589-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. Thrie Beam Railing Installation. Measurement will be taken as the number of feet of railing installed. Measurement will be taken along the top of the thrie beam, end -to-end of railing between the limits indicated on the contract plans. No additional measurement will be taken for overlapping sections of railing. If transition sectio ns are installed, measurement will be taken to the end of the transition section indicated on the contract plans.
587-5 BASIS OF PAYMENT. The unit price bid shall include the cost of all labor, materials and
equipment necessary to complete the work. When required, mortar leveling courses, anchor bolts, nuts and washers shall be included in the unit price bid. The drilling and grouting of anchor bolts, when required will be paid for under a separate item. Painting of the railing, if required, shall be paid under a separate item. Payment will be made under: Item No. Item Pay Unit 587.01 Bridge Railing Removal and Disposal Foot 587.02 Bridge Railing Removal and Storage Foot 587.03 Installation of Stored Bridge Railing Foot 587.1001 Box Beam Bridge Rail, One Rail Foot 587.1002 Box Beam Bridge Rail, Two Rail Foot 587.20 Thrie Beam Bridge Rail - Attachment to Existing Bridge Rail Foot 587.21 Thrie Beam Bridge Rail - New Post Installation Mounted on Concrete Surfaces Foot 587.22 Thrie Beam Bridge Rail - New Post Installation Mounted on Steel Surfaces Foot SECTION 588 - BRIDGE JOINT REHABILITATION
588-1 DESCRIPTION. The work in this section shall include work required for bridge joint
rehabilitation.
588-2 MATERIALS. Materials shall meet the requirements specified in the special specifications.
588-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
588-4 METHOD OF MEASUREMENT. As specified in the special specifications.
588-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 589 - REMOVAL OF STRUCTURAL STEEL (Last Revised September, 2016)
589-1 DESCRIPTION. The work shall consist of removal and disposal of existing structural steel as
shown in the contract documents and as directed by the Engineer.
589-2 MATERIALS. Not Specified.
589-3 Construction Details
589-3.01 General. A minimum of 14 days prior to the removal of existing structural steel, the Contractor
shall submit a written Structural Steel Removal plan meeting the requirements of §202 -3.01A. Demolition Plan to the Engineer for approval. The Structural Steel Removal plan shall set forth all expected
589-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 supports, disconnections and adjustments to steel which is to remain. If, during the course of the work it becomes necessary to support, disconnect, or adjust steel not previously noted in the Structural Steel Removal plan, the Contractor shall submit a r evised plan to the Engineer for approval. All work performed on steel which is to remain shall be in accordance with the applicable requirements of the Steel Construction Manual (SCM). Materials removed as part of this work shall become the property of the Contractor, and shall be removed from the work site. Cutting of steel to remain shall be performed in a manner to produce edges and surfaces suitable for welding, in accordance with the requirements of the SCM, Part 603 Surfaces and Edges to be Welded . Thermal cutting of A709 steels shall be performed in accordance with the requirements of the SCM, Part 602 Thermal Cutting of A709 Steels . Replacement of steel removed will be paid for separately.
589-3.02 Steel Structures Coated with Paint. If the steel is coated with paint, prior to the start of steel
removal operations, the paint shall be removed for a minimum distance of 4 inches on each side of the centerline of cut, bolt row, rivet row, or weld, as applicable. The paint removal work s hall be performed in accordance with the requirements of §202 -3.01D. Paint Removal.
589-3.03 Fastener Removals. If rivet shanks, or bolts, cannot be removed by punching without
damaging the base metal, the rivet shank, or bolt, shall be removed by drilling.
589-3.04 Welded Connection Disassembly. Welded connections shall be disassembled in accordance
with the following:
589-4 Method of Measurement.
The quantity to be measured for payment for removal of existing steel with a pay unit of pounds will be in pounds of existing steel removed, measured to the nearest whole pound. The weight of existing steel
590-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 removed will be computed from the nominal sizes indicated in the contract documents. If the nominal size is not indicated, field measurements shall be used to determine the weight, using 490 pcf as the density of steel. The weight of bolts, rivets and we lds will be neglected, and no deductions will be made for any rivet or bolt holes in the existing steel or for any section loss due to corrosion. The quantity to be measured for payment for removal of existing steel with an each pay unit will be in each unit of existing steel removed.
589-5 BASIS OF PAYMENT. The unit price bid shall include the cost of all labor, materials and
equipment necessary to satisfactorily complete the work, including the removal of paint and fasteners, and disconnecting, supporting, or adjusting steel as necessary. The treatment, handling and disposal of the paint removal waste will be paid separately. Payment will be made under: Item No. Item Pay Unit 589.01nnnn Removal of Existing Steel Pound 589.52nnnn Removal of Existing Steel Each NOTE: nnnn denotes a serialized pay item . SECTION 590 - ADJUSTMENT OF BRIDGE APPURTENANCES
590-1 DESCRIPTION. This work shall consist of adjusting the elevation of bridge joints and drainage
devices to meet the proposed finished elevations in the manner indicated on the Contract Plans. In order to perform the work, it may be necessary to remove structural concrete. Structural concrete removal, if performed, shall be done under its respective item.
590-2 MATERIALS. Materials shall meet the following requirements:
Structural Steel ASTM A36, A242 or A588 Nuts, Bolts, and Washers ASTM A307 Grade A Galvanized Coatings and Repair Methods 719-01 Preformed Elastic Joint Sealer 705-09
590-3 CONSTRUCTION DETAILS. All steel materials, including nuts, bolts, and washers, used as a
part of this work, shall be galvanized in accordance with §719 -01. Any galvanized surface, either existing or installed as a part of this work, which is damaged by welding or abrasion, shall be repaired in accordance with §719 -01. All welding shall be done in accordance with the applicable requirements of the New York State Steel Construction Manual. The Contractor shall take suitable precautions to prevent damage to materials designated to remain - in-place. Damage to such material, due to the Contractor's operations, shall be repaired or the damaged material replaced, as determined by the Engineer. Dimensions shown on the plans shall be verified by the Contractor and any necessary changes approved by the Engineer prior to construction of any needed fabrications. Preformed elastic joint sealer, where required, shall be installed in accordance with the Contract Plans.
590-4 Method of Measurement
590-4.01 Bridge Drainage Devices. The work will be measured as each bridge drainage device as
defined by the Contract Plans which has had its elevation adjusted in accordance with the Contract Plans.