596-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 splices. If the measured quantity is first computed in board feet, the conversion factor shall be 0. 083334 cubic feet per board feet.
594-5 BASIS OF PAYMENT. The unit price bid per cubic foot shall include the cost of furnishing all
spikes, nails, screws, timber connectors, bolts, nuts, washers, hardware, preservative treatment and other required materials together with labor and equipment necessary to complete the work. Payment will be made under: Item No. Item Pay Unit 594.01 Timber and Lumber Cubic Foot 594.02 Stress Graded Timber and Lumber Cubic Foot 594.03 Treated Timber and Lumber Cubic Foot SECTION 595 - WATERPROOFING SYSTEMS FOR STRUCTURES
595-1 DESCRIPTION. The work in this section shall include work required for waterproofing systems
for structures.
595-2 MATERIALS. Materials shall be as specified in the special specifications.
595-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
595-4 METHOD OF MEASUREMENT. As specified in the special specifications.
595-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 596 - OPEN STEEL FLOOR
596-1 DESCRIPTION. The work shall consist of furnishing and placing open steel floor in structural
slabs, at the locations indicated on the contract plans.
596-2 Materials
596-2.01 Steel. All steel for the component parts shall conform to the requirements of ASTM A36 or
A588. If steel conforming to ASTM A36 is used, it shall be furnished with a minimum copper content of 0.20 percent. The Contractor shall furnish the Department with two certified copies of the record of physical tests and chemical analysis of the steel used.
596-2.02 Fabrication. All the requirements and provisions of the SCM shall apply.
596-2.03 Shop Painting. The open steel floor shall be painted in accordance with the contract
documents. Surfaces which are to be welded shall not be painted until all welding is completed.
596-3 Construction Details
596-3.01 Placement. Open steel floor shall be placed true to line and grade and shall make full and even
bearing on the underlying surface.