803.01 Description
This Section describes the requirements for preparing existing soil for seeding.
803.02 Materials
Provide materials as specified: Soil Aggregate (I -14) ................................ ................................ ................................ ................................ .......... 901.11 Topsoil ................................ ................................ ................................ ................................ ................................ 917.01 365 803.03 CONSTRUCTION
803.03.01 Preparation of Existing Soil
Clear the surface of the existing soil of all stumps, brush, weeds, and debris. Cultivate the soil to a depth of 3 to 4 inch es to prepare a seed bed. Where depressions exceed 8 inches in depth, backfill with I -14 soil aggregate and cover with 4 inches of topsoil. Bring the entire area to a smooth grade, free from any depressions that would collect water. If necessary, use additional topsoil to fill depressions. Dispose of waste material and debris resulting from preparation of existing soil as specified in 201.03.01.H .
803.04 Measurement and Payment
The Department will measure and make payment for Items as follows: Item Pay Unit PREPARATION OF EXIST ING SOIL ACRE PREPARATION OF EXIST ING SOIL SQUARE YARD The Department will ma ke payment for ___ SOIL AGGREGATE as specified in 203.04 .