Rejected ................................................................... 1-41 Storage of ................................................................. 1-41 Sufficient, for Completion on Time .......................... 1-58 Unacceptable ........................................................... 1-41 Measurement and Payment ............................................................ 1-61 of Quantities ............................................................. 1-61 Methods and Equipment .......................................................... 1-54 Mobilization ............................................................................ 6-121 Muck Excavation ....................................................................... 2-19 Municipally-Owned Equipment .................................... See Publicly Navigable Waters ..................................................................... 1-18 Notice to Proceed ..................................................................... 1-51 Notification Contractor ................................................................ 1-15 Numbers, Item and Section ........................................................ 1-2 Office, Field ............................................................................. 6-125 Officials, Personal Liability of Public ......................................... 1-50 Opening Bids ............................................................................. 1-9 Concrete Bridge Decks ............................................. 1-27 To Traffic .................................................................. 1-28 Openings in Highway ................................................................ 1-18 Operations Limitations ................................................................ 1-54 Schedule of ............................................................... 1-51 Paint ........................................................................................... 7-4 Painting Existing Structural Steel ............................................ 5-124 Partial Acceptance of Project ............................................. 1-28 Payments .................................................................. 1-67 Participation, Federal ............................................................... 1-46 Patented Devices, Materials, and Processes ............................ 1-46 Pavement Markings, Retroreflectorized ................................... 6-79 Pavements .................................................................................. 4-1 Aggregate ................................................................... 4-1 Hot Bituminous ........................................................ 4-30 Hot Bituminous, Hand Method ................................ 4-30 Sawed ....................................................................... 6-78 Payment Contingent Upon Funds............................................ 1-60 Final .......................................................................... 1-68 For Material, Found on the Work ............................. 1-17 For Material, Not on Hand ....................................... 1-67 For Material, On Hand .............................................. 1-67 Force Account .......................................................... 1-63 Negotiated Prices ..................................................... 1-63 Partial ....................................................................... 1-67 Revisions to Contract ............................................... 1-63 Scope of ........................................ See Intent of Contract Permit(s) Licenses and Taxes ................................................... 1-44 Restoration of Surfaces Opened by .......................... 1-18 Personnel During Suspension .................................................... 1-54 Removal of ............................................................... 1-54 Skill and Experience .................................................. 1-54 INDEX
New Hampshire Department of Transportation Standard Specifications – 2016 iv Pile Locations, Fill Material at ................................................... 2-20 Piling, Sheet ................................................................................ 5-9 Pipe(s) Culverts ...................................................................... 6-1 Plate ....................................................................... 5-156 Removal...................................................................... 2-5 Removal for Relaying .................................................. 6-9 Sleeve ......................................................................... 6-8 Structural Plate ....................................................... 5-156 Underdrain ............................................................... 6-18 Pit(s) Limits ........................................................................ 1-32 Plans Conformity With ....................................................... 1-23 Coordination with Specifications .............................. 1-23 Examination of, by Bidder .......................................... 1-7 Interpretation of, by Engineer .................................. 1-22 Working Drawings ......................................See Drawings Plant Inspection ........................................................................ 1-40 Plant Material General ................................................................... 6-106 Inspection of ............................................................. 1-40 Transplanting .......................................................... 6-120 Pollution Control Air 1-44 Water ..................................................................... 6-131 Prefabricated Compression Joint ................................. 5-129, 5-132 Preparation For Concrete Bridge Deck Repairs ............................ 5-22 For Concrete Repairs ................................................ 5-25 Prequalification of Bidders ......................................................... 1-6 Proceed, Notice to .................................................................... 1-51 Progress Schedule..................................................................... 1-52 Bar Chart Method ..................................................... 1-53 Critical Path Method ................................................ 1-52 Progress Schedules ................................................................... 1-51 Critical Path ................................................................ 1-4 Property Damage Insurance .................................................... 1-48 Protection and Restoration of .................................. 1-47 Proposal(s) Combination ............................................................... 1-9 Consideration of ....................................................... 1-11 Contents of ................................................................. 1-6 Delivery of .................................................................. 1-8 Electronic ............................................................. 1-8, 1-9 Guaranty, Forfeiture of ............................................ 1-13 Irregular ...................................................................... 1-8 Issuance of.................................................................. 1-6 Opening of .................................................................. 1-9 Paper .......................................................................... 1-7 Preparation of ............................................................ 1-7 Quantities in ......................................... See Bid Proposal Return of Guaranty................................................... 1-11 Signed ......................................................................... 1-7 Unit Prices .................................................................. 1-7 Value Engineering, by Contractor ............................. 1-19 Withdrawal of............................................................. 1-9 Protection Environmental .......................................................... 1-19 Forest ....................................................................... 1-48 Of Property and Landscape ...................................... 1-47 Provisions General ...................................................................... 1-1 Sanitary, Health, and Safety..................................... 1-46 Public Convenience and Safety .......................................... 1-47 Liability Insurance .................................................... 1-48 Officials, Personal Liability of ................................... 1-50 Responsibility to ...................................................... 1-42 Utilities ..................................................................... 1-24 Publicly-Owned Equipment ...................................................... 1-62 Quality Requirements .............................................................. 1-32 Quantities Altered ..................................................................... 1-63 In Bid Schedule, Interpretation of .............................. 1-6 Measurement of ...................................................... 1-61 Rail Bridge Approach .................................................... 5-141 Guard ....................................................................... 6-21 Railing Bridge ..................................................................... 5-138 Rebuilding Damaged Work ...................................................... 1-48 Reclaimed Stabilized Base .......................................................... 3-7 Reinforcing Steel ...................................................................... 5-84 Release of Contractor .............................................................. 1-60 Removal of Abandoned Road Surface .......................................... 2-8 Existing Bridge Structure............................................ 5-3 Hazardous Materials ................................................ 1-50 Structures and Obstructions ...................................... 2-4 Unacceptable Materials ........................................... 1-41 Unauthorized Work ................................................. 1-26 Underground Storage Tanks and Hazardous Materials2-5 Rental Charge, Equipment ....................................................... 1-65 Repairs Preparation for Concrete ......................................... 5-25 Preparation for Concrete Bridge Deck ..................... 5-22 Representatives of the Engineer, Authority of ......................... 1-26 Responsibility For Damage Claims .................................................. 1-48 For the Work ............................................................ 1-18 Termination of Contractor’s .................................... 1-60 To Public .................................................................. 1-42 Restoration of Property and Landscape .......................................... 1-47 Surfaces Opened by Permit ..................................... 1-18 Restrictions, Load ..................................................................... 1-27 Retest of Materials ................................................................... 1-33 Revisions to the Contract......................................................... 1-14 Rights Civil .......................................................................... 1-50 In Materials Found on the Work .............................. 1-17 No Waiver of Legal ................................................... 1-50 Roadside Cleanup ...................................................................... 2-2 Roadway, Failure to Maintain .................................................. 1-28 Rock Excavation ......................................................................... 2-8 Safety Public ....................................................................... 1-47 Sanitary and Health Provisions ................................ 1-46 Samples .................................................................................... 1-32 Sand ........................................................................................... 3-1 Sanitary Provisions ................................................................... 1-46 INDEX
New Hampshire Department of Transportation Standard Specifications – 2016 v Sawed Pavement ...................................................................... 6-78 Schedule Of Operations .......................................................... 1-51 Quantities in .............................................................. 1-6 Seed, Grass ............................................................................... 6-90 Shear Connectors ..................................................................... 5-87 Sheet Piling................................................................................. 5-9 Shop Drawings ........................................................... See Drawings Shrubs Care While Excavating ............................................... 2-8 Deciduous .............................................................. 6-117 Evergreen ............................................................... 6-116 Sidewalks................................................................................. 6-35 Signals, Traffic .......................................................................... 6-53 Significant Changes in the Character of Work .......................... 1-14 Signs And Barricades ................................................ 1-47, 6-67 Construction ............................................................ 6-67 Guide ....................................................................... 6-68 Traffic ....................................................................... 6-46 silicone joint sealant............................................................... 5-137 Site of Work, Examination of ..................................................... 1-7 Slope Paving with Concrete.................................................... 5-150 Sod ......................................................................................... 6-104 Source of Supply, Requirements .............................................. 1-32 Sources, Local Material ............................................................ 1-32 Special Provisions Coordination of ........................................................ 1-23 Examination of ........................................................... 1-7 Specialty Items ......................................................................... 1-51 Specifications Cited ......................................................................... 1-32 Conformity With ...................................................... 1-23 Coordination of ........................................................ 1-23 Examination of ........................................................... 1-7 Interpretation of ............................................. 1-22, 1-23 Stakes, Construction ................................................................ 1-25 Stone Masonry ................................................................. 5-145 Walls ...................................................................... 5-148 Storage of Materials ................................................................. 1-41 Storm Water Pollution Prevention Plan ................................... 6-94 Structural Fill 5-10 Plate Pipes ............................................................. 5-156 Timber .................................................................... 5-142 Structure(s) ................................................................................ 5-1 Excavation ................................................................ 2-25 Failure to Maintain .................................................. 1-28 Stumps, Removing ..................................................................... 2-1 Subcontract .............................................................................. 1-51 Subcontractors, Contractor’s Liability for ............................... 1-42 Subletting of Contract .............................................................. 1-51 Sunday Work ............................................................................ 1-54 Superintendent ........................................................................ 1-24 Supplemental Plans........................................................... See Drawings Specifications, Coordination of ................................ 1-23 Supply, Source of ..................................................................... 1-32 Surety ....................................................................................... 1-59 Surplus Material, Disposal of ................................................... 2-21 Suspensions of Work ................................................................ 1-15 Taxes Contractor’s .............................................................. 1-44 Permits and Licenses ................................................ 1-44 Subcontractor’s ....................................................... 1-45 User’s ...................................................................... 1-46 Telephone Service .................................................................. 6-129 Temporary Bridge ....................................................................... 5-1 Temporary Water Pollution Control ....................................... 6-131 Termination Of Contract ............................................................... 1-59 Of Contractor’s Responsibility .................................. 1-60 Terms, Definitions and................................................................ 1-1 Tests ......................................................................................... 1-32 Third Party Beneficiary, No ....................................................... 1-50 Timber, Structural ................................................................... 5-142 Time Determination and Extension of Contract ................ 1-55 Failure to Complete on ............................................. 1-58 Tolerances, Manufacturing ....................................................... 1-62 Town Highways........................................................................ 1-27 Traffic Maintenance of ........................................................ 1-16 Opening Sections of Project to ................................. 1-28 Signals ...................................................................... 6-53 Signs ......................................................................... 6-46 Traffic Control Plan ................................................................... 1-54 Training Programs .................................................................. 6-122 Transplanting Plant Material .................................................. 6-120 Tree(s) Care While Excavating ................................................ 2-8 Deciduous ............................................................... 6-115 Evergreen ............................................................... 6-114 Trimming .................................................................... 2-2 Trench Excavation ................................... See Structure Excavation Turbidity ................................................................................... 1-43 Turf Establishment.................................................................. 6-102 Unacceptable Materials .................................................................. 1-41 Work, Removal of ..................................................... 1-26 Unauthorized Work, Removal of .............................................. 1-26 Unclassified Excavation .............................................................. 2-8 Underdrains .............................................................................. 6-18 Underground Facilities ............................................................. 1-24 Underground Storage Tanks and Hazardous Materials, Removal of .............................................................................................. 2-5 Understanding of Parties Regarding Department’s Performance 1- 60 Unsuitable Material .................................................................. 2-21 User’s Taxes ............................................................................. 1-46 Utilities, Cooperation with........................................................ 1-24 Value Engineering Proposals by the Contractor ....................... 1-19 Vines and Ground Covers ....................................................... 6-119 Volumes, Computing ................................................................ 1-61 Waiver of Legal Rights, No ........................................................ 1-50 Warning Signs ........................................................................... 1-47 Waste, Disposal of .................................................................... 2-21 Water Pollution ................................................................. 6-131 Repellent .................................................................. 5-77 Water Diversion Structures ........................................................ 5-4 INDEX
New Hampshire Department of Transportation Standard Specifications – 2016 vi Waterproofing .......................................................................... 5-76 Waterstops ............................................................................... 5-83 Weight and Weighing ............................................................... 1-61 Welding Aluminum Alloys ...................................................... 7-28 Winter Construction .......................................................... 2-20, 3-5 Witness Markers ....................................................................... 6-74 Work Complete in Place ....................................................... 1-2 Contractor’s Responsibility for ................................. 1-18 Control of ................................................................. 1-22 Examination of Site .................................................... 1-7 Holiday ..................................................................... 1-54 Inspection of ............................................................ 1-26 Removal of Unacceptable and Unauthorized .......... 1-26 Scope of ................................................................... 1-14 Start of ..................................................................... 1-51 Sunday ..................................................................... 1-54 Use of Materials Found on................................ 1-17, 2-8 Worker’s Compensation Insurance .......................................... 1-49 Working Drawings ...................................................... See Drawings Zone, Construction ................................................................... 1-27
RETROREFLECTIVE SHEETING in other states
Get an email when 718 changes
New Hampshire revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.