NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 be made for any losses of material which may result from shrinkage, compaction, foundation settlement, waste, overflow, erosion, leakage, or any other causes; the cost of such losses shall be included in the price bid for this work. Payment will be made under: Item No. Item Pay Unit 411.01 Stabilized Gravel Surface Course Cubic Yard 411.02 Calcium Chloride Stabilized Gravel Surface Course Cubic Yard 411.03 Sodium Chloride Stabilized Gravel Surface Course Cubic Yard SECTION 412 - CRACK SEALING ASPHALT PAVEMENTS
412-1 DESCRIPTION. The work in this section shall include work required for crack sealing asphalt
pavements.
412-2 MATERIALS. Materials shall be as specified in the special specifications.
412-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
412-4 METHOD OF MEASUREMENT. As specified in the special specifications.
412-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 413 - MICRO -SURFACING
413-1 DESCRIPTION. The work in this section shall include work required for micro -surfacing.
413-2 MATERIALS. Materials shall be as specified in the special specifications.
413-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
413-4 METHOD OF MEASUREMENT. As specified in the special specifications.
413-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 414 - QUICK -SET SLURRY
414-1 DESCRIPTION. The work in this section shall include work required for quick -set slurry.
414-2 MATERIALS. Materials shall be as specified in the special specifications.
414-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.