TABLE OF CONTENTS NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Contents Section 200 ................................ ................................ ................................ ................ 4 EARTHWORK ................................ ................................ ................................ ........ 4 SECTION 201 - CLEARING AND GRUBBING ................................ ........................... 4 SECTION 202 - DEMOLITION OF BUILDINGS AND STRUCTURES ....................... 7 SECTION 203 - EXCAVATION AND EMBANKMENT ................................ ............ 18 SECTION 204 - FLOWABLE FILL ................................ ................................ ........... 43 SECTION 205 - CONTAMINATED SOIL ................................ ................................ .. 46 SECTION 206 - TRENCH, CULVERT AND STRUCTURE EXCAVATION .............. 56 SECTION 207 - GEOSYNTHETICS ................................ ................................ .......... 60 SECTION 208 - STORMWATER MANAGEMENT PRACTICES ............................. 63 SECTION 209 - SOIL EROSION AND SEDIMENT CONTROL ................................ 67 SECTION 210 - REMOVAL AND DISPOSAL OF ASBESTOS -CONTAINING MATERIAL (BUILDINGS, BRIDGES AND HIGHWAYS) ................................ ........ 82 SECTION 211 - INTERNALLY STABILIZED CUT STRUCTURES ......................... 86 SECTION 212 – ROCK SLOPE REINFORCEMENT AND CATCHMENT SYSTEMS ................................ ................................ ................................ ................................ . 106 SECTIONS 213 THRU 299 (VACANT) ................................ ................................ .... 118 Section 300 ................................ ................................ ................................ ............ 119 BASES AND SUBBASES ................................ ................................ .................... 119 SECTION 301 (VACANT) ................................ ................................ ........................ 119 SECTION 302 - BITUMINOUS STABILIZED COURSE ................................ ......... 119 SECTION 303 (VACANT) ................................ ................................ ........................ 123 SECTION 304 - SUBBASE COURSE ................................ ................................ ....... 123 SECTIONS 305 AND 306 (VACANT) ................................ ................................ ....... 125 SECTION 307 - HYDRATED LIME STABILIZED SUBGRADE ............................. 125 SECTION 308 - SOIL CEMENT COURSE ................................ .............................. 129 SECTIONS 309 THRU 399 (VACANT) ................................ ................................ .... 132 Section 400 ................................ ................................ ................................ ............ 133 ASPHALT MIXTURE AND PAVEMENT ................................ ....................... 133 SECTION 401 - PLANT PRODUCTION ................................ ................................ .. 133 SECTION 402 - VACANT ................................ ................................ ........................ 138 SECTION 403 - VACANT ................................ ................................ ........................ 138 SECTION 404 - ASPHALT PAVEMENTS ................................ ............................... 138 SECTION 405 - COLD MIX BITUMINOUS PAVEMENT (OPEN GRADED) ......... 158 SECTION 406 ASPHALT PAVEMENT WITH POLYMER FIBERS ...................... 160 SECTION 407 - TACK COAT ................................ ................................ .................. 161 SECTIONS 408 AND 409 (VACANT) ................................ ................................ ....... 162 SECTION 410 – CHIP SEAL ................................ ................................ ................... 162 SECTION 411 - STABILIZED GRAVEL SURFACE COURSE ................................ 169 SECTION 412 - CRACK SEALING ASPHALT PAVEMENTS ................................ 171 SECTION 413 - MICRO -SURFACING ................................ ................................ .... 171 TABLE OF CONTENTS NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 SECTION 414 - QUICK -SET SLURRY ................................ ................................ .... 171 SECTION 415 - PAVER PLACED SURFACE TREATMENT ................................ .. 172 SECTION 416 - COLD RECYCLING ................................ ................................ ...... 172 SECTION 417 – ASPHALT PAVEMENT USING RECYCLING TREATMENTS .... 172 SECTION 418 – ASPHALT PAVEMENT JOINT ADHESIVE ................................ . 179 SECTION 419 - FOG SEAL ................................ ................................ ..................... 181 SECTION 420 - POROUS ASPHALT PAVEMENT ................................ ................. 181 SECTION 421 STONE MATRIX ASPHALT (SMA) PAVEMENTS ......................... 181 SECTIONS 422 THRU 489 - (VACANT) ................................ ................................ .. 181 SECTION 490 - COLD MILLING ................................ ................................ ............ 182 SECTIONS 491 THRU 499 (VACANT) ................................ ................................ .... 183 Section 500 ................................ ................................ ................................ ............ 184 PORTLAND CEMENT CONCRETE ................................ ............................... 184 SECTION 501 - PORTLAND CEMENT CONCRETE - GENERAL ......................... 184 SECTION 502 - PORTLAND CEMENT CONCRETE PAVEMENT ........................ 205 SECTION 503 - PORTLAND CEMENT CONCRETE FOUNDATION FOR PAVEMENT ................................ ................................ ................................ ............ 222 SECTION 504 VACANT ................................ ................................ .......................... 224 SECTION 505 – DIAMOND GRINDING ................................ ................................ . 224 SECTIONS 506 THRU 549 (VACANT) ................................ ................................ .... 227 STRUCTURES ................................ ................................ ................................ .....228 SECTION 551 - DEEP FOUNDATION INSTALLATION AND TESTING ............... 228 SECTION 552 - EXTERNALLY STABILIZED CUT STRUCTURES ...................... 256 SECTION 553 - COFFERDAMS AND WATERWAY DIVERSION STRUCTURES 263 SECTION 554 - FILL TYPE RETAINING WALLS ................................ ................. 266 SECTION 555 - STRUCTURAL CONCRETE ................................ ......................... 292 SECTION 556 - REINFORCING STEEL FOR CONCRETE STRUCTURES ........... 307 SECTION 557 - SUPERSTRUCTURE SLABS, SIDEWALKS ON BRIDGES, AND STRUCTURAL APPROACH SLABS ................................ ................................ ....... 312 SECTION 558 - LONGITUDINAL SAWCUT GROOVING OF STRUCTURAL SLAB SURFACE ................................ ................................ ................................ ................ 330 SECTION 559 - PROTECTIVE COATINGS FOR STRUCTURAL CONCRETE ..... 331 SECTION 560 - MASONRY ................................ ................................ ..................... 334 SECTION 561 (VACANT) ................................ ................................ ........................ 342 SECTION 562 - REINFORCED CONCRETE THREE -SIDED STRUCTURES ........ 342 SECTION 563 - PRESTRESSED CONCRETE UNITS (STRUCTURAL) ................. 345 SECTION 564 - STRUCTURAL STEEL ................................ ................................ .. 346 SECTION 565 - BRIDGE BEARINGS ................................ ................................ ...... 349 SECTION 566 - MODULAR EXPANSION JOINT SYSTEMS ................................ . 357 SECTION 567 - BRIDGE JOINT ................................ ................................ ............. 361 SECTION 568 - BRIDGE RAILING ................................ ................................ ......... 370 SECTION 569 - PERMANENT CONCRETE TRAFFIC BARRIER FOR STRUCTURES ................................ ................................ ................................ ......... 373 SECTION 570 - PAINT REMOVAL OPERATIONS ................................ ................ 381 SECTION 571 - DISPOSAL OF PAINT REMOVAL WASTE ................................ .. 393 SECTION 572 - STRUCTURAL STEEL PAINTING: SHOP APPLIED ................... 399 TABLE OF CONTENTS NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 SECTION 573 - STRUCTURAL STEEL PAINTING: FIELD APPLIED - TOTAL REMOVAL ................................ ................................ ................................ .............. 406 SECTION 574 - STRUCTURAL STEEL PAINTING: OVERCOATING AND LOCALIZED ................................ ................................ ................................ ........... 413 SECTION 575 (VACANT) ................................ ................................ ........................ 421 SECTION 576 - BRIDGE DRAINAGE SYSTEM ................................ ..................... 421 SECTION 577 (VACANT) ................................ ................................ ........................ 424 SECTION 578 - BONDED CONCRETE OVERLAY FOR STRUCTURAL SLABS .. 424 SECTION 579 - STRUCTURAL SLAB RECONSTRUCTION PREPARATION ...... 426 SECTION 580 - REMOVAL OF STRUCTURAL CONCRETE ................................ 430 SECTION 581 - REMOVAL OF BRIDGE OVERLAYS ................................ ........... 431 SECTION 582 - REMOVAL AND REPLACEMENT OF STRUCTURAL CONCRETE ................................ ................................ ................................ ................................ . 432 SECTION 583 - SHOTCRETE ................................ ................................ ................. 436 SECTION 584 - SPECIALIZED OVERLAYS FOR STRUCTURAL SLABS ............ 441 SECTION 585 - STRUCTURAL LIFTING OPERATIONS ................................ ...... 447 SECTION 586 - MISCELLANEOUS STRUCTURAL RECONSTRUCTION ........... 451 SECTION 587 - BRIDGE RAILING RECONSTRUCTION ................................ ..... 455 SECTION 588 - BRIDGE JOINT REHABILITATION ................................ ............ 458 SECTION 589 - REMOVAL OF STRUCTURAL STEEL ................................ ......... 458 SECTION 590 - ADJUSTMENT OF BRIDGE APPURTENANCES ......................... 460 SECTIONS 591 THRU 593 (VACANT) ................................ ................................ .... 461 SECTION 594 - TIMBER AND LUMBER ................................ ................................ 461 SECTION 595 - WATERPROOFING SYSTEMS FOR STRUCTURES .................... 463 SECTION 596 - OPEN STEEL FLOOR ................................ ................................ ... 463 SECTION 597 - TIMBER BRIDGE RAILING AND TRANSITIONS ....................... 464 SECTIONS 598 AND 599 (VACANT) ................................ ................................ ....... 467
201-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Section 200 EARTHWORK SECTION 201 - CLEARING AND GRUBBING
201-1 Description .
201-1.01 General. This work shall consist of clearing, grubbing, removing and disposing of all trees,
brush, stumps, fences, debris, and miscellaneous structures not covered under other contract items within the construction area and such other areas as specified or directed. The Contractor shall clear such additional areas within the limits of the right -of-way and easement lines as specified or directed.
201-1.02 No Burning Requirement. Materials generated by the work, including construction and
demolition debris, shall not be disposed of by burning on or off the site. Off site burning in a permitted solid waste incinerator or in another lawful manner as refuse derived fuel will be per mitted.
201-2 MATERIALS (Not specified)
201-3 Construction Details .
201-3.01 Limits of Work Areas. The Engineer will establish the limits of areas to be cleared and
grubbed, to be cleared but not grubbed, or areas, objects or features that are designated to remain undisturbed. In general, the work areas shall include the road section, stream channels, ditches, temporary approaches to bridges, detours and other areas as shown in the contract documents or directed by the Engineer. The Engineer will designate fences, structures, debris, trees and brush to be cleared where grubbing is not required. Clearing beyond the areas of construction shall be done only where specified or directed.
201-3.02 Clearing and Grubbing. During the life of the contract the Engineer may order the clearing of
any trees within the R.O.W. that the Engineer determines to be hazardous or dead and unsightly. The Contractor shall carefully prune all branches of trees less than 16 feet above any part of the roadway and all branches which have been broken or injured during construction. The work shall be done as specified under §614 -3.01A Equipment and B. Pruning. Whenever trees are felled or trimmed on/or adjacent to highways, all wood shall be immediately removed from the roadway or any area that would present a hazard to traffic. Grubbed stumps shall be moved immediately at least 30 feet from the edge of pavement. No trees, tree trunks, stumps or other debris shall be felled, sidecast or placed outside the limits of the road section. No grubbing will be required beneath the embankment where the finished grade will be 6 feet or more above the original ground surfac e unless otherwise specified in the contract documents. Where trees or existing stumps are cleared and grubbing is not required, the tree trunk or existing stump shall be cut off not more than 6 inches above the original ground surface unless otherwise approved. Exposed stumps not required to be removed , but which are within 30 feet of the edge of the pavement or are in a built -up area , shall be
201-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 chipped out to a depth of not less than 6 inches below the finished grade and the holes backfilled if directed by the Engineer. This work shall be completed within one week after start of work on the tree.
201-3.03 Disposal .
201-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 2. Chipping. Wood may be reduced to chips by the use of an approved chipping machine or stump grinder. Chips shall be 1/2 inch maximum thickness or of other approved thicknesses. Chips resulting therefrom may be disposed of by being stockpiled and used as mulch for planting, by distribution on the ground surface in wooded areas within the right -of-way as approved by the Engineer, or by disposal at a location off the contract site satisfactory to the Engineer.
201-4 Method of Measurement .
201-4.01 Per Acre . Payment for Clearing and Grubbing will be made at the unit price bid per acre
computed to the nearest one tenth acre .
201-4.02 Per Lump Sum. Payment for Clearing and Grubbing will be made on a lump sum basis for
work satisfactorily completed. Monthly payments will be made in proportion to the amount of work done as determined by the Engineer.
201-4.03 Borrow Areas. Borrow pits or other pit areas from which material is secured shall not be
included for measurement of clearing and grubbing.
201-5 Basis of Payment .
201-5.01 Clearing and Grubbing. Payment will be made at the contract price to furnish all materials,
labor and equipment necessary to satisfactorily complete the work as specified. No separate payment will be made for any excavation, backfill or earth cover necessary to complete the wo rk of disposal outside the embankment area nor for the work in handling, storing, rehandling and hauling of disposable material within or outside the right -of-way. Payment will be made under: Item No. Item PayUnit 201.06 Clearing and Grubbing Lump Sum 201.07 Clearing and Grubbing Acre
202-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 SECTION 202 - DEMOLITION OF BUILDINGS AND STRUCTURES (Last Revised May , 2022)
202-1 DESCRIPTION. This work shall consist of the demolition, removal and disposal of existing
buildings; and the demolition, removal and disposal of existing bridge structures, removal and disposal of steel supported and concrete superstructure supported structural slabs (with and without shear connectors), in accordance with the contract documents, or as directed by the Engineer.
202-2 MATERIALS. Not specified.
202-3 Construction Details .
202-3.01 General. The Contractor shall conduct all demolition and removal operations in accordance
with the contract documents and local building codes. The Contractor shall repair or replace in kind sidewalks, curbs, roadway and other materials designated to remain in p lace which are damaged as a result of the work at no additional cost to the State. Where a falling hazard of 6 feet or more above a lower level exists to workers, each worker shall be protected from falling by fall arrest systems, or guardrail systems to a height of approximately 42 inches, or by covering openings. All floor or deck ope nings not used as material drops shall be covered over with materials substantial enough to support the weight of any loads which may be imposed upon them. Such materials shall be properly secured to prevent accidental movement. When excavation is required, the Contractor shall provide protection for the public in accordance with §107 -05K. Open Excavations and Trenches . The Contractor shall make provisions to control dust resulting from demolition operations by wetting the work area and debris or other appropriate measures.
202-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 preparing an adequate Demolition Plan and conducting adequate engineering surveys that safeguard workers and the public. When the Demolition Plan is required to be prepared by a Professional Engineer, the Professional Engineer shall prepare the following, as appropriate. When the Demolition Plan is not required to be prepared by a Professional Engineer, the Contractor shall prepare the following, as ap propriate:
202-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 c. Description of ground and/or water protection plans and materials for containment associated with collection of paint waste or other falling debris generated from subsequent cutting/demo operations, or reference to other submittals .
202-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Before any structure or building served with or having utility facilities thereon is demolished, all utility services shall be shut off, capped, or otherwise made safe and controlled outside the building or off the structure, before the general demolition work is started. All severed sewer lines or drains emanating from the building or structure shall be capped or otherwise tightly sealed to prevent the entry of foreign materials into the main sewer or drain. All electric circuits in any work area that is or may become wet or humid during the work shall be shut down and locked out. If electrical power is required, temporary circuits may be brought into the work area, provided such circuits are ground fault pro tected.
202-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 The Contractor shall remove, or otherwise remediate, asbestos materials or other hazardous materials on each structure or building before demolition work begins. If it is not feasible to remediate hazardous materials from a building due to lack of structur al integrity, or other unsafe conditions, the Contractor shall obtain a regulatory variance as applicable, and perform controlled demolition in accordance with applicable federal and state regulations.
202-3.02 Disposal of Buildings. The Contractor shall demolish buildings designated for disposal and
released to the Contractor 30 days or more before the contract completion date in accordance with the contract documents. The Contractor shall demolish buildings on site without the use of explosives, unless approved by the Deputy Chief Engineer (Construction). Any proposal to allow such building or any portion thereof to remain standing at the site, or to be relocated to another site, will be referred to the Regional Director for approval and shall be accomplished under terms and conditions established by the St ate.
202-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 necessary for the treatment to be effective or to prevent migration of insect, pest, or vermin. Demolition work shall not proceed until the extermination is completed. If extermination is being conducted because it was ordered by the City, County, or NYS Department of Health, the Contractor shall notify that office that the extermination has been completed and shall obtain their written concurrence that the extermination work was satisfactorily completed.
202-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 4. Walls shall be made self -supporting, safe and weatherproof with construction similar to or consistent with the remaining building. Supports and bracing shall be installed in accordance with the contract documents.
202-3.03 Relocation of Buildings. The Contractor shall relocate buildings, to sites designated by the
owner and approved by the Department, in accordance with the contract documents. Sites to which the buildings are to be moved will be furnished without cost to the Contractor.
202-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 D. Restoration Work. The Contractor shall restore exterior portions of the building, including steps, porches, railings, and other appurtenances, to as good and serviceable condition, as existed prior to its relocation, in accordance with local building codes. Any property d amaged or destroyed during the execution of the work shall be repaired or replaced at no additional cost to the State.
202-3.04 Dismantling and Storage of Superstructures. The Contractor shall dismantle and store
existing superstructures in accordance with the contract documents. A superstructure is defined as that part of a structure above, supported by, and including the bearings. The Contractor shall carefully remove concrete, paving material and other materials from the existing superstructures so as to prevent damage to superstructures to be stored. The parts of superstructure designated to be stored shall be protected, and stored on site or at the locations designa ted. All stored members shall be adequately match -marked in order to facilitate reassembly. Any parts of the superstructure designated for storage or to remain which are damaged during the course of the operation or during storage shall be repaired or re placed at no additional cost to the State.
202-3.05 Removal of Superstructures. The Contractor shall demolish and remove existing
superstructures at the site in accordance with the contract documents. A superstructure is defined as that part of a structure above, supported by, and including the bearings. The removal of steel suppo rted structural slabs where the supporting structural steel is to remain shall be performed in accordance with §202 -3.07 Removal of Steel Supported Structural Slabs. The Contractor shall obtain the approval of the Deputy Chief Engineer, Structures (DCES) for any proposal to allow such structure or any portion thereof to remain standing on the site or to be relocated to another site. The Contractor shall designate all areas that could become subject to collapse or that could become unstable as a result of demolition activity as non -access areas, and clearly identify them. The public, workers and equipment with operators shall remain o utside these designated non -access areas at all times during demolition operations or at any time the area is subject to potential superstructure collapse.
202-3.06 Removal of Substructures. The Contractor shall demolish and remove existing substructures
in accordance with the contract documents. A substructure is defined as that part of a structure below the superstructure, such as abutments, piers, and wingwalls. The Contractor shall com ply with the appropriate construction details specified in Section 203 Excavation and Embankment . Excavations shall be dewatered and kept free from water, snow and ice as necessary. If excavation protection is necessary to protect structures or other improvements, or if the alternatives of laying back slopes or benching are not available, the support system shall be as indicated in the contract documents. Sheeting or piling shown in the contract documents which is integral with the substructure and is designated to remain in place shall be cut off at the elevations shown. If indicated in the contract documents, existing sheeting or piling shall be extracte d. The Contractor may, with the permission of the Engineer, extract sheeting or piling not shown to be extracted or designated to remain in place rather than cutting it off at the elevations shown on the plans, at no additional cost to the State. Resulting holes shall be backfilled with suitable material placed in lifts and compacted, and the area regraded.
202-3.07 Removal of Steel Supported Structural Slabs. The Contractor shall remove steel supported
structural slabs in accordance with the contract documents. All concrete and other materials carried by the supporting steel members of the superstructure shall be removed unless the plans specifically indicat e removal under another item or that the material is to remain in place. Prior to beginning removal operations, the Contractor shall mark the location of the existing primary structural steel members on the
202-3 08
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 surface of the slab. Prior to beginning any sawcutting of the structural slab in order to facilitate removal, the Contractor shall mark the edges of existing structural steel members in contact with the bottom of the slab on the slab surface, or make othe r adequate provisions approved by the Engineer to prevent damage to the underlying structural steel. The Contractor shall protect existing structural steel while removing steel supported structural slabs. Nicks or gouges in existing structural steel to remain caused by demolition operations shall be reviewed by the DCES and the Contractor shall repair tho se damages in accordance with the Steel Construction Manual (SCM) and the direction of the DCES. All unpainted structural steel surfaces exposed by concrete removal, against which new concrete will be subsequently placed, shall be cleaned sufficiently to ensure proper bond between the steel and concrete.
202-3.08 Removal of Concrete Superstructure Supported Concrete Slabs. Concrete slabs shall be
removed to expose the tops of the prestressed concrete beams and diaphragms while retaining the tie -in bar reinforcement, which is precast into the prestressed concrete beam and diaphragms. All other reinforcement and wire mesh shal l be removed. The concrete slab shall be removed with chipping hammers not exceeding 40 lbs in weight with the bit removed. The Contractor shall exercise care during
202-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 the execution of the work to avoid damaging or loosening material that is to remain. If the Contractor’s operations result in damage to concrete that is to remain, the Contractor shall stop work and make immediate corrections at no additional cost to the S tate. Any damage caused by the Contractor’s operations to material that is to remain shall be repaired or replaced. If the concrete superstructure to remain is cut, or otherwise damaged by Contractor operations, the Contractor shall stop work immediately until a repair procedure is approved by the DCES. The Contractor may request in writing to the DCES, to mill the top of the deck to a maximum depth of 2 inches, or until the top mat of reinforcing is exposed, whichever is less. The request shall include the specifications for the piece of equipment to be utilized.
202-4 Method of Measurement .
202-4.01 General. Vacant.
202-4.02 Disposal of Buildings. The work under disposal of buildings will be measured for payment on
a lump sum basis for a specific building.
202-4.03 Relocation of Buildings. The work under relocation of buildings will be measured for payment
on a lump sum basis for a specific building.
202-4.04 Dismantling and Storage of Superstructures. The work under dismantling and storage of
superstructures will be measured for payment on a lump sum basis for a specific superstructure.
202-4.05 Removal of Superstructures. The work under removal of superstructures will be measured for
payment on a lump sum basis for a specific superstructure.
202-4.06 Removal of Substructures. The quantity of removal of substructures to be measured for
payment will be in cubic yards measured to the nearest whole cubic yard, computed from the payment lines.
202-4.07 Removal of Steel Supported Structural Slab. The quantity to be measured for payment will
be in square feet of structural slab removed, measured to the nearest whole square foot. Measurements will not make any deductions for openings.
202-4.08 Removal of Concrete Superstructure Supported Concrete Slab. The quantity to be measured
for payment will be in square feet of structural slab removed, measured to the nearest whole square foot.
202-5 Basis of Payment .
202-5.01 General. Vacant.
202-5 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 202-5.02 Disposal of Buildings. The lump sum price bid shall include the cost of all labor, materials and equipment necessary to satisfactorily complete the work. Progress payments will be made monthly in proportion to the amount of work completed. Suitable or select material obtained from other than the demolition site and used to fill foundation holes, and surface restoration will be paid for separately. Water used for dust control or compaction will be paid for separately if a contract pay item f or water is included in the contract. Closure of basement petroleum storage tanks will be paid for separately if regulations require the tank to be closed. The cost of asbestos removal, abatement, and disposal will be paid for separately. The cost of extermination shall be included in the lump sum price bid if the contract documents indicate that extermination work is required, otherwise it will be considered extra work.
202-5.03 Relocation of Buildings. The lump sum price bid shall include the cost of all labor, materials,
and equipment necessary to satisfactorily complete the work, including excavation necessary at the old or the new building site and water used for dust control or compaction if a cont ract pay item for water is not included in the original contract bid documents. Extermination shall be included in the lump sum price bid if the original contract bid documents indicate that extermination work is required. Progre ss payments will be made monthly in proportion to the amount of work completed. If a property owner, upon agreement with the Department, removes the building, the Contractor will be paid 20% of the bid price for demolition of the existing foundation, walks and other facilities. Suitable or select material obtained from other than the demolition site and used to fill foundation holes, and surface restoration will be paid for separately. The work of reconnecting and providing services for the relocated building at its new site will be paid for separately.
202-5.04 Dismantling and Storage of Superstructures. The lump sum price bid shall include the cost
of all labor, materials, and equipment necessary to satisfactorily complete the work. Progress payments will be made in proportion to the amount of work completed. The cost of paint waste disposal will be pa id for separately.
202-5.05 Removal of Superstructures. The lump sum price bid shall include the cost of all labor,
materials, and equipment necessary to satisfactorily complete the work. Progress payments will be made in proportion to the amount of work completed. The cost of paint waste disposal will be pa id for separately.
202-5.06 Removal of Substructures. The unit price bid shall include the cost of furnishing all labor,
materials, and equipment necessary to satisfactorily complete the work. Excavation and excavation protection required to access portions of the substructure for removal will be paid for separately. Material obtained from other than the demolition site and used to fill substructure holes and surface restoration will be paid for separately. Water used for dust control or compaction will be paid for separately if a contract pay item for water is includ ed in the contract. The cost of asbestos removal, abatement, and disposal will be paid for separately.
202-5.07 Removal of Steel Supported Structural Slabs. The unit price bid shall include the cost of all
labor, materials and equipment necessary to satisfactorily complete the work, including any sawcutting performed in order to facilitate removal.
202-5.08 Removal of Concrete Superstructure Supported Concrete Slabs. The unit price bid shall
include the cost of all labor, materials and equipment necessary to satisfactorily complete the work, including any sawcutting performed in order to facilitate removal. No additional payment will be made for removals, repairs or re placements made necessary due to the Contractor’s operations.
203-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Payment will be made under: Item No. Item Pay Unit 202.01nnnn Disposal of Buildings Lump Sum 202.03nnnn Relocating Buildings Lump Sum 202.11nnnn Dismantling and Storing Existing Superstructures Lump Sum 202.12nnnn Removing Existing Superstructures Lump Sum 202.19 Removal of Substructures Cubic Yard 202.2201 Removal of Steel Supported Structural Slabs (with shear connectors) – Type A Square Foot 202.2202 Removal of Steel Supported Structural Slabs (with shear connectors) – Type B Square Foot 202.2301 Removal of Steel Supported Structural Slabs (without shear connectors) – Type A Square Foot 202.2302 Removal of Steel Supported Structural Slabs (without shear connectors) – Type B Square Foot 202.24 Removal of Concrete Superstructure Supported Concrete Slabs (with shear connectors) Square Foot 202.25 Removal of Concrete Superstructure Supported Concrete Slabs (without shear connectors) Square Foot NOTE: nnnn denotes serialized pay item for each building or structure. SECTION 203 - EXCAVATION AND EMBANKMENT (Last Revised January 20 20)
203-1 DESCRIPTION. This work shall consist of excavation, disposal, placement and compaction of all
materials that are not provided for under another section of these Specifications, and shall be executed in conformance with payment lines, grades, thicknesses and typical sections specified in the contract documents.
203-1.01 Definitions.
203-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 1. A line located 2 ft. below the subgrade surface and extended to the intersection with the embankment side slopes, or
203-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 J. Borrow. Borrow is material required for earthwork construction in excess of the quantity of suitable material available from the required grading, cuts and excavations. Borrow may be necessary even though not shown in the contract documents.
203-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 only. The Contractor will be required to reimburse the State with a rebate for the material obtained in these areas. Permission will not be granted to excavate material beyond the design slopes if it is to be used on other than State contract work. The rebate to be obtained from the Contractor for this material is comprised of 1) A royalty based on the actual value of the excavated material, and 2) A credit for the difference in the Contractor's handling costs if these handling costs have been reduce d. The royalty which is to be obtained for the excavated material shall be appropriate for the item for which it is to be utilized and shall be comparable to the current price being paid to purchase similar material in the area. If the Contractor's handling costs associated with obtaining material from within the R.O.W. limits are greater than those for obtaining material from other acceptable sources, these additional handling costs must be borne by the Contractor. The royalty sh all not be reduced to offset any increased handling costs incurred by the Contractor. If the Contractor's handling costs associated with obtaining materials from within the R.O.W. limits are less than those for obtaining material from other acceptable sources, the differences shall be reimbursed to the State as a credit in addition to the r oyalty. The difference in the Contractor's handling cost shall be determined by an analysis based on a comparison of haul lengths, hauling equipment, hauling operation, use of haul roads or public highways, preparation and restoration of the borrow areas, and any other variables involved. Prior to modifying rock cut slopes, the Geotechnical Engineering Bureau must be consulted. If rock cut slopes are flattened sufficiently to eliminate the need for presplitting, an additional rebate will be necessary. All special requirements to be fulfilled by the Contractor, at the Contractor's own expense, shall be clearly stated in the agreement. The foregoing requirement of receiving a rebate from the Contractor for material obtained by modification of slopes shall apply only to locations not designated in the Contract Documents.
203-2 Materials .
203-2.01 General. The requirements for select materials and subgrade area materials are described
below. All processing operations including washing, removal of oversize material, blending, or crushing shall be completed at the source of the material. The procedure for ac ceptance or rejection of these materials shall be in conformance with the procedures contained in the geotechnical control procedure “Procedure for the Control and Quality Assurance of Granular Materials ”.
203-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 graded rock option is used. In that case, refer to §733 -13 Select Granular Subgrade . If concrete is used, any exposed mesh or rebar shall not exceed 1 in. in length. RAP is also permitted.
203-2.02 Unclassified Excavation and Disposal . None Specified.
203-2.03 Embankment In Place . Provide backfill material meeting the requirements of §733 -08
Embankment In Place .
203-2.04 Select Borrow. Provide backfill material meeting the requirements of §733 -09 Select Borrow .
203-2.05 Select Fill. Provide backfill material meeting the requirements of §733 -10 Select Fill .
203-2.06 Select Granular Fill . Provide backfill material meeting the requirements of §733 -11 Select
Granular Fill .
203-2.07 Select Granular Fill Slope Protection . Provide backfill material meeting the requirements of
§733 -12 Select Granular Fill Slope Protection .
203-2.08 Surface Settlement Gauges . Provide materials for the embankment construction control device
surface settlement gauge meeting the requirements of §733 -17 Surface Settlement Gauge .
203-2 09
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 203-2.09 Settlement Rods . Provide materials for the embankment construction control device settlement rod meeting the requirements of §733 -18 Settlement Rod .
203-2.10 Piezometers . Provide materials for the piezometer installation meeting the requirements of
§732 -11 Open Well Piezometer .
203-2.11 Applying Water . Water used for dust control purposes may be obtained from any source.
203-2.12 Select Granular Subgrade . Provide backfill material meeting the requirements of §733 -13
Select Granular Subgrade .
203-2.13 Select Structural Fill . Provide backfill material meeting the requirements of §733 -14 Select
Structural Fill .
203-2.14 Sand Backfill . Provide backfill material meeting the requirements of §733 -15 Sand Backfill.
203-3 Construction Details .
203-3.01 General. The Contractor shall remove all soil, rock, and other material, and utilize or dispose of
these materials as required by the contract documents. All excavation and embankment work shall be executed to payment lines shown in the contract documents. All graded earth surfaces outside the roadway limits shall be smoothed and trimmed in reasonably close conformity (6± in.) of true grade. After trimming, the area shall be left in a compact and satisfactory condition, free of large stones or other objectio nable materials, as determined by the Engineer. Earthwork construction operations requiring compaction shall not be performed from November 1st thru April 1st except with a Winter Earthwork submittal subject to the provision of this Section and approved by the Regional Director or his designated representative. Winter earthwork operations constitute an additional risk to the Department and Winter Earthwork subm ittals should not be expected to be automatically approved. Winter Earthwork will be subject to the following restrictions: • Transitioning from the normal construction season to the exempt winter earthwork months between November 1st and April 1st, the use of standard earthwork materials may be permitted only under the conditions where the air temperature, ground temperature and material temperature are all above 32° F at the time of placement. Modifications to compaction procedures, including but not limited to the use of thinner lifts, may be required when the temperatures are above 32° F but below 40° F at the time of placemen t. • Between November 1st and April 1st, if the air temperature, ground temperature, or material temperature is at or below 32° F, earthwork may only proceed using material that meets the requirements of §733 -16 Winter Earthwork and/or standard earthwork materi al placement utilizing the modified methods and procedures contained in the approved Winter Earthwork Submittal.
203-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 In all work incorporated into the final product, the Contractor shall not place material that is frozen, or place fill material on ground that is frozen to any depth regardless of the date.
203-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 portion of the cut immediately adjacent to the design slope is at least 5 ft. lower than the general level of the cut at all times until the lower payment line is reached. The construction of these temporary drainage facilities shall be considered as incidental to the construction of the project and no additional payment will be allowed. Any portion of an embankment or subgrade which has been damaged by the Contractor's equipment during the course of construction, shall be repaired and re -compacted by the Contractor at no additional cost to the State. Where seepage causes instability of slopes, excavation and backfill or other corrective measures shall be performed as ordered by the Engineer and paid for under the appropriate item. Excavation for the installation of slope protection may be necessary at any time and location throughout the duration of the contract and may not necessarily coincide with the Contractor's performance of the general excavation work.
203-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 section shall be provided in conformance with Standard Sheet Earthwork Transition and Benching Details . Where a subgrade area becomes defined by §203 -1.01E. Subgrade Area in a cut section, the materials placed and other details shall be as specified under §203 -3.02C. Proof Rolling in Cut Sections 3. Procedure , unless otherwise required by the contract documents. Prior to subbase course placement, the surface on which the subbase is to be placed shall be thoroughly compacted to the satisfaction of the Engine er.
203-3.02 Unclassified Excavation and Disposal.
203-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 extend for a minimum distance equal to the burden plus 3 ft. beyond the limits of fragmentation blasting within the section.
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 blasting vibrations generated. The initial loading shall be computed using a Scaled Distance of 30 ft. The resulting particle velocity measured by the seismograph shall be evaluated by a Department Engineering Geologist. The Geologist's evaluation shall be the basis for adjusting the Scaled Distance. No separate payment shall be made for this work. The cost shall be included in the appropriate excavation item. The above requirements shall in no way relieve the Contractor of liability for any damage incurred as a result of the blasting operations.
203-3.03 Embankment In Place .
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 shall be prepared. Sod and topsoil shall be removed where the final pavement grade is 6 ft. or less above the existing ground surface and in other areas designated in the contract documents or by the Engineer. Prior to embankment construction and subbase c ourse placement, the surface on which the embankment and/or subbase is to be placed shall be thoroughly compacted to the satisfaction of the Engineer. Unsuitable materials other than sod and topsoil shall be removed to the depths shown in the contract docu ments or as directed by the Engineer. Underwater areas shall be filled in accordance with §203 -3.04 Select Borrow or §203 -3.05 Select Fill and paid for under its appropriate item. Where embankments are to be constructed over ground that will not adequately support embankment construction equipment, an initial layer of fill may be allowed to form a working platform. The need, manner of construction, and thickness of such a layer shal l be subject to approval of the Engineer, and the layer will be permitted only where the lack of support is, as determined by the Engineer, not due to deficient ditching, grading or drainage practices or where the embankment could be constructed in the app roved manner by the use of different equipment or procedures. Thicknesses of up to 3 ft. may be permitted for such a layer. Concrete or asphalt slabs may be used at the bottom of such a layer, provided they are placed horizontally. In locations where embankments are to be constructed on hillsides or against existing embankments with slopes steeper than 1 vertical on 3 horizontal, the slopes shall be benched. Required benches shall be constructed as shown on the Standard Sheet Earthwork Transition and Benching Details . Where old pavement is encountered within 2 ft. of the top of the subbase course, it shall be broken up or scarified.
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 C. Compaction
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 for soil compaction purposes and equipment which is not in proper working order in all respects shall not be approved or used. The Engineer will also withhold approval of any compactor for which the Contractor cannot furnish manufacturer's specifications c overing data not obvious from a visual inspection of the equipment and necessary to determine its classification. The term, “pass,” for any type of compactor, shall denote one direct vertical application of compactor effort over all elemental areas of a lift surface. Terms in common parlance, such as “coverage,” “trips,” etc., have no significance, equivalence, or app lication under these specifications. TABLE 203 -1 PNEUMATIC -TIRED COMPACTOR CLASSIFICATIONS Pneumatic Compactor Class Tire Requirements Range of Ballasted Wheel Loads (lbs. per Wheel) Tire Size No. Plys Inflation Pressure (psi) A 7.50 x 15 4 35 2,000 – 3,000 B 7.50 x 15 6 60* 2,000 – 4,000 10 90* C 7.50 x 15 14 130* 2,000 – 4,000 D 9.00 x 20 10 75* 4,000 – 6,000 12 90* E 11.00 x 20 12 90* 6,000 – 8,000 18 F 13.00 x 24 18 100* 8,000 – 10,000 * Inflation pressure for not less than the last two passes on each lift. May be reduced during earlier passes and gradually increased to this level.
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 The minimum effort for all pneumatic compactors shall be 6 passes, at speeds up to 12 ft./sec on no more than the first 2 passes, and all subsequent passes at speeds of 6 ft./sec. or less.
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 The unsprung drum weight is the static weight of the drum and appurtenances without any reaction transmitted to the drum from the main chassis of the compactor. The dynamic force produced is dependent on the frequency of vibration, and therefore, CFR ratings shall be determined for the actual operating frequency of the compactor. Approval for vibratory compactors shall be confined, however, to equipment operating at not less than 1100 vpm, nor more than 1500 vpm, and those where the actual dynamic force at the actual o perating frequency is at least 2.5 times the unsprung drum weight. Conversion of manufacturer's published ratings, at a given frequency, shall be made with the following equation: 2 1 2)()( VVF = F where: 1F = Dynamic Force at Rated Frequency 2F = Dynamic Force at Operating Frequency 1V = Rated Frequency 2V = Operating Frequency For the lift thickness selected by the Contractor, the minimum CFR rating and minimum effort on such a lift, shall be as shown in Figures 203 -2B&C, respectively. Non -Centrifugal (Vertical force only) types of vibratory compactors shall be approved as above , less 175 lbs./in. before using Figures 203 -2 B&C as a minimum number of passes at a single specified speed. An equivalent effort, relating varying numbers of passes to other speeds is given by the equation: Speed X = (Specified Speed) (Min. Passes at Speed X) (Specified Min. Passes) The Contractor may choose to alter the specified minimum pass requirement, provided that speed is adjusted to the value given by this equation and does not exceed 6 ft./sec.
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Where vibratory compactors are used on a project, the Contractor shall furnish for the exclusive use of the Engineer, one vibrating reed tachometer per project, plus one additional tachometer for each group of two vibratory compactors in excess of two per project. Tachometers shall have a frequency range adequate to cover operating frequencies of all vibratory compactors used on the project and shall have scale divisions of 50 vpm or less. Tachometers may be placed on the ground surface near the compactor w hen making readings, or with suitable damping materials interposed, placed directly on the compactor drum frame. The dispensations permitted under this specification for vibratory compactors are contingent upon proper operation of the equipment at all times during compaction operations. In any instance where the Engineer encounters any problems with operators rolling without vibration, for any reason, and immediate and effective corrective action is not taken by the Contractor, the Engineer will halt the work until the problem is resolved. If continuing problems of this nature occur, the Engineer may suspend all provi sions of this subparagraph
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 and consider the vibratory compactors as smooth steel wheel rollers classified according to their gross weight.
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 blending in a dry material or manipulation alone, to increase the rate of evaporation. Increased loose lift thickness caused by blending in a dry material, however, may necessitate a change in compaction equipment and/or methods to meet the minimum provisi ons of subparagraph 2. Compaction Equipment of this subsection.
203-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 a. The general description of the subgrade soils.
203-3.04 Select Borrow. The management of a select borrow source and the acceptability of all select
borrow material shall be in conformance with §203 -3.01F. Borrow . Underwater areas shall be filled with select borrow to 2 ft. above the water surface at the time of placement and in conformance with the details shown on the appropriate Standard Sheet or as noted in the contract documents. All select borrow placed within the limits of Embankment or the Subgrade Area shall be placed in conformance with §203 -3.03B. Embankments or §203 -3.01G. Subgrade Area respectively, as appropriate, or where used for fill or backfill at structures, culverts and pipes, in conformance with §203 -3.06 Select Granular Fill and §203 -3.17 Select Structural Fill.
203-3.05 Select Fill. Underwater areas shall be filled with select fill to 2 ft. above the water surface at the
time of placement and in conformance with the details shown on the appropriate Standard Sheet or as noted in the contract documents. All select fill placed within the limits of Embankment or the Subgrade Area shall be placed in conformance with §203 -3.03B. Embankments or §203 -3.01G. Subgrade Area respectively, as appropriate, or where used for fill or backfill at structures, culverts and pipes, in conformance with §203 -3.06 Select Granular Fill and §203 -3.17 Select Structural Fill.
203-3.06 Select Granular Fill . The type of material to be used in bedding, filling and backfill at
culverts, pipes, conduit and direct burial cable shall be in conformance with the details shown on the appropriate Standard Sheet or as noted in the contract documents. Do not use RAP. Do not use slabs or pieces of either concrete or asphalt.
203-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Fill or backfill material at culverts and pipes shall be deposited in horizontal layers not exceeding 6 in. in thickness prior to compaction. Compaction of each layer shall be as specified under §203 -3.03C. Compaction . A minimum of 95% of Standard Proctor Maximum Density will be required. When placing fill or backfill around culverts and pipes, layers shall be deposited to progressively bury the pipe or culvert to equal depths on both sides. The limits to which this su bsection will apply shall be in accorda nce with the Standard Sheets or as modified in the contract documents. Fill or backfill for conduit or cable placed in a trench shall be carefully placed in a horizontal layer to a depth of 6 in. over the top of the conduit or cable. This layer of material shall not be compacted, however, the remaining portion of the trench s hall be backfilled in accordance with the preceding paragraph. Where cables or conduits are placed and backfilled by a machine in one operation, the above requirements for backfilling do not apply. Where sheeting has been used for the excavation, and incremental removal of sheeting is not specified in the contract documents, sheeting shall be pulled when the trench has been backfilled to the maximum unsupported trench depth allowed by 29 CFR 1926.
203-3.07 Select Granular Fill Slope Protection . The Contractor shall perform the excavation in
accordance with the requirements for “Unclassified Excavation and Disposal” as described elsewhere in these specifications. The Contractor shall then spread material conforming to the requirements given in §733-12 Select Granular Slope Protection , in one layer to its full thickness by a method approved by the Engineer. The work shall be performed where shown in the contract documents or where directed by the Engineer in accordance with the Standard Sheets, and details shown on the contract documents. Compaction of the slope protection is not required. Slope Protection shall be either of two types, as described below:
203-3.08 Surface Settlement Gauges . Surface settlement gauges shall be constructed, installed, and
maintained where shown in the contract documents and in accordance with the details contained in the geotechnical control procedure “ Settlement Gauges and Settlement Rods ” covering construction, installation, maintenance, and abandonment of these devices. Where surface settlement gauges are called for, it will be the Contractor's option to install pipe gauges or manometer gauges, unless a definite type is specified in the contract documents. Surface settlement gauges will be accepted for conformance with th e specification requirements on the basis of an inspection of the installation by the Departmental Geotechnical Engineer.
203-3.09 Settlement Rods . Settlement rods shall be constructed, installed, and maintained where shown
in the contract documents and in accordance with the details contained in the geotechnical control procedure “ Settlement Gauges and Settlement Rods ” covering construction, installation, maintenance, and abandonment of these devices. Settlement rods will be accepted for conformance with the specification requirements on the basis of an inspection of the installation by the Departmental Geotechnical Engineer.
203-3.10 Piezometers . Piezometers shall be constructed, installed, and maintained at the locations shown
in the contract documents and in accordance with the detailed drawings included in the contract documents.
203-3 11
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 203-3.11 Applying Water . None Specified.
203-3.12 Select Granular Subgrade . The type of material to be used in fill or backfill of undercuts shall
be in conformance with the details shown in the contract documents or as ordered by the Engineer. Fill or backfill material shall be deposited in horizontal layers not exceeding 6 in. in thickness prior to compaction. Compaction of each layer shall be as specified under §203 -3.03C. Compaction . A minimum of 95% of Standard Proctor Maximum Density will be required.
203-3.13 Select Structural Fill . The type of material to be used in bedding, filling and backfill at
structures shall be in conformance with the details shown on the appropriate Standard Sheet or as noted in the contract documents or as ordered by the Engineer. Do not use RAP. Do not us e slabs or pieces of either concrete or asphalt. Fill or backfill material at structures shall be deposited in horizontal layers not exceeding 6 in. in thickness prior to compaction. Compaction of each layer shall be as specified under §203 -3.03C. Compaction . A minimum of 95% of Standard Proctor Maximum Density will be required. When filling behind abutments and similar structures, all material shall be placed and compacted in front of the walls prior to placing fill behind the walls to a higher elevation. Th e limits to which this subsection will apply shall be in accordance with the Standard Sheets or as modified in the contract documents. Where sheeting has been used for the excavation, and incremental removal of sheeting is not specified in the contract documents, sheeting shall be pulled when the trench has been backfilled to the maximum unsupported trench depth allowed by 29 CFR 1926.
203-3.14 Sand Backfill . The type of material to be used in bedding and filling shall be in conformance
with the details shown in the contract documents or as ordered by the Engineer. Bedding or fill material shall be deposited in horizontal layers not exceeding 6 in. in thickness prior to compaction. Compaction of each layer shall be as specified under §203 -3.03C. Compaction . A minimum of 95% of Standard Proctor Maximum Density will be required.
203-4 Method of Measurement . T..
203-4.01 General. Quantities for all items of work with payment units in cubic yards will be computed
from payment lines shown in the contract documents. Work performed beyond any designated payment line, including any offset required for the construction of presplit rock slopes in lifts, will not be included in the computation of quantities for the item involved. For any item paid for in its final position, no additional quantity will be measured for payment to make up losses due to foundation settlement, compaction, erosion or any other cause. Cross -sectioning, for the purpose of determining quantities for payment, will be employed only where payment lines are not shown in the contract documents or Standard Sheets, and cannot be reasonably established by the Engineer. Quantities for benching will be computed for payment from the details and instructions shown on the Standard Sheet Earthwork Transition and Benching Details . The excavation of unsuitable materials designated as topsoil under Section 713 Topsoil , will be included in the quantity measured for the appropriate unclassified excavation item, without distinction. . Where the item, “Embankment in Place,” is designated for the project by the proposal, all borrow of ordinary suitable materials shall be incidental to the work of that item.
203-4.02 Unclassified Excavation and Disposal. Unclassified excavation and disposal will be measured
in cubic yards, measured to the nearest whole cubic yard, computed in the original position for all excavation within right -of-way limits. No deduction shall be made for any pipes, culverts, structure s, or other obstructions, unless these are measured for payment under another contract item. Excavation for
203-4 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 borrow of suitable materials for embankment construction, shall not be included in the computation for this work.
203-4.03 Embankment in Place. Embankment in place will be measured in cubic yards, measured to the
nearest whole cubic yard, computed in the final compacted position. Any additional quantity of material required to compensate for embankment settlement shall not be included in the measurement of this item. The quantities of embankment will exclude the total volume of pipes, culve rts, other roadway items, and granular backfill within the payment lines for such granular backfill.
203-4.04 Select Borrow. Select borrow will be measured in cubic yards, measured to the nearest whole
cubic yard, computed in the original position.
203-4.05 Select Fill. Select fill will be measured in cubic yards, measured to the nearest whole cubic
yard, computed in the final compacted position.
203-4.06 Select Granular Fill . Select granular fill will be measured in cubic yards, measured to the
nearest whole cubic yard, computed in the final compacted position. A deduction shall be made for pipes (based on nominal diameters) and other payment items when the combined cross -sectional area exceeds 1 ft2 unless otherwise shown in the contract documents. No deduction will be made for the cross -sectional area of an existing facility.
203-4.07 Select Granular Fill Slope Protection . Select granular fill slope protection will be measured
in cubic yards, measured to the nearest whole cubic yard, computed in the final position.
203-4.08 Surface Settlement Gauges . Surface settlement gauges will be measured by the number of
devices satisfactorily installed.
203-4.09 Settlement Rods . Settlement rods will be measured by the number of devices satisfactorily
installed.
203-4.10 Piezometers . Piezometers will be measured by the number of devices satisfactorily installed.
203-4.11 Applying Water . The unit of measurement of water will be one pressure distributor per
calendar day, denoted hereafter as one p.d.d., for dust control. Where the Contractor works in more than one separate and distinct shift per calendar day, each shift shall be considered as one p.d.d. A single shift plus overtime work, however, shall be considered as one p.d.d. The quantity thus determined shall be applied directly as the quantity to be paid for where the distributors used have a capacity of 3,000 gal. or less. Provided that the Engineer determines that the total operating distributor capacity (number and sizes of all distributors) employed is reasonably commensurate with the needs for water application, additional payment will be allowed for distributors exceedi ng 3,000 gal. in capacity as follows: Distributor Capacity Pressure Distributor per Calendar Day Adjustment 3,000 gal. < distributor capacity < 5,000 gal. p.d.d.'s will be multiplied by 1.5 5,000 gal. ≤ distributor capacity p.d.d.’s will be multiplied by 2.0 No additional quantity shall be measured for payment for compaction purposes.
203-4 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 203-4.12 Select Granular Subgrade . Select granular subgrade will be measured in cubic yards, measured to the nearest whole cubic yard, computed in the final compacted position.
203-4.13 Select Structural Fill . Select structural fill will be measured in cubic yards, measured to the
nearest whole cubic yard, in the final compacted position. A deduction shall be made for pipes (based on nominal diameters) and other payment items when the combined cross -sectional a rea exceeds 1 ft2 unless otherwise shown in the contract documents. No deduction will be made for the cross -sectional area of an existing facility.
203-4.14 Sand Backfill . Sand backfill will be measured in cubic yards, measured to the nearest whole
cubic yard, in the final compacted position. A deduction shall be made for pipes (based on nominal diameters) and other payment items when the combined cross -sectional area exceed s 1 ft2 unless otherwise shown in the contract documents. No deduction will be made for the cross -sectional area of an existing facility.
203-5 Basis of Payment . T
203-5.01 General -All Items. The unit price bid shall include the cost of furnishing all labor, materials,
and equipment as necessary to complete the work, except where specific costs are designated or included in another pay item of work. Incidental costs, such as acquisition of bo rrow pits or material outside of the right -of-way, rock drilling and blasting, compaction and special test requirements, stockpiling and re - handling of materials, precautionary measures to protect private property and utilities, to form and trim graded surfaces, proof rolling, re -proof rolling, corrective work disclosed by proof rolling and any delays caused by this corrective work, shall be included in the unit price of the pay item where such costs are incurred. The exception is that corrective work ordered in cut sections based on an evaluation of proof rolling will be paid for under the appropriate excavation and backfill items. Quantities for any additional items of work or substitution of material in accordance with the approved Winter Earthwork submittal shall be furnished at no cost to the State.
203-5.02 Unclassified Excavation and Disposal. The provisions of § 203-5.01 General -All Items apply
including the following: The unit price bid shall cover all costs of required excavation within the right of way limits, and all costs of disposal if the excavated materials are not used under another pay item.
203-5.03 Embankment In Place. The provisions of § 203-5.01 General -All Items apply.
203-5.04 Select Borrow. The provisions of § 203-5.01 General -All Items apply.
203-5.05 Select Fill. The provisions of § 203-5.01 General -All Items apply.
203-5.06 Select Granular Fill . The provisions of § 203-5.01 General -All Items apply.
203-5.07 Select Granular Fill Slope Protection . The provisions of § 203-5.01 General -All Items apply.
203-5.08 Surface Settlement Gauges . The provisions of § 203-5.01 General -All Items apply including
the following: The unit price bid shall cover all costs of providing, installing and maintaining each device, including excavation, trenching and backfill during the course of the work. No payment will be made under any other item of the contract for any work associated with these items. When each installation is completed, 75% of the item unit price will be paid. The remaining 25% will be paid when each device has been properly maintained and is abandoned according to the procedures
203-5 09
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 contained in the geotechnical control procedure “ Settlement Gauges and Settlement Rods ”. Unless otherwise specified in the proposal, the unit price shall also include the costs of removal.
203-5.09 Settlement Rods . The provisions of § 203-5.01 General -All Items apply including the
following: The unit price bid shall cover all costs of providing, installing and maintaining each device, including excavation, trenching and backfill during the course of the work. No payment will be made under any other item of the contract for any work associated with these items. When each installation is completed, 75% of the item unit price will be paid. The remaining 25% will be paid when each device has been properly maintained and is abandoned according to the procedures contained in the geotechnical control procedure “ Settlement Gauges and Settlement Rods ”. Unless otherwise specified in the proposal, the unit price shall also include the costs of removal.
203-5.10 Piezometers . The provisions of § 203-5.01 General -All Items apply including the following:
The unit price bid shall cover all costs of providing, installing and maintaining each device, including excavation, trenching and backfill during the course of the work. No payment will be made under any other item of the contract for any work associated with these items. When each installation is completed and the device placed in satisfactory operation, 75% of the unit price will be paid. The remaining 25% will be paid when all earthmoving and slope work is completed in the vicinity of each installation. Any installation rendered inoperative due to damage by construction equipment after partial or full payment, shall be immediately repaired or the full amount of such payment shall be deducted from other monies due the Contractor under the contract.
203-5.11 Applying Water . The unit price bid per one operating pressure distributor per calendar day for
applying water shall include the costs of furnishing all labor, material and equipment necessary for dust control.
203-5.12 Select Granular Subgrade . The provisions of § 203-5.01 General -All Items apply.
203-5.13 Select Structural Fill . The provisions of § 203-5.01 General -All Items apply.
203-5.14 Sand Backfill . The provisions of § 203-5.01 General -All Items apply.
Payment will be made under: Item No. Item Pay Unit 203.02 Unclassified Excavation and Disposal Cubic Yards 203.03 Embankment In Place Cubic Yards 203.05 Select Borrow Cubic Yards 203.06 Select Fill Cubic Yards 203.07 Select Granular Fill Cubic Yards 203.0801 Select Granular Fill, Slope Protection - Type A Cubic Yards 203.0802 Select Granular Fill, Slope Protection - Type B Cubic Yards 203.10 Surface Settlement Gauges Each 203.12 Settlement Rods Each 203.13 Piezometers Each 203.1601 Applying Water P.D.D. 203.20 Select Granular Subgrade Cubic Yards 203.21 Select Structural Fill Cubic Yards 203.25 Sand Backfill Cubic Yards
204-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 SECTION 204 - FLOWABLE FILL
204-1 DESCRIPTION. The work shall consist of mixing and placing flowable fill at the locations
shown in the contract documents.
204-1.01 Controlled Low Strength Material. Controlled Low Strength Material (CLSM) is an
acceptable alternative to compacted soil backfill in confined spaces. CLSM consists of cement, water and, at the Contractor’s option, fly ash, aggregate or chemical admixtures in any proportions such that the f inal product meets the strength and flow consistency requirements included in the specification. The mix is proportioned to be self leveling and does not require compaction. It is much lower in strength than concrete, making future excavation possible.
204-1.02 Lightweight Concrete Fill. Lightweight Concrete Fill is an engineered geotechnical material
with a unique strength / density relationship which can be used to reduce loads on soft foundation soils, buried structures, or against retaining walls. Lightweight Concrete Fill consists of a Portland cement matrix containing uniformly distributed, non -interconnected air voids introduced by a foaming agent. The flowability and cementitious properties provide a product that is self leveling and does not require compaction.
204-2 Materials .
204-2.01 Controlled Low Strength Material. Provide backfill material meeting the requirements for
CLSM as stated in §733 -01 Flowable Fill .
204-2.02 Lightweight Concrete Fill. Provide backfill material meeting the requirements for
Lightweight Concrete Fill as stated in §733 -01 Flowable Fill .
204-3 Construction Details .
204-3.01 Controlled Low Strength Material.
204-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 If the CLSM is to be placed via pumps, the placement sequence shall be such that the equipment is able to access the entire volume to be filled without separating the mixture. Keep CLSM encapsulated with soil or protected by other means so as to prevent erosion and environmental degradation.
204-3.02 Lightweight Concrete Fill.
204-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 materials to accurate proportions, either by volume or by weight, so that when the materials are incorporated in the mix, a thorough and uniform mix will result. Locate equipment such that the mixed product is capable of being pumped into place properly.
204-4 Method of Measurement .
204-4.01 Controlled Low Strength Material. CLSM will be measured for payment in cubic yards
measured to the nearest 0.1 cubic yard computed from the payment lines shown on the contract documents. A deduction will be made for pipes (based on nominal diameters) and other features when the combined cross -sectional area exceeds 1 ft2. No additional quantity shall be measured for payment to make up losses due to foundation settlement, compaction, erosion or any other cause.
204-4 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Cross sectioning, for the purpose of determining quantities for payment, will be employed only where payment lines are not shown on the contract documents or Standard Sheets, and cannot be reasonably established by the Engineer.
204-4.02 Lightweight Concrete Fill. Lightweight Concrete Fill will be measured for payment in cubic
yards measured to the nearest 0.1 cubic yard computed from the payment lines shown on the contract documents.
204-5 Basis of Payment
204-5.01 Controlled Low Strength Material. The unit price bid shall include the costs of all labor,
material, and equipment necessary to satisfactorily complete the work.
204-5.02 Lightweight Concrete Fill. The unit bid price shall include the cost of all labor, materials, and
equipment necessary to satisfactorily complete the work. Payment will be made under: Item No. Item Pay Unit 204.01 Controlled Low Strength Material (CLSM) Cubic Yard 204.02 Controlled Low Strength Material (CLSM) (No Fly Ash) Cubic Yard 204.03 Lightweight Concrete Fill (Type A) Cubic Yard 204.04 Lightweight Concrete Fill (Type B) Cubic Yard SECTION 205 - CONTAMINATED SOIL (Last Revised January 2019)
205-1 Description .
205-1.01 General. Soil contamination may include:
205-1.02 Segregation and Storage. This work shall consist of segregating contaminated soil from non -
contaminated soil during excavation, and the temporary storage and management of contaminated soil (pending sampling, analysis and ultimate disposition) in accordance with an accepted Cont aminated Material Handling Plan.
205-1 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 205-1.03 Field Organic Vapor Monitoring. This work shall consist of screening soil for contamination during excavation using field vapor monitoring equipment and observations. This work shall be performed by an independent firm hired by the Contractor and completed in accordance with an accepted Field Organic Vapor Monitoring Plan.
205-1.04 Sampling and Analysis. This work shall consist of collecting soil samples and arranging for
samples to be analyzed at a laboratory in accordance with an accepted Sampling Plan. The laboratory shall be accredited for the specified parameters by the New York State Department o f Health (NYSDOH) under the Environmental Laboratory Approval Program (ELAP). The results of the laboratory analysis will determine or confirm the final regulatory classification of the soil for appropriate handling, transpo rtation, treatment and disposal methods and requirements.
205-1.05 Transportation and Disposal. This work shall consist of transporting and disposing of
contaminated soil, and completing any other related activities, in accordance with an accepted Disposal Plan. For shipping and disposal purposes, the regulatory classification of the soil (as eithe r contaminated non-hazardous industrial waste or RCRA regulated hazardous waste) will be based on investigations conducted prior to award or based on the results of laboratory analysis included in this section.
205-1.06 Reuse of Contaminated Soil. This work shall consist of the reuse of contaminated soil within
the contract limits as embankment, fill or other appropriate on -site use. Contaminated soil areas and reuse locations, if provided , are indicated in the contract documents or shall be determined and approved by the Department. The reuse of contaminated soil may be deemed appropriate based upon the following a) an investigation conducted prior to the contract award and/or sampling and analysis conducted during project construction and the q ualification of the soil placement as a generic beneficial use determination (BUD) or b) as a site specific BUD obtained from the NYSDEC. The material must be considered suitable material as per Section 203.
205-2 Materials .
205-2.01 General. As per the Contaminated Material Handling Plan, (Section 205 -1.02).
205-2.02 Segregation and Storage. None Specified.
205-2.03 Field Organic Vapor Monitoring. Field organic vapor monitoring shall be conducted using a
photoionization detector (PID) with a 10.2eV or higher ultraviolet lamp. The PID shall have a minimum detection range of 0.1 ppm to 2,000 ppm and shall be calibrated with isobutylene or other appr opriate calibration gas. A flame ionization detector (FID) may be used in lieu of a PID if a written request and justification is submitted by the Contractor and approved by the Department. The FID shall have a minimum detection range of 1.0 ppm to 50,000 ppm and shall be calibrat ed with appropriate calibration gas.
205-2.04 Sampling and Analysis. None Specified.
205-2.05 Transportation and Disposal. None Specified.
205-2.06 Reuse of Contaminated Soil. None Specified.
205-3 Construction Details .
205-3.01 General. Work activities shall be performed in accordance with the contract documents and with
applicable Contaminated Material Handling Plan, Field Organic Vapor Monitoring Plan, Sampling Plan
205-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 and/or Disposal Plan. The Contractor shall initiate any measures necessary to protect the safety and health of workers and the general public based on the potential hazards associated with the contaminated soil.
205-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 g. Describe how potential air quality impacts such creation of dust particulates and vapors will be minimized to protect air quality within, adjacent to or downwind from the project.
205-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 b. Name, address, telephone number, and ELAP certification number of the proposed NYSDOH ELAP accredited laboratory;
205-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 (2) Name, address, experience and qualifications of each individual who will collect soil samples. Each individual shall be thoroughly trained in sampling protocols, handling and chain of custody procedures, and laboratory requirements.
205-3.02 Segregation and Storage. The Contractor shall have an accepted CMHP prior to commencing
work within potentially contaminated soil areas. Contaminated soil areas are identified in the contract documents. Soil determined to be contaminated (by PID/FID screening or observation) sha ll be segregated from non -contaminated soil and stored pending sampling, analysis and disposal. If feasible, soil with significantly higher PID/FID head space readings and soil exhibiting unusual visual or odor characteristics shall be segregated from othe r contaminated soil. The Contractor shall notify the Engineer immediately if soil is discovered that appears to contain unknown contaminants or soil that varies significantly from the type of contamination identified in the contract documents. The Departme nt will determine the preliminary regulatory classification of the suspect soil and will determine how the soil is to be managed. The Contractor shall not store contaminated soil for more than 40 calendar days, with this time limit beginning on the first day soil is placed in a stockpile, truck -bed or roll -off container. If the Engineer approves additional storage time for soil deter mined to be contaminated non -hazardous industrial waste, the Contractor shall also request approval from NYSDEC for any storage greater than 60 calendar days. If the Engineer approves additional storage time for soil determined to be RCRA regulated hazard ous waste, the Contractor shall also obtain approval from NYSDEC for any storage greater than 90 calendar days. Contaminated soil may be placed in stockpiles, trucks or roll -off containers as follows:
205-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 d. Stockpile locations shall be within the right -of-way and accepted by the Engineer prior to use.
205-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 205-3.03 Field Organic Vapor Monitoring. The Contractor shall hire an independent firm to perform field organic vapor monitoring in accordance with the accepted FOVMP. The individual conducting the monitoring, hereafter referred to as the Field Monitor, shall be experienced and thoroughly train ed in sampling protocols, organic vapor monitoring procedures, and equipment calibration procedures. The Field Monitor shall screen potentially contaminated soil during excavation using field vapor monitoring equipment (PID/FID) and visual observations. Ba sed on the screening results, the Field Monitor shall direct the Contractor on the proper segregation of the material. Field organic vapor monitoring shall be conducted when working in the contaminated soil areas identified in the contract documents, or whenever unusual or suspicious soil conditions based on visual or odor evidence are encountered during excavation. The Co ntractor or Field Monitor shall notify the Engineer immediately if soil is discovered that appears to contain unknown contaminants or soil that varies significantly from the type of contamination identified in the contract documents. (For health and safety reasons, personnel shall not evaluate odor by placing soil directly to the nose or by inhaling vapors from grab or bag samples). The Field Monitor shall calibrate the PID/FID on a daily basis prior to starting field work and shall determine a background measurement. Excavated soil shall be tested with the PID/FID at intervals that will ensure the soil is being properly assessed for contamination. The PID/FID will be used to take head space readings from bag samples with the soil temperature at least 50OF. The Field Monitor shall maintain detailed and legible field notes indicating work locations, nature of work being performed, PID/FID head space readings, time of readings, pertinent measurements, visual and odor observations, quantities of both contaminated and non -contaminated soils excavated at each location, storage/stockpile locations, work hours, weather conditions, and any un usual conditions encountered. The Contractor shall provide the Engineer with a copy of all field notes within 5 work days from their recording. The segregation threshold established below (25ppm) is based on gasoline being the predominant contaminant. If a different contaminant(s) is present or suspected, a different segregation threshold may need to be established. Alternative segregation thresho lds may be designated in the contract documents. PID/FIDs detect and measure gas concentrations (specifically volatile organic compounds); they do not quantify or identify the contaminants in the soil. Therefore, PID/FID readings can not determine specific contaminant concentrations within the soil. Segregate soil as follows:
205-3.04 Sampling and Analysis. The Contractor shall have an accepted Sampling Plan prior to
commencing work within potentially contaminated areas. Sampling shall be conducted by individuals thoroughly trained in sampling protocols, handling and chain of custody procedures, and laborat ory requirements. Accepted sampling practices shall be used to obtain representative composite sample(s) and/or grab sample(s) as required for the specific analyses to be completed. Representative samples shall be collected from stored soil as soon as pos sible after excavation. Soil shall be taken from a depth greater than one foot within the stockpile. Each composite sample shall include a minimum of four sample
205-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 points. Grab samples shall be collected in a manner so as to best characterize the extent of contamination of the soil in question and best characterize the extent of contamination of the pile. If any soil areas are present with field indications of cont amination discretely different than the other areas (i.e., significantly elevated PID/FID readings, staining, etc.), the area may require a separate sample and the Engineer shall be alerted to approve additional sample and analysis. Analyses shall be com pleted at a NYSDOH ELAP accredited laboratory that is certified to perform the required tests. Analyses shall be completed within 10 work days of sample collection. The Contractor shall provide the Engineer with a copy of all reports within 2 work days of their receipt from the laboratory. Soil shall not be added to any stockpile, truck or roll -off container after its contents have been sampled. If soil is added after sampling, or sampled soil is otherwise tampered with, the Contractor shall re-sample the soil at no additional cost to the St ate. Conduct specified analyses as follows:
205-3.05 Transportation and Disposal. The Contractor shall have an accepted Disposal Plan prior to
the transportation and disposal of contaminated soil. Contaminated soil shall not be transported until all sampling and analysis, as required by the Department or by the Disposal facility, hav e been performed and laboratory reports have been provided and accepted by the Department.
205-3.06 Reuse of Contaminated Soil. The Contractor shall place contaminated soil as embankment, fill
or other appropriate on -site use as determined and approved by the Department, and in accordance with the contract documents. Only appropriate soils placed in appropriate locations as incl uded in the contract documents shall be reused.
205-4 Method of Measurement.
205-4.01 General. (Vacant)
205-4 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 205-4.02 Segregation and Storage. The work under segregation and storage will be measured for payment on a lump sum basis.
205-4.03 Field Organic Vapor Monitoring. The quantity for payment will be in hours of field organic
vapor monitoring performed, measured to the nearest one -half hour.
205-4.04 Sampling and Analysis. The quantity to be measured for payment will be the number of soil
samples analyzed as included in the contract documents.
205-4.05 Transportation and Disposal. The quantity to be measured for payment will be in tons of
contaminated soil transported to a disposal/treatment facility, measured to the nearest 0.1 ton. If measurement of the contaminated soil by weight is not feasible, a conversion factor of 1.4 ton s per cubic yard will be used to determine the quantity for payment.
205-4.06 Reuse of Contaminated Soil. The quantity to be measured for payment will be in cubic yards
of contaminated soil stockpiled for reuse, computed to the nearest whole cubic yard.
205-5 BASIS OF PAYMENT. The price bid shall include the cost of all labor, materials and equipment
necessary to complete the work. Excavation will be paid for separately. Payment will be made under: Item No. Item Pay Unit 205.02nn Segregation and Storage of Contaminated Soil Lump Sum 205.03 Field Organic Vapor Monitoring of Contaminated Soil Hour 205.0401 Petroleum Contamination Parameter Analysis Each 205.0402 Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic Each 205.0403 Laboratory Analysis for Ignitability Each 205.0404 Laboratory Analysis for ph Each 205.0405 Laboratory Analysis for Polychlorinated Biphenyls (PCB's) Each 205.0406 Laboratory Analysis for Total Petroleum Hydrocarbons – Gasoline Range Organics Each 205.0407 Laboratory Analysis for Total Petroleum Hydrocarbons – Diesel Range Organics Each 205.0501nn Disposal of Contaminated Hazardous Waste Soil Ton 205.0502nn Disposal of Contaminated Non -Hazardous Waste Soil Ton 205.06nn Reuse of Contaminated Soil Cubic Yard Note: nn denotes serialized pay item for each discrete contaminated area of property as indicated on the plans. The serialized items allow for different plans and different disposal procedures for discretely different areas and nature of the contamination. SECTION 206 - TRENCH, CULVERT AND STRUCTURE EXCAVATION
206-1 Description .
206-1.01 General. This work shall consist of the excavation and disposal of excavated material required
for trenches, culverts, structures, conduit and direct burial cable not otherwise provided for in other sections of these specifications. All such excavation shall be unc lassified excavation as defined in §203 - 1.01. The work shall be conducted in accordance with 29 CFR 1926 Subpart P.
206-1.02 Structure Excavation. The work specified under this item shall include the excavation for all
bridge foundations, walls and other major structures.
206-1 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 206-1.03 Trench and Culvert Excavation. The work specified under this item shall include the excavation of all materials and disposal of excavated material required for trenches, culverts, pipes, manholes, drainage structures and other minor structures, conduit and direct burial cable.
206-1.04 Conduit Excavation and Backfill including Surface Restoration. The work specified under
this item shall include the excavation, necessary backfill and surface restoration required for conduits and direct burial cables.
206-1.05 Test Pits. The work specified under this item shall include the excavation and backfill of test
pits at locations shown in the contract documents, or as directed by the Engineer. Excavation and backfill methods, limits and equipment used shall be approved by the Engi neer. This work will not relieve the contractor of the responsibility to locate underground facilities as required under 16 NYCRR 753.
206-2 MATERIALS. (Not Specified).
206-3 Construction Details .
206-3.01 General. The appropriate construction details specified for “Excavation and Embankment” in
§203 -3.01 through §203 -3.14 shall apply to the work specified in this section. The excavation shall be dewatered and kept free from water, snow and ice when necessary. Special care shall be taken not to disturb the bottom of the excavation, and not to remove the material at final grade until just before the structure is placed. The provisions of §203 -3.01D Suitable Materials and/or §203 -3.01E Unsuitable Materials shall apply to all material excavated under this section. The Contractor shall carry out all excavation operations in a safe and prudent manner so that the workers, the public, and adjacent public and private property will be protected from unreasonable hazard in accordance with §107 -05K. Open Excavations and Trenches. Slopes may not be steeper than allowed by 29 CFR 1926 Subpart P. When excavation is required for the installation of conduit or direct burial cable, the Contractor shall notify the Engineer upon completion of the excavation. No conduit or cable shall be placed in the excavation until the Engineer has approved the depth and cross -section. When the Contractor, in placing conduits, direct burial cable or utilities, excavates into the pavement, subgrade, subbase, or shoulder courses, such courses must be replaced in kind, character and condition, to maintain a uniform road section, except when the Contract Documents specify that other materials shall be used.
206-3.02 Structure Excavation. The Contractor’s competent person shall verify field conditions,
including excavation depth, groundwater, and soil conditions with the Engineer in accordance with 29 CFR 1926 Subpart P prior to performing structure excavation for all bridge foundations, wa lls and other major structures.
206-3.03 Trench and Culvert Excavation. The Contractor’s competent person shall verify field
conditions, including excavation depth, groundwater, and soil conditions with the Engineer in accordance with 29 CFR 1926 Subpart P prior to performing trench and culvert excavation. For utility lines, exclusive of conduit and cable lines, of less than 12 inches in diameter, the excavation width shall be the actual bottom width necessary to properly perform the installation work required, or 3 feet, whichever is less.
206-3.04 Conduit Excavation and Backfill including Surface Restoration. When the Contractor is
required to excavate through portland cement concrete, asphalt concrete, composite pavement, or
206-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 sidewalk, a saw cut shall be made along neat lines and to the depth as shown in the contract documents or as directed by the Engineer. Any damage to existing pavement, sidewalk, curb or other facilities caused by the Contractor’s operations under this item shall be repaired by the Contractor at no additional cost to the State.
206-3.05 Test Pits. The Contractor shall excavate and backfill test pits in order to determine existing
underground utility type, size and/or condition where new utility connections to existing facilities are proposed. The Contractor shall excavate and backfill test pits in a manner approved by the Engineer that prevents damage to wrappin gs, coatings or other protective coverings, such as by hand digging, vacuum excavation or similar non -destructive locating equipment. The limits of the excavation shall be those sufficient to determine existing utility type, size and/or condition.
206-4 Method of Measurement .
206-4.01 General. The quantity of excavation will be in cubic yards, to the nearest whole cubic yard,
computed from payment lines shown on the plans or the appropriate standard sheets. Work performed beyond any designated payment line will not be included in the computation of quantities for the item involved.
206-4.02 Structure Excavation. Vacant.
206-4.03 Trench and Culvert Excavation. Unless otherwise shown or indicated on the contract plans,
payment lines for excavation of pipe and culvert lines, and minor structures will be determined as follows:
206-4.04 Conduit Excavation and Backfill including Surface Restoration. The quantity of conduit
and/or cable excavation and backfill including surface restoration for payment will be the number of
206-4 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 linear feet measured along the center of the conduit and/or cable placed, in accordance with the methods stated below. Wherever a pair or group of conduits and/or cables are physically connected together, they will be considered as a single conduit and/or cable.
206-4.05 Test Pits. The quantity to be measured for payment will be the number of test holes excavated
and backfilled in accordance with the contract documents.
206-5 Basis of Payment .
206-5.01 General. The cost for necessary guarding to protect the public from open trenches, and that
required for the protection to ensure the safety of the workers, and for any necessary excavation support shall be included in other items. No extra payment will be made for the cost of any materials excavated or placed outside the payment lines shown on the plans or as described in this specification. No extra payment will be made for excavation protection or support systems not shown in the contract plans, unless use of such systems is directed by the Engineer. With exception of the Conduit Excavation and Backfill including Surface Restoration item, the work of replacing pavement, subcourses and shoulder courses will be paid for and performed under the provisions of their respective items and subsections.
206-5.02 Structure Excavation. The unit price bid for this work shall include the cost of labor, materials
and equipment required to satisfactorily complete the work including the costs of excavation, disposal of excavated material, presplitting rock excavations where required, and keep ing the site dewatered and free from earth, water, ice and snow where necessary. Payment for Sheeting, Cofferdams or Temporary Water Diversion Structures required by the contract documents will be made in accordance with the appropriate item. Where cofferdams are specified for structure excavation, the work required to keep the site free from earth, water, ice and snow shall be included in the item for cofferdams when necessary.
206-5.03 Trench and Culvert Excavation. The unit price bid for this work shall include the cost of
labor, materials and equipment required to satisfactorily complete the work, including the costs of excavation, disposal of excavated material, presplitting rock excavations where required, and kee ping the site dewatered and free from earth, water, ice and snow when necessary.
206-5.04 Conduit Excavation and Backfill including Surface Restoration. The unit price bid for this
work shall include the cost of furnishing all labor, materials and equipment necessary to satisfactorily excavate and backfill the trench, including sawcutting, and to restore and replace any pavement, shoulder, and sidewalk cou rses, subcourses, curbs, drives, lawns and other top surfaces as required to complete the work.
206-5 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 206-5.05 Test Pits. The unit price bid for this work shall include the cost of furnishing all labor, materials and equipment necessary to satisfactorily excavate and backfill the test pit and replace any pavement, shoulder and sidewalk courses, subcourses, curbs, drives, lawn s and other top surfaces required to complete the work. Payment will be made under: Item No. Item Pay Unit 206.01 Structure Excavation Cubic Yard 206.0201 Trench and Culvert Excavation Cubic Yard 206.03 Conduit Excavation and Backfill including Surface Restoration Foot 206.05 Test Pit Excavation Each SECTION 207 - GEOSYNTHETICS
207-1 Description .
207-1.01 Geotextiles. The work shall consist of furnishing and installing approved Geotextile of the
Class and Type indicated, at the locations, and in the manner shown on the plans or as directed by the Engineer, in writing, prior to performing the work.
207-1.02 Geomembranes. The work shall consist of furnishing and installing approved Geomembrane ,
includ ing the preparation of the surface upon which the Geomembrane is placed, at the locations and in the manner shown on the plans or as directed by the Engineer, in writing, prior to performing the work.
207-1.03 Prefabricated Composite Drains for Structures. The work shall consist of furnishing and
installing an approved Prefabricated Composite Structural Drain (PCSD) or Prefabricated Composite Integral Abutment Drain (PCIAD) as specified at the location (s) shown on the contract documents or as directed by the Engineer, in writing, prior to performing the work. Prior to installation, the Contractor shall furnish the Engineer with copies of the manufacturer’s literature with details and installation requirements for the PCSD or PCIAD. If not included in the manufacturer’s literature, a letter identifying the geote xtile wrap shall also be provided to the Engineer.
207-2 MATERIALS. Materials shall meet the requirements specified in the following subsections of
Section 700 – Materials. Geotextiles §737 -01 Geotextile Bedding §737 -01 A. Geotextile Separation §737 -01 B. Geotextile Drainage §737 -01 C. Geotextile Slope Protection §737 -01 D. Geotextile Stabilization §737 -01 E. Turbidity Curtain §737 -01 F. Silt Fence §737 -01 G. Geomembranes §737 -02 Prefabricated Composite Structural Drains §737 -04 Prefabricated Composite Integral Abutment Drains §737 -05 Materials shall be subject to the Department’s Quality Assurance (QA) program outlined in Section 737.
207-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Adhesives used for joining geotextiles shall be fast -tacking, not be detrimental to the performance, lifespan or function of the geotextile, and c reate a bond strong enough to meet AASHTO M288 requirements for seam efficiency.
207-3 Construction Details .
207-3.01 Geotextiles .
207-3.02 Geomembranes. The Geomembrane shall be protected during transport and storage. The
surface upon which the Geomembrane is to be placed shall be within reasonable conformity to the proposed grade. Traffic or construction equipment will not be permitted directly on the Geo membrane. Care shall be exercised by workers when walking or working on the Geomembrane. Seams shall be sealed as per the manufacturer's recommendations and to the satisfaction of the Engineer. The edges of the Geomembrane shall be secured in the manner shown on the contract plans or as directed by the Engineer.
207-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Geomembrane which becomes torn or damaged shall be replaced or patched as ordered by the Engineer. The patch shall extend 3 ft. beyond the perimeter of the tear or damage and the seams shall be approved by the Engineer.
207-3.03 Prefabricated Composite Drains for Structures. The Contractor shall install the drain in
conformance with the manufacturer’s installation procedures. The drain shall be installed so that the backfill, when placed, will be in contact with the geotextile and forms a continuous drainage layer without interruption within the drain’s plane. In installations where concrete is to be poured against the prefabricated composite drain, only drains with impermeable cores will be allowed. At all locations, a positive outlet for the water in the drain shall be provided. This may involve making a hole in the core at the weep hole locations for approved drains with an impermeable core. Do not puncture the geotextile. Any damaged geotextile shall be repaired. Adhesive shall be applied to the wall surface, and not directly to the drain. During all periods of shipment and storage, the drain shall be wrapped and protected from direct exposure to sunlight, mud, dirt and debris. Care shall be exercised while backfilling to prevent damage to the drain. Repairs or replacements of drain damaged by construction operations shall be performed, as directed by the Engineer, at no cost to the State.
207-4 Method of Measurement .
207-4.01 Geotextiles .
207-4.02 Geomembranes. The quantity of Geomembrane will be the number of square yards c omputed
from the payment lines indicated in the contract documents. Measurement will not be made for Geomembranes used for repairs, seams, or overlaps.
207-4.03 Prefabricated Composite Drains for Structures. The quantity of PCSD or PCIAD will be
measured in square yards installed computed from the payment lines indicated in the contract documents.
207-5 Basis of Payment .
207-5.01 Geotextiles. The unit price bid shall include the cost of furnishing all labor, equipment, and
materials necessary to complete the work, including the cost of preparing the surface upon which the Geotextile is placed. No payment will be made for replacement or repairs.
207-5.02 Geomembranes. The unit price bid shall include the cost of furnishing all labor, materials, and
equipment necessary to satisfactorily complete the work, i ncluding the cost of preparing the surface upon which the Geomembrane is placed and securing the edges of the Geomembrane. No payment will be made for replacement or repairs.
207-5 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 207-5.03 Prefabricated Composite Drains for Structures. The unit price bid shall include the cost of furnishing all labor, equipment, and material necessary to complete the work. No payment will be made for repairs or replacement. Payment will be made under: Item No. Item Pay Unit 207.20 Geotextile Bedding Square Yard 207.21 Geotextile Separation Square Yard 207.22 Geotextile Drainage Square Yard 207.23 Geotextile Slope Protection Square Yard 207.24 Geotextile Stabilization Square Yard 207.25 Geomembrane Square Yard 207.26 Prefabricated Composite Structural Drain Square Yard 207.27 Prefabricated Composite Integral Abutment Drain Square Yard SECTION 208 - STORMWATER MANAGEMENT PRACTICES (Last Revised May 2022)
208-1 DESCRIPTION . The work shall include furnishing, installing, maintaining, and cleaning
stormwater management practices, in accordance with the contract documents and as directed by the Engineer.
208-1.01 General .
208-1 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 hydrocarbons, nutrients and/or metals collected by the practice.
208-1.02 SWTD. The work shall include furnishing, installing, and maintaining a SWTD, in accordance
with the contract documents and as directed by the Engineer.
208-1.03 Cleaning SWTD. The work shall include cleaning SWTDs in accordance with the contract
documents and as directed by the Engineer.
208-2 Materials.
208-2.01 General. None specified
208-2.02 SWTD. The materials shall meet the requirements of the following subsections of Section 700,
Materials and Manufacturing . Stormwater Treatment Device 738-01 The Contractor shall provide a SWTD that is:
208-2.03 Cleaning SWTD. None specified.
208-3 Construction Details.
208-3.01 General. The Contractor shall inspect and maintain the stormwater management practices for
the duration of the contract. The schedule for inspecting and maintaining each stormwater management practice shall be per the manufacturer’s recommendations to sustain prac tice performance and efficiency, and/or as indicated in the contract documents. Inspection and maintenance shall be included in the cost of the payment item. The Contractor shall keep a record of stormwater management practice inspections and maintenance. Stormwater management practices not performing to manufacturer’s defined efficiency standards shall be repaired or replaced at no additional cost to the Stat e.
208-3.02 SWTD . The Contractor shall install and maintain the SWTD in accordance with manufacturer
recommendations and the contract documents.
208-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 C. Submittals . A minimum of two weeks prior to installation, the Contractor shall provide a copy of the manufacturer’s cut sheets, installation details, and operations and maintenance manuals for each SWTD unit type. Electronic copies are acceptable.
208-3.03 Cleaning SWTD. Cleaning shall be performed during dry weather. Entry into the SWTD or
nearby drainage structure may be necessary to complete the work described under this specification. SWTDs and other subsurface stormwater drainage devices are confined spaces. Entr y into confined spaces requires compliance with OSHA safety procedures (29 CFR 1910.146 and 29 CFR 1926.21) and NYS Industrial Code Rules 12 and 23. The Contractor shall ensure that employees wear all required personal protective equipment (PPE) when perf orming this work.
208-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. Inspection . In the presence of the Engineer, the Contractor shall open the SWTD access and make a visual inspection. The Contractor shall determine if the device’s inlet and/or outlet is submerged. If the inlet/outlet is submerged, the pipe(s) connecting to the S WTD shall be plugged using a standard rubber expandable plug, or other type of approved fabricated plug. The depth of accumulated sediment in each device shall be measured with a probe and recorded.
208-4 Method of Measurement.
208-4.01 General. Vacant.
208-4.02 SWTD. The work will be measured as the number of each SWTD installed and maintained.
208-4.03 Cleaning SWTD. The work will be measured as the number of each SWTD cleaned.
208-5 Basis of Payment.
208-5.01 General. Vacant.
208-5.02 SWTD. The unit price bid for each SWTD shall include the cost of all labor, materials and
equipment necessary to satisfactorily complete the work, including manhole frames and covers, and SWTD cleaning and maintenance.
208-5 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. Backfill. Backfill of drainage structures and leaching basins will be paid for under the item(s) shown in the contract documents.
208-5.03 Cleaning SWTD. The unit bid price per each SWTD cleaned shall include the cost of
furnishing all labor, materials, equipment, transport and disposal necessary to satisfactorily complete the work. Progress payments will be made upon the satisfactory cleaning of the SWTD at 75% of the unit price bid. The remaining percentage will be paid after the Engineer has verified and checked quantities on receipts for all wastes received by the disposal facili ties. Payment will be made under: Item No. Item Pay Unit 208.5101 SWTD - Maximum Treatment Flow Rate up to 1.0 cfs Each 208.5201 SWTD - Maximum Treatment Flow Rate over 1.0 cfs up to 2.0 cfs Each 208.5301 SWTD - Maximum Treatment Flow Rate over 2.0 cfs up to 2.8 cfs Each 208.5401 SWTD - Maximum Treatment Flow Rate over 2.8 cfs up to 3.8 cfs Each 208.5501 SWTD - Maximum Treatment Flow Rate over 3.8 cfs up to 5.0 cfs Each 208.5601 SWTD - Maximum Treatment Flow Rate over 5.0 cfs up to 7.0 cfs Each 208.5701 SWTD - Maximum Treatment Flow Rate over 7.0 cfs up to 10.0 cfs Each 208.5801 SWTD - Maximum Treatment Flow Rate over 10.0 cfs up to 15.0 cfs Each 208.5901 SWTD - Maximum Treatment Flow Rate over 15.0 cfs up to 25.0 cfs Each 208.60 Cleaning Stormwater Treatment Device Each SECTION 209 - SOIL EROSION AND SEDIMENT CONTROL (Last Revised January 2019 )
209-1 DESCRIPTION. This work shall consist of furnishing, installing, inspecting, maintaining, and
removing soil erosion and sediment control measures as shown on the contract documents and as directed by the Engineer.
209-1.01 Erosion Control. Erosion Control is any action taken to reduce soil erosion and control
sedimentation, including the use of mulch, straw/wood fiber mulch, seed and mulch, seed and straw/wood fiber mulch, rolled erosion control products, soil stabilizers, and pipe slope dra ins.
209-1.02 Sediment Control. Sediment Control is any action taken to minimize suspended solid material
transport by water, including the use of sediment traps, turbidity curtains, sediment filter logs, silt fence, check dams, drainage structure inlet protection, and stabilized constru ction entrance/exits.
209-2 Materials.
209-2.01 General. None specified.
209-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 209-2.02 Mulch -Temporary. The materials shall meet the requirements of the following subsections of §700 Materials and Manufacturing . Straw 713-19 Wood Fiber Mulch 713-11
209-2.03 Seed -Temporary. The materials shall meet the requirements of the following subsections of
§700 Materials and Manufacturing . Seeds 713-04 Water 712-01 Seed shall be ryegrasses (annual or perennial) or cereal grasses suitable for the area as a temporary cover and which will not compete with the grasses sown later for permanent cover.
209-2.04 Check Dams. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Stone Filling 733-21 Coarse Aggregate 703-02 Sediment Filter Logs 713-20 Geotextile 737-01
209-2 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Stone shall meet the requirements of §703 -02 Coarse Aggregate , size designation 1 as described in Table 703 -4. Stone filling shall be placed over the geotextile apron. Refer to the standard sheets for additional information.
209-2.05 Linear Measures. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing. Geotextiles 737-01 Sediment Filter Logs 713-20
209-2.06 Sediment Traps -Temporary. The materials shall meet the requirements of the following
subsections of §700 Materials and Manufacturing : Stone Filling 733-21 Geotextile 737-01
209-2 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Sieve Size Percent Passing by Weight 6 inch 90 – 100 3/4 inch 50 – 100 1/4 inch 40 – 90 #40 30 – 85 #200 25 - 75
209-2.07 Pipe Slope Drain -Temporary. The materials shall meet the requirements of the following
subsections of §700 Materials and Manufacturing . Smooth Interior Corrugated Polyethylene Pipe 706-12 Corrugated Interior Polyethylene Pipe 706-14 Corrugated Steel Pipe 707-02 Corrugated Aluminum Pipe 707-13 Stone Filling 733-21 Coarse Aggregate 703-02 Geotextile 737-01
209-2 08
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 A. Pipe. The pipe shall be corrugated plastic pipe per §706 -14 or corrugated metal pipe (CMP) per §707 -02 or 707 -13 or other material as approved by the Engineer. The pipe shall have soil-tight or better connections. Refer to the standard sheets for direction on pipe sizes.
209-2.08 Rolled Erosion Control Products and Soil Stabilizers. The materials shall meet the
requirements of the following subsections of Section 700 Materials and Manufacturing. Rolled Erosion Control Products and Soil Stabilizers 713-07 The Type and Class shall be as specified in the contract documents.
209-2.09 Stabilized Construction Access Construction Entrance/Exit -Temporary . The materials shall
meet the requirements of the following subsections of this Section and §700 Materials and Manufacturing . Straw 713-19 Wood Fiber Mulch 713-11 Seeds 713-04 Water 712-01 Coarse Aggregate 703-02 Geotextiles 737-01
209-2 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. Crushed Stone or Gravel. Crushed stone or gravel shall meet the requirements of size designation #3 on Table 703 -4.
209-2.10 Turbidity Curtain -Temporary. The materials shall meet the requirements of the following
subsections of §700 Materials and Manufacturing. Turbidity Curtain 737-01F. The Turbidity Curtain shall be a commercially available, pre -assembled system, including a geotextile, flotation system, bottom weight, and anchoring and securing mechanism. If assembled in panels, it shall include a secure mechanism for joining panels tog ether. Hemmed pockets shall be sewn or heat bonded to contain flotation material, bottom weights, and for anchor lines. The flotation material shall maintain buoyancy if punctured or cut. The bottom weight shall be sufficient to hold the curtain in a vertical position. For sites not subject to tidal or heavy wave action, the curtain shall be capable of molding to conform to bottom contours so that suspended sediment is prevented from escaping underneath the curtain. Anchorage lines shall be provided of suff icient strength and number to support the curtain and maintain it in position under normally expected conditions. End anchors shall be provided, with intermediate anchor points (for stakes or anchors) such that unanchored spans do not exceed 100 feet, suff icient to maintain the turbidity curtain in place. Where the turbidity curtain is constructed in panels, anchor -line and shackle connections securing the panels together shall be sufficient for normally expected current, wind, or wave conditions.
209-2.11 Drainage Structure Inlet Protection -Temporary. The materials shall meet the requirements
of the following subsections of Section 700 Materials and Manufacturing. Coarse Aggregate 703-02 Geotextiles 737-01 Sediment Filter Logs 713-20
209-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 3. Fasteners. Fasteners shall be heavy duty staples, hog rings, tie wires, or any other fastener compatible with the post material.
209-3 Construction Details.
209-3.01 General. In the event of conflict between these requirements and pollution control laws, rules,
regulations or permit conditions by other federal or state agencies, the more restrictive shall apply. Soil erosion and sediment control shall be performed consistent with §107 -12 Water Quality Protection and included as part of the construction schedule submitted by the Contractor in accordance with §108 -01 Start and Progress of Work. To the extent practicable, this work shall be coordinated with other items of work specified elsewhere in the contract documents. The intent is to assure effective and continuous erosion and sediment control throughout the construction phase and post cons truction to reduce the impacts of soil loss on receiving waters and adjacent properties.
209-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Sediment controls shall be installed prior to performing grubbing, excavation, and borrow or fill operations, except for those actions necessary to install the sediment controls. The Contractor shall limit the area of clearing and grubbing, excavation, bor row and embankment operations in progress commensurate with their capability to minimize erosion and sediment transport and keep the finish grading, mulching, seeding and other temporary and/or permanent control measures current in accordance with the appr oved schedule. The Engineer may determine that a potential for erosion or sediment transport exists and direct the Contractor to install temporary erosion controls earlier. When permanent soil erosion and sediment control measures cannot be installed due t o seasonal or other limitations, temporary soil erosion and sediment control measures shall be installed. Prior to removing or disturbing any erosion or sediment control measure that may be required to be reestablished due to continual grading operations, the Contractor shall verify the proposed progression of operations and the reestablishment of control measures with the Engineer to ensure the continuity of erosion and sediment control. Sediment control measures shall not be removed without the Engineer’s approval.
209-3.02 Mulch -Temporary. The Contractor shall have the capability to mulch any disturbed areas on
any given day (e.g., those areas where earthwork operations are ongoing, etc.). The Contractor shall apply mulch on disturbed areas consistent with the approved project schedule or no later than seven days after grading. Straw mulch shall be spread uniformly in a continuous blanket at a rate of 2 tons per acre. Wood fiber mulch shall be applied at a rate of 1.5 tons per acre. Mulch may be spread by hand, mecha nical spreaders, or blowers.
209-3.03 Seed and Mulch -Temporary. The Contractor shall apply seed and mulch on disturbed areas
that will remain idle for more than fourteen days and regraded at a later date. The Contractor shall clean all equipment involved in seeding to remove all unwanted plants, seeds and propagules p rior to starting work.
209-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Prior to the application of seed, all areas where compaction has occurred shall be scarified. The seed bed shall be loose and friable for positive seed retention. The Contractor shall spread ryegrass at a rate of 30 pounds per acre or cereal grasses spread at a rate of 100 pounds per acre to uniformly cover the ground. The Contractor shall evenly distribute seed by any method of sowing that does not injure the seed s in the process of spreading. The Contractor shall spread mulch immediately following application of seed. If using straw mulch, it shall be spread uniformly in a continuous blanket at an approximate rate of 2 tons per acre by hand, or by mechanical spreaders or blowers. Mulch and seed shall not be placed simultaneously, except in the case of hydroseeding. The Contractor shall secure straw mulch to the soil surface by crimping or applying a soil stabilizer immediately after mulching, then water the seeded area. The application of water shall not result in damage to the seeded area including the redistribution of seeds (congregating seeds as a result of ponding or pooling water) or soil erosion (rilling). The Contractor shall water the temporary seed and mulch area until seed has germinated. Maintenance of temporary seed and mulch areas shall include re -seeding, as necessary, to achieve temporary stabilization.
209-3.04 Check Dams. Check dams shall be constructed in accordance with the standard sheets and to
the dimensions and locations shown in the contract documents. A bedding type geotextile (§737 -01 Geotextiles ) or stone (§733 -21 Stone Filling, Light or §703 -02 Coarse Aggregate ) scour protection shall be placed as indicated in the contract documents. Temporary Silt Dike check dams shall be attached to the ground with wire staples. Staples shall be placed according to Manufacturer’s instructions. Sediment Filter Log prefabricated check dams shall be installed according to Manufacturer’s instructions. Sediment Filter Logs shall be removed at the end of the contract, unless noted otherwise in contract documents.
209-3.05 Linear Measures. Linear measures shall be constructed in accordance with the standard sheets
and to the dimensions and locations shown in the contract documents.
209-3.06 Sediment Trap -Temporary. Sediment traps shall be constructed in accordance with the
standard sheets and to the dimensions and locations shown in the contract documents. The area under which the berm will be constructed shall be cleared, grubbed and stripped of any vegetation and root mat. The pool area shall be cleared of woody vegetation. All work shall be performed in accordance with §201 Clearing and Grubbing and paid for separately.
209-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Proctor Maximum Density. Impervious embankment material shall then be deposited in lifts not exceeding 8 inches and compacted to not less than 95 percent of Standard Proctor Maximum Density. The moisture content of all impervious embankment material shall not be greater than 2 percent above Optimum Moisture Content as determined by AASHTO T -99 Standard Method of Test for Moisture -Density relations of Soils using a 5.5 pound Rammer and a 12 inch Drop, Method C at the time of compaction.
209-3.07 Pipe Slope Drain -Temporary. Pipe slope drain shall be installed in accordance with the
contract documents and standard sheets. Additional right -of-way may be required to accommodate this practice.
209-3.08 Rolled Erosion Control Products and Soil Stabilizers. Rolled Erosion Control products and
Soil Stabilizers shall be installed or applied as specified in the contract documents and/or according to Manufacturer’s instructions. For areas at final grade, all loose stones, clods, sticks, or other undesirable mater ial shall be removed in accordance with the Manufacturer’s recommendations or as specified in the contract documents. Where topsoil is specified, the rolled erosion control product will be inst alled within 2 work days of topsoil placement and soil stabilizers shall be applied according to Manufacturer’s instructions.
209-3 09
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 (2) An approved RECP (Class I or II)
209-3.09 Stabilized Construction Access Construction Entrance/Exit -Temporary . Stabilized
Construction Access Construction entrances/exits shall be placed where shown in the contract documents and constructed in accordance with the standard sheets, or as otherwise approved by the Engineer. The Contractor shall grade, including excavating or placing fill, to prepare the original ground surface for the placement of a stabilized pad of at least 6 inches of coarse aggregate material, underlain by a geotextile. If necessary, a drainage pipe shall be installed to maintain the capacity of the ditch. The pipe dimension shall be consistent with the modified soil erosion and sediment control plan approved by the Engineer. All areas cut or filled and not stabilized by the construction Entrance/Exit stabilized construction access material shall be covered with an erosion control treatment (temporary mulch, temporary seed and mulch, etc.) and shall be included in this pay item. When wheel washing is performed, the washing area shall be located away from the construction entrance/exit stabilized construction access in an area which will drain into an approved sediment control measure(s). The construction entrance/exit stabilized construction access shall be maintained in a condition which will prevent tracking or flowing of sediment onto a paved public roadway. All sediment spilled, dropped, washed or tracked onto paved public roadway shall be removed immediately. In the event the stabilized construction access entrance/exit is no longer performing properly (i.e. the entrance/exit course aggregate becomes clogged with sediment), the Contractor shall top -dress the stabilized construction access entrance/exit with additional coarse aggregate material.
209-3.10 Turbidity Curtain -Temporary.
209-3 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 3. If constructed in panels, panels shall be connected in such a manner as to prevent suspended particles passing through joints. Load lines shall be connected so as to develop the full strength of the line across the joint.
209-3 11
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 3. The turbidity curtain shall remain in place until the protected construction activities have ceased and there is no visible contrast between the water being contained and the water body being protected.
209-3.11 Drainage Structure Inlet Protection -Temporary. Drainage structure inlet protection shall be
placed where shown in the contract documents and constructed in accordance with the standard sheets.
209-4 Method of Measurement.
209-4.01 General. Vacant.
209-4.02 Mulch -Temporary. The quantity to be measured for payment will be in square yards to the
nearest whole square yard of mulch -temporary installed.
209-4.03 Seed and Mulch -Temporary. This work will be measured in square yards to the nearest whole
square yard of seed and mulch -temporary installed.
209-4.04 Check Dam.
209-4.05 Linear Measures. The work will be measured as the number of linear feet to the nearest whole
linear foot of silt fence or sediment filter logs installed. No additional measurement will be made for seams or overlaps.
209-4.06 Sediment Traps -Temporary. The work will be measured as the number of sediment traps
installed.
209-4.07 Pipe Slope Drains -Temporary. The work will be measured as the number of pipe slope drains
installed.
209-4.08 Rolled Erosion Control Products and Soil Stabilizers. The work will be measured as the
number of square yards to the nearest square yard of rolled erosion control products and soil stabilizers installed.
209-4.09 Stabilized Construction Access Construction Entrance/Exit -Temporary . The work will be
measured as the number of square yards to the nearest square yard of construction stabilized construction access entrance/exit installed.
209-4 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 209-4.10 Turbidity Curtain -Temporary. This work will be measured in linear feet, to the nearest whole linear foot, of turbidity curtain installed.
209-4.11 Drainage Structure Inlet Protection -Temporary. This work will be measured as the number
of linear feet to the nearest whole linear foot of drainage structure inlet protection installed. No additional measurements will be made for seams or overlaps.
209-5 Basis of Payment.
209-5.01 General. The unit price bid for all work items shall include the cost of all labor, equipment, and
materials necessary to satisfactorily complete the work, including the cost of removal of accumulated sediment. Progress payments will be made for all sediment control measures as follows: Seventy -five percent of the price bid will be paid after installation of Check Dams, Silt Fence -Temporary, Construction Entrance/Exit -Temporary Stabilized Construction Access , Drainage Structure Inlet Protection - Temporary, Sediment Filter Logs and Turbidity Curtain -Temporary. Fifty percent of the price bid will be paid after installation of Sediment Traps and Pipe Slope Drains. The remaining percentage will be paid when the te mpora ry practice is removed and the remaining area is permanently stabilized. Payment for Mulch -Temporary, Seed and Mulch -Temporary and Rolled Erosion Control Products and Soil Stabilizers will be paid in full after installation of the practice.
209-5.02 Mulch -Temporary. The unit price bid per square yard of mulch -temporary shall include the
cost of all labor, equipment, and materials necessary to satisfactorily complete the work.
209-5.03 Seed and Mulch -Temporary. The unit price bid per square yard seed and mulch -temporary
shall include the cost of all labor, equipment, and materials necessary to satisfactorily complete the work.
209-5.04 Check Dams. The unit price bid for check dams shall include the cost of all labor, material and
equipment necessary to satisfactorily complete the work.
209-5.05 Linear Measures. The unit price bid for silt fence -temporary or sediment filter logs shall
include the cost of all labor, materials and equipment necessary to satisfactorily complete the work.
209-5.06 Sediment Traps -Temporary. The unit price bid for sediment traps -temporary shall include the
cost of all labor, material and equipment necessary to satisfactorily complete the work. Temporary seed and mulch and rolled erosion control product will be paid for separately.
209-5.07 Pipe Slope Drains -Temporary. The unit price bid for pipe slope drains -temporary shall include
the cost of all labor, material and equipment necessary to satisfactorily complete the work, including gravel bags, stone, sediment filter logs, manufactured silt dikes and/or other materials necessary to construct the practice.
209-5.08 Rolled Erosion Control Products and Soil Stabilizers. The unit price bid for rolled erosion
control products and soil stabilizers shall include the cost of all labor, material and equipment necessary to satisfactorily complete the work.
209-5.09 Stabilized Construction Access Construction Entrance/Exit -Temporary . The unit price bid
for stabilized construction access construction entrance/exit -temporary shall include the cost of all labor, material and equipment necessary to satisfactorily complete the work. Payment will not be made for construction entrances associated with the Contractor’s facilities (e.g., staging areas, storage yards, borrow sites, etc.).
209-5 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2
209-5.10 Turbidity Curtain -Temporary. The unit price bid for turbidity curtain -temporary shall include
the cost of all labor, materials, and equipment necessary to satisfactorily complete the work.
209-5.11 Drainage Structure Inlet Protection -Temporary. The unit price bid for drainage structure
inlet protection – temporary shall include the cost of all labor, materials, and equipment necessary to satisfactorily complete the work. Payment will be made under: Item No. Item Pay Unit 209.100101 Mulch -Temporary Square Yard 209.100102 Seed -Temporary Square Yard 209.1003 Seed and Mulch -Temporary Square Yard 209.110101 Check Dam (Ditch Bottom Width 0.0 to 3′), Stone -Temporary Each 209.110102 Check Dam (Ditch Bottom Width >3′ to 6′), Stone -Temporary Each 209.110103 Check Dam (Ditch Bottom Width >6′ to 10′), Stone -Temporary Each 209.110104 Check Dam (Ditch Bottom Width >10′), Stone -Temporary Each 209.110201 Check Dam (Ditch Bottom Width 0.0 to 3′), Gravel Bag -Temporary Each 209.110202 Check Dam (Ditch Bottom Width >3′ to 6′), Gravel Bag -Temporary Each 209.110203 Check Dam (Ditch Bottom Width >6′ to 10′), Gravel Bag -Temporary Each 209.110204 Check Dam (Ditch Bottom Width >10′), Gravel Bag -Temporary Each 209.1105 Check Dam, Prefabricated -Temporary Foot 209.110601 Check Dam, (Ditch Bottom Width 0.0 to 3′), Stone -Permanent Each 209.110602 Check Dam, (Ditch Bottom Width >3′ to 6′), Stone -Permanent Each 209.110603 Check Dam, (Ditch Bottom Width >6′ to 10′), Stone -Permanent Each 209.110604 Check Dam, (Ditch Bottom Width >10′) Stone -Permanent Each 209.13 Silt Fence -Temporary Foot 209.1401nn Sediment Trap, Earth Berm -Temporary Each 209.1402nn Sediment Trap, Sand Bag -Temporary Each 209.1403nn Sediment Trap, Ditch Dam -Temporary Each 209.1501 Turbidity Curtain -Temporary Foot 209.160103 Pipe Slope Drain, 12" -Temporary Each 209.160105 Pipe Slope Drain, 18" -Temporary Each 209.160106 Pipe Slope Drain, 24" -Temporary Each 209.1701 Drainage Structure Inlet Protection, Silt Fence -Temporary Foot 209.1702 Drainage Structure Inlet Protection, Gravel Bag -Temporary Cubic Yard 209.1703 Drainage Structure Inlet Protection, Prefabricated -Temporary Foot 209.1704 Drainage Structure Inlet Protection, Concrete Block -Temporary Foot 209.1705 Drainage Structure Inlet Protection, Excavated -Temporary Foot 209.1801 Rolled Erosion Control Product, Class I Type A, Short Term Square Yard 209.1802 Rolled Erosion Control Product, Class I Type B, Short Term Square Yard 209.1803 Rolled Erosion Control Product, Class I Type C, Short Term Square Yard 209.1901 Rolled Erosion Control Product, Class II Type A, Intermediate Square Yard 209.190201 Rolled Erosion Control Product, Class II Type B, Intermediate Square Yard 209.190301 Rolled Erosion Control Product, Class II Type C, Intermediate Square Yard 209.1904 Rolled Erosion Control Product, Class II Type D, Intermediate Square Yard 209.200101 Turf Reinforcement Mats, Class III Type A, Permanent Square Yard 209.200201 Turf Reinforcement Mats, Class III Type B, Permanent Square Yard 209.200301 Turf Reinforcement Mats, Class III Type C, Permanent Square Yard 209.200401 Turf Reinforcement Mats, Class III Type D, Permanent Square Yard 209.2101 Soil Stabilizers, Class IV Type A Square Yard
209-5 11
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 209.2102 Soil Stabilizers, Class IV Type B Square Yard 209.22 Stabilized Construction Access Square Yard 209.2103 Soil Stabilizers, Class IV Type C Square Yard 209.2301 Sediment Filter Log, 12″ Foot 209.2302 Sediment Filter Log, 18″ to 20″ Foot 209.2303 Sediment Filter Log, 24″ Foot NOTE: nn denotes serialized pay item. These items will be paid for within established size groups. SECTION 210 - REMOVAL AND DISPOSAL OF ASBESTOS -CONTAINING MATERIAL (BUILDINGS, BRIDGES AND HIGHWAYS)
210-1 DESCRIPTION. This work shall consist of removal and disposal of asbestos - containing
material (ACM) from locations designated in the Contract Documents and/or where directed by the Engineer. Additional contract -specific requirements may be found on the plans or in the proposal in a Special Note entitled "Asbestos Remediation Supplemental Requirements.”
210-2 MATERIALS. All materials used in the performance of the work shall comply with all
applicable regulatory standards. Respirators and filters shall comply with NIOSH and MSHA standards. HEPA filtration systems shall comply with ANSI Z9.2 -79.
210-3 CONSTRUCTION DETAILS. Prior to beginning any work under this item, the Contractor shall
supply the Engineer with proof that the firm performing the work has a valid asbestos handling license; that its insurance coverage whether provided by the Contractor or the Asbestos Subc ontractor, is consistent with §107 -06 Insurance and includes an asbestos -specific, occurrence -type policy with no deductible or sunset clause; that its project supervisor is a NYSDOL certified asbestos project supervisor; that al l employees engaged in the work are properly certified and have current physical examinations and respirator fit tests; and that the proper notification of work beginning on the asbestos project has been given to the New York State Department of Labor (NYS DOL) and the United States Environmental Protection Agency (USEPA). The Contractor shall schedule a coordination meeting between the Asbestos Subcontractor and the Department contracted Asbestos Project Monitor to be held at least two (2) weeks before the start of any asbestos abatement work. The meeting shall be held at the Engineer’s Field Office unless otherwise approved by the Engineer. The Contractor shall remove and dispose of ACMs in accordance with 12 NYCRR 56 or, if indicated, an approved variance thereof promulgated by the New York State Department of Labor (NYSDOL); the National Emission Standards for Hazardous Air Pollutants (NES HAP), promulgated by the United States Environmental Protection Agency (USEPA); and the Occupational Safety and Health Administration (OSHA). In the event of a conflict between these specification requirements and laws, rules and regulations of Federal, State, or local agencies, the more restrictive shall apply. ACM shall be disposed of in accordance with 40 CFR Part 61 and all other requirements and laws, rules, and regulations of applicable Federal, State, or local agencies. Disposal sites which accept ACM for disposal shall be permitted by the New York State D epartment of Environmental Conservation (NYSDEC). If disposed of out -of-state, the rules, regulations, and laws of that state shall apply. After the work is completed, the Contractor shall provide the Engineer with two copies of Daily Logs, Visitor Logs, Final Visual Inspection Logs and OSHA Air Monitoring records. The Contractor shall also provide the Engineer with a written certification t hat the material was disposed of in an approved waste disposal site. For friable waste this certification shall be in the form of a Waste Shipment Record. For non-friable waste this certification shall include the name and address of the waste disposal s ite or sites used.
210-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 210-4 METHOD OF MEASUREMENT. The quantity of ACM to be measured for payment will be determined by one of the following methods:
210-4.01 Square Foot . The quantity to be measured will be the area, measured to the nearest 0.1 square
foot, of asbestos -containing material removed and disposed of.
210-4.02 Foot . The quantity to be measured will be the length, measured to the nearest 0.1 foot, of
asbestos -containing material removed and disposed of.
210-4.03 Lump Sum . The quantity will be measured for payment on a lump sum basis.
210-4.04 Fixed Price Lump Sum. The lump sum shown in the itemized proposal for this item will be
considered the price bid even though payment will be made for the work performed. Should the amount shown be altered, the altered figures will be disregarded and the original price will be used to determine the total contract bid amount. Payments will be based on one or both of the following:
210-5 BASIS OF PAYMENT. Payment for the work under this specification shall include all labor,
materials, equipment, and asbestos -related fees and insurances necessary to satisfactorily complete the work. Payment shall not include Work Zone Traffic Control devices outside the regulated asbestos work area.
210-5.01 Square Foot , Foot , or Lump Sum Bid Items. Payment for 75% of the completed quantity
will be made upon the Project Monitor's written concurrence with the Contractor's certification as to the following: that the building, structure, and/or highway is visually free of asbestos; that the removal of the asbestos containing material was performed as required; that the final clearance air monitoring results meet the acceptable level specified in 12 NYCRR 56; and, that the building(s), bridge(s), and/or highway(s) are certified by the asbestos Contractor to be available for normal demolition. The remainder of the payment for completed work will be made upon receipt by the Engineer of a certified statement from the disposal facility, signed by an official thereof, that the asbestos -containing material has been accepted and disposed of in accorda nce with all applicable laws, codes, rules, and regulations.
210-5.02 Fixed Price Lump Sum. The fixed price lump sum published in the proposal is an amount
estimated by the State to be adequate to complete the work. Payments under this work will be made by Force Account or by Agreed Price, or by a combination thereof. Payment for 75% of the Agreed Price or Force Account charges will be made upon the Project Monitor's written concurrence with the Contractor's certification that the building, structure, and/or highway is visually free of asbestos; the removal of the asbe stos containing material was performed as required; that the final clearance air monitoring results meet the acceptable level specified in 12 NYCRR 56; and, that the building(s), bridge(s), and/or highway(s) are certified by the asbestos Contractor to be available for subsequent demolition and/or construction. The remainder of the payment for completed work will be made upon receipt by the Engineer of a written certification that the ACM was disposed of in an approved waste disposal site.
210-5 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Asbestos -specific insurance premiums will be reimbursed as the actual and identifiable cost of the portion of the premium attributable to the work performed under the Fixed Price Lump Sum Item. No overhead or profit will be allowed on asbestos specific in surance premiums. Payment will be made under: Item No. Item Pay Unit Roofing (Buildings) 210.1002 Removal and Disposal of Roofing ACM Square Foot 210.1003 Removal and Disposal of Roofing ACM Lump Sum 210.1004 Removal and Disposal of Roofing ACM Fixed Price Lump Sum Siding (Buildings) 210.1102 Removal and Disposal of Siding ACM Square Foot 210.1103 Removal and Disposal of Siding ACM Lump Sum 210.1104 Removal and Disposal of Siding ACM Fixed Price Lump Sum Window Caulking and/or Glazing (Buildings) 210.1201 Removal and Disposal of Caulk/Glazing ACM Foot 210.1203 Removal and Disposal of Caulk/Glazing ACM Lump Sum 210.1204 Removal and Disposal of Caulk/Glazing ACM Fixed Price Lump Sum Flooring/Mastic (Buildings) 210.1302 Removal and Disposal of Flooring/Mastic ACM Square Foot 210.1303 Removal and Disposal of Flooring/Mastic ACM Lump Sum 210.1304 Removal and Disposal of Flooring/Mastic ACM Fixed Price Lump Sum Ceilings (Buildings) 210.1402 Removal and Disposal of Ceiling ACM Square Foot 210.1403 Removal and Disposal of Ceiling ACM Lump Sum 210.1404 Removal and Disposal of Ceiling ACM Fixed Price Lump Sum Thermal System Insulation (Buildings) 210.1501 Removal and Disposal of Thermal System Insulation ACM Foot 210.1502 Removal and Disposal of Thermal System Insulation ACM Square Foot 210.1503 Removal and Disposal of Thermal System Insulation ACM Lump Sum 210.1504 Removal and Disposal of Thermal System Insulation ACM Fixed Price Lump Sum Miscellaneous (Buildings) 210.2901XX Removal and Disposal of Miscellaneous ACM Foot 210.2902XX Removal and Disposal of Miscellaneous ACM Square Foot 210.2903XX Removal and Disposal of Miscellaneous ACM Lump Sum 210.2904XX Removal and Disposal of Miscellaneous ACM Fixed Price Lump Sum
210-5 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Concrete Encased Pipe (Bridges & Highways) 210.3001 Removal and Disposal of Concrete -Encased Pipe ACM Foot 210.3003 Removal and Disposal of Concrete -Encased Pipe ACM Lump Sum 210.3004 Removal and Disposal of Concrete -Encased Pipe ACM Fixed Price Lump Sum 210.3011 Removal and Disposal of Concrete -Encased Pipe ACM (BV14) Foot 210.3013 Removal and Disposal of Concrete -Encased Pipe ACM (BV14) Lump Sum 210.3014 Removal and Disposal of Concrete -Encased Pipe ACM (BV14) Fixed Price Lump Sum Underground Pipe (Bridges & Highways) 210.3101 Removal and Disposal of Underground Pipe ACM Foot 210.3103 Removal and Disposal of Underground Pipe ACM Lump Sum 210.3104 Removal and Disposal of Underground Pipe ACM Fixed Price Lump Sum 210.3111 Removal and Disposal of Underground Pipe ACM (BV14) Foot 210.3113 Removal and Disposal of Underground Pipe ACM (BV14) Lump Sum 210.3114 Removal and Disposal of Underground Pipe ACM (BV14) Fixed Price Lump Sum Suspended Pipe (Bridges & Highways) 210.3201 Removal and Disposal of Suspended Pipe ACM Foot 210.3203 Removal and Disposal of Suspended Pipe ACM Lump Sum 210.3204 Removal and Disposal of Suspended Pipe ACM Fixed Price Lump Sum 210.3211 Removal and Disposal of Suspended Pipe ACM (BV14) Foot 210.3213 Removal and Disposal of Suspended Pipe ACM (BV14) Lump Sum 210.3214 Removal and Disposal of Suspended Pipe ACM (BV14) Fixed Price Lump Sum Bond Breaker/Filler (Bridges & Highways) 210.3302 Removal and Disposal of Bond Breaker/Filler ACM Square Foot 210.3303 Removal and Disposal of Bond Breaker/Filler ACM Lump Sum 210.3304 Removal and Disposal of Bond Breaker/Filler ACM Fixed Price Lump Sum 210.3312 Removal and Disposal of Bond Breaker/Filler ACM (BV14) Square Foot 210.3313 Removal and Disposal of Bond Breaker/Filler ACM (BV14) Lump Sum 210.3314 Removal and Disposal of Bond Breaker/Filler ACM (BV14) Fixed Price Lump Sum Caulking (Bridges & Highways) 210.3401 Removal and Disposal of Caulking ACM Foot 210.3403 Removal and Disposal of Caulking ACM Lump Sum 210.3404 Removal and Disposal of Caulking ACM Fixed Price Lump Sum 210.3411 Removal and Disposal of Caulking ACM (BV14) Foot 210.3413 Removal and Disposal of Caulking ACM (BV14) Lump Sum 210.3414 Removal and Disposal of Caulking ACM (BV14) Fixed Price Lump Sum Miscellaneous (Bridges & Highways) 210.4801XX Removal and Disposal of Miscellaneous ACM Foot 210.4802XX Removal and Disposal of Miscellaneous ACM Square Foot 210.4803XX Removal and Disposal of Miscellaneous ACM Lump Sum 210.4804XX Removal and Disposal of Miscellaneous ACM Fixed Price Lump Sum
211-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 210.4811XX Removal and Disposal of Miscellaneous ACM (BV14) Foot 210.4812XX Removal and Disposal of Miscellaneous ACM (BV14) Square Foot 210.4813XX Removal and Disposal of Miscellaneous ACM (BV14) Lump Sum 210.4814XX Removal and Disposal of Miscellaneous ACM (BV14) Fixed Price Lump Sum Item Number Codes 210.xxyz XX where xx equals Category
10-28 Buildings, 29 Miscellaneous (Buildings)
30-47 Bridges and Highways, 48 Miscellaneous (Bridges and Highways)
where y equals BV
1-9 In order of listing within the category, 0 No BV
where z equals Payment Method 1=Foot , 2=Square Foot , 3=Lump Sum, 4=Fixed Price Lump Sum where XX denotes serialization (applicable to only miscellaneous items) SECTION 211 - INTERNALLY STABILIZED CUT STRUCTURES
211-1 DESCRIPTION. This work shall consist of designing, furnishing, installing, and testing an
internally stabilized cut structure at the location(s) and to the elevation(s) shown in the contract documents.
211-1.01 Soil Nail Wall System. A Soil Nail Wall System is comprised of cement -grouted steel nail
tendons, a drainage network and a facing system to internally stabilize a cut and/or underpin a structure.
211-1 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 a. Epoxy Coating – A product containing pigments, thermosetting epoxy resins, cross linking agents, and other additives, which is applied in the form of a powder onto a clean, heated metallic substrate and fuses to form a continuous barrier coating.
211-1.02 Grouted Tieback System. A Grouted Tieback System is comprised of cement -grouted steel
tendons installed to internally stabilize and supplement the resisting force of an external support system retaining a cut and/or underpinning a structure.
211-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 6. Bond Breaker. A sleeve placed over the tendon in its free stressing length to allow elongation of the tendon free stressing length during stressing.
211-2 Materials .
211-2.01 Soil Nail Wall System (SNWS) . Ensure that the proper materials are supplied for the chosen
system design.
211-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 1. SNWS Soil Nail Tendon Assembly . Provide components for assembling a soil nail tendon conforming to the requirements of §731 -01 A. SNWS Temporary .
211-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. SNWS Permanent. Provide materials meeting the requirements §211 -2.01 A. SNWS Temporary with the following exceptions :
211-2.02 Grouted Tieback System (GTS) . Ensure that the proper materials are supplied for the chosen
system design.
211-3 Construction Details .
211-3.01 Soil Nail Wall System (SNWS).
211-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 satisfactorily place the shotcrete. This will be based on either previous ACI nozzlemen certification or satisfactory completion of preconstruction test panels.
211-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 (1) Compressive strength test results supplied by a qualified independent testing laboratory verifying a minimum 3 -day compressive strength of 2000 psi and a minimum 28-day compressive strength of 4000 psi.
211-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 required to maintain a clean and open hole. Utilize a drill bit with a diameter not smaller than the specified hole diameter minus ⅛ in. Extend the hole a minimum of 2 ft. beyond the nail length. Drill the holes to the inclination specified on the approv ed Working Drawings within a 3° tolerance. Provide centralizers at a maximum of 10 ft. center -to-center spacing throughout the length of the nail to position the bar within 1 in. of the center of the hole and to provide a minimum 1 in. grout cover over bare or epoxy -coated bars or ½ in. grout cover over the encapsulation of an encapsulated nail. Size the centralizers to allow insertion of a tremie pipe to the bottom of the drillhole and to allow grout to freely flow up the drillhole. Provide a centralizer within 2 ft. of the top and bottom of the nail. Sag of the nail shall be taken into account when selecting centralizer diameter and spacing. Insert the nail in the casing or hole after the hole is drilled to the final depth. Locate the nail within a 6 in. tolerance, in any direction. Location tolerances are applicable to only one nail and not accumulative over large wall areas. Repair encapsulated nails that are damaged or defective in accordance with the manufacturer’s recommendations or remove them from the site. Provide a colloidal mixer and grouting equipment capable of continuous mixing and producing grout free of lumps equivalent to the strength and consistency of the approved mix design created by the independent testing laboratory. Equip the grout pump with a grout pressure gage capable of measuring at least twice but not more than three times the intended grout pressure. Size the grouting equipment to enable the entire nail to be grouted in one continuous operation. Place grout within 60 minutes after mixing or within the time recommended by the admixture manufacturer, if admixtures are used. Grout not placed in the allowed time limit will be rejected. Perform the grouting operation after the nail is inserted. Grout each drillhole within 2 hours of completion of drilling. To prevent air voids, fill the hole with grout progressively from the bottom to the top. Completely fill the drillhole in one continu ous operation. Cold joints in the grout column are not allowed except at the top of the test -bond length of proof -tested production nails. Maintain sufficient grout level within the casing to offset the external groundwater/soil pressure and prevent hole caving during casing removal for drillholes advanced by either cased or auger methods. Maintain grout head or grout pressures sufficient to ensure that the drillhole will be completely filled with grout and to prevent unstable soil or groundwater from contaminating or diluting the grout. Control grout pressures to prevent excessive ground heave or fracturing. Remove the grout and nail if grouting is suspended for more than 30 minutes or does not satisfy the requirements of this specification or the approved Working Drawings, and replace with fresh grout and undamaged nail bar at no additional cost. Test nails as specified in §211 -3.01 E SNWS Testing .
211-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Ensure that the thickness of shotcrete satisfies the minimum requirements as shown on the approved Working Drawings using shooting wires, thickness control pins, or other acceptable devices. Fill all depressions along the excavated face with shotcrete at n o additional cost to the State. Repair shotcrete surface defects as soon as possible after placement. Remove and replace shotcrete which exhibits segregation, honeycombing, lamination, voids, or sand pockets. In -place shotcrete determined not to meet the specified strength requirements w ill be subject to remediation. Finish shotcrete with either an undisturbed gun finish as applied from the nozzle or a rough - screeded finish. Attach a bearing plate and nut to each nail head as shown on the approved Working Drawings. While shotcrete is still plastic and before its initial set, uniformly seat the plate on the shotcrete by hand wrench tightening the nut. Where uniform contact betw een the plate and the shotcrete cannot be provided, set the plate in a bed of grout. After grout has set for 24 hours, tighten the nut using a hand wrench. Ensure bearing plates with headed studs are in intimate contact with the construction facing and the studs are located within the tolerances specified herein. Locate the SNWS facing elements from the contract documents location and dimensions within the tolerances provided in Table 211 -3 SNWS Tolerances for Facing Elements : TABLE 211 -3 SNWS TOLERANCES FOR FACING ELEMENTS Facing Element Tolerance Horizontal location of wire mesh, rebar and headed studs ± ⅝ in. Location of headed studs on bearing plate ± ¼ in. Spacing between reinforcing bars ± 1 in. Reinforcing lap ± 1 in. Shotcrete thickness ± ⅜ in. Nail head bearing plate ± 10° deviation from parallel to the wall face Do not excavate to the next lift until nail installation, reinforced shotcrete placement, attachment of bearing plates, and nuts and nail testing has been completed and accepted in the current lift. Ensure nail grout and shotcrete have cured for at least 72 hours or attaine d at least their specified 3 -day compressive strength before excavating the next underlying lift.
211-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 1. PreProduction Verification Test. Perform a preproduction verification test prior to installation of production nails to verify the Contractor’s installation methods and nail pullout resistance. Testing requirements are contained in §211 -3.01 E. 2. Verification Testing .
211-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 b. The total measured movement at the maximum test load exceeds 80% of the theoretical elastic elongation of the test nail unbonded length.
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 a. A total load hold movement of less than 0.04 in. measured between the 1 and 10 minute readings or a total load hold movement of less than 0.08 in. is measured between the 6 and 60 minute readings and the creep rate is linear or decreasing throughout the load hold period.
211-3.02 Grouted Tieback System (GTS).
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 ft. or as shown in the contract documents, whichever is greater. The tieback hole shall remain inside the right -of-way or easement limits shown in the contract documents. Provide working drawings conforming to the size and type requirements in accordance with §718-01 Prestressed Concrete Units (Structural) A. Size and Type. Include the following:
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 connected to the supporting structure. If operations cause subsidence or physical damage, immediately cease operations and repair the damage. The Contractor shall immediately revise operations to prevent reoccurrence of such damage. Any and all costs incur red due to this subsidence or physical damage shall be at no additional cost to the State. If the hole will not stand open, casing shall be installed as required to maintain a clean and open hole. The hole diameter shall be no less than 3 in. if using pres sure grouting in the bond length and 4 in. if not using pressure grouting. The Contractor shall provide a drill bit with a diameter no less than the specified hole diameter minus ⅛ in. The hole shall extend a minimum of 2 ft. beyond the tendon length. The holes shall be located in elevation as shown in the contract documents, within a 3 in. tolerance. The holes shall be progressed to the inclination and alignment as specified in the contract documents, within a ±3° tolerance. All tieback holes shall be prog ressed perpendicular to the direction of the wall, as seen in the contract documents. Holes in rock shall be thoroughly cleaned of all dust, rock chips, grease or other material which may affect bond prior to inserting the tendon. Strands shall not be coupled, except in the case of repairs of installed tendons or for extending stressed strand anchors. A water -tightness test will be required for all tiebacks bonded in rock if grout is injected at a pressure of less than 50 psi. The water -tightness test shall be performed by filling the entire hole in the rock with water and subjecting it to a pressure of 5 psi as measured at the top of the hole. If the stressing length portion of hole is in soil or fractured rock, a packer or casing shall be used to allow the bond length to be pressure -tested. If the leakage rate from the hole, over a 10 minute period, exceeds 0.001 gal. of water per inch of hole diameter per foot of length of hole per minute, the hole shall be grouted, redrilled and retested. Should the subsequent water -tightness test fail, the entire process shall be repeated until results are attained w hich are within leakage allowances. If artesian or flowing water is encountered in the drilled hole, pressure shall be maintained on the grout until the grout has reached initial set. The Contractor may eliminate the requirement for water -tightness tests in rock by using pressure grouting techniques. Pressure grouting requires that the drill hole be sealed and that the grout be injected until a 50 psi grout pressure, measured at the top of the hole, can be maintained on the grout for 5 minutes without further grout injection. In the bond length, centralizers and their installed locations shall be subject to approval by the Engineer. Centralizers shall be provided at a maximum of 10 ft. center to center spacing throughout the bond length so that not less than ½ in. of grout cove r along the bond length is achieved. A centralizer shall be provided at the bottom end of the tendon. Sag of the tendon shall be taken into account when selecting centralizer diameter and spacing. Multi -element tendons shall also employ spacers at maximum 10 ft. intervals throughout the bond length to ensure grout cover on all elements.
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 When the contract documents require encapsulation to provide double -corrosion protection for the tendons:
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 plastic soils. • Proof Tests . Proof tests shall be performed on all anchors not performance or creep tested. These tests are used to verify load capacity. • Lift-Off Readings . Lift-off readings shall be taken on all tiebacks after the load has been transferred to the anchorage but prior to removing the jack. • Lift-Off Tests . Lift-off tests shall only be performed on tiebacks in rock. If required, lift -off tests shall be performed on at least 2 tiebacks at locations to be chosen by the Engineer. Additional tests, up to 10% of the total number of tiebacks may be directed by t he Engineer. Copies of all test results and graphs shall be prepared by the Contractor’s Engineer and transmitted to the Director, Geotechnical Engineering Bureau (as each test is completed) for review and approval. The Department will render a decision within 10 worki ng days after the receipt of all pertinent information. Do not excavate more than 2 ft. below the tieback elevation until testing has been completed and accepted in the current lift. Copies of all test results and graphs shall be transmitted to the Director , Geotechnical Engineering Bureau as each test is completed. Jacks shall have ram travel at least equal to the theoretical elastic elongation of the stressing length plus the bond length at the maximum test load, and be sufficient to accommodate wall movements. A pressure gauge shall be used with each jack. Gauges s hall be calibrated with a single jack and shall not be used with any other jack. All gauges shall be accurate enough to read 100 psi changes in pressure. For performance and creep tests, the jack used shall have two calibrated gauges; a master gauge and ba ckup gauge. The pump shall be capable of applying each load increment in less than 60 seconds. A load cell, which has been calibrated by an independent testing laboratory within 14 days prior to the start of work and at least annually thereafter, shall be used to measure the small changes in load during the load hold portion of the performance and c reep tests. There will be no substitute for the load cell on testing of the performance and creep tests. Load cells are not required for proof tests. The Contractor shall provide the Engineer with the calibration curve for the load cell prior to testing. For the performance and creep tests, the master gauge and backup gauge shall be connected to the same pressure hose between the pump and jack and be used to measure the applied loads. If the load measured by the master gauge and backup gauge differ by more than 10%, the jack, master gauge and backup gauge shall be recalibrated as a unit at no expense to the State. At the completion of the test the tieback load shall be adjusted to the lock -off load and transferred to the anchorage. The movement of the tieback tendon at each load increment shall be recorded to the nearest 0.001 in. relative to an independent, fixed reference point.
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 1P = Design Load AL = Alignment Load. The AL necessary to maintain position of the stressing and testing equipment shall not exceed 0.05 P. Set dial gauges to “zero” after the alignment load has been applied. TABLE 211 -6 GTS PERFORMANCE/CREEP TEST LOAD SCHEDULE 3 AL Maximum of 1 minute2 Maximum of 1 minute2 0.25 P Maximum of 1 minute2 Maximum of 1 minute2 0.50 P Maximum of 1 minute2 Maximum of 1 minute2 0.75 P Maximum of 1 minute2 30 minutes 0.50 P Maximum of 1 minute2 Maximum of 1 minute2 0.25 P Maximum of 1 minute2 Maximum of 1 minute2 4 AL Maximum of 1 minute2 Maximum of 1 minute2 0.25 P Maximum of 1 minute2 Maximum of 1 minute2 0.50 P Maximum of 1 minute2 Maximum of 1 minute2 0.75 P Maximum of 1 minute2 Maximum of 1 minute2 1.00 P Maximum of 1 minute2 45 minutes 0.75 P Maximum of 1 minute2 Maximum of 1 minute2 0.50 P Maximum of 1 minute2 Maximum of 1 minute2 0.25 P Maximum of 1 minute2 Maximum of 1 minute2 Temporary Tieback AL Maximum of 1 minute2 NA3 0.25 P Maximum of 1 minute2 0.50 P Maximum of 1 minute2 1.00 P Maximum of 1 minute2 1.25 P Maximum of 1 minute2 1.33 P (Load Hold) 50 minutes4 AL Maximum of 1 minute2 Cycle 5 is the end of the load schedule for a temporary tieback. Adjust to the lock -off load of 0.80 P (or as specified in the contract documents) Permanent Tieback AL Maximum of 1 minute2 Maximum of 1 minute2 0.25 P Maximum of 1 minute2 Maximum of 1 minute2 0.50 P Maximum of 1 minute2 Maximum of 1 minute2 1.00 P Maximum of 1 minute2 Maximum of 1 minute2 1.25 P Maximum of 1 minute2 60 minutes 1.00 P Maximum of 1 minute2 Maximum of 1 minute2 0.50 P Maximum of 1 minute2 Maximum of 1 minute2 0.25 P Maximum of 1 minute2 Maximum of 1 minute2 Permanent Tieback AL Maximum of 1 minute2 Maximum of 1 minute2 0.25 P Maximum of 1 minute2 Maximum of 1 minute2 0.50 P Maximum of 1 minute2 Maximum of 1 minute2 1.00 P Maximum of 1 minute2 Maximum of 1 minute2 1.25 P Maximum of 1 minute2 Maximum of 1 minute2 1.50 P (Load Hold) 10 minutes (or 60 minutes depending on total movement5) 300 minutes AL Maximum of 1 minute2 Maximum of 1 minute2 Adjust to the lock-off load of 0.80 P (or as specified in the contract documents)
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 2The load shall be held at each increment just long enough to obtain the total movement reading but no longer than 1 minute. 3Creep tests determine the long -term load carrying capacity of a grouted tieback. This test is not applicable to temporary tiebacks. 4The load hold portion of the performance test for a temporary tieback is a test load of 1.33 P, which shall be held constant for 50 minutes. The load hold time shall start when the pump begins to load the anchor from the 1.25 P load to the test load. A loa d cell shall be used to monitor the constant load. Total movements with respect to an independent fixed reference point shall be recorded at 0, ½, 1, 2, 5, 10, 30, and 50 minutes. If the total movement between 1 minute and 10 minutes is less than 0.04 in. , the temporary tieback will be accepted and the test may be terminated without taking the 30 and 50 minute readings. 5The load hold portion of the performance test for a permanent tieback is a test load of 1.50 P, which shall be held constant for 10 minutes. The load hold time shall start when the pump begins to load the anchor from the 1.25 P load to the test load. A load cell shall be used to monitor the constant load. Total movements with respect to an independent fixed reference point shall be recorded at 1 minute, 2, 3, 4, 5, 6, and 10 minutes. If t he total movement between 1 minute and 10 minutes exceeds 0.04 in., the test load shall be held for an additional 50 minutes. Total movements shall be recorded at 15, 20, 25, 30, 45 and 60 minutes. The Contractor shall plot the tendon movement versus load for each load increment. He shall also plot the creep movement for the load hold as a function of the logarithm of time.
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 0.75 P Maximum of 1 minute2 1.00 P Maximum of 1 minute2 1.25 P Maximum of 1 minute2 Load Hold3,4 Permanent Tieback 1.50 P 10 minutes (or 60 minutes depending on total movement3) Temporary Tieback 1.33 P 5 minutes (or 50 minutes depending on total movement4) Adjust to the lock -off load of 0.80 P (or as specified in the contract documents) 1P = Design Load AL = Alignment Load. The AL necessary to maintain position of the stressing and testing equipment shall not exceed 0.05 P. Set dial gauges to “zero” after the alignment load has been applied. 2The load shall be held at each increment just long enough to obtain the total movement reading but no longer than 1 minute. 3The load hold portion of the proof test for a permanent tieback is a test load of 1.50 P, which shall be held constant for 10 minutes. The load hold time shall start when the pump begins to load the anchor from the 1.25 P load to the test load. A load cell shall be used to monitor the constant load. Total movements with respect to an independent fixed reference point shall be recorded at 1 minute, 2, 3, 4, 5, 6, and 10 minutes. If the total movement between 1 minute and 10 minutes exceeds 0.04 in., the tes t load shall be held for an additional 50 minutes. Total movements shall be recorded at 15, 20, 25, 30, 45 and 60 minutes. 4The load hold portion of the proof test for a temporary tieback is a test load of 1.33 P, which shall be held constant for 5 minutes. The load hold time shall start when the pump begins to load the anchor from the 1.25 P load to the test load. A load cell shall be used to monitor the constant load. Total moveme nts with respect to an independent fixed reference point shall be recorded at 0, ½, 2, and 5 minutes. If the total movement between ½ minute and 5 minutes exceeds 0.08 in., the test load shall be held for an additional 45 minutes. Total movements shall be recorded at 10, 15, 20, 25, 30, 40 and 50 minutes. The Contractor shall plot the tendon movement versus load for each load increment. He shall also plot the creep movement for the load hold as a function of the logarithm of time.
211-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 a. All tiebacks and components shall be free of detrimental corrosion.
211-4 Method of Measurement .
211-4.01 Soil Nail Wall System. A SNWS will be measured in square feet of face area measured in a
vertical plane between the payment lines shown in the contract documents.
211-4.02 Grouted Tieback System. A GTS will be measured by the number of grouted tiebacks
installed.
211-4.03 Grouted Tieback Creep Test. A GTS Creep Test will be measured by the number of tests
performed. f s P P = P 5.0 5.1 5.1 +
211-5 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 211-5 BASIS OF PAYMENT .
211-5.01 Soil Nail Wall System. The unit bid price shall include the cost of all labor, materials, and
equipment required to satisfactorily complete the work including the wall drainage network, the temporary shotcrete construction facing and preproduction verification tests, verification tests, and proof tests of the soil nails along with successful completion of quality assurance tests indicating that the material conforms to the specification. Excavation will be paid for separately to the temporary shotcrete - soil interface and to the limits shown in the contract documents. Permanent wall facing will be paid for separately.
211-5.02 Grouted Tieback System. The unit bid price shall include the cost of all labor, materials, and
equipment required to satisfactorily complete the work including performance tests, proof tests, lift -off readings and lift -off tests of the tiebacks along with successful completion of quality assurance tests indicating that the material conforms to the specification. For tiebacks which do not meet all the acceptance criteria but do meet the conditional acceptance criteria, the original tieback and any required supplemental tiebacks(s) are, in sum, considered to be one tieback for payment purposes. No payment will b e made for any additional wall connections required for installation of supplemental tiebacks. Permanent wall facing will be paid for separately.
211-5.03 Grouted Tieback Creep Test. The unit bid price shall include the cost of all labor, materials,
and equipment required to satisfactorily complete the work. Payment will be made under: Item No. Item Pay Unit 211.01 Soil Nail Wall System (Temporary) Square Feet 211.02 Soil Nail Wall System (Permanent) Square Feet 211.10 Grouted Tiebacks (Temporary) Each 211.11 Grouted Tiebacks (Permanent) Each 211.12 Creep Test for Grouted Tiebacks Each SECTION 212 – ROCK SLOPE REINFORCEMENT AND CATCHMENT SYSTEMS (Last Revised January 2019)
212-1 DESCRIPTION. This work shall consist of furnishing and installing rock slope stabilization
techniques or roadside protective measures in conformance with payment lines, type, size, and at the locations specified in the contract documents.
212-1.01 Definitions.
212-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 and rock fallout area. The catchment area width is the horizontal distance between the roadway edge of pavement and the base (toe) of a rockslope.
212-2 Materials .
212-2.01 Wire Rope Rock Catchment Fence . The rock catchment fence system, as obtained from the
manufacturer, shall have a tested capability of retaining a rock impact of 155 kip -ft of kinetic energy. The result of demonstration tests shall be furnished as required by the Engineer.
212-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 212-2.02 Chain Link Rock Catchment Fence .
212-02 Chain Link Rock Catchment Fence .
212-2 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 3. Turnbuckles. Provide galvanized steel turnbuckle cable end assemblies conforming to the requirements of §710 -22 Cable Guide Railing and as shown in Detail G of the Standard Sheet
212-02 Chain Link Rock Catchment Fence .
212-2.03 Wire Mesh Slope Protection .
212-2 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 212-2.04 Wire Mesh Drape .
212-2.05 Temporary Rock Catchment Barrier.
212-2 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 The precast concrete barrier units shall form a smooth and continuous barrier when joined together. Any sections damaged or misaligned while in service shall be corrected or replaced.
212-2.06 Move Temporary Rock Catchment Barrier . None Specified.
212-3 Construction Details .
212-3.01 Wire Rope Rock Catchment Fence . Assemble the wire rope rock catchment fence as detailed
on the Standard Sheet 212 -01 Wire Rope Rock Catchment Fence . Submit to the Engineer for approval not less than two weeks prior to the installation of the wire rope rock catchment fence. Do not begin work prior to approval. Provide the following:
212-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 C. Proposed anchor installation procedure including grout placement procedures, grouting equipment, and the procedure for setting the wire rope anchor centralizers.
212-3.02 Chain Link Rock Catchment Fence . Assemble the chain link rock catchment fence as detailed
on the Standard Sheet 212 -02 Chain Link Rock Catchment Fence . Install galvanized No. 11 steel rebar posts in 2 in. diameter vertical holes drilled to a minimum depth of 2 ft. into rock. Post spacing shall be 8 ft. Pour a sufficient amount of concrete grouting material into the hole before inserting the post to allow overflow after insertion. Install anchor angles for terminal sections. The location of the anchor angles shall be in line with the corresponding fence section and shall be determined by the angle (60° minimum) between the top longitudinal cable and the end post. The angle between a ny longitudinal cable and the end post shall not exceed 90°. Drill bolt holes for anchor angles into the rock spaced 16 in. on -center to a depth of 4 ft. The bolt hole diameter shall be compatible with the bolt/drill hole/resin cartridge diameter, as recom mended by the bolt manufacturer, but in no case shall the bolt hole diameter exceed the resin cartridge diameter by more than 3/8 in. Install the anchor angle within 90°± 15° to the axis of the rock bolt and in intimate contact with the rock surface for it s entire contact area.
212-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 2. Applying a special mix supplied by the bolt manufacturer for leveling purposes.
212-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Bottom of fence fabric shall be in contact with the ground surface. Add fence fabric material as necessary. Added material shall be overlapped a minimum of four chain link rows. Tie both ends of the overlap at 1 ft. intervals, or as approved by the Enginee r. Attach tie -back cables on uphill side of rebar posts after longitudinal cables have been tightened and chain link fence fabric has been installed. Tie -back cables shall have a maximum sag of ¾ in. measured at the center.
212-3.03 Wire Mesh Slope Protection . Assemble the wire mesh slope protection as detailed on the
Standard Sheet 212 -03 Wire Mesh Slope Protection . Design the grouted wire rope anchors so that the design load (P) is at least equal to 30 kips. Submit shop drawings to the Engineer for approval not less than two weeks prior to the installation of the wire mesh slope protection. Do not begin work prior to approval.
212-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 TABLE 212 -1 WIRE MESH SLOPE PROTECTION PROOF TEST LOAD SCHEDULE Load1 Observation Period AL Minimum of 1 minute2 0.25 P Minimum of 1 minute2 0.50 P Minimum of 1 minute2 0.75 P Minimum of 1 minute2 1.00 P Minimum of 1 minute2 1.25 P Minimum of 1 minute2 1.50 P (Load Hold)2 10 minutes (or 60 minutes depending on total movement3) 1P = Design Load AL = Alignment Load. The AL necessary to maintain position of the stressing and testing equipment shall not exceed 0.05 P. Set dial gauges to “zero” after the alignment load has been applied. 2Hold each load increment, except for the 1.5 P load, until the deflection stabilizes. 3The load hold portion of the proof test is a maximum test load of 1.50 P, which shall be held constant for 10 minutes. The load hold time shall start when the pump begins to load the anchor from the 1.25 P load to the test load. A load cell shall be used t o monitor the constant load. Total movements with respect to an independent fixed reference point shall be recorded at 1 minute, 2, 3, 4, 5, 6, and 10 minutes. If the total movement between 1 minute and 10 minutes exceeds 1/24 in., the test load shall be held for an additional 50 minutes. Total movements shall be recorded at 15, 20, 25, 30, 45 and 60 minutes. No part of the temporary yoke or load frame shall bear within 3 ft. of the anchor. Plot the movement versus load for each increment. An anchor will be accepted by the Engineer if the creep rate at 1.5P does not exceed 1/24 in. between the 1 and 10 minute readings or for a load hold time of 60 minutes, the creep rate does not exceed 1/12 in. per log cycle of time. If an anchor fails the proof test, install a new anchor at no cost to the State.
212-3.04 Wire Mesh Drape . Assemble the wire mesh drape as detailed on the Standard Sheet 212 -04
Wire Mesh Drape . Install untensioned resin rock bolts at the top of the rockslope on 50 ft. centers (maximum) or as shown in the contract documents. Proof test the first rock bolt per resin lot number to 20 kips in accordance with §212 -3.03 B. Anchor Testing. Place ¾ in. diameter guide rail cable horizontally across the top of the rock slope, secured by 1 ¼ in. diameter resin rock bolts. Maintain a minimum cable sag of 2 ft. to 3 ft. between rock bolts. Do not draw cable taut. Splices of the guide rail cable wi ll not be allowed. Fold the mesh over or under the guide rail cable a minimum of 1 ft. and connect the horizontal lap with galvanized tie wire with a continuous weave through each of the mesh openings. Install the wire mesh in vertical strips, each lapped over the other by a minimum of 1 ft. Connect the adjacent vertical strips by either a continuous weave of galvanized tie wire along the edge of the outer mesh strips only, or with hog rings or metal tie s on a 6 in. staggered pattern along the edges of both panels. When used, overlay horizontal laps a minimum of 1 ft. and connect with a continuous weave of galvanized tie wire along the edge of the upper mesh strip. Install the wire mesh to cover the area of rock face identified in the contract documents. Repair all damaged galvanized surfaces in accordance with §719 -01 Galvanized Coatings and Repair Methods .
212-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 212-3.05 Temporary Rock Catchment Barrier . Assemble and maintain the temporary rock catchment barrier as detailed on the Standard Sheet 212 -05 Temporary Rock Catchment Barrier .
212-3.06 Move Temporary Rock Catchment Barrier . Move and reset the temporary rock catchment
barrier in accordance with the requirements of §212 -3.05 Temporary Rock Catchment Barrier.
212-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 212-4 METHOD OF MEASUREMENT .
212-4.01 Wire Rope Rock Catchment Fence . Wire rope rock catchment fence will be measured as the
number of linear feet of fencing, measured from center -to-center of end posts.
212-4.02 Chain Link Rock Catchment Fence . Chain link rock catchment fence will be measured as the
number of linear feet of fence, measured along the top of the fence between the terminal posts. An allowance of 10 linear feet will be added for each terminal section anchorage and for each intermedia te section anchorage installed.
212-4.03 Wire Mesh Slope Protection . Wire mesh slope protection will be measured as the number of
square feet of rock face satisfactorily covered. No measurement will be made of wire mesh used in any overlap.
212-4.04 Wire Mesh Drape . Wire mesh drape will be measured as the number of square feet of rock face
satisfactorily covered. No measurement will be made of wire mesh used in any overlap.
212-4.05 Temporary Rock Catchment Barrier . Temporary rock catchment barrier will be measured as
the number of linear feet of barrier, measured along the centerline of the uppermost concrete barrier surface, from one end anchor to the other.
212-4.06 Move Temporary Rock Catchment Barrier . Moving temporary rock catchment barrier will
be measured as the number of linear feet of barrier moved, measured along the centerline of the uppermost concrete barrier surface, from one end anchor to the other.
212-5 Basis of Payment .
212-5.01 Wire Rope Rock Catchment Fence . The unit price bid per linear feet for wire rope rock
catchment fence shall include the costs of furnishing all labor, material and equipment necessary to complete the work.
212-5.02 Chain Link Rock Catchment Fence . The unit price bid per linear feet for chain link rock
catchment fence shall include the costs of furnishing all labor, material and equipment necessary to complete the work.
212-5.03 Wire Mesh Slope Protection . The unit price bid per square feet for wire mesh slope protection
shall include the costs of furnishing all labor, material and equipment necessary to complete the work, including anchor testing and disposal of any material removed from the slope.
212-5.04 Wire Mesh Drape . The unit price bid per square feet for wire mesh drape shall include the
costs of furnishing all labor, material and equipment necessary to complete the work, including anchor testing and disposal of any material removed from the slope.
212-5.05 Temporary Rock Catchment Barrier . The unit price bid per linear feet for temporary rock
catchment barrier shall include the costs of furnishing all labor, material and equipment necessary to erect, maintain, and remove the required barrier, including any required connection devices, end treatments, delineation or guiding devices, and devices for pinning and connecting temporary precast concrete barrier units. After placement, 90% of the item unit price will be paid. The remaining 10% will be paid when the rock catchment barrier has been removed.
212-5 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 212-5.06 Move Temporary Rock Catchment Barrier . The unit price bid per linear feet for moving temporary rock catchment barrier shall include the costs of furnishing all labor, material and equipment necessary to remove, transport, erect, and maintain the required barrier, including any required connecti on devices, end treatments, delineation or guiding devices, and devices for pinning and connecting temporary precast concrete barrier units. Movements necessary to maintain, realign, or replace damaged units will not be considered as moving temporary rock catchment barrier and shall be done at no additional cost to the State. Payment will be made under: Item No. Item Pay Unit 212.0106 Wire Rope Rock Catchment Fence (Medium Impact – 6 ft.) Feet 212.0108 Wire Rope Rock Catchment Fence (Medium Impact – 8 ft.) Feet 212.0110 Wire Rope Rock Catchment Fence (Medium Impact – 10 ft.) Feet 212.0112 Wire Rope Rock Catchment Fence (Medium Impact – 12 ft.) Feet 212.0201 Chain Link Rock Catchment Fence Feet 212.0202 Vinyl Coated Chain Link Rock Catchment Fence Feet 212.03 Wire Mesh Slope Protection Square Feet 212.04 Wire Mesh Drape Square Feet 212.0501 Temporary Rock Catchment Barrier (10 ft.) Feet 212.0502 Move Temporary Rock Catchment Barrier (10 ft.) Feet SECTIONS 213 THRU 299 (VACANT)
302-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Section 300 BASES AND SUBBASES SECTION 301 (VACANT) SECTION 302 - BITUMINOUS STABILIZED COURSE
302-1 DESCRIPTION. This work shall consist of furnishing and placing a course of bituminous
stabilized granular material and stabilized reclaimed asphalt pavement shoulder in conformance with this specification, the payment lines, and typical sections shown on the plans or as specified by the Engineer.