Structures (500-599)

552EXTERNALLY STABILIZED CUT STRUCTURES

NY · 2024 Standard SpecificationsBook pages 259265View official source ↗

552-1 01

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 551.51020 Drilled Shafts (Low Overhead Clearance - 2.0 ft. Diameter) Foot 551.51025 Drilled Shafts (Low Overhead Clearance - 2.5 ft. Diameter) Foot 551.51030 Drilled Shafts (Low Overhead Clearance - 3.0 ft. Diameter) Foot 551.51035 Drilled Shafts (Low Overhead Clearance - 3.5 ft. Diameter) Foot 551.51040 Drilled Shafts (Low Overhead Clearance - 4.0 ft. Diameter) Foot 551.51045 Drilled Shafts (Low Overhead Clearance - 4.5 ft. Diameter) Foot 551.51048 Drilled Shafts (Low Overhead Clearance - 4.8 ft. Diameter) Foot 551.51050 Drilled Shafts (Low Overhead Clearance - 5.0 ft. Diameter) Foot 551.51055 Drilled Shafts (Low Overhead Clearance - 5.5 ft. Diameter) Foot 551.51060 Drilled Shafts (Low Overhead Clearance - 6.0 ft. Diameter) Foot 551.51065 Drilled Shafts (Low Overhead Clearance - 6.5 ft. Diameter) Foot 551.51070 Drilled Shafts (Low Overhead Clearance - 7.0 ft. Diameter) Foot 551.51075 Drilled Shafts (Low Overhead Clearance - 7.5 ft. Diameter) Foot 551.51080 Drilled Shafts (Low Overhead Clearance - 8.0 ft. Diameter) Foot 551.52 Trial Shafts Each 551.53 Furnishing Equipment for Installing Drilled Shafts Lump Sum 551.54 Furnishing Equipment for Installing Drilled Shafts (On Water) Lump Sum 551.55 Furnishing Equipment for Installing Drilled Shafts (Low Overhead Clearance) Lump Sum 551.56 Crosshole Sonic Logging (CSL) of Drilled Shafts Each SECTION 552 - EXTERNALLY STABILIZED CUT STRUCTURES (Last Revised May, 2016)

552-1 Description

552-1.01 Permanent Sheeting. Under this work, the Contractor shall furnish and install permanent

sheeting of the type, at the locations and to the elevation(s) shown in the contract documents or as directed by the Engineer. All the sheeting and supports will be left in place as a finished structure unless removal of waling and bracing is called for in the contract documents.

552-1.02 Temporary Sheeting. Under this work, the Contractor shall furnish, install, maintain and

remove temporary sheeting of the type, at the locations and to the elevation(s) shown in the contract documents or as directed by the Engineer. It may be left in place only with the writ ten permission of the Engineer. 552.1.03 Interim Sheeting. Under this work, the Contractor shall furnish, install, maintain, cut off and remove sheeting of the type, at the locations and to the elevation(s) shown in the contract documents or as directed by the Engineer. The interim sheeting shall be cut off and removed only to the elevation shown in the contract documents. The remaining material shall be left in place.

552-1.04 Shields and Shoring. Under this work, the Contractor shall design, furnish, place, maintain and

remove a shields and shoring system at locations shown in the contract documents or as directed by the Engineer. Details of the shields and shoring system must conform to the requir ements of 29 CFR 1926. It may be left in place only with the written permission of the Engineer.

A.Shields and Shoring (S&S) System. An S&S system is a pre -engineered, protective/support system used in trenches to provide direct support of the trench sidewalls in addition to protecting

552-1 05

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 workers within the trench. An S&S system may consist of sheeting, shoring, shield systems, trench box, trench shield or other pre -engineered protective systems.

552-1.05 Soldier Pile and Lagging Wall. Under this work, the Contractor shall furnish and place a

soldier pile and lagging wall in accordance with the contract documents; cut off walls located within the roadway limits to the elevation shown in the contract documents and leave the remainder in p lace unless removal is granted, in writing, by the Engineer; completely remove walls outside the roadway limits if noted on the plans; and dispose of removed material.

552-1.06 Alternate Design. The Contractor may submit to the Department a construction alternate other

than that presented in the contract documents as a Value Engineering Change Proposal. A simple material substitution involving a sheeting section modulus or soldier pile designation greater than that shown in the contract documents will be considered for acceptance. All proposed changes to details shown in the contract documents must be approved, in writing, by the Deputy Chief Engineer for Technical Servic es. Any geotechnical analysis for a flexible support system shall be done in accordance with the procedures contained in the geotechnical design procedure “ Geotechnical Design Procedure for Flexible Wall Systems ”.

552-2 Materials

552-2.01 Permanent Sheeting

A.Permanent Timber Sheeting. Permanent timber sheeting shall be new and unused and consist of any acceptable species which can be placed satisfactorily in accordance with the requirements of §712 -14 Stress Graded Timber and Lumber . Timber sheeting shall be treated in accordance with §708 -31 Wood Preservative - Waterborne and applied in conformance with American Wood Preservers Association (AWPA) Use Category Designation UC4B. The timbers shall meet or exceed the actual cross section or stress grade shown i n the contract documents. The timbers shall be sound and free from any defects which might impair its strength or tightness. The materials shall include all necessary waling and bracing required.
B.Permanent Steel Sheeting. Steel sheeting shall be new and unused conforming to the provisions of §715 -17 Steel Sheeting . Waling and bracing shall be new and unused conforming to the provisions of §715-01 Structural Steel . Stock steel may be used.

552-2.02 Temporary Sheeting

A.Temporary Timber Sheeting. Temporary timber sheeting shall consist of any acceptable species which can be placed satisfactorily in accordance with the requirements of §712 -14 Stress Graded Timber and Lumber . Temporary timber sheeting shall consist of new or used, treated or untreated material in satisfactory condition and suitable for the intended use. The Engineer will reject unsatisfactory materials.
B.Temporary Steel Sheeting. The steel sheeting, waling and bracing shall consist of new or used material in satisfactory condition and suitable for the intended use. The materials shall include all necessary waling and bracing required. The Engineer will reject unsatisfactory materia ls.

552-2.03 Interim Sheeting

552-2 04

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 A. Interim Timber Sheeting. Interim timber sheeting shall consist of any acceptable species which can be placed satisfactorily in accordance with the requirements of §712 -14 Stress Graded Timber and Lumber . Interim timber sheeting shall consist of new or used, treated or untreated material but shall be in satisfactory condition and suitable for the intended use. The Engineer will reject unsatisfactory materials.

B.Interim Steel Sheeting. Steel sheeting and any steel waling and bracing to remain in place shall be new and unused conforming to the provisions of §715 -17 Steel Sheeting . Steel sheeting, steel waling and bracing which is removed after use shall consist of new or used material in satisfactory condition and suitable for the intended use. The materials shall include all necessary waling and bracing required. The Engineer wil l reject unsatisfactory materials. .

552-2.04 Shields and Shoring. The selection of S&S systems and materials shall be the Contractor's

option. The Engineer will reject unsatisfactory materials.

552-2.05 Soldier Pile and Lagging Wall.

A.Soldier Pile. Soldier piles shall be as shown on the contract documents and conform to the requirements of §715 -18 Soldier Piles . Waling and bracing shall be as shown in the contract documents and conform to the requirements of §715-01 Structural Steel . No pile splices will be allowed unless approved, in writing, by the Deputy Chief Engineer for Technical Services. Used material is permitted for temporary walls unless otherwise noted on the plans, provided the material is in conformance with the specification and is acceptable for use.
B.Lagging. Lagging type(s) shall be as shown in the contract documents:
1.Treated Wood. Treated wood shall meet or exceed the full dimension thickness shown in the contract documents and graded for an extreme fiber stress of at least 1000 psi conforming to the material requirements of §712 -14 Stress Graded Timber and Lumber . Timbers shall be treated in accordance with §708 -31 Wood Preservative - Waterborne. The treatment shall be applied in conformance with American Wood Preservers Association (AWPA) Use Category Designation UC4B.
2.Untreated Wood. Untreated wood shall be graded for an extreme fiber stress of at least 1000 psi conforming to the provisions of §712-14 Stress Graded Timber and Lumber and shall meet or exceed the full dimension thickness shown in the contract documents.
3.Precast Concrete Panels. Precast concrete panels shall conform to the provisions of §704-24 Precast Concrete Panels .
4.Steel Sheeting. Steel sheeting shall conform to the provisions of §552-2.01 B. Permanent Steel Sheeting .
C.Backfill for Holes. Backfill material shall be as shown in the contract documents:
1.Concrete Backfill. Concrete backfill shall be Class G concrete conforming to the provisions of Section 555 Structural Concrete .
2.Grout Backfill. Grout backfill shall be a workable mixture capable of stabilizing the hole being excavated. The Contractor shall use either:

552-3 01

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 a. Controlled Low Strength Material. Material meeting the requirements for Controlled Low Strength Material as stated in §733 -01 Flowable Fill .

b.Controlled Low Strength Material (No Fly Ash). Material meeting the requirements for Controlled Low Strength Material (No Fly Ash) as stated in §733 -01 Flowable Fill .
c.Grout. Cement, concrete sand and water conforming to Table 552 -1 Grout Backfill Requirements . TABLE 552 -1 GROUT BACKFILL REQUIREMENTS Material Subsection Portland Cement Type 2 §701-01 Concrete Sand §703-07 Water §712-01

552-3 Construction Details

552-3.01 General. The Contractor shall install sheeting having a section modulus not less than that

shown in the contract documents. The Contractor shall install soldier piles meeting the size designation shown in the contract documents. Any material which stops the driving of sheeting or soldier piles within a depth of 10 feet from the ground surface at the time of driving shall be removed by the Contractor. Payment for removal of such material and any backfill required to fill the result ing void will be made under the appropriate pay items. If very compact material or boulders prevent the progression of the sheeting or soldier piles to the design tip elevation at a greater depth, the Contractor shall notify the Engineer. The Contractor shall perform work in a manner that causes no subsidence of the surrounding ground surface. If subsidence should occur, the Contractor shall cease work and provide a written plan to prevent subsidence for approval by the Engineer. The Contra ctor shall repair all damage that resulted from the subsidence at no additional cost to the State.

552-3.02 Temporary Sheeting. The Contractor shall install temporary sheeting having a section modulus

which meets or exceed that shown in the contract documents. After its function is no longer required, the Contractor shall remove the sheeting placed under this work, or with the written permission of the Engineer, leave it in place after cutting off the tops at an agreed elevation.

552-3.03 Interim Sheeting. The Contractor shall install interim sheeting having a section modulus which

meets or exceed that shown in the contract documents. The Contractor shall cut off the interim sheeting and remove it to the elevation shown in the contract documents. The remaining material shall be left in place.

552-3.04 Shields and Shoring. The Contractor shall install a S&S system in accordance with the contract

documents. The S&S installed under this work shall be of sufficient size and strength to meet the requirements of 29 CFR 1926 and the Live Load requirement as contained in the AASHTO Standard Specifications for Highway Bridges. Prior to use, the Contractor shall supp ly the Engineer with documentation of compliance. The S&S may be left in place only with the written permission of the Engineer. All damage to the adjacent pavement or ground caused by the use of the chosen S&S (e.g. voids beneath the pavement or shoulder, pavement or shoulder cracking or subsidence, ground settlement) shall be repaired at no additional cost to the State. Severe dam age which directly affects the safety of the public

552-3 05

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 shall be immediately repaired. The operation shall be halted until a satisfactory prevention method is instituted.

552-3.05 Soldier Pile and Lagging Wall. The Contractor shall install Soldier Piles meeting the size

designation shown in the contract documents either by driving or by placing them in holes as indicated on the plans in accordance with Table 552 -2 Soldier Pile and Lagging Wall Pile Tolerances . For each pile out of tolerance, provide a satisfactory replacement or provide a modification approved by the Engineer prior to proceeding. No pile splices will be allowed unless approved, in writing, by the Deputy Chie f Engineer of the Office of Technical Services. TABLE 552 -2 SOLDIER PILE AND LAGGING WALL PILE TOLERANCES Survey Location Tolerance Plan 3 inches at the top of pile. Vertical Vertical tolerance of ⅛ inch per foot on each axis of the soldier pile shown on the plans. Verify the axis on the top 5 feet of the soldier pile with a straight edge (5 feet minimum length) and a level (4 feet minimum length).

A.Driving Piles. Soldier piles shall be equipped with shoes in conformance with provisions of §551- 3.02 Steel H -Piles , and driven in conformance with provisions of §551-3.04 Furnishing Equipment for Driving Piles , except that submission of Form BD 138 is not required and the use of a vibratory hammer is an acceptable means of pile driving.
B.Creating Holes for Pile Installation. The Contractor shall provide equipment capable of establishing and maintaining holes of the minimum diameter and to the depth or elevation shown in the contract documents. Temporary sleeves or casings are permitted and may be required as per the plans. Jetting is not permitted. If the top of socket elevation shown in the contract documents varies by more than 2 feet, the Contractor shall stop work and notify the Engineer. The Engineer will notify the Geotechnical Engineering Bureau and obtain written recommendations prior to allo wing the work to proceed. Upon completion of the hole, the Contractor shall install the soldier pile in accordance with Table

552-2 Soldier Pile and Lagging Wall Pile Tolerances.

C.Backfilling. After placing the piles, the Contractor shall backfill holes with the backfill(s) indicated in the contract documents.
1.Concrete Backfill. The Contractor shall place backfill in accordance with the provisions of §555-3.04 Handling and Placing Concrete and §555-3.05 Depositing Structural Concrete Under Water as shown in the contract documents. The Contractor shall allow a minimum curing time of one day before placing any lagging.
2.Grout Backfill. The Contractor shall place backfill in accordance with the provisions of §555- 3.04 Handling and Placing Concrete and §555-3.05 Depositing Structural Concrete Under Water . The Contractor shall allow a minimum curing time of one day before placing any lagging.
D.Lagging. The Contractor shall install horizontal lagging so that the unsupported soil height does not exceed 3 feet at any time. If the method chosen for attaching the lagging to the soldier piles requires reattachment of lagging to the soldier piles due to planned excavation on both sides of the wall, the Contractor shall reattach the lagging at no additional cost to the State.

552-4 01

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 The Contractor shall fabricate the precast concrete lagging to the shape and size shown in the contract documents.

E.Wall Removal. The Contractor shall cut off soldier piles placed within the roadway limits at the subgrade surface unless otherwise noted in the contract documents. Soldier piles placed outside the roadway limits may be removed or cut off a minimum of 2 feet below final ground surface unless otherwise noted in the contract documents. If lagging is to be removed, the Contractor shall remove the lagging so that the unsupported soil height does not exceed a maximum of 3 feet at any time. This maximum height may be reduced, based on specific site conditions, in order to prevent collapse an d loss of ground.

552-4 Method of Measurement

552-4.01 General. When a support system is used in stage construction, the quantity of support system

will be the maximum number of square feet satisfactorily installed between the payment lines shown in the Contract Documents measured on only one side of adjacent construction stages.

552-4.02 Permanent Sheeting. The quantity of sheeting will be in square feet, measured to the nearest

square foot. The upper payment line will be at the intersection of the sheeting and the ground surface at the time of commencing work or at the completion of backfilling operations, w hichever is higher. The lower payment line will be the minimum embedment depth shown in the contract documents. The horizontal length will be measured along a projection of the sheeting on a plane parallel to and midway between the front and rear face of the sheeting wall.

552-4.03 Temporary Sheeting. The quantity of sheeting will be in square feet, measured to the nearest

square foot. The upper payment line will be the original ground at the time of commencing work. The lower payment line will be the minimum embedment depth shown in the contract docume nts. The horizontal length will be measured along a projection of the sheeting on a plane parallel to and midway between the front and rear face of the sheeting wall.

552-4.04 Interim Sheeting. The quantity of sheeting will be in square feet, measured to the nearest

square foot. The upper payment line will be the original ground at the time of commencing work. The lower payment line will be the minimum embedment depth shown in the contract docume nts. The horizontal length will be measured along a projection of the sheeting on a plane parallel to and midway between the front and rear face of the sheeting wall.

552-4.05 Shields and Shoring. The quantity of shields and shoring will be in square feet, measured to the

nearest square foot, obtained by multiplying the vertical length between the payment lines herein described, measured on both sides of the excavation, by the horizontal length of S&S actually used. The upper payment line will b e the ground surface existing at the site prior to the beginning of the work. The lower payment line will be the bottom of the excavation immediately adjacent to the protection system. The horizontal length will be the length of protection system installed measured along the payment lines as shown in the contract documents. Both sides of the excavation will be measured and computed for payment.

552-4.06 Soldier Pile and Lagging Wall.

A.Holes in Earth. The quantity to be measured for payment will be in feet of holes in earth installed. The upper payment limit is the intersected grade or ground line whichever is lower. For holes requiring rock sockets, the lower payment limit is the top of rock. For holes without rock sockets, the lower payment limit is the pile tip elevation.

552-5 01

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. Rock Sockets. The quantity to be measured for payment will be in feet of sockets in rock installed. The upper payment limit is the top of rock as shown on the plans. The lower payment limit is the pile tip elevation.

C.Soldier Piles. The quantity to be measured for payment will be in feet of soldier piles installed. The upper payment limit is the pile top elevation. The lower payment limit is the pile tip elevation.
D.Lagging. The quantity of lagging to measure for payment will be the number of square feet, to the nearest square foot, between the payment lines shown in the contract documents.

552-5 Basis of Payment

552-5.01 Permanent Sheeting. The unit price bid for this work shall include the cost of furnishing all

labor, materials and equipment necessary to satisfactorily complete the work, including driving equipment, waling, and bracing. The cost of maintaining the excavated area free from e arth, water, ice, and snow will be included in the price bid for the appropriate excavation item.

552-5.02 Temporary Sheeting. The unit price bid for this work shall include the cost of furnishing all

labor, materials and equipment necessary to satisfactorily complete the work, including driving equipment, waling, and bracing. The cost of maintaining the excavated area free from e arth, water, ice, and snow will be included in the price bid for the appropriate excavation item. Progress payments in the amount of 75% of the bid amount will be made upon installation of the sheeting with the remainder paid upon its satisfactory removal. If the Contractor leaves all or part of the sheeting in place, it will be at no additional cost to the State and the remaining 25% of the bid amount will be paid after its function is no longer required.

552-5.03 Interim Sheeting. The unit price bid for this work shall include the cost of furnishing all labor,

materials and equipment necessary to satisfactorily complete the work, including driving equipment, waling, and bracing. The cost of maintaining the excavated area free from e arth, water, ice, and snow will be included in the price bid for the appropriate excavation item. Progress payments in the amount of 75% of the bid amount will be made upon installation of the sheeting with the remainder paid upo n satisfactory removal of that portion specified in the contract documents. If the support system is to be left in place in its entirety, the remainder will be paid after its function is no longer required. The cost of any work necessary to cut off and rem ove the specified portion shall be included in the unit price bid.

552-5.05 Shields and Shoring. The unit price bid for this work shall include the cost of furnishing all

labor, materials and equipment necessary to satisfactorily complete the work, including equipment, waling, bracing, and design services when employed. If the Engineer directs, in writing, that the S&S be left in place, this will be classified as extra work.

552-5.05 Soldier Pile and Lagging Wall.

A.Holes in Earth. The unit price bid shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including progressing the hole through obstructions.
B.Rock Sockets. The unit price bid shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work.
C.Soldier Piles. The unit price bid shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including pile driving equipment, pile shoes,

553-1 01

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 backfilling the hole and cutting off the soldier pile where required. No additional payment will be made for complete pile removal, where allowed. Splices approved, in writing, by the Deputy Chief Engineer for Technical Services will be paid for under the appropriate pay item.

D.Lagging. The unit price bid shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including waling, bracing, connections and lagging removal, where required. No additional payment will be made when a wall is excavated on both sides. No additional payment will be made if wood lagging is placed behind concrete. Payment will be made under: Item No. Item Pay Unit 552.10 Permanent Timber Sheeting Square Foot 552.11 Permanent Steel Sheeting Square Foot 552.12 Temporary Timber Sheeting Square Foot 552.13 Temporary Steel Sheeting Square Foot 552.14 Interim Timber Sheeting Square Foot 552.15 Interim Steel Sheeting Square Foot 552.17 Shields and Shoring Square Foot 552.20nn Holes in Earth for Soldier Pile and Lagging Wall Foot 552.21nn Rock Sockets for Soldier Pile and Lagging Wall Foot 552.22nn Soldier Piles for Soldier Pile and Lagging Wall Foot 552.2301nn Treated Wood Lagging for Soldier Pile and Lagging Wall Square Foot 552.2302nn Untreated Wood Lagging for Soldier Pile and Lagging Wall Square Foot 552.2303nn Precast Concrete Panel Lagging for Soldier Pile and Lagging Wall Square Foot 552.2304nn Steel Sheeting Lagging for Soldier Pile and Lagging Wall Square Foot Note: nn denotes serialized pay item. Each wall and its associated components will be serialized. SECTION 553 - COFFERDAMS AND WATERWAY DIVERSION STRUCTURES (Last Revised January, 2021)

553-1 Description

553-1.01 Cofferdams. This work shall consist of the design, placement, maintenance, and removal of

cofferdams as shown in the contract documents. The Contractor shall also construct, maintain, stabilize, backfill, and restore adequate sediment removal area(s) for water discha rge control at location(s) shown on the contract documents or where allowed by the Engineer. For design purposes, the bottom of excavation elevation shall be assumed to be the deepest excavation of the entire area enclosed by the coffer dam. A waterway diversion structure is not a substitution for, or equal to, a cofferdam.

A.Cofferdams (Type 1). Cofferdams (Type 1) shall apply for a water depth exceeding 8 '’-0"”, measured from the bottom of excavation to the Ordinary High Water Elevation, as shown in the contract plans or when special conditions warrant.
B.Cofferdams (Type 2). Cofferdams (Type 2) shall apply to a maximum anticipated depth of 8' -0", measured from the bottom of excavation to the Ordinary High Water Elevation, as shown in the contract plans.

553-1.02 Temporary Waterway Diversion Structures . This work shall consist of the design,

installation, maintenance, and removal of a temporary Waterway Diversion structure as shown in the contract documents.

Source: New York Standard Specifications, 2024 Edition. Pages 259265 of 1,264.