B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Estimate & calculate
CalculatorsChecklists
PricingLog in
Division 800 — Landscaping

807Topsoil Stabilization

NJ · 2019 (rev. 2022-12-21) Standard Specifications✓ Full text on BuildSpecBook pages 405–405 Save this section

Ask about Section 807

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

SECTION 807 – TOPSOIL STABILIZATION

807.01 Description

This Section describes the requirements for providing and placing jute and excelsior mats, erosion control mulch blankets, turf reinforcement mats, and mechanically bonded fiber matrices on prepared topsoiled surfaces.

807.02 Materials

Provide materials as specified: Fertilizer ................................ ................................ ................................ ................................ .................. 917.02.02 Pulverized Limestone ................................ ................................ ................................ ............................... 917.02.03 Grass Seed Mixtures................................ ................................ ................................ ................................ . 917.03.01

Get an email when 807 changes

New Jersey revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Road and Bridge Construction, 2019 (rev. 2022-12-21) Edition. Pages 405–405 of 651. View official source ↗

Ask about this section

Scoped to New Jersey 2019 Standard Specifications for Road & Bridge Construction, Section 807 — Topsoil Stabilization. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.