TABLE OF CONTENTS NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Contents Section 600 ................................ ................................ ................................ ................ 4 INCIDENTAL CONSTRUCTION ................................ ................................ ........ 4 SECTION 601 - ARCHITECTURAL PAVEMENTS AND TREATMENTS .................. 4 SECTION 602 - REHABILITATION OF CULVERT AND STORM DRAIN PIPE ....... 5 SECTION 603 - CULVERTS AND STORM DRAINS ................................ ................. 12 SECTION 604 - DRAINAGE STRUCTURES ................................ ............................. 20 SECTION 605 - UNDERDRAINS ................................ ................................ ............... 25 SECTION 606 - GUIDE RAILING, MEDIAN BARRIER, AND CONCRETE BARRIER ................................ ................................ ................................ ................................ ... 28 SECTION 607 - FENCES ................................ ................................ ........................... 51 SECTION 608 - SIDEWALKS, DRIVEWAYS, BICYCLE PATHS, AND VEGETATION CONTROL STRIPS ................................ ................................ .......... 56 SECTION 609 - CURB AND CURB & GUTTER ................................ ........................ 65 SECTION 610 - GROUND VEGETATION - PREPARATION, ESTABLISHMENT AND MANAGEMENT ................................ ................................ ............................... 71 SECTION 611 - PLANTING, TRANSPLANTING AND POST PLANTING CARE ................................ ................................ ................................ ........................... 868680 SECTION 612 (VACANT) ................................ ................................ .................. 929387 SECTION 613 - WILDLIFE AND ECOLOGY ................................ ................... 929387 SECTION 614 - PRUNING, IMPROVING AND REMOVING EXISTING VEGETATION ................................ ................................ ................................ .. 939387 SECTION 615 - LANDSCAPE APPURTENANCES ................................ ........... 979892 SECTION 616 - SOIL BIOENGINEERING ................................ ....................... 979892 SECTION 617 - INVASIVE SPECIES MANAGEMENT ................................ .... 989892 SECTION 618 (VACANT) ................................ ................................ .................. 989892 SECTION 619 - WORK ZONE TRAFFIC CONTROL ................................ ....... 989892 SECTION 620 - BANK AND CHANNEL PROTECTION ............................. 160161153 SECTION 621 - CLEANING CULVERTS, DRAINAGE STRUCTURES AND EXISTING ROADSIDE SECTIONS ................................ ............................ 164165157 SECTION 622 - BUILDINGS AND MISCELLANEOUS STRUCTURES ..... 167168160 SECTION 623 - SCREENED GRAVEL, CRUSHED GRAVEL, CRUSHED STONE, CRUSHED SLAG ................................ ................................ ........................ 167168160 SECTION 624 - PAVED GUTTERS ................................ ............................. 168169161 SECTION 625 - SURVEY OPERATIONS ................................ .................... 171172164 SECTIONS 626 THRU 628 (VACANT) ................................ ........................ 183184176 SECTION 629 - PETROLEUM STORAGE TANK CLOSURE .................... 183184176 SECTION 630 - BARRICADES ................................ ................................ .... 188189181 SECTION 631 (VACANT) ................................ ................................ ............ 189190182 SECTION 632 (VACANT) ................................ ................................ ............ 189190182 SECTION 633 - CONDITIONING EXISTING PAVEMENT PRIOR TO ASPHALT OVERLAY ................................ ................................ ................................ ... 189190182 SECTION 634 (VACANT) ................................ ................................ ............ 193193185 SECTION 635 - CLEANING AND PREPARATION OF PAVEMENT SURFACES FOR PAVEMENT MARKINGS ................................ ................................ ........... 193193185 TABLE OF CONTENTS NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 SECTION 636 (VACANT RESPONSE WORK ) ................................ .......... 195196187 SECTION 637 - ENGINEER’S FIELD OFFICE, LABORATORY AND EQUIPMENT ................................ ................................ ................................ ..................... 199196187 SECTION 638 - WHITE SYNTHETIC RESIN BINDER CONCRETE ......... 209206198 SECTION 639 - CONSTRUCTION CONTRACT MANAGEMENT SYSTEMS ................................ ................................ ................................ ..................... 212209200 SECTION 640 - REFLECTORIZED PAVEMENT MARKING PAINTS ...... 212209201 SECTION 641 - BRIDGE WASHING ................................ ........................... 214211202 SECTION 642 - ROADSIDE MAINTENANCE ................................ ............ 214211203 SECTION 643 - NOISE BARRIERS ................................ ............................. 214211203 SECTION 644 - OVERHEAD SIGN STRUCTURES ................................ .... 215212203 SECTION 645 - SIGNS ................................ ................................ ................ 225222213 SECTION 646 - DELINEATORS, REFERENCE MARKERS AND SNOWPLOWING MARKERS ................................ ................................ ................................ .. 234231223 SECTION 647 - REMOVING, STORING, AND RELOCATING SIGNS, SIGN PANEL ASSEMBLIES, SIGN SUPPORTS, AND FOUNDATIONS ........................... 237234225 SECTION 648 - SUBSURFACE EXPLORATIONS ................................ ...... 240237229 SECTION 649 - AUDIBLE ROADWAY DELINEATORS ............................ 248245236 SECTION 650 - TRENCHLESS INSTALLATION OF CASING .................. 251248239 SECTION 651 - COMMUNICATION FACILITIES ................................ ..... 261258250 SECTION 652 - FURNISHING AND APPLYING SALTS ............................ 261258250 SECTION 653 PAVEMENT RIDE QUALITY ................................ ............. 262259251 SECTION 654 - IMPACT ATTENUATORS - PERMANENT ....................... 264261253 SECTION 655 - FRAMES, GRATES AND COVERS ................................ ... 269266257 SECTION 656 - MISCELLANEOUS METALS ................................ ............ 270267259 SECTION 657 – PAINTING GALVANIZED AND ALUMINUM SURFACES ................................ ................................ ................................ ..................... 271268260 SECTION 658 - WATER WELLS ................................ ................................ 276273264 SECTION 659 - TELECOMMUNICATION UTILITIES .............................. 276273264 SECTION 660 - UTILITIES ................................ ................................ ......... 276273265 SECTION 661 - ELECTRIC UTILITIES ................................ ..................... 277274265 SECTION 662 - GAS, OIL & STEAM UTILITIES ................................ ....... 277274266 SECTION 663 - WATER SUPPLY UTILITIES ................................ ............ 278275266 SECTION 664 - SANITARY SEWER UTILITIES ................................ ........ 289286278 SECTION 665 - WATERWAYS ................................ ................................ ... 290287278 SECTION 666 (VACANT) ................................ ................................ ............ 290287278 SECTION 667 - LOCAL ROAD GRAVEL SURFACE, BASE, AND SUBBASE COURSES ................................ ................................ ................................ .... 290287279 SECTIONS 668 AND 669 (VACANT) ................................ ........................... 293290281 SECTION 670 - HIGHWAY LIGHTING SYSTEM ................................ ...... 293290281 SECTIONS 671 THRU 674 (VACANT) ................................ ........................ 305302293 SECTION 675 - RAILROAD TRACK AND APPURTENANCES ................. 305302294 SECTIONS 676 THRU 679 (VACANT) ................................ ........................ 305302294 SECTION 680 - TRAFFIC SIGNALS ................................ ........................... 305302294 SECTION 681 AND 682 (VACANT) ................................ ............................. 327324316 SECTION 683 - INTELLIGENT TRANSPORTATION SYSTEMS .............. 327324316 TABLE OF CONTENTS NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 SECTION 684 (VACANT) ................................ ................................ ............ 328325316 SECTION 685 - EPOXY REFLECTORIZED PAVEMENT MARKINGS ..... 328325316 SECTION 686 (VACANT) ................................ ................................ ............ 336330319 SECTION 687 - THERMOPLASTIC REFLECTORIZED PAVEMENT MARKINGS ................................ ................................ ................................ ..................... 336330319 SECTION 688 - PREFORMED REFLECTORIZED PAVEMENT MARKINGS ................................ ................................ ................................ ..................... 340334323 SECTION 689 (VACANT) ................................ ................................ ............ 343338327 SECTION 690 - SPECIALTY WORK ................................ .......................... 343338327 SECTIONS 691 THRU 695 - (VACANT) ................................ ...................... 344338327 SECTION 696 - CONTRACTOR CHARGES (for Construction’s use only) .. 344338327 SECTION 697 - FIELD CHANGE PAYMENT ................................ ............. 344338328 SECTION 698 - PRICE ADJUSTMENTS ................................ ..................... 345340329 SECTION 699 - MOBILIZATION ................................ ............................... 350344333
601-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Section 600 INCIDENTAL CONSTRUCTION SECTION 601 - ARCHITECTURAL PAVEMENTS AND TREATMENTS (Last Revised September 2016)
601-1 DESCRIPTION. This work shall consist of the construction, placing, or applying of architectural
pavements and treatments in accordance with the Contract Documents or as directed by the Engineer.
601-2 MATERIALS. Materials shall conform to the following subsections.
Bituminous Materials 702 Bituminous Tack Coat ( SS-1h or CSS-1h) 702-3601 Fine Aggregates 703-01 Mineral Filler 703-08 Precast Concrete Street Pavers 704-23 Water 712-01
601-2.01 Precast Concrete Street Paving.
601-3 Construction.
601-3.01 Precast Concrete Street Paving
602-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 The Contractor shall fill gaps at the edges of the paved area with cut pavers or edge units. The Contractor shall adjust pattern at pavement edges such that cutting of edge pavers is minimized. All cut pavers subject to tire traffic shall be no less than o ne-third (1/3) of a whole unit. After pavers are placed on the adhesive, set them in it with at least one pass of a minimum 300 pound hand roller. Replace any cracked units with whole units and set them with the hand roller. Polymeric sand shall be swept over the precast concrete street pavers until the joints are completely filled. The paver surface shall be swept clean and the joints lightly wetted with water. This joint filling operation shall not be performed if the air te mperature is expected to fall below 40ºF, or there is an expectation of rain within 4 hours of the completion.
601-4 METHOD OF MEASUREMENT. Architectural pavements and treatments will be measured by
the number of square yards placed.
601-5 BASIS OF PAYMENT. The unit price bid per square yard shall include the cost of all labor,
materials and equipment necessary to satisfactorily complete the work, including setting bed material, except that any sawcutting of existing pavement, excavation, concrete base, curb, curb and gutter, and subbase course will be paid for separately. Payment will be made under: Item No. Item Pay Unit 601.01 Precast Concrete Street Paving (Bituminous Setting Bed) Square Yard SECTION 602 - REHABILITATION OF CULVERT AND STORM DRAIN PIPE (Last Revised January 2019)
602-1 DESCRIPTION. Rehabilitate culvert and storm drain pipe in accordance with these
specifications, the contract documents, and as directed by the Engineer.
602-2 Material Requirements.
602-2.01 General. Materials requirements are specified in the following subsections:
Portland Cement Concrete 501 Shotcrete 583 Concrete Repair Material 701-04 Vertical and Overhead Patching Material 701-08 Concrete Repair Material - High Early Strength 701-12 Grout Sand 703-04 Cured in Place Pipe (CIPP) Liner 706-09 Polyvinyl Chloride Pipe (relining) 706-10 (Profile Wall) (Corrugated) High Density Polyethylene Pipe (HDPE) (relining) 706-11 (Profile Wall) (Smooth Wall) Corrugated Steel Pipe 707-02 (Polymer Coated) Tunnel Liner Plate (relining) 707-05 Structural Steel Plate for Pipe, Pipe Arches and Underpasses 707-08 Corrugated Structural Steel Plate for Pipe and Pipe Arches and Underpasses 707-09 Anchor Bolts for Corrugated Culverts 707-20 Zinc Chromate Primer 708-04
602-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Bar Reinforcement, Grade 60 709-01 Wire Fabric for Concrete Reinforcement 709-02 Stud Shear Connectors 709-05 Membrane Curing Compound 711-05 Admixtures 711-08 Lightweight Concrete Fill (Type A or B) 733-01
602-2.02 Grout for Annular Space. Design the grout for the annular space between the existing pipe
and new liner pipe in accordance with the pipe Manufacturer’s recommendations. Grout for the annular space shall be in accordance with 733 -01 Lightweight Concrete Fill (Type B). Calculate the required volume of grout based on the existing culvert/storm drain internal diameter (minus deformations) and the external diameter of liner pipe. All grout components must appear on the Approved List unless approved by the Director, Materials Bureau.
602-3 CONSTRUCTION DETAILS. Provide the Engineer, a minimum of 10 days prior to starting of
the work, a written proposal of how the work will be progressed. The proposal shall include dewatering of the pipe; procedures for maintaining line and grade of the lining pipe, pipe manufa cturer’s recommendations for the assembly of preapproved joints, or joint fusion methods; bracing methods; grout mix design; and void filing techniques. Such proposals are also required, regardless of the rehabilitation method, for shotcreting, concrete, and void filling methods.
602-3.01 Existing Pipe Preparation. Dewater, clean and inspect the existing pipe. Determine the
location of and remove obstructions that may prevent proper installation of the paving or lining material. Inspect small inaccessible pipes, generally less than 48 inches in diameter, using a closed circuit television and camera to provide a visual inspection. Provide strutting and bracing as required to ensure stability of the pipe.
602-3.02 Handling & Installing Lining Materials
602-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 the pipe then upon completion of the anchoring, restore the coating in accordance with §702 -02 Corrugated Steel Pipe, E. Coating restoration is not required where mechanical anchoring of the reinforcement has been utilized.
602-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 a. Hydrostatic Head. The standpipe height must be sufficient to maintain at least the minimum required pressure between the CIPP liner and the existing (host) pipe. The lower end of the liner must extend beyond the outlet end whenever possible. Where changes in elevation may create excessive stresses on the liner felt, the use of bulkheads may be necessary. Alternative installation methods using a hydrostatic head will be subject to approval by the Director, Materials Bureau.
602-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Office.
602-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 additional cost to the state. Grout that fills invert and connected voids is covered in the cost for these items.
602-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 grout into the annular space. Once lining with this item has been completed, apply §603 -3.07 Concrete Paving for Corrugated Structural Plate Pipe and as indicated in the contract documents.
602-3.03 Damaged Pipe and Repair. Repair all damage to the existing host pipe caused that is strictly
obstructing the progress of the relining operation. Repair any damage to the newly installed liner caused during construction, consistent with recommendations of Section 603 - 3.04 Damag ed Pipe and Repair.
602-4 Method of Measurement
602-4.01 Lining with new pipe. This work will be measured as the number of feet along the bottom
centerline, measured to the nearest foot.
602-4.02 Paving inverts. This work shall be measured as the number of square feet determined by the
paved width measured along the pipes interior circumference at the top of the corrugations and the length along the centerline of the pipe measured to the nearest square foot.
602-4.03 Shotcreting. This work shall be measured as the number of square feet determined by the
shotcreted width measured along the pipes interior circumference at the top of the corrugations and the length along the centerline of the pipe measured to the nearest square foo t.
602-5 BASIS OF PAYMENT. Include the cost of furnishing all labor, materials, and equipment
necessary to complete the work in the unit price bid. Include the cost of all fill material needed to fill the annular space between the existing pipe and the liner pipe, dewatering and cleaning of existing pipe, and the removal of any obstructions, intrusions or damaged pipe prior to lining. For Paving Inverts and Shotcreting, include the cost of furnishing all labor, materials and equipment necessary to complete the work for the unit price bid and include all necessary preparations such as dewatering and cleaning to the existing pipe. For Cured in Place Pipe, include the cost of furnishing all labor, materials and equipment necessary to complete the work for the price unit bid and include all necessary preparations such as dewatering and
603-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 cleaning to the existing pipe, all activities involving water treatment as well as water and waste transportation and disposal. The excavation for the resin containment pit, temporary storage of the fill and restoration of the downstream channel will be paid for under 206.04 Trench and Culvert Excavation – O.G. Payment will be made under: Item No. Item Pay Unit 602.2002 Structural Paving of Inverts with Portland Cement Concrete Square Feet 602.2101 Lining Culvert with Shotcrete Square Feet 602.25xx Lining with High Density Polyethylene Pipe Feet 602.26xx Lining with Smooth Wall High Density Polyethylene Pipe Feet 602.27xx Lining with Profile Wall High Density Polyethylene Pipe Feet 602.30xx Lining with Polyvinyl Chloride Pipe Feet 602.36xx Lining with Cured in Place Pipe (CIPP) Feet 602.37xx Lining Concrete pipe with Cured in Place Pipe (CIPP) Feet 602.4xynnn Lining with Structural Steel Plate for Pipe, Pipe Arches and Underpasses Square Feet x – Thickness (2= ½ inch, 3= ¾ inch, 4=1 inch, 5=1⅛ inch, 6=1¼ inch, 7= 1⅜ inch) y- Shape (1= Arch, 2=Box, 3=Horizontal Ellipse, 4=Vertical Ellipse, 5=Round) nnn=serialized pay item 602.51xxxx Lining with Corrugated Steel Structural Plate Pipe with PCC Paved invert Feet 602.53xxxx Lining with Corrugated Steel Structural Plate Pipe Arch with PCC Paved invert Feet 602.550101 Lining with Steel Tunnel Liner Plate 10ga Square Feet 602.550102 Lining with Steel Tunnel Liner Plate 8ga Square Feet 602.550103 Lining with Steel Tunnel Liner Plate 7ga Square Feet 602.550104 Lining with Steel Tunnel Liner Plate 5ga Square Feet 602.550105 Lining with Steel Tunnel Liner Plate 3ga Square Feet 602.75xx Lining with Polymer Coated CSP 12ga, (2 - 2/3”x1/2”) Feet 602.80xx Lining with Polymer Coated CSP 12ga, (3”x1”) or (5”x1”) Feet Refer to Contract Proposal for full Item Number and full description. SECTION 603 - CULVERTS AND STORM DRAINS
603-1 DESCRIPTION. Construct culverts and storm drains in accordance with these specifications, the
contract plans, and the appropriate standard sheets.
603-2 Materials
603-2.01 General. Materials requirements are specified in the following subsections:
Geotextile 207 Corrugated Structural Steel Plate for Pipe, Portland Cement Concrete 501 Pipe-Arches and Underpasses 707-09 Portland Cement 701-01 Galvanized Steel End Sections 707-10 Masonry Cement 701-02 Aluminum End Sections 707-11 Concrete Repair Material 701-04 Corrugated Aluminum Pipe 707-13 Concrete Repair Material – Corrugated Aluminum Structural
603-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 High Early Strength 701-12 Plate for Pipe and Pipe -Arches 707-14 Mortar Sand 703-03 Anchor Bolts for Corrugated Culverts 707-20 Non-Reinforced Concrete Pipe 706-01 Zinc Chromate Primer 708-04 Reinforced Concrete Pipe 706-02 Bar Reinforcement, Grade 60 709-01 Reinforced Concrete Elliptical Pipe 706-03 Wire Fabric for Concrete Reinforcement 709-02 Reinforced Concrete End Sections 706-07 Plastic Coated Fiber Blankets (For Curing) 711-03 Polypropylene Pipe 706-08 Smooth Interior Corrugated Membrane Curing Compound 711-05 Polyethylene Pipe 706-12 Water 712-01 Corrugated Steel Pipe 707-02 Galvanized Coatings and Repair Methods 719-01 Ductile Iron Pipe (Non -Pressure) 707-03
603-3 Construction Details
603-3.01 Excavation. Apply the requirements specified in Section 206, Trench, Culvert and Structure
Excavation, except as modified by the Contract Documents or as directed by the Engineer.
603-3.02 Laying Pipe
603-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 F. Polyethylene and Polypropylene Pipe . Handle, store and assemble all pipe in accordance with the Approved Materials Details except as modified in the Contract Documents or by the Engineer. Joint misalignment resulting in offsets greater than 1/4 inch or joint separations greater than 1/2 b etween adjoining sections of pipe will not be allowed. Field cuts are permitted only at the terminal ends and with a minimum pipe length of 40 inches.
603-3.03 Bedding and Backfilling Pipe. Apply the standards of Section 203, Select Granular Fill and
the appropriate NYSDOT Standard Sheets. Select Granular Fill used to backfill around aluminum or aluminum coated pipes will be free of portland cement unless the pipe sections are thoroughly coated with Zinc Chromate Primer, §708 -04 or an equivalent alternative as approved by the Materials Bureau. 100% of the Select Granular Fill used around Type IR and IIR corrugated aluminum pipe must pass a 2 inch sieve.
603-3.04 Damaged Pipe and Repair
603-3.05 Field Strutting of Corrugated and Structural Plate Pipe. Field strutting of corrugated metal
pipe and structural plate pipe may be done at the Contractor's option and expense to provide added protection from construction equipment and other loads during installation, backfilling and filling above
603-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 the pipe. The method and scheduling of installation and removal of strutting, must be approved by the Engineer. Field strutting shall constitute installation of structurally sound timber sills, compression caps and struts.
603-3.06 Joints
603-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Galvanized Coatings and Repair Methods: Type I for straps and Type II for nuts, bolts, and washers for the steel strap and anchoring hardware. Alternative designs of the restraining device and anchoring hardware will be considered for approval by the Director of the Materials Bureau if they provide equivalent restraining properties and durability. Restraining devices may be placed on either the inside or outside of the pipe. If placed on the inside, the device shall not protrude from the wall to the degree where flow would be obstructed. Only cold bending of the restraining device is allowed. Hole s in the pipe and end sections required for the anchor bolts may be drilled in the field.
603-3.07 Concrete Paving for Corrugated Structural Plate Pipe. Place reinforced Portland Cement
Concrete over the inverts of corrugated structural plate pipe where specified and indicated on the Contract Documents, so as to form a smooth interior. Do not place pavement until the embankment has been completed over the pipe and settlement has been completed to the satisfaction of the Engineer. Pave the bottom 25 percent of the inside circumference for round pipe, the bottom 30 percent of the inside periphery for arch spans of 10 feet 3 inches and shorter and the bottom 35 percent of the inside periphery for arch spans longer than 10 feet 3 inch es unless otherwise specified by the Engineer. A minimum cover of 4 inches is required over all corrugations. Schedule and conduct the diversion of water operations prior to and during the placement of pavement in a manner satisfactory to the Engineer. Pr ior to placing pavement clean and dry the surfaces to be in contact with concrete to the satisfaction of the Engineer. Place the steel fabric reinforcement on the crests of corrugations and securely fasten to the pipe or pipe-arch by welding or by other methods acceptable to the Engineer. Place the reinforcement to provide a 4 inch minimum clearance from the edges of con crete and lap 6 inch minimum. Unless otherwise shown
603-3 08
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 on the plans, the steel fabric reinforcement shall consist of No. 6 gauge wire at 6 inch centers transversely and longitudinally. Finish the pavement to a smooth surface acceptable to the Engineer. Within 18 hours after completion of finishing, protect the surface by either an approved curing cover or an approved membrane curing compound applied at a minimum rate of 1 gallon per 150 square feet. However, any concrete in the invert that would be exposed to sunlight must be cured immediately after the finishing operations have been completed and the surface water has evaporated. Cure the concrete for a minimum period of 48 hours before water is permitted to flow on the invert. If the atmospheric temperature is below 45°F, the requirements of 555 -3.08C, Provisions for Concreting in Cold Weather, shall apply.
603-3.08 Relaying Pipe. Carefully remove, clean, preserve, haul and relay pipe as directed by the
Engineer or as called for in the Contract Documents. The relaid pipe shall be true to line and grade, and have a full, firm, even bearing and be comparable to newly laid pipe. Co nstruct joints of relayed pipe as specified in §603 -3.06. When existing pipe is damaged during removal or relaying, rendering it unfunctional, replace it with new pipe at no additional cost to the State. Existing pipe which is determined by the Engineer t o be unfit for relaying may be destroyed before removal. Apply the requirements of §603 -3.03 for backfill and placement.
603-3.09 Ancho r Bolts. Unless instructed otherwise, use anchor bolts, as specified in §707 -20 to anchor
the ends of corrugated metal pipes, and sectional plate arches to either reinforced or plain concrete headwalls.
603-3.10 Culvert -End Safety Grates. Culvert -end safety grates shall be fabricated in accordance with
the Standard Sheets. The grate shall lay flat on the embankment slope, overlap the opening equally on each side, and at the top as indicated in the contract documents. The Contractor shall perform any necessary excavation, backfill, and final slope shaping and grading to ens ure proper grate support and smooth uniform slopes in the area surrounding the grate. All disturbed areas will be reestablished to the satisfaction of the Engineer.
603-4 Method of Measurement
603-4.01 Pipe. The Engineer will measure the pipe, in feet along the bottom centerline, furnished and
incorporated into the work in accordance with the Contract Documents.
603-4.02 End Sections. The Engineer will count the number of units of each size or diameter furnished
and incorporated into the work in accordance with the Contract Documents.
603-4.03 Relaying Pipe. The Engineer will measure the existing pipe relayed and any new pipe laid and
furnished to replace existing pipe, in feet along the bottom centerline, incorporated into the work in accordance with the Contract Documents.
603-4.04 Concrete Collars. The Engineer will count the number of concrete collars furnished and
incorporated into the work in accordance with the Contract Documents.
603-4.05 Culvert -End Safety Grates. Culvert -end safety grates will be measured in square feet to the
nearest 0.1 square foot of safety -grate installed, using payment areas shown on the Standard Sheet. For sizes that are not shown on the Standard Sheet, the area will be computed as the pro duct of the overall length and width.
603-5 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 603-5 BASIS OF PAYMENT
603-5.01 General. The accepted quantities of all pipe construction and reconstruction will be paid for at
the contract price bid which will include the cost of furnishing all labor, materials and equipment necessary to complete the work including those joints made with o akum, portland cement and mortar or poured caulking compounds. For concrete end sections include the cost of the restraining devices and their installation. If no end sections are specified and restraining devices are required, include the cost of the restraining devices in the unit price bid for the pipe. Include the cost of bituminous coating or concrete paving including steel wire fabric reinforcement, when specified in the unit price bid for the respective pipe items. Include the cost of breaking into existing drainage structures to connect new pipe in the unit bid price for the respective pipe items. Include the cost of anchor bolts, when required, in the unit bid price for pipe items. Progress payment may be made to the extent of 80% of the price bid for pipe items requiring concrete invert paving when the installation is substantially completed and backfilled to a minimum of 24 inch over the top of the pipe plus whatever additional co ver is necessary to protect the installation from construction traffic. The remaining 20% will be paid upon completion of the invert paving. Excavation, granular fill and backfill will be paid for separately under their appropriate items in Sections 203 and 206, as applicable except include the additional costs necessary for the special gradation for Backfill Material for Corrugated Aluminum P ipe-Type IR and the additional cost necessary to assure the backfill material be free of portland cement in the unit bid price for these pipes. Include the cost of adding water for compaction in the price bid, unless items for furnishing water equipment and applying water are included in the proposal. Payment for the geotextile material and its installation is included under the structural pipe arch item.
603-5.02 End Sections. Include the cost of all labor, materials and equipment necessary to complete the
work as specified in the contract documents. The cost of the restraining devices and their installation, required for concrete pipe, shall be included in the unit price bid for the end sections.
603-5.03 Concrete Collars. Include the cost of all labor, materials (including concrete repair material)
and equipment necessary to complete the work as specified in the contract documents.
603-5.04 Culvert -End Safety Grates. The unit price bid shall include the cost of all labor, materials,
and equipment necessary to complete the work, including excavation, topsoil, seeding and mulching. Payment will be made under: Item No. Item Pay Unit 603.0101 Culvert -End Safety Grate Square Foot 603.0102 Culvert -End Safety Grate (Heavy -Duty) Square Foot 603.02xx Non-Reinforced Concrete Pipe Foot 603.05xxxx Corrugated Steel Pipe (2 2/3 x 1/2) Foot 603.06xxxx Corrugated Steel Pipe Paved Invert (2 2/3 x 1/2) Foot 603.07xxxx Corrugated Steel Pipe Fully Paved (2 2/3 x 1/2) Foot 603.08xxxx Corrugated Steel Pipe Arch (2 2/3 x 1/2) Foot 603.09xxxx Corrugated Steel Pipe Arch, Paved Invert (2 2/3 x 1/2) Foot 603.10xxxx Corrugated Steel Pipe Arch, Fully Paved (2 2/3 x 1/2) Foot 603.11xxxx Corrugated Steel Pipe (3 x 1) or (5 x 1) Foot 603.12xxxx Corrugated Steel Pipe Paved Invert (3 x 1) or (5 x 1) Foot 603.13xxxx Corrugated Steel Pipe Fully Paved (3 x 1) or (5 x 1) Foot 603.14xxxx Corrugated Steel Pipe Arch (3 x 1) or (5 x 1) Foot 603.15xxxx Corrugated Steel Pipe Arch Paved Invert (3 x 1) or (5 x 1) Foot 603.17xxxx Galvanized Steel End Sections Pipe (2 2/3 x 1/2) Each
603-5 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 603.18xxxx Galvanized Steel End Sections Pipe Arch (2 2/3 x 1/2) Each 603.20xxxx Galvanized Steel End Sections Pipe Arch (3 x 1) or (5 x 1) Each 603.23xx Corrugated Structural Steel Plate Pipe (60 - 108 Diam.) Foot 603.24xx Corrugated Structural Steel Plate Pipe (114 - 162 Diam.) Foot 603.25xx Corrugated Structural Steel Plate Pipe (168 - 216 Diam.) Foot 603.26xx Corrugated Structural Steel Plate Pipe (222 - 252 Diam.) Foot 603.27xx Corrugated Structural Ste el Plate Pipe PCC Paved Invert (60 - 108 Diam.) Foot 603.28xx Corrugated Structural Steel Plate Pipe PCC Paved Invert (114 - 162 Diam.) Foot 603.29xx Corrugated Structural Steel Plate Pipe PCC Paved Invert (168 - 216 Diam.) Foot 603.30xx Corrugated Structural Steel Plate Pipe PCC Paved Invert (222 - 252 Diam.) Foot 603.31xx Corrugated St ructural Steel Plate Pipe Arch (6 feet 1 inch - 20 feet 7 inch span, 9PI, Corner Plate) Foot 603.32xx Corrugated Structural Steel Plate Pipe Arch, PCC Paved Invert (6 feet 1 inch - 19 feet 8 inch span, 9PI, Corner Plate) Foot 603.35xx Corrugated Structural Steel Plate Underpass Foot 603.40xxxx Round Corrugated Aluminum Pipe (2 2/3 x 1/2) (12 - 30 Diam.) Foot 603.41xxxx Round Corrugated Aluminum Pipe (3 x 1) (36 - 96 Diam.) Foot 603.44xxxx Corrugated Aluminum Structural Plate Pipe (9 x 2 1/2)(60 - 114 Diam.) Foot 603.46xxxx Corrugated Aluminum Structural Plate Pipe (9 x 2 1/2)(120 - 180 Diam.) Foot 603.48xxxx Corrugated Aluminum Pipe -Arch (2 2/3 x 1/2)(17 Span, 13 Rise) to (57 Span, 38 Rise), and (3 x 1) (60 span, 46 R ise to 95 Span, 67 Rise) Foot 603.50xxxx Corrugated Aluminum Structural Plate Pipe -Arch (9 x 2 1/2) (6 ft 1 in Span, 5 ft Rise to 11 ft 5 in Span, 7 f t Rise) Foot 603.52xxxx Corrugated Aluminum Structural Plate Pipe -Arch (9 x 2 1/2) (12 feet 3 in ch Span, 7 f eet 3 in ch Rise to 19 feet 5 in ch Span, 11 f eet 11 in ch Rise) Foot 603.53xxxx Corrugated Aluminum Pipe, Type IIR Foot 603.54xxxx Corrugated Aluminum End Sections Pipe Each 603.55xxxx Corrugated Aluminum End Sections, Pipe Arch Each 603.56xxxx Corrugated Steel Pipe - Type IR Foot 603.58xxxx Corrugated Aluminum Pipe - Type IR Foot 603.59xxxx Corrugated Steel Pipe - Type IIR Foot 603.60xx Reinforced Concrete Pipe Class III Foot 603.61xx Reinforced Concrete Pipe Class IV Foot 603.62xx Reinforced Concrete Pipe Class V Foot 603.66xx Reinforced Concrete Horizontal Elliptical Pipe Class HE II Foot 603.67xx Reinforced Concrete Horizontal Elliptical Pipe, Class HE III Foot 603.68xx Reinforced Concrete Horizontal Elliptical Pipe, Class HE IV Foot 603.69xx Reinforced Concrete Vertical Elliptical Pipe, Class VE IV Foot 603.70xx Reinforced Concrete Vertical Elliptical Pipe, Class VE V Foot 603.71xx Reinforced Concrete Vertical Elliptical Pipe, Class VE VI Foot 603.72xx Reinforced Concrete Cattle Pass Foot 603.73xx Reinforced Concrete Pipe End Sections Each 603.74xx Reinforced Concrete Pipe Class II Foot 603.77 Concrete Collars Each 603.7802xx Polypropylene Pipe (Optional) -Type S, or Type D Foot xx= 12, 15, 18, 24, 30, 36, 42, 48, 60 (denoting pipe diameter in inches) 603.80xxxx Corrugated Steel Pipe -Polymer Coated (2 2/3 x 1/2) Foot 603.81xxxx Corrugated Steel Pipe -Polymer Coated Paved Invert (2 2/3 x 1/2) Foot 603.82xxxx Corrugated Steel Pipe -Arch Polymer Coated (2 2/3 x 1/2) Foot
604-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 603.83xxxx Corrugated Steel Pipe -Arch Polym er Coated Paved Invert (2 2/3 x 1/2) Foot 603.84xxxx Corrugated Steel Pipe -Polymer Coated (3x1) or (5x1) Foot 603.85xxxx Corrugated Steel Pi pe-Polymer Coated Paved Invert (3x1) or (5x1) Foot 603.86xxxx Corrugated Steel Pipe -Arch Polymer Coated (3x1) or (5x1) Foot 603.87xxxx Corrugated Steel Pipe -Arch Polymer Coated Paved Invert (3x1) or (5x1) Foot 603.88xxxx Corrugated Steel Pipe -Aluminum Coated (Type II) (2 2/3 x 1/2) Foot 603.89xxxx Corrugated Steel Pipe -Arch Alum inum Coated(Type II) (2 2/3 x 1/2) Foot 603.90xxxx Corrugated Steel Pipe-Aluminum Coated (Type II)(3x1) or (5x1) Foot 603.91xxxx Corrugated Steel Pipe -Arch Aluminum Coated(Type II)(3x1) or (5x1) Foot 603.92xxxx Corrugated Steel Pipe -Aluminum Coated (Type 2) Type IR Foot 603.93xxxx Corrugated Steel Pipe -Arch Aluminum Coated (Type 2) Type IIR Foot 603.95xx Ductile Iron Pipe Foot 603.96xxxx Smooth Lined Corrugated Aluminum Pipe (2 2/3 x 1/2) Foot 603.97xxxx Smooth Lined Corrugated Aluminum Pipe (3 x 1) Foot 603.98xx Smooth Interior Corr ugated Polyethylene Culvert and Storm Drain Pipe Foot 603.99 Relaying Pipe Foot Refer to Standard Contract Pay Item Catalog for full Item Number and full Description. Numbers in parentheses (without denota tion) are spacing and depth of corrugations in inches. SECTION 604 - DRAINAGE STRUCTURES
604-1 Description
604-1.01 General. This work shall consist of the construction or alteration of drainage structures,
manholes, leaching basins and transverse drainage interceptors in accordance with these specifications, the contract plans and the standard sheets.
604-1.02 Adjustment Rings and Frames for Drainage Structures and Manholes. The Contractor
shall furnish and install prefabricated adjustment rings and frames for drainage structures and manholes. The extensions shall elevate and support drainage structure grates or manhole covers without the necessity of removing the original d rainage structure frame or manhole casting, when the roadway is resurfaced.
604-2 Materials
604-2.01 Drainage Structures and Manholes. Materials used for the construction of drainage structures
and manholes shall be as indicated on the plans, and/or Standard Sheets, and shall conform to the requirements of the following: Cast-in-Place Concrete - Class A 501 Frames and Grates 655 Concrete Repair Material 701-04 Concrete Grouting Material 701-05 Concrete Repair Material - High Early Strength 701 -12 Precast Concrete Driveway and Sidewalk Pavers. 704-13 Premolded Resilient Joint Filler 705-07 Masonry Mortar 705-21 Reinforced Concrete Pipe 706 02 Precast Concrete Drainage Units 706-04 Bar Reinforcement, Grade 60 709-01
604-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Wire Fabric for Concrete Reinforcement 709-02 Cold Drawn Wire for Concrete Reinforcement 709-09 Steps for Manholes 725-02
604-2.02 Transverse Drainage Interceptors. Materials used for the construction of transverse drainage
interceptors shall meet the requirements of §604 -2.01, except that bar reinforcement shall meet the requirements of §709 -04, Epoxy Coated Bar Reinforcement, Grade 60. Transverse drainage interceptors, if precast, shall meet the requirements of §706 -04, Precast Concrete Drainage Units. Dowels shall be fabricated from epoxy coated bar reinforcement conforming to §709 -04.
604-2.03 Leaching Basins . Materials used for the construction of leaching basins shall conform to the
requirements of §604 -2.01 and shall be as indicated on the plans. Concrete for precast units shall conform to the requirements of §706 -04, Precast Concrete Drainage Units.
604-2.04 Adjustment Rings and Frames for Drainage Structures and Manholes. Materials for
prefabricated adjustment rings and frames for drainage structures and manholes shall conform to the following: Prefabricated Adjustment Rings & Frames for Drainage Units & Manholes 715-13
604-2.05 Altering Drainage Structures, Leaching Basins and Manholes. Materials for the repair and
alteration of existing structures shall meet the requirements of §604 -2.01 and shall be as indicated on the contract plans. Structures originally constructed with concrete block, common brick or concrete brick shall be altere d with Precast Concrete Driveway and Sidewalk Pavers, §704 -13, unless indicated otherwise on the contract plans.
604-3 Construction Details
604-3.01 Excavation. Excavation shall be in conformance with the Construction Details of §206 -3
Trench, Culvert and Structure Excavation.
604-3.02 Concrete Drainage Structures and Manholes. Concrete drainage structures and manholes
shall be constructed in accordance with the requirements of these specifications, the Standard Sheets and plans. The Contractor shall have the option of erecting either cast -in-place or precast drainage structure s unless specified otherwise. Cast -in-place drainage structures shall be constructed of Class A concrete and to the requirements of Section 555 Structural Concrete. The Contractor shall have the option of constructing either a rectangular or circular drainage structure when such option is specified and allowed in the contract documents. When the circular structure is selected, it shall conform to the requirements of §706 -04 and will require submission of complete working drawings to the Engineer for review and approval. Contractor proposed changes to drainage structures shown on the Standard Sheets or on the plans, other than minor changes approved by the Engineer, shall require submission of complete working drawings to the Engineer for review and approval. Unless prohibited in the contract documents, the Contractor shall have the option of reducing the size of the drainage structure riser above the uppermost pipe entry in accordance with the requirements of the Standard Sheets. Flat slab reducer designs proposed by the Contractor shall be subject to the review and approval of the Engineer and shall be accompanied by the following:
604-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 B. The design calculations used in the preparation of the working drawings. Acceptance of flat slab tops or platforms for flat slab reducer designs will be on the Basis of Proof -of- Design Test or on the Basis of Rational Design as required by ASTM C478.
604-3.03 Masonry Construction. Masonry construction, when indicated on the plans or standard sheets,
shall consist of concrete pavers laid in full mortar beds. All joints shall be full mortar joints not greater than 1/2 inch wide. When specified, the outside of the masonry constructio n shall be plastered with 1/2 inch thick mortar coat.
604-3.04 Leaching Basins. Leaching basins shall be constructed in accordance with these specifications
and the contract plans.
604-3.05 Pipe Entries. All pipe(s) built into the wall(s) of a drainage structure shall be flush with the
inside face of the drainage structure wall and shall project outside a sufficient distance to allow connection with the adjoining section. The wall knockouts and sealing t he space around the pipe shall be in accordance with the Standard Sheets. The bell of concrete pipe shall be cut off at every pipe entry where the bell enters the drainage structure.
604-3.06 Steps. Drainage structures steps may be cast or bolted in place during construction, mortared
with a concrete grouting material after the structure is completed or attached by friction locking into preformed or drilled holes. The steps shall clear all pipes. Steps in risers and coni cal top sections shall be aligned to form a continuous ladder with rungs equally spaced vertically in the completed structure at a maximum distance of 16 inches. Steps shall be embedded into the walls of the riser or conical top section a minimum of 3 inch es. The rung shall project a minimum clear distance of 4 inches from the walls of the riser or conical sections measured from the point of embedment.
604-3.07 Frames and Grates. Frames and grates shall be as specified in the contract documents. Frames
located in the top slab or top of the uppermost riser shall be secured and held in place by a minimum of 4 stirrups or studs per frame, welded to the frame near the corners. Parallel bar frames shall contain shear stud anchors, for the purpose of transferring loads, as required and detailed on the standard sheet for parallel bar grates and frames. Shear stud anchors, when required, shall replace the frame securing stirrups or studs.
604-3.08 Altering Drainage Structures, Leaching Basins and Manholes. Reconstruction and
adjustment of existing drainage structures shall be as detailed and specified on the contract plans. Construction with cast -in-place concrete shall conform to the requirements of Section 555, Structural Concrete. Frames, grates and covers to be reused shall be removed, cleaned and reset at the required elevations. New frames, grates and manhole covers shall be installed when specified. Upon completion, each structure shall be cleaned of any accumulation of silt, d ebris or foreign matter of any kind and shall be kept clear of such accumulation until final acceptance of the work.
604-3.09 Adjustment Rings and Frames for Drainage Structures and Manholes. Prior to the
placement of the surface course and after the placement of the binder course, when required, the Contractor shall install adjustment rings and frames for manholes and drainage units. The adjustment ring or frame shall be placed so the manhole cover or drainage unit grate will not protrude above the finished surface of the pavement. To assure a firm and secure fit with the adjustment ring or frame, the seat of the existing manhole casting or drainage unit frame shall be free of all foreign material at the time of installation. The entire assembly shall be set on the seat of the exist ing manhole casting or drainage unit frame and the locking
604-3 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 devices shall be tightened evenly. The manhole cover or drainage unit grate shall then be set upon the seat of the adjustment ring or frame. The Contractor shall be responsible for insuring that the adjustment rings and frames are compatible with the existing manhole castings and covers or drainage frames and grates. All rings or frames shall be protected from displacement caused by traffic maintained on the roadway or equipment used in the paving operation. The Contractor shall have the option of removing and resetting the existing manhole casting or drainage unit frames to the required grade where shown on the plans or approved by the Engineer.
604-3.10 Transverse Drainage Interceptors. This work shall consist of the construction of reinforced
concrete transverse drainage interceptors with frames and grates, and dowels as shown on the plans or Standard Sheets. Unless specifically designated on the plans and/or in the proposal, the Contr actor shall have the option of constructing cast -in-place or precast transverse drainage interceptors.
604-3.11 Backfill. No structure shall be backfilled until all the mortar has completely set. The
requirements of Section 203, Select Granular Fill , shall apply.
604-4 Method of Measurement
604-4.01 Drainage Structures, Leaching Basins and Manholes. Drainage structures, leaching basins
and manholes will be measured for payment by the number of linear feet of height measured to the nearest tenth of a foot from the bottom of the base to the top of the masonry, including the top slab.
604-4.02 Transverse Drainage Interceptors
604-4.03 Altering Drainage Structures, Leaching Basins and Manholes. Altering drainage structures,
leaching basins and manholes will be measured by the number of structures altered.
604-4 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 604-4.04 Adjustment Rings and Frames for Drainage Structures and Manholes. This work will be measured by the number of prefabricated adjustment rings or frames furnished and installed.
604-5 Basis of Payment
604-5.01 Drainage Structures, Leaching Basins and Manholes. The unit price bid per linear foot shall
include the cost of all labor, equipment and materials, including bar reinforcement and welded wire fabric, necessary to complete the work, except the following:
604-5.02 Contractor Options. When the specifications allow the Contractor to substitute a precast
circular drainage unit in lieu of a rectangular drainage unit or the Contractor constructs a flat slab reducer design under the provisions of §604 -3.02, the following basis of payment p rovisions will apply :
604-5.03 Altering Drainage Structures, Leaching Basins and Manholes. The unit price bid for each
shall include the cost of all materials, labor and equipment necessary to satisfactorily complete the work including all necessary cleaning, excavation, backfill, and replacement of any pavement, shoulder and sidewalk courses, subcourses, curbs, drives, lawns and any other surface. Frames, covers or grates to be reused that are broken by the Contractor's operations shall be replaced at the Contractor's expense. New frames, covers and grates will be paid for under the appropriat e payment items for Frames and Grates in Section 655.
604-5.04 Adjustment Rings and Frames for Drainage Structures and Manholes. The unit price bid
for each adjustment ring or frame shall include the cost of all material, labor and equipment necessary to satisfactorily install the adjustment rings and frames. If the Contractor elects to reset the existing casting or frames, the co sts of the work involved in the removal and replacement of existing disturbed pavement shall be included in the price bid for the adjustment rings and frames.
604-5.05 Transverse Drainage Interceptors. The price per linear foot bid for this work shall include the
cost of furnishing all labor, materials and equipment necessary to complete the work, except the excavation will be paid for under Trench and Culvert Excavation, and the Underdrain and Underdr ain Filter will be paid for under their respective items. Payment will be made under: Item No. Item Pay Unit 604.01 Leaching Basin Foot 604.06 Transverse Drainage Interceptors Foot
605-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 604.07XXYY Altering Drainage Structures, Leaching Basins and Manholes Each XX = Region (01 through 11) YY = Serialized 01 to 99 * 604.10 Prefabricated Adjustment Rings for Manholes Each 604.11 Prefabricated Adjustment Frames for Drainage Structures Each 604.30XXYY Rectangular Drainage Structure Foot XX = Structure Type ** YY = Frame No. ** 604.31XXYY Rectangular Drainage Structure with Round Option Foot XX = Structure Type ** YY = Frame No. ** 604.32XXYY Rectangular Drainage Structure with Concrete Cap Foot XX = Structure Type ** YY = Frame No. ** 604.40XX Round Precast Manhole Foot XX = Type ** 604.50XXYY Special Drainage Structure Foot XX = Region (01 through 11) YY = Serialized 01 to 99 * * Serialized number identified structure detailed on the plans. ** Structure type and frame number are as defined on the Drainage Structure Details Standard Sheets and the Grate and Frame Standard Sheets. SECTION 605 - UNDERDRAINS
605-1 DESCRIPTION. The work shall consist of constructing underdrain installations in accordance
with these specifications and in conformity with the lines, grades, and cross -sections shown in the contract documents.
605-2 Materials
605-2.01 Underdrain Pipe. Underdrain pipe shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing for the type of pipe specified in the contract documents: Corrugated Steel Pipe - Type III, 16 gage 707-02 Porous Concrete Pipe Underdrain 706-05 Extra Strength Porous Concrete Pipe Underdrain 706-05 Perforated Corrugated Polyethylene Underdrain Tubing 706-13 Corrugated Aluminum Pipe - Type III, 16 gage 707-13 Perforated Polyvinyl Chloride Underdrain Pipe 706-18 Optional underdrain pipe shall meet the requirements of any of the above at the Contractors option except that porous concrete pipe shall not be used in an edge of pavement underdrain installation.
605-2.02 Underdrain Filter. The requirements for Underdrain Filter materials are described below. The
procedure for acceptance or rejection of Underdrain Filter materials shall be in conformance with the procedures contained in the geotechnical control procedure “ Procedure for the Control and Quality Assurance of Granular Materials ”. Underdrain Filter material shall meet the requirements of the following subsections of Section 700 Materials and Manufacturing for the type of underdrain filter material specif ied in the contract documents:
605-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 A. Underdrain Filter Type I. Provide material meeting the requirements of §733 -20 Underdrain Filter, Type 1 .
605-3 Construction Details
605-3.01 Underdrain Pipe. The construction details of Section 603 Culverts and Storm Drains shall
apply. The type of filter material to be used at any location will be as shown in the contract documents. A carefully leveled and compacted bed of this material shall be prepared just prior to the placement of the underdrain pipe. The upgrade end of corrugated polyethylene underdrain pipe shall be closed with a solid plastic cap; the upgrade end of all other types of underdrain pipe shall be closed with a suita ble plug. Unless otherwise shown in the contract documents, the underdrain pipe shall be placed with the perforations down. In the event that the semi -circular option of the Steel Pipe underdrain is utilized, the pipe shall be placed such that the flat sur face is on the top.
605-3.02 Underdrain Filter. After the pipe installation has been inspected and approved, Underdrain
Filter shall be loosely placed around and over the pipe to such a depth that, after compaction, Underdrain Filter shall extend to a level 6 in. above the underdrain pipe or to the next course, whichever is less. Subsequent lifts of Underdrain Filter shall be no more than 6 in. thick prior to compaction and shall be compacted by two passes of a vibrating pad or drum type compactor. The remainder of the install ation shall be in accordance with the applicable standard sheet or as indicated in the contract documents. If the excavation for the underdrain extends outside the payment lines, it shall be backfilled with Underdrain Filter material installed at the Contractor's expense.
605-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Any contaminated underdrain filter material shall be replaced by the Contractor at no additional cost to the State. For corrugated polyethylene underdrain tubing, the filter material shall be placed around and over the tubing to such a depth that, after compaction, the underdrain filter material shall extend to a level 12 in. above the underdrain tubing or to the next course, whichever is less. After placement, the surface of the filter material shall be compacted by three passes of a vibrating pad or drum type compactor. The remainder of the backfill shall be placed in maximum 2 ft. loose lift thicknesses and compacted by three passes of a vibrating pad or drum type compactor after the placement of each lift. In the event that a pipe is not included in this installation, the filter shall be placed in horizontal layers not exceeding 6 in. in thickness prior to compacting. Each lift shall be compacted by two passes of a vibrating pad or drum type compactor. No compaction control tests will be required.
605-4 Method of Measurement
605-4.01 Underdrain Pipe. Underdrain pipe will be measured in feet, measured to the nearest whole
foot, installed in accordance with the contract documents.
605-4.02 Underdrain Filter. Underdrain filter material will be measured in cubic yards, measured to the
nearest whole cubic yard, installed between the payment lines shown in the contract documents. A deduction to the cross sectional area of the underdrain trench will be made for the pipes (based on nominal diameters) when the combined cross -sectional area exceeds 1.0 sq. ft. No deduction will be made for the cross -sectional area of an existing facility.
605-5 Basis of Payment
605-5.01 Underdrain Pipe. The unit price bid per foot shall include the cost of all labor, materials and
equipment necessary to satisfactorily complete the work. The unit price bid per foot for perforated corrugated polyethylene underdrain tubing and perforated PVC underdrain pipe installations that are daylighted through the side slope shall include the shield pipe. Excavation, granular fill and backfill will be paid for separately.
605-5 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 605-5.02 Underdrain Filter. The unit price bid per cubic yard shall include the cost of all labor, materials and equipment necessary to sat isfactorily complete the work. Excavation, granular fill and backfill will be paid for separately. Payment will be made under: Item No. Item Pay Unit 605.04xx Porous Concrete Pipe Underdrain Foot 605.05xx Extra Strength Porous Concrete Pipe Underdrain Foot 605.07xx Corrugated Steel Pipe - Type III Foot 605.08xx Corrugated Aluminum Pipe - Type III Foot 605.0901 Underdrain Filter, Type I Cubic Yard 605.1001 Underdrain Filter, Type II Cubic Yard 605.1101 Underdrain Filter, Type III Cubic Yard 605.15xx Perforated Corrugated Polyethylene Underdrain Tubing Foot 605.16xx Perforated Polyvinyl Chloride Underdrain Pipe Foot 605.17xx Optional Underdrain Pipe Foot Refer to the Standard Contract Pay Item Catalog for full Item Number and full Description. SECTION 606 - GUIDE RAILING, MEDIAN BARRIER, AND CONCRETE BARRIER (Last Revised May 1, 20 23)
606-1 DESCRIPTION. This work shall consist of the construction, reconstruction, removal, disposal,
storage, and resetting of highway barrier systems and component parts in accordance with the specifications, standard sheets, manufacturer’s drawings, manufacturer’s directio ns and contract documents to the lines and grades shown on the plans or established by the Engineer. The types of barrier systems are designated as follows: Cable Guide Railing and Median Barrier. Corrugated Beam Guide Railing and Median Barrier Modified Heavy Post Blocked -Out (HPBO (Mod.)) Corrugated Beam Guide Railing and Median Barrier Box Beam Guide Railing and Median Barrier Concrete Barrier
606-1.01 I-Beam Posts for Existing Highway Barrier. Under this work the Contractor shall furnish and
install I -beam posts and necessary hardware for existing highway barriers in accordance with the plans, specifications, and as directed by the Engineer.
606-1.02 Guide Railing with Extra Long Posts. Under this work the Contractor shall furnish and install
guide railing of the type specified with extra long (7 foot) posts in accordance with the contract documents, and as directed by the Engineer.
606-1.03 Retensioning Existing Cable Guide Railing And Median Barrier. Under this work the
Contractor shall retension existing guide rail and median barrier cables in accordance with the Contract Documents.
606-2 MATERIALS. Materials shall meet the requirements specified in the following subsections of
Section 700 -- Materials and Manufacturing and ASTM Specifications:
606-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Concrete Grouting Material 701-05 Anchoring Materials -Chemically Curing 701-07 Precast Concrete Barrier 704-05 Premo lded Resilient Joint Filler 705-07 Joint Filler ASTM D1056 Wire Fabric For Concrete Reinforcement 709-02 Epoxy Coated Bar Reinforcement, Grade 60 709-04 Wood and Timber Posts and Timber Blockouts 710-13 Galvanized Steel Barrier Posts 710-14 Corrugated Beam Guide Railing End Terminal (Energy -Absorbing) 710-17 HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy -Absorbing) 710-18 HPBO (Mod.) Corrugated Beam Median Barrier End Terminal (Energy -Absorbing) 710-19 Corrugated Beam Guide Railing and Median Barrier 710-20 Box Beam Guide Railing and Median Barrier 710-21 Cable Guide Railing and Median Barrier. 710-22 Box Beam End Assembly Type III and Box Beam Median Barrier End Assembly, Type C 710-24 Plastic and Synthetic Block -Outs for Heavy Post Guiderail Systems 710-26 Anchor Bolts for Guide Railing 710-28 Galvanized Coatings And Repair Methods 719-01 Reflective Sheeting 730-05 (Materials Designation 730 -05.02) Paint for Galvanized Surfaces 708-06 Rolled Steel Channels for Continuity Connections ASTM A36 Steel Plates for Continuity Connections ASTM A36
606-2.01 Steel Hardware. Steel posts, plates, channels, stiffeners, block -outs, angles, brackets, slipbases
and other miscellaneous steel hardware not referenced to or specified by §710 -14, §710 -20, §710 -21, §710 -22, §710 -24 or other sections of this specification shall be fabri cated as shown in the contract plans and documents from steel meeting the requirements of ASTM A36 unless specified otherwise. All components shall be galvanized in accordance with §719 -01, Type I or II. Components shall be fabricated prior to gal vanizing.
606-2.02 Anchor Bolts. For the purpose of the guide railing specifications, the term anchor bolt will be
used when referring to anchor rods, hooks, or studs. Unless otherwise specified, anchor bolts embedded or grouted in concrete for securing post and railing base plates, or transitioning to concrete walls, parapets, and barriers shall meet the requirements of §710 -28. Anchor bolts embedded in concrete anchorage units for terminating guide rail and median barrier systems shall have minimum yield and tensile strength meeting the requirements of ASTM F1554 Grade 36. Anchor bolts, nuts, and washers shall be galvanized in accordance with §719 -01, Galvanized Coatings and Repair Methods, Type II, unless indicated otherwise on the plans or Standard Sheets. Grout for anchor bolts shall conform to the requirements of §701 -07 or §701 -05.
606-2.03 Fasteners. Bolts, nuts and washers shall conform to the following, unless specified otherwise
on the plans, standard sheets, manufacturer’s drawings’, or in the contract documents.
606-2 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Bolts Bolts ASTM A307 Grade A Nuts ASTM A563 Grade A or Better Washers ASTM F436 Bolts, nuts and washers shall be galvanized in accordance with the provisions of §719 -01 Galvanized Coatings and Repair Methods, Type II.
606-2.04 I-Beam Posts for Existing Highway Barrier. I-beam posts for existing highway barrier
shall conform to the requirements of §710 -14 Galvanized Steel Barrier Posts. Posts shall conform to the details shown on the plans or the latest edition of the standard sheet for the guide railing or median barrier affected. Hardware (nuts, bolts, “J” bolts, offset beams or block -outs, back up plates, washers, and shelf angles) necessary shall conform to the requirements of the current specifications and standard sheets for the highway barrier affected.
606-2.05 Extra Long Guide Rail Posts. Extra long Guide Rail Posts shall conform to the requirements
of §710 -14 Galvanized Steel Barrier Posts. The posts shall conform to the details for extra long posts shown on the standard sheets or plans.
606-2.06 Concrete for End Assembly Anchorage Units. Cast-in-place concrete shall meet the
requirements of Class A Concrete in Section 501 Portland Cement Concrete -General. The Contractor may submit, for approval by the Director of the Materials Bureau, a mix at least equivalent to the specified Class A Concrete, with a minimum cement content of 575 lb/cu yd. Precast concrete anchorage units, when selected as an alternate to cast -in-place units by the Contractor, shall meet the requirements of Section 704 -03 Precast Concrete -General.
606-2.07 Concrete Barrier
606-2.08 Resetting Guide Railing, Median Barrier, Anchorage Unit Assemblies and End
Assemblies. The materials comprising the existing system shall be used if they conform to the materials requirements specified for new guide rail systems and are found to be in satisfactory condition as determined by the Engineer. The Contractor shall supply all new hardware (splice tongues, plates, nuts, bolts, washer, etc.) Replacement materials shall meet the material requirements specified for new guide rail systems. Galvanizing of railin g and posts may be repaired in accordance with §719 -01, Galvanized Coatings and Repair Methods. HPBO guide railing and median barrier (pre -2013 design) shall be reset as detailed in the current standard sheets, including 12 inch block -outs.
606-2.09 HPBO (Mod.) Corrugated Beam Guide Railing and Median Barrier. The material
requirements of §710 -20 Corrugated Beam Guide Railing and Median Barrier shall apply except that posts, block -outs, soil plates, anchor bolts, hardware, and fasteners shall be as detailed on the Standard Sheets. The Wood and Timber Posts and Timber Block -Outs shall conform to §710 -13. The Plastic and Synthetic Block -Outs for Heavy Post Guiderail Systems sha ll conform to §710 -26.
606-2 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606-2.10 Corrugated Beam Guide Rail Transition To Bridge Rail, Concrete Barrier and Concrete Parapets. Corrugated beam rail sections shall conform to the requirements of §710 -20 and as detailed on the Standard Sheets or Bridge Detail Sheets. Thrie beam shall conform to the material specifications of 710 -20 and shall be as detailed on the Standard Sheets. . All remaining material shall conform to the requirements of §710 -23 except that:
606-2.11 Vacant.
606-2.12 Vacant
606-2.13 (Vacant)
606-2.14 Transitions Constructed of, or with, Concrete. Concrete transition between concrete
barriers of different shapes and the concrete elements of transitions between metal barriers and concrete barriers shall conform to §606 -2.07 Concrete Barrier, A. Precast Concrete Barrier or, with the permission of the Engineer, B. Cast -in-Place Concrete Barrier.
606-3 Construction Details
606-3.01 General. All barrier systems and transitions described by these specifications shall be subject
to the following requirements.
606-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 D. Erection. Posts, railing, barrier systems, rail transitions, end assemblies, and anchorage units shall be erected as specified in the contract plans or manufacturer’s drawings. Where drilling and grouting is required, Section 586 – Miscellaneous Structural Reconstruction shall apply, unless otherwise approved. Rail mounting height shall be within +/ - 1/4 inch of that indicated on the Standard Sheets and plans. Prior to installing guide rail, median barrier, transitions, or end terminals, the Contractor shall determine the locations of all structures, including underground structures, that may be affected by the installation. If there are conflicts between the proposed installation and other structures, the Contractor shall discuss with and recommend to the Engineer alternative locations or types of barrier, transitions, or end terminals that will not be in conflict with the structure. Posts and foundation tube(s) shall be driven unless otherwise specified by the Engineer. The driving shall be accomplished with approved equipment and methods that will leave the posts and foundation tube(s) in their final position, free of any distortion , burring or other damage. When posts and foundation tube(s) are driven through asphalt concrete or a bituminous treated material, the Contractor shall take care to prevent damage to the paved or treated areas. Large holes and voids caused by driving the p osts and foundation tube(s) shall be filled and compacted with a bituminous treated material or asphalt concrete similar to that damaged. The small area adjacent to the post and foundation tube(s) disturbed during installation or where gaps exist at the po st and foundation tube(s) after pavement repairs shall be sealed with a bituminous material approved by the Engineer. As an alternate to driving posts and foundation tube(s) on unpaved medians and where site conditions are such that driving is not possible, the Contractor shall carefully excavate for all post and foundation tube(s) holes. Post and foundation tube(s) hole s and post and foundation tube(s) foundation structures shall be backfilled and backfilled material compacted in accordance with Section 203, Select Granular Fill . On structures, concrete anchors, and paved medians, base plates for posts shall be anchored as shown in the Contract Documents. Alternate construction methods and equipment for drilling and grouting of holes shall be submitted to the Engineer for approval before operations begin. The work of installing the guide railing system when it abuts stabilized shoulder courses shall be coordinated and progressed to provide the least disturbance between the two phases of the work. All posts shall be aligned to a tolerance of 1/4 inch for plumb and grade line. Box beam to be installed on a curved alignment shall be shop bent or shop curved in accordance with Table 606 -1. TABLE 606 -1 SHOP BENDING AND SHOP MITERING OF BOX BEAM GUIDE RAILING AND MEDIAN BARRIER Barrier Type Shop Bending Required Shop Mitering Required Box Beam Guide Railing Radius over 20 ft and less than 720 ft Radius of 20 ft or less Box Beam Median Barrier Radius over 30 ft and less than 1525 ft Radius of 30 ft or less When shop bending or shop mitering of box beam guide railing or box beam median barrier is required, the rail element shall be shop -worked to the radius that the barrier will be installed on. Corrugated beam guide railing and median barrier shall require shop curving if the radius is equal to or less than 150 feet. When shop curving of corrugated beam is required, the rail element shall be shop -worked to the radius that the barrier will be in stalled on.
606-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 F. End Terminals and Assemblies. Installation of all proprietary products shall follow the manufacturer’s instructions. The following shall apply to end terminals or assemblies to be installed under this section.
606-3.02 Cable Guide Railing and Median Barrier. Beginning with the first post where the rail is
parallel to the edge of pavement, every sixth post in the line of guide rail shall be reflectorized (96 foot spacing for reflectors) except those posts in the approach terminal and intermediate anchorage area , which curve away from the shoulder, or used in a median barrier. The reflector and method of attachment shall be as indicated on the standard sheet.
606-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 For mid -tension cable guide rail, install a turnbuckle on one end of the cable, pull the cable to remove slack, and place a second turnbuckle on the other end. Once the assembly of the run is complete, tension each cable according to temperature from the data in the table on the standard sheets. Measure the tension using a three -point cable tension meter. For high -tension cable systems, follow the manufacturer’s directions.
606-3.03 Box Beam Guide Railing and Median Barrier. Rail sections for tangent runs shall be at least
18 feet long. Rail splices shall be a minimum of 18 inches from the centerline of any post which is to be bolted to the rail.
606-3.04 Weak Post and HPBO (Mod.) Corrugated Beam Guide Railing and Median Barrier In the
erection procedures, the free end of the rail element shall not be allowed to swing free and cantilever around the mounting bolt. The free end shall be supported in a manner approved by the Engineer while the splice bolts a nd mounting bolts are fastened. Rail splicing shall be as shown on the Standard Sheets.
606-3.05 Concrete Barrier. Unless specified otherwise in the contract documents the Contractor shall
have the option of providing precast concrete barrier, cast -in-place concrete barrier, or machine formed barrier. No intermixing in any run of barrier will be permitted unless show n otherwise in the contract documents except that precast transition sections and ends may be used with cast -in-place or machine formed concrete barriers. Unless otherwise specified, excavation shall be performed in accordance with §206 -3. Granular back fill shall conform to Section 304 and shall match the subbase course type used on the adjacent roadway. Half section concrete barrier shall be erected with the appropriate back -up posts and continuity plates as shown on the Standard Sheets and plans.
606-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 A. Precast Concrete Barrier
606-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 formation of uncontrolled shrinkage cracks. Clear curing compound shall be promptly applied to the saw cut.
606-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 8. Placement Adjacent to Cement Concrete Pavement or Shoulders. The barrier shall be separated from the cement concrete pavement or shoulder by a 1/2 inch wide vertical joint extending down to the bottom of the pavement or shoulder. The joint shall b e formed with and contain Premo lded Resilient Joint Filler conforming to the requirements of §705 -07. A recess of approximately one inch shall be provided at the top of the joint for installation of a backer rod and joint sealant. The joint sealant shall be a silicone sealant appearin g on the Department’s Approved List and shall be applied in accordance with the manufacturer’s instructions.
606-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 discharge until approximately two -thirds (2/3) of the load, as determined by the Engineer, has been discharged. After the water addition, the concrete shall be mixed at least 30 revolutions in the mixing range. The slipforming equipment shall have as nearly a continuous forward movement as possible to provide uniform progress with stopping and starting of the equipment held to a minimum. Any edge slump resulting from slipforming operations in excess of 1/4 inch, as measured from the top surface of the median barrier, exclusive of edge rounding, shall be corrected before the concrete has hardened. Concrete supply shall be sufficient to produce a continuous, completely shaped barrier. If concrete placement is interrupted for a period of time where the delay will affect the quality and structural integrity of the barrier, the contractor shall termina te his operations by one of the following procedures. The Engineer shall determine when the slipform operation is to be terminated.
606-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 9. Expansion Joints. Machine formed concrete barriers shall not extend more than 400 feet without an expansion joint. Expansion joints shall be formed no rmal to the pavement with Premo lded Resilient Joint Filler meeting the requirements of §705 -07 and shall provide for expansion of 1/2 inch. The filler material shall be cut to conform to the cross section of the barrier. The expansion joints shall be located at all immovable objects (bridge substructures, etc.), where shown on the plans, and/or as directed by the Engineer. Expansion joints shall not be required at regular intervals unless shown on the plans.
606-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Repaired portions shall exactly match shape requirements. The repaired portion shall withstand a moderate blow from a 16 ounce hammer.
606-3.06 Resetting Guide Railing, Median Barrier and Precast Concrete Barrier. The Contractor
shall remove, store, clean and reset railing, posts, and precast concrete barrier as shown on the plans or as directed by the Engineer. The Contractor shall remove designated existing guide railing, median barrier and precast concrete barr ier and neatly store them at locations approved by the Engineer. The work shall be done in a workmanlike manner so as to salvage all usable parts. The reset guide railing and/o r median barrier shall be placed in accordance with the requirements of §606 -3.01 General and the subsection for each specific system. Unless otherwise specified by the designer, all existing hardware, i.e., post bolts, J - bolts, splice bolts, etc., shall be replaced with new hardware. Cable systems shall be retensioned and all existing splice couplings and wedges shall be replaced. HPBO guide railing and median barrier (pre -2013 design) shall be reset as detailed in the current standard sheets, including 12 inch block -outs. The existing block -outs shall become the property of the Contractor.
606-3.07 Resetting Guide Railing and Median Barrier (New Posts). The construction details of §606 -
3.06 shall apply, except that the Contractor shall furnish and install new posts and remove the old posts from the site.
606-3.08 Removing and Storing Guide Railing, Median Barrier, and Precast Concrete Barrier. The
Contractor shall remove designated existing guide railing, median barrier and precast concrete barrier and neatly store the component parts in separate piles at locations designated for future pick up by Department forces, or its designee. The work s hall be done in a workmanlike manner so as to salvage all usable parts. Unusable material shall be disposed of by the Contractor.
606-3.09 Removing and Disposing of Guide Railing, Median Barrier, Concrete Barrier, Guide
Posts, Guide Rail Posts, and Median Barrier Posts. The Contractor shall remove designated existing guide railing, median barrier, concrete barrier, guide posts, guide rail posts, and median barrier posts and remove them from the site of work. Holes shall be backfilled with a suitable material and compact ed in a manner approved by the Engineer.
606-3.10 I-Beam Posts for Existing Highway Barrier. I-beam posts for existing highway barrier shall
be installed at the locations indicated in the contract documents or where directed by the Engineer. The driving shall be in accordance with the requirements of §606 -3.01 and the applicable standard sheet(s ). All hardware necessary for mounting the rail elements or cable to the post shall be supplied by the Contractor. New heavy post block -outs shall be supplied to replace damaged or unusable block -outs. S3x5.7 posts installed as intermediate posts to reduce post spacing on weak post corrugated beam guide railing and median barrier and on box beam guide railing shall not be attached to the rail element. All reflectors, delineators, reference markers, or other items, which are to remain in place, that are damaged by or during the Contractor's operations shall be replaced by the Contractor unless indicated otherwise on the Standard Sheets or project plans .
606-3 11
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606-3.11 Retensioning Existing Cable Guide Railing and Median Barrier. Cable guide rail and median barrier shall be retensioned in accordance with the cable tensioning requirements of §606 -3.02.
606-3.12 Resetting Anchorage Unit Assemblies and End Assemblies for Guide Rail and Median
Barrier. The Contractor shall remove, store, clean and reset existing anchorage units and terminals for Guide Railing and Median Barrier as shown on the plans or as directed by the Engineer. The anchorage units and terminals shall be reset and placed in accordance with the requirements of §606 -3.01 General. Any anchor blocks that will not remain in use in their existing location are to be removed and the holes backfilled as detailed in §606 -3.13 The Contractor shall take care so reusable parts are not damaged by their operations. Any parts damaged in handling and placing shall be replaced by the Contractor. Unusable material shall be disposed of by the Contractor. Surface areas disturbed during the removal operations shall be reestablished, as nearly as possible, to match the adjacent surfaces to remain.
606-3.13 Removing and Storing Anchorage Unit Assemblies and End Assemblies for Guide Railing
and Median Barriers The construction details of §606 -3.08 shall apply. However, concrete anchor blocks shall be completely removed, and the resulting holes backfilled. If the center of the anchor block is inboard from a line six feet beyond the theoretical shoulder break, the Contractor shall backfill with material meeting the requirements of §733 -04 compacted in 6 -inch lifts. If the center of the anchor block is more than six feet past the shoulder break, the backfill material and compaction shall be replaced in kind, character and condition, compacted in 6 -inch lifts. Other excavation and backfill shall conform to the requirements outlined in §606 -3.01E. Roadway edge drains damaged due to the Contractor’s operations shall be repaired or replaced at no additional cost to the State.
606-3.14 Removing and Disposing Anchorage Unit Assemblies and End Assemblies for Guide
Railing and Median Barriers. The construction details of §606 -3.13 shall apply except the anchor blocks and terminals become the property of the Contractor and shall be removed from the project.
606-3.15 Box Beam Guide Rail Transition to Concrete Barrier. The contractor shall construct a guide
rail transition from concrete barrier to box beam guide rail at the locations indicated and as detailed on the contract plans. The work shall conform to the requirements of §606 -3.01.
606-3.16 Corrugated Beam Guide Rail T ransition to Bridge Rail, Concrete Barrier and Concrete
Parapets. The contractor shall construct corrugated beam guide transitions to bridge rail, concrete barrier and/or concrete parapets at the locations and as detailed on the contract plans. The requirements of §606 - 3.01 shall apply together with the following: Railing shall be erected so that the rails are parallel to the roadway, except in those sections where it is necessary to vertically transition the highway barrier to the bridge railing, or barri er. Bending or curving of rail elements in order to fit alignment requirements in the field shall not be permitted. The Engineer may order some bending or curving to allow for necessary minor adjustments. The Contractor shall exercise care in attaching the guide rail to the bridge rail so as not to damage the rails, posts, or joints, or splices. Any damage to the material attributable to the Contractor's operation shall require that the material be repaired, or replaced. The decision to repair, or replace, shall rest solely with the Engineer.
606-3.17 Vacant.
606-3.18 Vacant
606-3 19
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606-3.19 Transitions Constructed of, or with, Concrete. Transitions constructed of concrete and the concrete elements of transitions constructed of metal components and concrete elements shall be constructed at the locations indicated in the contract documents, or those indicated by the Engineer, in accordanc e with these specifications, the contract documents, and the directions of the Engineer. The shapes indicated on the Standard Sheets are standard. The Deputy Chief Engineer (Design) will consider other shapes for approval. §606 -3.05 Concrete Barrier, A. Precast Concrete Barrier and B. Cast -in-Place Concrete Barrier shall apply.
606-4 Method of Measurement
606-4.01 Cable, Corrugated Beam or Box Beam Guide Railing and Median Barrier. The quantity to
be measured for payment will be in feet to the nearest foot of guide railing or median barrier installed, measured along the axis of the railing and between its pay limits as shown on the plans and/or standard sheets. The quantity to be measured for payment will be in feet to the nearest foot of shop bent or shop mitered guide railin g or median barrier installed. If the guide railing does not terminate at an anchorage unit, end assembly, or transition to another type of barrier, but is anchored to a structure, the railing will be measured up to the structure. When installing new or replacement runs containing stretches with or consisting entirely of reduced post spacings, the following payment factors shall be applied to the prices bid per foot for the normally spaced guide rail. TABLE 606 -2 PAYMENT FACTORS FOR GUIDE RAIL AND MEDIAN BARRIER POST SPACING Payment Factor s >> 1.0 1.1 1.3 1.4 1.6 1.8 1.9 Rail Type s ↓↓ Post Spacing Center to Center in Feet & Inches 3-Cable 16’ 12’ -- 8’ -- -- 4’ Mid-Tension Cable 10’ -- -- 5’ -- -- -- Box Beam 6’ -- 3’ -- -- -- -- Weak -Post Corrugated 12’-6” -- -- 6’-3” 4’-2” -- 3’-1½” HPBO 6’-3” -- -- -- -- 3’-1½”
606-4.02 Anchorage Units, End Assemblies and Transitions for Guide Railing or Median Barrier.
Anchorage units, end assembly units and transitions between various highway guide railing and median barrier systems will be measured by the actual number of units installed in accordance with the plans, standard sheets, manufacturer’s drawings, manufact urer's directions and/or as directed by the Engineer. The payment limits for the Box Beam Guide Rail End Assembly Type III and Box Beam Median Barrier End Assembly, Type C will be separated by a distance of 50 feet extending along the end assembly from the front of the Nose Assembly to a point 50 feet remov ed. These payment limits apply regardless of whether the Type III End Assembly or Type C End Assembly employs crushable fiberglass elements or beam bursting type mandrels to absorb the energy of the impacting vehicle. The limits of payment for the Corrugated Beam Guide Railing End Terminal (Energy -Absorbing) will extend a distance of 100 feet from the outer end of the terminal. At that point, payment will begin for corrugated beam guide railing. The limits of payment for HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy - Absorbing) will extend a distance of 50 feet from the outer end of the terminal. At that point, payment will begin for heavy post blocked -out corrugated beam guide railing. The limits of payment for HPBO (Mod.) Corrugated Beam Median Barrier End Terminal (Energy - Absorbing) will extend a distance of 50 feet from the outer end of the terminal. At that point, payment will begin for heavy post blocked -out corrugated beam median barrier.
606-4 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606-4.03 Concrete Barrier and Terminal Sections. The quantity of concrete barrier sections measured for payment will be the number of feet placed in accordance with the plans and specifications, measured along the axis of the barrier . The quantity of concrete barrier terminals will be measured by the actual number of units installed in accordance with the plans, standard sheets, and/or as directed by the Engineer
606-4.04 Resetting Guide Railing, Median Barrier and Precast Concrete Barrier. The quantity of
reset guide railing or median barrier measured for payment will be the number of feet reset in accordance with the specifications, plans and as directed by the Engineer, exclusive of anchorage units and end assemblies. If the guide railin g is anchored to a structure instead of an anchorage unit or end assembly, measurement will be made up to the structure. The quantity of reset precast concrete barrier measured for payment will be the number of feet placed in accordance with the plans and specifications measured along the axis of the barrier between its extreme outer limits.
606-4.05 Resetting Guide Railing and Median Barrier (New Posts). The Method of Measurement of
§606 -4.04 will apply.
606-4.06 Removing and Storing Guide Railing, Median Barrier and Precast Concrete Barrier. The
quantity of removed and stored guide rail and median barrier measured for payment will be the number of feet removed in accordance with the specifications, plans, and as directed by the Engineer, exclusive of anchorage units and end assemblies. If th e guide rail or median barrier is anchored to a structure, measurement will be made up to the structure. The quantity of removed and stored precast concrete barrier measured f or payment will be the number of feet removed in accordance with the specifications and plans, measured along the axis of the barrier between its extreme outer limits.
606-4.07 Removing and Disposing of Guide Railing, Median Barrier and Concrete Barrier. The
quantity of guide rail and median barrier measured for payment will be the number of feet of railing and posts removed and disposed of in accordance with the specifications and plans, exclusive of anchorage units and end assembly components that would not be used in the middle of a continuous run. The quantity of concrete barrier measured for payment will be the number of feet removed and disposed of in accordance wit h the specifications and plans measured along the axis of the barrier between its extreme outer limits and including any backup posts.
606-4.08 Removing and Disposing of Guide Posts, Guide Rail Posts, and Median Barrier Posts. The
quantity to be measured for payment will be the number of posts removed and disposed of in accordance with the specifications and plans and as directed by the Engineer.
606-4.09 Resetting Anchorage Unit Assemblies and End Assemblies for Guide Railing and Median
Barrier This work shall be measured by the number of anchorage units and/or terminals reset in accordance with the requirements of the contract documents.
606-4.10 Removing and Storing or Disposing of Anchorage Unit Assemblies and End Assemblies
for Guide Railing and Median Barrier. This work shall be measured by the number of Anchorage Units or End Assemblies properly removed and stored for pick up by others or removed and disposed of in accordance with the contract documents and to the satisfaction of the Engineer
606-4.11 Retensioning Existing Cable Guide Railing and Median Barrier . Quantity measured for
payment will be the number of sections retensioned. A section shall consist of the length of cable guide rail or median barrier running between two concrete anchorage units.
606-4.12 Vacant .
606-4 13
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606-4.13 Corrugated Beam Guide Rail Transition to Bridge Rail, Concrete Barrier and Concrete Parapets. Measurement will be taken as the actual number of transition units installed in accordance with the plans and specifications.
606-4.14 Box Beam Guide Rail Transition to Concrete Barrier. Measurement will be taken as the actual
number of transition units installed in accordance with the specifications, plans and standard sheets.
606-4.15 Vacant
606-4.16 I-Beam Posts for Existing Highway Barrier. I-beam posts for existing highway barrier will
be measured by the actual number of posts installed in accordance with the contract documents and as directed by the Engineer.
606-4.17 Transition between Concrete Sections. Transitions will be measured by the actual number of
units installed in accordance with the plans, standard sheets and/or as directed by the Engineer.
606-5 Basis of Payment
606-5.01 Guide Railing, Median Barrier, Concrete Barrier and Terminal Sections; Various Types.
The unit price bid for the above work shall include the cost of all labor, equipment and material necessary to complete the work, including the cost of any repairs required, and the costs of bending any rail element to the required curvature. Payment for corrugated guide rail and median barrier, or bent box beam guide rail, will be determined using the payment factors for the various typical post spacings listed in Table 606 -2. Payment will be the sum of the products obtained by multiplying t he unit price bid for a rail or median barrier by the payment factors listed in Table 606 -2 for the relevant post spacings and multiplying each of those products by the length of rail having that given post spacing. Payment for mitered box beam and median barrier with 6 foot post spacings will be made at the unit prices bid. If a reduced post spacing of 3 feet is used for mitered box beam guide rail, the payment will be determined by multiplying the unit price bid b y a payment factor of 1.1for the length installed. When posts are driven through asphalt concrete or bituminous treated material, any repairs to damage paved or treated areas shall be at the Contractor's expense. Progress payments will be made when the metal railing and/or metal barrier is erected in the position and manner indicated on the standard sheets and in a manner approved by the Engineer, exclusive of bituminous repair and final alignment. Payment will be made, at the unit price bid, for 90% of th e measured quantity erected. The balance of the quantity erected will be paid for upon proper repair to the bituminous surfaces and alignment of the metal railing and/or metal barrier to the specified tolerances.
606-5.02 End Assembly, End Anchorage Units and Transitions for Guide Railing and Median
Barrier. The unit price bid for each end assembly, end anchorage unit or transition shall include the cost of furnishing all labor, materials and equipment necessary to complete the work, including the necessary concrete, excavation, backfill, reflectorization, o bject markers when required at driveways and vehicle openings, and spring cable assembly (compensating device) and/or steel turnbuckle cable end assembly required for c able guide rail.
606-5.03 Resetting; Removing and Storing; Removing and Disposing; of Guide Railing, Median
Barrier and Concrete Barrier. The unit price bid per foot for the above work items shall include the cost of furnishing all labor, equipment and materials necessary to complete the work and restore the system to full operating capacity. Any materials damaged due to Contractor's operation shall be replaced by him and the cost shall be included in the price bid for this item.
606-5 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Payment for resetting guide rail and median barrier shall include the unit price bid multiplied by the measured quantity multiplied by the payment factor for the various typical pos t spacings listed in Table 606-2, except that posts required to reduce the post spacing from the original post spacing shall be paid for under the appropriate I -beam post for existing highway barrier item.
606-5.04 Removing and Disposing of Guide Posts, Guide Rail Posts and Median Barrier Posts. The
unit price bid per post for the above work items shall include the cost of furnishing all labor, equipment and material necessary to complete the work.
606-5.05 Resetting; Removing and Storing; Removing and Disposing; of Anchorage Unit
Assemblies and End Assemblies for Guide Railing and Median Barrier. The unit price bid for each of these items shall include the cost of furnishing all labor, equipment and material necessary to complete the work including excavation and backfill. If the Contractor elects to install new concrete anchors, in lieu of removing and resetting the existing ones, the cost of furnishing and installing the new anchor as well as the cost for necessary adjustments to the existing one shall be included in the p rice bid for these items.
606-5 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 3. The balance of the unit bid price for the quantity of anchorage units reset upon the reestablishment of surface areas disturbed.
606-5.06 Vacant
606-5.07 Corrugated Beam Guide Rail Transition to Bridge Rail, Concrete Barrier and Concrete
Parapets. The unit price bid per guide rail transition shall include the cost of all labor, materials, and equipment necessary to satisfactorily complete the work, including back -up posts, connections and hardware.
606-5.08 Box Beam Guide Rail Transition to Concrete Barrier. The unit price bid per guide rail
transition shall include the cost of all labor, equipment, and material necessary to satisfactorily complete the work, including back -up posts, necessary rail curvature, splices, connections and hardware.
606-5.09 Vacant
606-5.10 I-Beam Posts for Existing Highway Barrier. The unit price bid for I -beam posts for existing
highway barrier shall include the cost of furnishing all labor equipment and material necessary to complete the work. Removal of damaged posts and hardware is included in other items of work. When posts are driven through asphalt concrete or bituminous treated material, any repairs to damaged paved or treated areas shall be at the Contractor's expense.
606-5.11 Retensioning Existing Gable Guide Railing and Median Barrier . The unit price bid for
retensioning a section of cable guide railing or median barrier shall include the cost of all labor, materials and equipment necessary to complete the work.
606-5.12 Transition between Concrete Sections. The unit price bid per concrete transition shall include
the cost of all labor, equipment, and material necessary to satisfactorily complete the work, including back -up posts, connections and hardware. Payment will be made under: Item No. Item Pay Unit 606.01 Cable Guide Railing Foot 606.0101 Cable Guide Railing With Extra Long Posts Foot 606.010605 Mid-Tension Cable Guide Rail – 5-foot Post Spacing Foot 606.010610 Mid-Tension Cable Guide Rail – 10-foot Post Spacing Foot 606.0201 Anchorage Units for Cable Guide Railing Each 606.020101 Mid-Tension Trailing End Cable Terminal Each 606.03 Cable Median Barrier Foot 606.0310 Anchorage Units for Cable Median Barrier Each 606.10 Box Beam Guide Railing Foot
606-5 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606.100002 Box Beam Guide Railing (Shop Bent or Shop Mitered) Foot 606.100003 Box Beam Guide Railing (Shop Mitered) Foot 606.1001 Box Beam Guide Railing With Extra Long Posts Foot 606.100102 Box Beam Guide Railing with Extra Long Posts (Shop Bent or Shop Mitered)Foot 606.100103 Box Beam Guide Railing with Extra Long Posts (Shop Mitered) Foot 606.11 Box Beam Median Barrier Foot 606.110002 Box Beam Median Barrier (Shop Bent or Shop Mitered) Foot 606.110003 Box Beam Median Barrier (Shop Mitered) Foot 606.120101 Box Beam End Piece Each 606.120102 Box Beam Guide Railing End Assembly Type I Each 606.120103 Box Beam Guide Railing End Assembly Type I with 18 ft Extension Each 606.120201 Box Beam Guide Railing End Assembly Type IIA Each 606.1203 Box Beam End Assembly Type III Each 606.1401 Box Beam Median Barrier End Assembly, Type A Each 606.1402 Box Beam Median Barrier End Assembly, Type B Each 606.1403 Box Beam Median Barrier End Assembly, Type C Each 606.17 Corrugated Beam Median Barrier Foot 606.170001 Corrugated Beam Median Barrier (Shop Curved) Foot 606.18 Weak -Post, Corrugated Beam Guide Rail Foot 606.180001 Weak -Post, Corrugated Beam Guide Rail (Shop Curved) Foot 606.1801 Weak -Post, Corrugated Beam Guide Rail With Extra Long Posts Foot 606.180101 Weak -Post, Corrugated Beam Guide Rail With Extra Long Posts (Shop Curved) Foot 606.22 Anchorage Units for Corrugated Beam Guide Railing Each 606.2201 Anchorage Units for Corrugated Beam Guide Railing Buried In Back Slope Each 606.23 Anchorage Units for Corrugated Beam Guide Railing (Driveways, Walkways, and Other Openings) Each 606.24 Anchorage Units for Corrugated Beam Median Barrier Each 606.26 Corrugated Beam Guide Railing End Terminal (Energy -Absorbing) Each 606.27 HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy -Absorbing) Each 606.2701 HPBO (Mod.) Corrugated Beam Guide Railing Foot 606.270101 HPBO (Mod.) Corrugated Beam Guide Railing (Shop Curved) Foot 606.2702 HPBO (Mod.) Corrugated Beam Guide Railing with Extra Long Posts Foot 606.270201 HPBO (Mod.) Corrugated Beam Guide Railing with Extra Long Posts (Shop Curved) Foot 606.2703 Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing Each 606.2704 Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing Buried in Back Slope Each 606.28 HPBO (Mod.) Corrugated Beam Median Barrier End Terminal (Energy -Absorbing) Each 606.2801 HPBO (Mod.) Corrugated Beam Median Barrier Foot 606.280101 HPBO (Mod.) Corrugated Beam Median Barrier (Shop Curved) Foot 606.2802 Anchorage Units for HPBO (Mod.) Corrugated Beam Median Barrier Each 606.3001 Concrete Barrier Type A (Optional) Foot 606.3002 Concrete Barrier Type B (Optional) Foot 606.3003 Concrete Barrier Type C (Optional) Foot 606.3004 Half Section Concrete Barrier (Optional) Foot
606-5 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606.3005 Concrete Barrier - Mounting Block Section Each 606.3011 Concrete Barrier Type A (Precast) Foot 606.3012 Concrete Barrier Type B (Precast) Foot 606.3013 Concrete Barrier Type C (Precast) Foot 606.3014 Half Section Concrete Barrier (Precast) Foot 606.3021 Concrete Barrier Type A (Cast -in-Place) Foot 606.3022 Concrete Barrier Type B (Cast -in Place) Foot 606.3023 Concrete Barrier Type C (Cast -in Place) Foot 606.3024 Half Section Concrete Barrier (Cast -in Place) Foot 606.3031 Concrete Barrier Type A (Machine Formed) Foot 606.3032 Concrete Barrier Type B (Machine Formed) Foot 606.3033 Concrete Barrier Type C (Machine Formed) Foot 606.3034 Half Section Barrier (Machined Formed) Foot 606.3041 Single -Slope Concrete Median Barrier (Optional) Foot 606.3042 Single -Slope Concrete Median Barrier (Precast) Foot 606.3043 Single -Slope Concrete Median Barrier (Cast -in-Place) Foot 606.3044 Single -Slope Concrete Median Barrier (Machine Formed) Foot 606.3051 Single -Slope Concrete Median Barrier - Wide (Optional) Foot 606.3052 Single -Slope Concrete Median Barrier - Wide (Precast) Foot 606.3053 Single -Slope Concrete Median Barrier - Wide (Cast -in-Place) Foot 606.3054 Single -Slope Concrete Median Barrier - Wide (Machine Formed) Foot 606.3061 Single -Slope Concrete Half Section Barrier (Optional) Foot 606.3062 Single -Slope Concrete Half Section Barrier (Precast) Foot 606.3063 Single -Slope Concrete Half Section Barrier (Cast -in-Place) Foot 606.3064 Single -Slope Concrete Half Section Barrier (Machine Formed) Foot 606.3110 Embedded Low-Profile Concrete Barrier , TL-2 Feet 606.3111 Embedded Low -Profile Concrete Barrier, TL -2 – Left Terminal Each 606.3112 Embedded Low -Profile Concrete Barrier, TL -2 – Right Terminal Each 606.311 3 Free-standing Low-Profile Concrete Barrier , TL-2 Feet 606.3114 Free -standing Low -Profile Concrete Barrier, TL -2 – Terminal Each 606.4701 I-Beam Posts for Existing Cable Median Barrier Each 606.48 Retensioning Existing Cable Guide railing or Median Barrier Each 606.4801 I-Beam Posts for Existing Cable Guide Railing Each 606.4803 Extra Long I -Beam Posts for Existing Cable Guide Railing Each 606.4805 I-Beam Posts for Existing Corrugated Beam Guide Railing Each 606.4807 Extra Long I -Beam Posts for Existing Corrugated Beam Guide Railing Each 606.4809 I-Beam Posts for Existing Box Beam Guide Railing Each 606.4811 Extra Long I -Beam Posts for Existing Box Beam Guide Railing Each 606.4813 I-Beam Posts for Existing Corrugated Beam Median Barrier Each 606.4815 I-Beam Posts for Existing Box Beam Median Barrier Each 606.4818 I-Beam posts for Existing HPBO (Mod.) Corrugated Beam Guide Railing Each 606.4820 Extra Long I -Beam Posts for Existing HPBO (Mod.)Corrugated Beam Guide Railing Each 606.4822 I-Beam Posts for Existing HPBO (Mod.) Corrugated Beam Median Barrier Each 606.4824 Extra Long I -Beam Posts for Existing HPBO (Mod.) Corrugated Beam Median Barrier Each 606.50 Resetting Cable Guide Railing Foot 606.5010 Resetting Cable Median Barrier Foot 606.5048 Resetting Cable Guide Railing (New Posts) Foot 606.5049 Resetting Cable Median Barrier (New Posts) Foot 606.51 Resetting Corrugated Beam Guide Railing Foot
606-5 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606.5148 Resetting Corrugated Beam Guide Railing (New Posts) Foot 606.52 Resetting Corrugated Beam Median Barrier Foot 606.5248 Resetting Corrugated Beam Median Barrier (New Posts) Foot 606.53 Resetting Box Beam Guide Railing Foot 606.5348 Resetting Box Beam Guide Railing (New Posts) Foot 606.54 Resetting Box Beam Median Barrier Foot 606.5448 Resetting Box Beam Median Barrier (New Posts) Foot 606.5501 Resetting HPBO Corrugated Beam Guide Railing (New 12 in. Blockouts) Foot 606.5601 Resetting HPBO Corrugated Beam Median Barrier (New 12 in. Blockouts) Foot 606.57 Resetting Precast Concrete Barrier Foot 606.5710 Resetting Precast Concrete Barrier - Half Section Foot 606.58 Resetting HPBO (Mod.) Corrugated Beam Guide Railing Foot 606.5801 Resetting HPBO (Mod.) Corrugated Beam Guide Railing (New Posts) Foot 606.5810 Resetting HPBO (Mod.) Corrugated Beam Median Barrier Foot 606.581001 Resetting HPBO (Mod.) Corrugated Beam Median Barrier (New Posts) Foot 606.5901 Resetting Anchorage Units for Cable Guide railing or Median Barrier Each 606.5910 Resetting Anchorage Units for Corrugated Beam Guide Railing or Median Barrier Each 606.5920 Resetting Box Beam Guide Rail Turned -Down Terminal Each 606.5921 Resetting Box Beam Guide Rail Energy -Absorbing Terminal Each 606.5930 Resetting Box Beam Median Barrier End Assembly --Type A Each 606.5931 Resetting Box Beam Median Barrier End Assembly --Type B Each 606.5941 Resetting Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing Each 606.5946 Resetting Anchorage Units for HPBO (Mod.) Corrugated Beam Median Barrier Each 606.60 Removing and Storing Cable Guide Railing Foot 606.6010 Removing and Storing Cable Median Barrier Foot 606.61 Removing and Storing Corrugated Beam Guide Railing Foot 606.62 Removing and Storing Corrugated Beam Median Barrier Foot 606.63 Removing and Storing Box Beam Guide Railing Foot 606.64 Removing and Storing Box Beam Median Barrier Foot 606.65 Removing and Storing Precast Concrete Barrier Foot 606.6510 Removing and Storing Precast Concrete Barrier -Half Section Foot 606.66 Removing and Storing HPBO (Mod.) Corrugated Beam Guide Railing Foot 606.67 Removing and Storing HPBO (Mod.) Corrugated Beam Median Barrier Foot 606.6910 Removing and Storing Anchorage Units for Corrugated Beam Guide Railing and Median Barriers Each 606.6911 Removing and Storing Weak - and Heavy -Post Corrugated Beam Terminals Each 606.6920 Removing and Storing Box Beam Guide Railing End Assembly Each 606.6932 Removing and Storing Box Beam Median Barrier End Assembly -Type C Each 606.6941 Removing and Storing Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing Each 606.6946 Removing and Storing Anchorage Units for HPBO(Mod) Corrugated Beam Median Barrier Each 606.70 Removing and Disposing Cable Guide Railing Foot 606.7010 Removing and Disposing Cable Median Barrier Foot 606.71 Removing and Disposing Corrugated Beam Guide Railing Foot 606.7101 Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing Foot
606-5 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606.72 Removing and Disposing Corrugated Beam Median Barrier Foot 606.7201 Removing and Disposing HPBO (Mod.) Corrugated Beam Median Barrier Foot 606.73 Removing and Disposing Box Beam Guide Railing Foot 606.74 Removing and Disposing Box Beam Median Barrier Foot 606.75 Removing and Disposing Concrete Barrier Foot 606.7510 Removing and Disposing Concrete Barrier -Half Section Foot 606.76 Removing and Disposing of Guide Posts, Guide Rail Posts, and Median Barrier Posts Each 606.79 Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier Each 606.7910 Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier Each 606.7911 Removing and Disposing Weak - and Heavy -Post Corrugated Beam Energy -Absorbing Terminals Each 606.7920 Removing and Disposing Box Beam Guide Rail Turned -Down Terminal Each 606.7921 Removing and Disposing Box Beam Energy -Absorbing Terminal Each 606.7930 Removing and Disposing Box Beam Median Barrier End Assembly -Type A Each 606.7931 Removing and Disposing Box Beam Median Barrier End Assembly --Type B Each 606.7932 Removing and Disposing Box Beam Median Barrier End Assembly -Type C Each 606.7941 Removing and Disposing Anchorage Units for HPBO(Mod) Corrugated Beam Guide Railing Each 606.7946 Removing and Disposing Anchorage Units for HPBO(Mod) Corrugated Beam Median Barrier Each 606.8101 Guide Rail Transition Weak -Post Corrugated Beam to Box Beam Guide Rail (One or Two Way Operation) Each 606.8201 Guide Rail Transition Box Beam to Weak -Post Corrugated Beam Guide Rail (One Way Only) Each 606.83 Guide Rail Transition Cable to Box Beam (One or Two Way Operation) Each 606.84 Guide Rail Transition Box Beam to Cable (One Way Only) Each 606.8401 Guide Rail Transition Box Beam to Mid -Tension Cable (One Way Only) Each 606.8501 Median Barrier Transition Weak -Post Corrugated Beam to Box Beam Each 606.86 Guide Rail Transition Corrugated Beam to Thrie Beam Each 606.8701 Corrugated Beam Guide Railing Transition Assembly Two Rail Steel Bridge Railing Each 606.8702 Corrugated Beam Guide Railing Transition Assembly Four Rail Steel Bridge Railing Each 606.8703 Corrugated Beam Guide Railing Transition Assembly Discontinuous Steel Bridge Railing Each 606.8704 Corrugated Beam Guide Railing Transition Assembly Concrete Parapets, or Concrete Barrier Each 606.8801 Transition from Box Beam Guide Rail to Jersey -shaped Concrete Barrier (One - or Two -Way Operation) Each 606.8802 Transition from Jersey -shaped Concrete Barrier to Box Beam Guide Rail (One Way - Trailing End of Barrier) Each 606.8803 Transition Between Box Beam Guide Rail and Single Slope Half Section Concrete Barrier (One or Two Way Operation) Each 606.8804 Transition Between Single Slope Half Section Concrete Barrier and Box Beam Guide Rail (One Way - Trailing End of Barrier) Each 606.8805 Transition Between Box Beam Median Barrier and
607-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Single Slope Concrete Median Barrier Each 606.880 6 Transition from Box Beam Guide Rail to Full -Section Single -Slope Concrete Barrier (One - or Two -Way Operation) Each 606.880 7 Transition from Full -Section Single -Slope Concrete Barrier to Box Beam Guide Rail (One Way - Trailing End of Barrier) Each 606.8901 Transition: HPBO (Mod.) Corrugated Guide Railing to Beam Box Beam Guide Railing Each 606.8902 Transition: HPBO (Mod.) Corrugated Beam Guide Railing to Weak Post Corrugated Beam Guide Railing Each 606.8903 Transition: HPBO (Mod.) Corrugated Beam Guide Railing to Single Slope Concrete Half Section Barrier Each 606.8904 Transition: HPBO (Mod.) Corrugated Beam Median Barrier to Beam Box Beam Median Barrier Each 606.8905 Transition: HPBO (Mod.) Corrugated Beam Median Barrier to Weak Post Corrugated Beam Median Barrier Each 606.8906 Transition: HPBO (Mod.) Corrugated Beam Median Barrier to Single Slope Concrete Median Barrier Each 606.9001 Transition between Standard (NJ) Concrete Barrier and Single -Slope Concrete Barrier Each 606.9002 Transition between Wide and Normal Single Slope Concrete Median Barrier Each 606.9003 Transition between Half -Section and Full -Section Single Each Slope Concrete Barrier (Left Pocket) 606.9004 Transition between Half -Section and Full -Section Single Each Slope Concrete Barrier (Right Pocket) SECTION 607 - FENCES
607-1 DESCRIPTION. This work shall consist of furnishing and erecting fencing and metal fence gates
of the type and size, and at the locations shown on the plans or as directed by the Engineer. Construction of fencing and gates shall be done in accordance with the specifications, the standard sheets, and the plans, and in reasonable close conformity with the lines and grades shown o n the plans or established by the Engineer.
607-1.01 Fence Types. The fence shall be designated as follows:
Optional Chain Link Fence Type I Optional Chain Link Fence Type II Vinyl Coated Chain Link Fence on Plastic Coated Frame Right -of-Way Fencing The options for Type I and Type II chain link fences shall be as follows: TYPE I Fabric Options Frame Options Coated Steel Fence Fabric Mischmetal Alloy Coating (95% Zinc 5% Aluminum - Mischmetal Alloy) (95% Zinc 5% Aluminum) Galvanized Steel Galvanized Steel Aluminum Combined Coating on Steel
607-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Aluminum Coated Steel Aluminum Aluminum Coated Steel TYPE II Fabric Options Frame Options Coated Steel Fence Fabric Mischmetal Alloy Coating (95% Zinc 5% Aluminum - Mischmetal Alloy) (95% Zinc 5% Aluminum) Galvanized Steel Galvanized Steel Vinyl Coated Steel Combined Coating on Steel Aluminum Plastic on Steel Aluminum Coated Steel Aluminum Aluminum Coated Steel Fence gates for Type I and Type II optional fences shall be consistent with the fabric and frame option selected for the contract. Fence frame and fabric selected shall be consistent throughout the contract except where intermixing is permitted by the Engineer.
607-2 MATERIALS. Materials shall conform to the requirements specified in the following subsections
of Section 700 - Materials and Manufacturing : Zinc Chromate Primer 708-04 Aluminum Fence Fabric 710-01 Galvanized Steel Fence Fabric 710-02 Vinyl Coated Steel Fence Fabric 710-03 Aluminum Coated Steel Fence Fabric 710-04 Coated Steel Fence Fabric (95% Zinc 5% Aluminum -Mischmetal Alloy) 710-05 Steel and Iron Posts, Rails, Braces and Fittings for Chain -Link Fence 710-10 Aluminum Posts, Rails, Braces and Fittings for Chain -Link Fence 710-11 Plastic Coated Posts, Rails, Braces and Fittings for Chain -Link Fence 710-12 Right -of-Way Fencing 710-30
607-2.01 Portland Cement Concrete for Bases. Portland Cement concrete used for bases shall be Class
A or C conforming to the requirements of Section 501 Portland Cement Concrete --General except that requirements for automated batching shall not apply.
607-2.02 Right -of-Way Fencing. The Contractor has the option of using posts and braces fabricated
from either high carbon shapes of steel or pressure treated wood meeting the requirements of §710 -30 Right -of-Way Fencing.
607-2.03 Fence Gates. Fence gates for Right -of-Way Fencing shall Conform to the requirements for
Right -of-Way Fence Gates of §710 -30. Fence gates for Chain -Link Fence shall conform to the following:
607-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 3/8 inch nominal diameter diagonal truss rod. Gate leaves over 16 feet shall have both a horizontal brace and a 3/8 inch nominal diameter truss rod.
607-3 Construction Details
607-3.01 General. The Contractor shall perform such clearing and grubbing as may be necessary to
construct the fence to the required grade and alignment. At locations where breaks in a run of fencing are required, or at intersections with existing fences, appropriate adjustment in post spacing shall be made to conform to the requirements for the type of closure indicated. When the plans require that the posts, braces, or anchors be embedded in concrete, the Contractor shall install temporary guys or braces as may be required to hold the posts in proper position until such time as the concrete has set sufficiently to hold t he posts. Unless otherwise permitted, no materials shall be installed on posts or strain placed on guys and bracing set in concrete until seven days have elapsed from the time of placing the concrete. All posts shall be set vertically and to the required grade and alignment. Cutting of the tops of the posts will be allowed only with the approval of the Engineer and under the Engineer's specified conditions. Wire or fencing of the size and type required shall be firmly attached to the posts and braces in the manner indicated. All wire shall be stretched taut and be installed to the required elevations. At each location where an electric transmission, distribution or secondary line crosses any of the types of fences covered by these specifications, the Contractor shall furnish and install a ground conforming to the requirements of Subsection 9 of the Nat ional Electric Safety Code. Fence shall generally follow the contour of the ground, with the bottom of fence fabric no less than 1 inchnor more than 6 inch from the ground surface. Grading shall be performed where necessary to provide a neat appearance. Line posts shall be spaced equidistant in the fence line at the spacing shown on the plans, standard sheets or as directed by the Engineer. End, corner, and intermediate posts shall be placed at the locations indicated on the plans, standard sheets or as directed by the Engineer, and shall be braced as shown on the plans or standard sheets. When chain link fence is on a long curve intermediate posts shall be evenly spaced so that the strain of the fence will not bend the line posts. All end, corner, and intermediate posts shall be set plumb in concrete bases of the depth and diameter shown on the plans or standard sheets. The Contractor shall have the option of setting the line posts in concrete bases or using methods of driving and anchoring specified by the fence manufacturer and approved by the Engineer.
607-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 The concrete bases shall be rough cast in the ground around the posts. The top surfaces shall be domed to shed water and provide a neat workmanlike appearance when completed. Extensions of up 45 minutes for the allowed time for pouring the concrete will b e permitted.
607-3.02 Chain -Link Fencing with Top Rail. Posts shall be set so they are equidistant with a maximum
of 10 foot centers. All top rails shall pass through the base of the post caps and shall form a continuous brace from end to end of each stretch of fence. Top rail lengths shall be joined with sleeve couplings with expansion sleeves provided at 100 foot intervals. Top rails shall be securely fastened to end posts by means of approved rail end connectors. Horizontal braces shall be provided at all intermediate posts, midway between the top rail and ground as shown on the plans or standard sheets. Diagonal truss rods shall be installed with the horizontal braces as indicated on the plans or standard sheets. Fence fabric shall be installed approximately 2 inch above the ground level and securely fastened along the bottom, and to all braces, top rails, line and pull posts, at the intervals indicated on the standard sheets by approved methods. The fabric shall be secured to all end, corner and gate posts with stretcher bars fastened to the posts, with stretcher bands spaced at a maximum of 14 inches and in a manner permitting adjustment of the fabric tension. If the Contractor elects the option of using one piece roll -formed sections, the fence fabric shall be integrally woven into the fabric loops on the end, corner, pull and gate posts. The fabric shall be attached to the top braces and line posts as shown o n the standard sheets.
607-3.03 Chain -Link Fencing with Top Tension Wire. The construction details specified in §607 -3.02
Chain Link Fencing with Top Rail shall apply with the following modifications:
607-3.04 Vinyl Coated Chain -Link Fencing on Plastic Coated Frame. The construction details
specified in §607 -3.02 Chain -Link Fencing with Top Rail or §607 -3.03 Chain -Link Fencing with Top Tension Wire shall apply with the following addition: If any of the resin clad material specified under this item has the protective resin coating damaged so its effectiveness to prevent corrosion of the base material is impaired, the Contractor shall repair such parts by applying one coat of an approved com pound of a color to match original material.
607-3.05 Aluminum Posts. Aluminum posts shall be set in accordance with requirements pertaining to
fence posts of §607 -3.01 General, and §607 -3.02 Chain -Link Fencing with Top Rail or §607 -3.03 Chain - Link Fencing with Top Tension Wire and with the following additional requirement : The portions of aluminum posts that will be in contact with the concrete bases shall be coated with Zinc Chromate Primer conforming to the requirements of §708 -04. The primer shall be thoroughly dry before setting of the post in the concrete.
607-3.06 Right -of-Way . Fencing posts shall be set plumb and firm to the satisfaction of the Engineer in
properly prepared post holes, as indicated on the plans or standard sheet. The concrete for post holes where required shall be placed in accordance with the requirements of §6 07-3.01 General.
607-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 All line posts of the type and size shown on the plans or standard sheets shall be placed equidistant in the fence line. Wood line posts shall be placed on a maximum of 15 foot centers and metal line posts shall be placed on a maximum of 10 foot centers. Intermediate posts and post assemblies, end posts, corner posts, approach spans, and bracing shall be as shown on the plans or standard sheets. The woven wire fencing shall be fastened to all steel line posts with at least 5 galvanized wire fasteners or clamps and to all steel end, intermediate and corner posts with aluminum wire not less than 5/32 inch diameter. The woven wire fencing shall be fastened to all wood posts with either 1 1/2 inch galvanized or aluminum staples. The top and bottom wires and every other in -between wires shall be stapled, alternating the stapling of the in -between wires on successive po sts.
607-3.07 Fence Gates. The Contractor shall construct metal fence gates of the type and size as indicated
on the plans or standard sheets, and in the location shown or ordered by the Engineer.
607-4 Method of Measurement
607-4.01 General. The quantity to be paid for all fencing exclusive of fence gates and fencing of the
types listed in subsequent subsections, will be the number of linear feet of chain -link fencing measured along the top of fencing, center to center of end posts, properly furnished and installed in accordance with the plans, specifications, standard sheets and directions of the Engineer. An allowance of 10 feet will be added for each end post, corner post and pull post installed in accordance with the plan s, specifications, standard sheets and directions of the Engineer.
607-4.02 Right -of-Way Fencing. Right -of-Way Fencing shall be measured as the number of feet along
the top of the fencing from center to center of the end posts, properly furnished and installed in accordance with the plans, specifications, standard sheets and directions of the Enginee r. An allowance of 20 feet will be added for each end post, corner post, intermediate post, and approach post installed in accordance with the plans, specifications, standard sheets and directions of the Engineer.
607-4.03 Fence Gates. Fence gates shall be measured as the number of complete gates furnished and
erected in accordance with the specifications, plans, standard sheets and directions of the Engineer.
607-5 Basis of Payment
607-5.01 General. The unit price bid per linear foot of fencing shall include the cost of furnishing all
labor, materials, tools and equipment necessary to satisfactorily complete the work.
607-5.02 Fence Gates. The unit price bid for each size gate shall cover the cost of furnishing all labor,
materials, tools and equipment necessary to satisfactorily complete the work and shall include all necessary clearing, grubbing, excavation and disposal, fill, concrete, gates, gate posts, lock, bracing and all other necessary materials. Payment will be made under: Item No. Item Pay Unit 607.051X Vinyl Coated Steel Chain -Link Fencing on Plastic Coated Frame with Top Rail Foot 607.052X Vinyl Coated Steel Chain -Link Fencing on Plastic Coated Frame with Top Tension Wire Foot 607.16xx Fence Gate with Vinyl Coated Steel Chain -Link Fencing on Plastic Coated Frame Each
608-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 607.19 Right -of Way Fencing Foot 607.20xx Right -of Way Fence Gates Each 607.30xx Optional Chain -Link Fence, Type I, with Top Rail Foot 607.31xx Optional Chain -Link Fence, Type I, with Top Tension Wire Foot 607.32xx Optional Chain -Link Fence, Type II, with Top Rail Foot 607.33xx Optional Chain -Link Fence, Type II with Top Tension Wire Foot 607.40xx Optional Fence Gates Each Refer to the Standard Contract Pay Item Catalog for full Item Number and full Description. SECTION 608 - SIDEWALKS, DRIVEWAYS, BICYCLE PATHS, AND VEGETATION CONTROL STRIPS (Last Revised January , 2023)
608-1 DESCRIPTION. This work shall consist of the construction of portland cement concrete or asphalt
sidewalks and driveways; asphalt bicycle paths and vegetation control strips; precast concrete paving, brick paving, grouted stone block paving, and detectable warnings on pedestrian facilities in accordance the contract documents and as directed by the Engineer.
608-2 MATERIALS. Provide materials meeting the requirements specified in the following subsections
of Section 700 - Materials and Manufacturing : Portland Cement 701-01 Bituminous Materials 702-00 Fine Aggregates 703-01 Coarse Aggregates 703-02 Mortar Sand 703-03 Cushion Sand 703-06 Concrete Sand 703-07 Mineral Filler 703-08 Brick Sidewalk and Driveway Pavers 704-08 Stone Blocks 704-09 Precast Concrete Driveway and Sidewalk Pavers 704-13 Caulking Compound for Structures 705-06 Premo lded Resilient Joint Filler 705-07 Masonry Mortar 705-21 Wire Fabric for Concrete Reinforcement 709-02 Fibers for Concrete Reinforcement 711-01 Membrane Curing Compound 711-05 Form Insulating Materials for Winter Concrete 711-07 Admixtures 711-08 Water 712-01 Surface -applied Detectable Warning Units 726-01 Embedded Detectable Warning Units 726-02
608-2.01 Portland Cement Concrete Sidewalks and Driveways.
608-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 B. Machine Formed Sidewalks. Provide concrete meeting the requirements for Class J in accordance with Section 501 Portland Cement Concrete -General with the exception that the mix incorporates fibers for concrete reinforcement meeting the requirements of §711 -01 Fibers for Concrete Reinforcement .
608-2.02 Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips. Provide a 9.5
mixture for surface course or 19.0 mixture for any course below the surface designed for < 0.3 million ESALs and produced in accordance with Section 401 using coarse aggregate Type F9. Use a PG 64S -22 binder to produce the asphalt mixture . Alternate PG binder grades may be allowed with the approval of the Regional Materials Engineer. Do not use polyphosphoric acid (PPA) downstate to modify the PG binder properties for mixtures containing limestone, limestone as an aggregate blend component, limestone as a constituent in crushed gravel aggregate, or recycled asphalt pavement (RAP) that includes any limestone. Do not use PPA downstate as a cross -linking agent for polymer modification of mixtures containing limestone, limestone as an aggregate blend component, limestone as a constituent in crushed gravel aggregate, or recycled asphalt pavement (RAP) that includes any limestone. Downstate, as it relates to PG binder is defined as Orange, Putnam, Rockland, Westchester, Nassau, Suffolk Counties and the City of New York. Do not use polyphosphoric acid (PPA) upstate to modify the PG binder properties or as a cross -linking agent for polymer modification, regardless of the type of aggregate. Upstate is defined as all counties not designated as downstate.
608-2.03 Brick Paved Sidewalks and Driveways. Provide brick pavers meeting the requirements of §704 -
08 Brick Pavers , of the size, shape and color specified in the contract documents.
608-2 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 D. Sand -Cement Setting Bed. Provide sand -cement mixture for setting bed consisting of 1 part Portland Cement Type 2 and 6 parts Fine Aggregate, by volume.
608-2.04 Grouted Stone Block Paved Sidewalks and Driveways. Provide stone blocks meeting the
requirements of §704 -09 Stone Blocks of the size, shape and color specified in the contract documents.
608-2.05 Precast Concrete Block Paved Sidewalks and Driveways. Provide precast concrete driveway
and sidewalk pavers meeting the requirements of §704 -13 Precast Concrete Driveway and Sidewalk Pavers of the size, shape and color specified in the contract documents. Provide granular setting bed material consisting of hard, durable; uncoated particles of soil or rock, free from lumps of clay and all deleterious substances in accordance with Table 608 -1 Granular Material Setting Bed Gradation . TABLE 608 -1 GRANULAR MATERIAL SETTING BED GRADATION Sieve Size Percent Passing by Weight 1/4 inch 100 # 10 50-85 # 40 20-45 # 200 3-10
608-2.06 Surface -Applied Detectable Warning Units. Provide surface -applied detectable warning units
meeting the requirements of §726 -01 Surface -applied Detectable Warning Units of the color specified in the contract documents. If no color is specified, the color must be an approximate visual match to the Red color of SAE Standard AMS -STD -595 #31350. Provide setting bed material and/or surface preparation materials in accordance with the manufacturer’s recommendations.
608-2.07 Embedded Detectable Warning Units. Provide embedded detectable warning units meeting the
requirements of §726 -02 Embedded Detectable Warning Units of the color specified in the contract documents. If no color is specified, the color must be an approximate visual match to the Red color of SA E Standard AMS -STD -595 #31350. Provide setting bed material and/or surface preparation materials in accordance with the manufacturer’s recommendations. Provide embedded detectable warning units meeting the requi rements of §726 -02 Embedded Detectable Warning Units of the color specified in the contract documents. Provide setting bed material and/or surface preparation materials in accordance with the manufacturer’s recommendations.
608-3 CONSTRUCTION DETAILS. Construct all pedestrian facilities in accordance with the
requirements of the Proposed Accessibility Guidelines for Pedestrian Facilities in the Public Right Of Way (PROWAG). Not all facilities can be designed to meet the current PROWAG design standards. Features that do not meet PROWAG requirements must be approved by the Department and noted as non standard features in the contract documents. Chapter 2 of the NYS DOT Highway Design Manual provides direction. For facilities that cannot meet the current PROWAG design standards, construct facilities to meet the standards to the greatest extent practicable. Install all work in accordance with the Standard Sheets and the lines and grades shown in the contract documents. Dimension s shown on the Standard Sheets are the
608-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 minimum values in order to be compliant with the PROWAG requirements and for acceptance of the work. Slopes shown on the Standard Sheets are maximum values for design and layout. Ensure constructed facilities do not have construction tolerances that result in work that does not meet the PROWAG requirements.
608-3.01 Portland Cement Concrete Sidewalks and Driveways. Install concrete sidewalks and
driveways in accordance with Section 501 Portland Cement Concrete - General and the contract documents. Start concrete placement operations when the ambient air temperature is 40°F or higher, when measured in the shade, within an accuracy of ± 2°F. Discontinue placement if the ambient air temperature falls below 40°F. Ensure th e surface temperature of the base material is 40°F or higher and that the surface does not have any snow, ice, frost, or standing water on it. Do not place concrete in the rain. Use insulating materials or heating equipment if necessary to prepare base material before placement begins. Form sidewalks and driveways conventionally or by machin e. Install a pr emolded resilient joint filler at all joints between sidewalk and curb, pavement, buildings, or other vertical surfaces, and at all transverse construction joints. Fill any transverse gaps from ½ inch to 1 inch in width with Caulking Compo und for Structures. Ensure workers installing pedestrian facilities are familiar with the requirements for those facilities under the Americans with Disabilities Act . Provide an American Concrete Institute (ACI) Certified Concrete Flatwork Technician to perform all finishing. When the contract includes 10 cubic yards or more of sidewalk and driveway concrete, provide an ACI Certified Concrete Flatwork Finisher to dir ectly supervise all finishing. Provide proof of ACI flatwork certification to the Engineer prior to concrete placement.
608-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 rigid side forms that laterally support the concrete and minimize edge slumping, a full -width finishing pan, and attached internal vibrators capable of consolidating the entire concrete placement. Apply the provisions of §569 -3.05 E. Central and Transit Mixed Concrete to maintain desired slump during the concrete placement. Use fiber reinforcement only, do not use welded wire fabric reinforcement. Make water additions at the point of deposition in accordance with §569 -3.05 E.
608-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 approval by the Director, Materials Bureau. If the ambient air temperature is expected to fall below 40°F anytime during the curing period, provide a supply of form insulating materials capable of maintaining a surface temperature of 55°F at the work site sufficient to cover all concrete placed. Cure all driveways and sidewalks at driveways for a minimum of 3 days prior to opening to vehicle traffic. Place form insulating materials as necessary to prevent the newly placed concrete from being exposed to ambient air temperatures at the concrete su rface below 36°F during the curing period. Secure and overlap the form insulating materials tight to the concrete surface extending a minimum of 12 inches beyond the edge of the concrete to prevent air intrusion beneath the insulation. Maintain form insu lating materials in place for the curing period. If the ambient air temperature falls below 40°F anytime during the curing period, cure conventionally formed sidewalks and driveways and machine formed sidewalks for a minimum of 6 days. If the concrete temperature falls b elow 32°F or the concrete is damaged by cold weather, remove and replace it at no additional cost to the State. Place 4 equally spaced recording surface thermometers between the concrete surface and the insulating material and 12 inch from the outside edge of concrete for each day’s placement. Do not subject the concrete to a temperature drop in excess of 50°F dur ing the first 24 hours after removing the insulation. If saw cutting is necessary, use diamond blade saws equipped with cutting guides, blade guards, water cooling systems, dust controls, and cut depth control capable of making straight cuts to the dimensions required.
608-3.02 Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips. Install asphalt
sidewalks, driveways, bicycle paths and vegetation control strips in accordance with the provisions Section 404 Asphalt Pavements , the Standard Sheets, and the contract documents. Place the number of courses and course thicknesses in accordance with Table 608 -2 Asphalt Pavement Course Thicknesses . Place vegetation control strips using a 9.5 mix with a minimum thickness of 3 inches in one course. Compact the asphalt mixture in accordance with the requirements of §40 4-3.07D. 80 Series Compaction Method . TABLE 608 -2 ASPHALT PAVEMENT COURSE THICKNESSES Thickness 9.5 Mix 12.5 Mix 19.0 Mix Minimum 1 ½ inches 2 inches 2 ½ inches Maximum 2 inches 2 ½ inches 4 inches NOTES:
608-3.03 Brick Paved Sidewalks and Driveways. Install brick pavers to the lines and grades and in the
pattern shown in the contract documents to provide a uniform, even surface. Ensure joints between bricks are hand tight. Do not install or grout brick pavers in freezing weather. After installation, sweep a dry mixture of masonry mortar over the brick pavers until the joints are completely filled, and then lightly wet the joints with water. Clean brick pavers of excess mortar, and finish joints prior to th e mortar setting up. Keep brick paving moist for 4 days after filling the joints with mortar. After the 4 day curing period, remove remaining mortar film using a light acid wash (10% solution of hydrochloric or muriatic acid) followed by flushing clean wit h water or as approved by the Engineer. Avoid the use of acid in areas where runoff could damage trees or other vegetation.
608-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 B. Brick Paved Sidewalks and Driveways (Mortar Setting Bed). Lay brick pavers in a mortar setting bed, a minimum of 1 inch thick over the concrete or bituminous subbase.
608-3.04 Grouted Stone Block Paved Sidewalks and Driveways. Install grouted stone blocks in the
pattern shown in the contract documents to provide a uniform, even surface. Ensure joints between blocks are a maximum of 1 -1/4 inch. Do not lay or grout blocks in freezing weather. After installation, sweep a dry mi xture of masonry mortar over the stone blocks until the joints are completely filled and then lightly wet the joints with water. Clean stone blocks of excess mortar, and finish joints prior to the mortar setting up. Keep grouted stone block paving moist fo r 4 days after filling the joints with mortar. After the four day curing period, remove remaining mortar film using a light acid wash (10% ± solution of hydrochloric or muriatic acid) followed by flushing clean with water, or as approved by the Engineer. Avoid the use of acid in areas where runoff could damage trees or other vegetation.
608-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 2. Lay stone blocks in accordance with B. Grouted Stone Block Paved Sidewalks and Driveways (Mortar Setting Bed) .
608-3.05 Precast Concrete Block Paved Sidewalks and Driveways. Install precast concrete driveway
and sidewalk pavers, in the pattern shown in the contract documents to provide a uniform, even surface. Lay blocks on a setting bed not to exceed 2 inches of uniformly compacted material placed over the specified subbas e. Install the pavers in accordance with the manufacturer's recommended procedures. Ensure joints are hand tight unless otherwise specified. Do not lay pavers in freezing weather. After the pavers are in place, sweep sand joint filler over the pavers until the joints are completely filled.
608-3.06 Surface -Applied Detectable Warning Units. Install surface -applied detectable warning units
on existing curb ramps in accordance with the contract documents and the manufacturer’s recommendations for environmental conditions, surface preparation, installation procedures, curing procedures, and mate rials compatibility. If no color is specified in the contract documents, the color must be an approximate visual match to the Red color of SAE Standard AMS -STD -595 #31350. Ensure the detectable warning un its provide the required contrast, light -on-dark or dark -on-light, with the adjacent sidewalk or ramp.
608-3.07 Embedded Detectable Warning Units. Install embedded detectable warning units in plastic
concrete, directly on existing subbase prior to placing concrete, or inlaid on prepared concrete surfaces in accordance with the contract documents and as directed by the manufacturer. If no color is specified in the contract documents, the color must be an approximate visual m atch to the Red color of SAE Standard AMS - STD -595 #31350. Ensure the detectable warning units provide the required contrast, light -on-dark or dark - on-light, with the adjacent sidewalk or ramp. Follow all applicable manufacturers' recommendations for enviro nmental conditions, surface preparation, installation procedures, curing procedures, and materials compatibility.
608-4 Method of Measurement
608-4.01 Portland Cement Concrete Sidewalks and Driveways. The quantity to be measured for
payment will be in cubic yards to the nearest 0.1 cubic yard of concrete installed.
608-4.02 Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips. The quantity to
be measured for payment will be in tons to the nearest 0.01 tons of asphalt installed. The asphalt produced for these types of applications is considered certified material in accordance with Materials Procedure (MP) 401. A Quality Adjustment Factor (QAF) of 1.00 will be assigned to Material meeting the specification requirement as certified by the Qua lity Control Technician (QCT). A QAF of 0.85 will be assi gned to material that fails to meet the specification as tested by the Quality Assurance Technician (QAT). Quality Units will be determined when there is a disincentive and will be calculated as per §40 4-4, Method of Measurement.
608-4.03 Brick Paved Sidewalks and Driveways. The quantity to be measured for payment will be in
square yards to the nearest 0.1 square yard of brick paving installed.
608-4.04 Grouted Stone Block Paved Sidewalks and Driveways. The quantity to be measured for
payment will be in square yards to the nearest 0.1 square yard of stone block paving installed.
608-4.05 Precast Concrete Block Paved Sidewalks and Driveways. The quantity to be measured for
payment will be in square yards to the nearest 0.1 square yard of precast concrete paving installed.
608-4.06 Surface -Applied Detectable Warning Units. The quantity to be measured for payment will be
in square yards to the nearest 0.1 square yard of surface -applied detectable warning units installed.
608-4 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 608-4.07 Embedded Detectable Warning Units. The quantity to be measured for payment will be in square yards to the nearest 0.1 square yard of embedded detectable warning units installed.
608-5 Basis of Payment
608-5.01 Portland Cement Concrete Sidewalks and Driveways. The unit price bid for concrete
sidewalks and driveways shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including preparing the subgrade, saw cutting and wire fabric reinforcement. Excavation and subbase course will be paid for separately.
608-5.02 Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips. The unit price
bid for asphalt sidewalks, driveways and paths shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including preparing the subgrade, milling, cleaning surfaces, tack coat, saw cut, truing and leveling co urses. Excavation and subbase course will be paid for separately. Payment adjustments will be made when there is a disincentive based on the Quality Units multiplied by the fixed index price for asphalt items listed in the contract documents for the quantit y placed on the day the Quality Adjustment Factor represent.
608-5.03 Brick Paved Sidewalks and Driveways. The price bid for brick paved sidewalks and driveways
shall include the cost of furnishing all labor, materials and equipment necessary to satisfactorily complete the work, including setting bed material. Excavation and subbase course will be paid for s eparately.
608-5.04 Grouted Stone Block Paved Sidewalks and Driveways. The unit bid for grouted stone block
paved sidewalks and driveways shall include the cost of furnishing all labor, materials and equipment necessary to satisfactorily complete the work, including setting bed material. Excavation and subbase course will be paid for separately.
608-5.05 Precast Concrete Block Paved Sidewalks and Driveways. The unit price bid for precast
concrete block paved sidewalks and driveways shall include the cost of all labor, materials and equipment necessary to satisfactorily complete the work, including setting bed material. Excavation and subbase course will be paid for separately.
608-5.06 Surface -Applied Detectable Warning Units. The unit price bid for surface -applied detectable
warning units shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including surface preparation.
608-5.07 Embedded Detectable Warning Units. The unit price bid for embedded detectable warning units
shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including bedding material. No adjustment will be made for concrete removed t o accommodate embedded units. Payment will be made under: Item No. Item Pay Unit 608.0101 Concrete Sidewalks and Driveways Cubic Yard 608.0102 Accelerated Cure Sidewalks and Driveways Cubic Yard 608.020102 Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips Ton 608.000013 Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips Quality Unit 608.03 Brick Paved Sidewalks and Driveways (Sand Setting Bed) Square Yard 608.04 Brick Paved Sidewalks and Driveways (Mortar Setting Bed) Square Yard
609-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 608.05 Brick Paved Sidewalks and Driveways (Bituminous Setting Bed) Square Yard 608.06 Brick Paved Sidewalks and Driveways (Sand -Cement Setting Bed) Square Yard 608.07 Brick Paved Sidewalks and Driveways (Optional Concrete Setting Bed) Square Yard 608.08 Grouted Stone Block Paved Sidewalks and Driveways (Sand Setting Bed) Square Yard 608.09 Grouted Stone Block Paved Sidewalks and Driveways (Mortar Setting Bed) Square Yard 608.10 Grouted Stone Block Paved Sidewalks and Driveways (Sand -Cement Setting Bed) Square Yard 608.11 Grouted Stone Block Paved Sidewalks and Driveways (Optional Concrete Setting Bed) Square Yard 608.12 Precast Concrete Block Paved Sidewalks and Driveways (Granular Material Setting Bed) Square Yard 608.20 Surface -Applied Detectable Warning Units Square Yard 608.21 Embedded Detectable Warning Units Square Yard SECTION 609 - CURB AND CURB & GUTTER (Last Revised January , 2022)
609-1 DESCRIPTION. Construct and place curb, and curb & gutter, and/or reset curb as indicated in
the Contract Documents or established by the Engineer.
609-2 MATERIALS. The materials shall meet the requirements of the following subsections of Section
700 - Materials and Manufacturing. Portland Cement, Type II 701-01 Concrete Repair Material 701-04 Concrete Grouting Material 701-05 Anchoring Material - Chemically Curing 701-07 Concrete Repair Material - High Early Strength 701-12 Coarse Aggregate 703-02 Concrete Sand 703-07 Premolded Resilient Joint Filler 705-07 Masonry Mortar 705-21 Stone Curb Anchor Bars 709-07 Quilted Covers (for Curing) 711-02 Plastic Coated Fiber Blankets (for Curing) 711-03 Polyethylene Curing Covers (White Opaque) 711-04 Membrane Curing Compound 711-05 Stone Curb 714-01 Precast Concrete Curb 714-04
609-2.01 (Vacant)
609-2.02 Concrete for Cast -in-Place Concrete Curb and Curb & Gutter.
609-2 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Admixtures and provides a minimum of 10% reduction of the design water content from the target mix design for Class D.
609-2.03 Stone Curb. Stone curb shall conform to the requirements for Stone under §714 -01.
609-2.04 Curb Anchors. Curb anchors for cast -in-place concrete curb, and curb & gutter shall be
fabricated from material conforming to the requirements for Longitudinal Joint Ties §705 -14 and to the details shown on the Standard Sheet for concrete curb or as indicated in the Con tract Documents.
609-2.05 Concrete for Backing and Bedding Precast Concrete Curb and Stone Curb . The
Contractor shall use any Class Concrete, or a concrete mix as specified in Section 501 proportioned as follows: TABLE 609 -1 POUNDS OF AGGREGATE PER BAG OF CEMENT Specific Gravity of Aggregate 2.60 2.70 2.80 2.90 Concrete Sand 326 337 350 364 Coarse Aggregate, CA 2 Gradation 536 556 558 597
609-3 Construction Details
609-3.01 General. Curb or curb & gutter found to be dirty, damaged , or out of alignment shall be
cleaned, repaired, or replaced as necessary by the Contractor to the satisfaction of the Engineer prior to final acceptance of the work. When the Contract Documents have no reference to placing curb across driveway entrances, no curb shall be placed across driveway entrances.
609-3.02 Setting Precast Concrete Curb or Stone Curb. All precast concrete curb and stone curb,
excluding stone traversable sloped (TRS) curb, shall be set on a 3 -inch thick continuous bed of dry concrete mix, or on a 3 inch thick dry concrete mix bed at the joints as shown on the Standard Sheets and wet concrete mix between the joints, or on a 3 -inch minimum thick ness continuous bed of compacted granular material, at the Contractor's option. Precast concrete curb and stone curb, excluding stone traversable sloped curb and Lean Back curb , shall be backed up with concrete using one of the following methods depending on the type of pavement:
609-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 When the curb is set next to a concrete (rigid) pavement, grout conforming to §701 -04 Concrete Repair Material, §701 -12 Concrete Repair Material - High Early Strength, or §705 -21 Masonry Mortar shall be placed in the joint formed between the curb and the pavement. The grout shall extend from the bottom to the top of the pavement slab. Before proceeding with any further work adjacent to the curb, the curb shall be backfilled with material approved by the Engineer and the backfill material shall be thoroughly tamped as per contract documents .
609-3.03 Stone Curb - Bridge Type. The requirements of §609 -3.02 shall apply with the following
modifications:
609-3.04 Cast -In-Place Concrete Curb and Curb & Gutter. Cast-in-place concrete curb and curb &
gutter shall either be conventionally formed or machine formed to the size and shape shown on the Standard Sheets or as indicated in the Contract Documents. If no width is indicated in the Contract Documents, the w idth shall be the minimum shown on the Standard Sheet. Curb anchors, as required on the Standard Sheets or the Contract Documents, shall not be coated with materials which impair bonding. Curb anchors shall be installed a minimum of 12 inches from the ends of a pavement slab. Curb anchors for new concrete pa vement, when placed simultaneously with pavement concrete, shall be placed by equipment which can demonstrate to the satisfaction of the Engineer placement of the anchors in accordance with these specifications. Curb anchors, when not placed simultaneousl y with pavement concrete, shall be placed rigidly secured by chairs or other supports to prevent displacement of the anchors when pavement concrete is placed. Curb anchors for existing concrete pavement shall be inserted into holes drilled in the side of the existing concrete pavement. The holes shall be thoroughly cleaned and filled with Concrete Grouting Material §701 -05 or Anchoring Materials - Chemically Curing §701 -07 immediately before placing the curb anchor. The curb anchor shall be securely suppo rted in position until the grout has hardened. Curing of the curb and curb & gutter shall comply with the requirements of §502 -3.11 Curing, except that a clear membrane curing compound with fugitive dye conforming to the requirements of Membrane Curing Compound §711 -05 may be used in lieu of the white pigmented membrane curing compound.
609-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 2. Casting Segments. Curb and curb & gutter shall be cast in segments having a uniform length of approximately 10 feet. The joints between segments shall not exceed 1/4 inch in width. When curb and curb & gutter is constructed next to concrete pavement, the curb and curb & g utter joints shall line up with the pavement joints or additional joints shall be provided in the curb and curb & gutter which line up with the pavement joints.
609-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 directed by the Engineer. Expansion joints shall not be required at regular intervals unless otherwise shown in the Contract Documents.
609-3.05 Setting Stone Traversable Sloped Curb. Stone traversable sloped curb (TRS) shall be set on
a continuous trapezoidal shaped wedge bed of dry concrete mix, with 12 inches of wet concrete mix at the front base and 6 inches at the back top as shown on the Standard Sheets. Stone traversable curb shall be set such that the front bottom arris line is at the top of pavement and is on a 1 on 3 slope.
609-3.06 Optional Curb. Under Optional Curb, the Contractor shall have the option of placing precast
concrete curb, or cast -in-place concrete curb, or stone curb. Precast concrete curb or stone curb shall be
609-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 placed in accordance with the requirements of §609 -3.02. Cast -in-place curb shall be placed in accordance with the requirements of §609 -3.04. No intermixing of curb will be allowed without the Engineer's written permission. Optional Lean Back Stone Curb shall be at the contractor’s option.
609-3.07 Resetting Curb. Care shall be taken in removing the curb to be reset so that there will be no
unnecessary breakage. All curb damaged in removing, hauling, storing, or resetting shall be replaced by the Contractor. The curb shall be reset, in accordance with the requirements of §609 -3.02 or §609 -3.03 for resetting bridge type curbs, to the lines and grades specified in the Contract Documents.
609-4 METHOD OF MEASUREMENT. All curb and curb & gutter placed , and curb reset under these
specifications will be measured by the number of linear feet, rounded to the nearest foot. The measurement will be taken along the top front arris line of full height, transition and terminal sections. The measurement will be t aken along the top front arris line of curb reveals across driveway entrances only when placed and not removed.
609-5 Basis of Payment
609-5.01 Concrete Curb, Curb & Gutter, Stone Curb, Optional Curb. The unit price bid per foot
shall include the cost of all labor, materials, equipment, curb anchors , saw-cutting and excavation to place, backfill, concrete, grout ing and caulk ing, curb & gutter in accordance with these specifications. When select backfill is specified, the select backfill will be paid under its respective item. No additional payment will be made to the Contractor when more than the minimum width of curb is placed. No additional payment will be made to the Contractor when curb (including bedding) is removed and replaced across driveway entrance s to facilitate concrete machine forming operations .
609-5.02 Stone Curb - Bridge Type. The unit price bid per foot shall include the cost of furnishing all
labor, equipment, and materials including concrete bedding, mortar for stone curbs, chemically curing anchoring materials, and stone curb anchors required to bed and place stone bridge curb, in accordance with these specifications.
609-5.03 Resetting Curb. The unit price bid per foot shall include the cost of furnishing all labor,
equipment, and materials to remove, haul, store and reset curb, in accordance with these specifications. In addition, the unit price shall also include any re -dressing of tops a nd joints of bridge type curb, as directed by the Engineer, and replacement of curb damaged by the Contractor's operations. Payment will be made under: Item No. Item Pay Unit 609.0212 Stone Curb – Near Vertical Face (NVF) Foot 609.0213 Stone Curb - Optional Lean Back (LB) for HMA pavement Foot 609.0214 Stone Curb – Mountable (MT) Foot 609.0215 Stone Curb – Light Duty (LD) Foot 609.0216 Stone Curb – Traversable Sloped (TRS) Foot 609.021 7 Stone Curb – Traversable (TR) Foot 609.0218 Stone Curb – Roundabout (RD) Foot 609.03 01 Stone Curb – Bridge (Type A ) Foot 609.0302 Stone Curb – Bridge (Type F1) Foot 609.035 0 Stone Bridge Curb (As Detailed) Foot 609.04 Cast-in-Place Concrete Curb (As Detailed) Foot 609.04XX Cast-in-Place Concrete Curb (Various Types as indicated) Foot
610-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 609.05 Cast-in-Place Concrete Curb & Gutter (As Detailed) Foot 609.05XX Cast-in-Place Concrete Curb & Gutter (Various Types as indicated) Foot 609.08XX Precast Concrete Curb (Various Types as indicated) Foot 609.0901 Optional Curb (Precast Concrete Type PVF 6 or Cast -In-Place Concrete Type VF 6 or Stone Type NVF ) Foot 609.0902 Optional Curb (Precast Concrete Type PM 4 or Cast -In-Place Concrete Type M 4 or Stone Type MT) Foot 609.0903 Optional Curb (Precast Concrete Type PT 4 or Cast -In-Place Concrete Type T 4) Foot 609.0904 Optional Curb (Precast Type Pm6 Or Cast -In-Place Type M6 ) Foot 609.15 Resetting Existing Curb Foot SECTION 610 - GROUND VEGETATION - PREPARATION, ESTABLISHMENT AND MANAGEMENT
610-1 Description.
610-1.01 Topsoil. This work shall consist of furnishing, screening, storing, stockpiling and placing
topsoil in accordance with the contract documents and as directed by the Engineer.
610-1.02 Preparation of Subsoil for Turf Establishment. This work shall consist of ground preparation
when topsoil is not included in the work prior to establishment of turf in accordance with the contract documents and as directed by the Engineer.
610-1.03 Turf Establishment. The work shall consist of establishing turf, including sowing seeds,
applying initial watering, mulch and mulch anchorage, and initial mowing (as indicated to meet performance criteria) in accordance with the contract documents and as directed by the Engin eer.The work shall consist of ground preparation and establishing turf in accordance with the contract documents and as directed by the Engineer.
610-1.04 Wildflower Seeding. The work shall consist of ground preparation, furnishing and placing
wildflower seeding materials and caring for wildflower areas in accordance with the contract documents and as directed by the Engineer.
610-1.05 Sod. The work shall consist of ground preparation, furnishing, installing and caring for sod in
accordance with the contract documents and as directed by the Engineer.
610-1.06 Soil Amendments. The work consists of furnishing and placing soil amendments in accordance
with the contract documents and as directed by the Engineer.
610-1.07 Compost. The work consists of furnishing, placing and incorporating compost in accordance
with the contract documents and as directed by the Engineer.
610-1.08 Mulch for Planting. The work consists of furnishing and placing mulch, in accordance with
the contract documents and as directed by the Engineer.
610-1.09 Permeable Weed Control Landscape Fabric. The work consists of furnishing and placing
permeable landscape fabric for weed control, in accordance with the contract documents and as directed by the Engineer.
610-1 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
610-1.10 Watering Vegetation. This work shall include watering turf, sod, wildflower seeding, trees,
shrubs, ground covers, vines, other plants, and filling portable drip irrigation systems in accordance with the contract documents and as directed by the Engineer.
610-1.11 Weed Removal. This work shall consist of removal and disposal of all native and non -native
weeds including roots from newly established turf and sod areas, wildflower seeded areas, tree and shrub pits and plant beds in accordance with the contract documents and as dire cted by the Engineer.
610-1.12 Mowing. This work shall consist of mowing newly established seeded or sodded areas
including the removal and disposal of any debris and litter which has accumulated prior to or between mowings, in accordance with the contract documents and as directed by the Eng ineer.
610-1.13 Mowing Limits Markers. This work consists of furnishing and installing mowing limit
markers in accordance with the contract documents and as directed by the Engineer.
610-1.14 Turf Establishment - Performance. This work consists of turf establishment – performance,
including: soil preparation, topsoil, applying soil amendments, sowing seeds, watering, and mowing in accordance with the contract documents and as directed by the Engineer.
610-2 Materials
610-2.01 Topsoil. The materials shall meet the requirements of the following subsections of Section 700
Materials and Manufacturing . Excavated material from earthwork operations defined in Section 203 Excavation and Embankment that is unsuitable for embankments but conforms to §713 -01 Topsoil is acceptable. Topsoil 713-01
610-2.02 Preparation of Subsoil for Turf Establishment. None specified.
610-2.03 Turf Establishment. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Water 712-01 Seeds 713-04 Mulch For Turf Establishment and Erosion Control 713-11 Mulch anchorage 713-12 Straw 713-19
610-2.04 Wildflower Seeding. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Water 712-01 Seeds 713-04 Mulch For Turf Establishment and Erosion Control 713-11 Mulch anchorage 713-12 Straw 713-19
610-2.05 Sod. The materials shall meet the requirements of the following subsections of Section 700
Materials and Manufacturing .
610-2 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Water 712-01 Topsoil 713-01 Sod 713-14
610-2.06 Soil Amendment. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Water 712-01 Limestone 713-02 Fertilizer 713-03 Mycorrhizal Fungi 713-09 Moisture Retention Additive 713-10 Sulfur 713-17
610-2.07 Compost. The materials shall meet the requirements of the following subsections of Section
700 Materials and Manufacturing . Compost 713-15
610-2.08 Mulch for Planting. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Mulch for Planting 713-05
610-2.09 Permeable Weed Control Landscape Fabric. The materials shall meet the requirements of the
following subsections of Section 700 Materials and Manufacturing . Weed Control Barriers 713-18
610-2.10 Watering Vegetation. The materials shall meet the requirements of the following subsections
of Section 700 Materials and Manufacturing . Water 712-01
610-2.11 Weed Removal. None specified.
610-2.12 Mowing. None specified.
610-2.13 Mowing Limits Markers. The materials shall meet the requirements of the following
subsections of Section 700 Materials and Manufacturing . Materials for the Protection of Plants 713-08
610-2.14 Turf Establishment – Performance. The materials shall meet the requirements of the
following subsections of Section 700 Materials and Manufacturing. Water 712-01 Topsoil 713-01 Limestone 713-02 Seeds 713-04 Mulch for Turf Establishment and Erosion Control 713-11
610-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Mulch Anchorage 713-12 Sulfur 713-17 Straw 713-19 With the following exceptions: Topsoil (§713 -01) excludes the following: • B.2. Topsoil – Lawns • B.3. Topsoil – Special Planting Mix • B.4. Topsoil – Acidic • C. Topsoil – Wetlands The seed mix used shall be one of the standard seed mixes described under §713 -04 (A, B, C, or D) . If a desired standard mix is not specified in the contract documents, the Contractor may select which standard mix to use.
610-3 Construction Details
610-3.01 Topsoil.
610-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 D. Topsoil – On-Site Wetland and Wetland Off -Site or Manufactured. The Contractor shall not use topsoil wetlands materials which exhibit the presence of invasive species. Care shall be taken not to impact wetland areas remaining. On-site wetland topsoil stripping shall be completed prior to starting the general excavation in an area. After stripping, on -site wetland topsoil shall be placed within 24 hours or stored within the contract limits at a location approved by the Engineer.
610-3.02 Preparation of Subsoil for Turf Establishment. Prior to establishment of turf in areas that are
not to receive topsoil or other permanent erosion control measures, the Contractor shall remove all loose stones and other objects over 2 inches in size to a 4 inch depth. The Contractor shall mix compost w ith subsoil in accordance with §610 -3.07 B. Turf Establishment With No Topsoil/ On Subsoil within the areas to be seeded and grade the surface so that the completed work shall conform to the specified finished lines and grades. Compost will be paid for separately.
610-3.03 Turf Establishment. The Contractor shall coordinate establishment of turf with other site and
construction activities.
610-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 crop type is indicated. §610 -3.03 A1, D4, F6, and G7 shall apply to nurse crops. Nurse crops are paid for separately and do not have establishment criteria.
610-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 2. Turf Establishment – Lawns. Areas indicated in the contract documents for Turf Establishment – Lawns or other payment items – as indicated in the contract documents - will be accepted for final payment when the specified, established, permanent turf grass species are:
610-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Payment Item Recommended Acceptance Criteria 610.1601 – Turf Establishment – Roadside §610 -3.03 J10. 1A, 3C, or 4D 610.1602 – Turf Establishment – Lawns §610 -3.03 J10. 2B. 610.1603 – Turf Establishment – Restoration/High Traffic Seed Mix §610 -3.03 J10. 1A, 3C, or 4D 610.1604 – Turf Establishment – Salt Tolerant Seed Mix §610 -3.03 J10. 1A, 3C, or 4D 610.1605 – Turf Establishment – Performance §610 -3.14 J10. 8H.
610-3.03 Turf Establishment. The Contractor shall coordinate establishment of turf with other site and
construction activities. The Contractor shall clean all equipment involved in turf establishment to remove plants, seeds and propagules prior to commencement of work. Any work to clean equipment shall be at no additional cost to the State. The Contractor shall apply the seed mix at one and one half to two times the manufacturer’s recommended rate. Any method of sowing that does not injure the seeds and achieves even coverage in the process of spreading will be acceptable. The Contractor shall perform the initial watering and shall spread straw uniformly in a continuous blanket to hide the soil from view or mulch Types I – V as specified in the contract documents. Rolled Erosion Control products shall be installed according to manufacturer’s recommendations and paid for separately. Mulch anchorage shall be applied. The Contractor shall water, mow, and weed the turf establishment areas for the duration of the contract or until turf areas are accepted. Watering, mowing, and weeding to care for the turf will be paid for separately. Any work required to correct initial seeding (installation) shall be done at no additional cost to the State.
610-3.04 Wildflower Seeding. The Contractor shall clean all equipment involved in wildflower seeding
to remove plants, seeds and propagules prior to commencement of work at no additional cost to the State.
610-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 The Contractor shall install wildflower seeding materials in accordance with the contract documents. Any method of sowing that does not injure the seeds and provides soil contact in the process of spreading will be acceptable. The Contractor shall apply the seed mix at twice the seed supplier’s recommended rate. The Contractor shall perform the initial watering and spread straw or mulch Types I – V as specified in the contract documents, uniformly at a rate consistent with seed supplier recommendations. Mulch anchorage is required unless otherwise specified in the contract documents. Wildflower seeding areas will be accepted after the seeding operation is complete. Any work required to correct initial seeding (installation) shall be do ne at no additional cost to the State. The Contractor shall water the wildflower seeding areas for the duration of the contract. Watering to care for the wildflower seeding areas will be paid for separately.
610-3.05 Sod. The Contractor shall generally place sod during the seasons identified in Table 610 -1
Sodding Seasons . The Contractor may request extension of seasons, provided the other conditions are met. TABLE 610 -1 SODDING SEASONS Geographic locations Spring Fall R1-Essex, Warren (north of towns of Bolton & Warrensburg), R2-Hamilton, Herkimer (towns of Ohio and Webb) R7-Lewis, St. Lawrence, Franklin, Clinton, Jefferson (east of Rte 81) 4/15-6/30 8/15-10/15 R1– Greene, Rensselaer, Schenectady, Saratoga, Washington, Albany, Warren (towns of Bolton & Warrensburg & south) R2- Montgomery, Fulton, Oneida, Madison, Herkimer (south of town of Ohio) R3,6,9 – All counties R7- Jefferson (west of Route 81) 4/1-6/15 8/15-10/31 R4, 5 & 8 - All counties 4/1 – 5/31 8/15 – 10/31 R10, 11 - All counties 3/1-4/30 8/21-11/15 The subgrade of areas to be sodded shall be excavated and firmed to a sufficient depth below the finished grade of the sod to accommodate the tamped or rolled thickness of topsoil and sod. No frozen sod shall be placed nor shall sod be placed on frozen gro und surface. The Contractor shall exercise care to retain the soil existing on the roots of the sod during transporting, handling and transplanting operations. Sod shall be placed on a minimum of 3 inches of moist topsoil. The topsoil will be paid for separately. The finished sod soil surface shall be flush with surface of the adjacent soil and adjacent structures. It shall meet the finished grades as shown in the contract documents. Sod will be accepted when:
610-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
610-3.06 Soil Amendments. The Contractor shall place, apply or incorporate fertilizer, limestone,
mycorrhizal fungi, sulfur and/or moisture retention additive where shown in the contract documents. When mycorrhizal fungi are specified, application rates for turf shall ensure an even distribution of 100,000 propagules minimum per acre for drill seeding and 1,000,000 propagules minimum per acre for hydroseeding. Application rates for planting and Tree Root Zone Treatment, as well as any other aspects of distributing and/or incorporating mycorrhizal fungi, shall be in accordance with the manufacturer’s recommendations. All other amendments shall be mixed with topsoil prior to placing, spread evenly over the surface of turf, wildflower or sod areas, applied within shrub saucers or applied over the plant beds as appropriate, at the rates recommended by the manufacturer or as specified in the contract documents. The method of application shall ensure an even distribution. When hydraulic application is used, the minimum rate of water application shall be in accordance with manufacturer’s recommendation. Trees shall be fertilized using Method No. 1, No. 2 or No. 3 in accordance with the contract documents.
610-3.07 Compost.
610-3 08
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 610-3.08 Mulch for Planting. The Contractor shall apply mulch consisting of wood chips, pine nuggets or shredded bark to the surface of the beds and tree pit areas in accordance with the contract documents. The Contractor shall apply mulch to a uniform depth of 3 inches over the sh rub bed and tree pit areas and 2 inches over groundcover beds. The mulch shall be distributed so as to create a smooth, level cover over the exposed soil. Mulch shall not cover plants or be in contact with tree root flare, tre e trunks, and plant stems.
610-3.09 Permeable Weed Control Landscape Fabric. Areas where landscape fabric is to be installed
shall be smooth, firm, stable and free of rocks, clods, foliage, roots, trash, debris or other material that will prevent the matting from lying in direct contact with the soil surface. The landscape fabric shall be placed where shown in the contract documents and as required by the manufacturer.
610-3.10 Watering Vegetation. The Contractor shall provide water without damage to plants, mulch,
stakes, plant saucers, sod, or other areas to be watered. Damage resulting from watering operations shall be repaired at no additional cost to the State. Watering shall be applied in accordance with §610 -3.03 Turf Establishment , §610 -3.04 Wildflower Seeding , §610 -3.05 Sod, or §611 -3.01 General . Watering for existing vegetation shall be as specified in the contract documents. Watering shall be applied at the following rates:
610-3.10 Watering Vegetation. The Contractor shall provide water without damage to plants, mulch,
stakes, plant saucers, sod or other areas to be watered. Damage resulting from watering operations shall be repaired at no additional cost to the State. Watering shall be applied in accordance with §610 -3.03 Turf Establishment , §610 -3.04 Wildflower Seeding , §610 -3.05 Sod or §611 -3.01 General . Watering for existing vegetation shall be as specified in the contract documents. Watering shall be applied at the following rates:
610-3 11
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
610-3.11 Weed Removal. The Contractor shall perform weed removal in accordance with the contract
documents. The Contractor shall remove and dispose of weeds including roots prior to flowering and seed formation by manual, chemical or mechanical means. Any method of weed remova l that leaves live roots in the soil will not be permitted. An appropriately licensed applicator is required for chemical weed control methods. The Contractor shall ensure the preservation of desirable vegetation. Treatment and remov al of invasive species will be paid for separately.
610-3.12 Mowing. The schedule may be modified to accommodate prevailing or forecast weather
conditions. The Contractor shall be responsible, prior to each mowing, for the removal and disposal of any debris and litter which has accumulated since the last mowing. Care shall be taken to avoid damage to existing plant materials.
610-3.13 Mowing Limits Markers. The Contractor shall install mowing limit markers plumb to a depth
in accordance with the manufacturer’s instruction.
610-3.14 Turf Establishment – Performance. Shall be §610 -3.03 Turf Establishment, with the
following exceptions.
610-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 a. not thinly or sparsely establishment, resulting in bare ground greater than one foot in diameter.
610-4 Method of Measurement
610-4.01 Topsoil. The quantity to be measured for payment will be in cubic yards of each type of topsoil
measured to the nearest whole cubic yard of topsoil placed, from payment lines shown in the contract documents. Cross sectioning, for the purpose of determining quantities for payment, will be employed only where payment lines are not shown on the Plans and cannot be reasonably established by the Engineer.
610-4.02 Preparation of Subsoil for Turf Establishment. The quantity to be measured for payment
will be in square yards on slope to the nearest whole square yard of subsoil area prepared for turf establishment.
610-4.03 Turf Establishment. The work will be measured as the number of square yards on slope to the
nearest whole square yard on slope of turf established. For Turf Establishment – Nurse Crops, the work will be measured as the number of square yards on slope to the nearest whole square yard on slope of nurse crop sown.
610-4.03 Turf Establishment. The quantity to be measured for payment will be in square yards on slope
to the nearest whole square yard of turf established.
610-4.04 Wildflower Seeding. The quantity to be measured for payment will be in square yards on slope
to the nearest whole square yard of wildflower seeding.
610-4.05 Sod. The quantity to be measured for payment will be in square yards on slope to the nearest
whole square yard of sod placed.
610-4.06 Soil Amendments. The quantity to be measured for payment will be in pounds to the nearest
whole pound or in gallons to the nearest whole gallon of soil amendments (fertilizer, limestone, mycorrhizal fungi, sulfur and/or moisture retention additive) applied.
610-4.07 Compost. The quantity to be measured for payment will be in cubic yards to the nearest whole
cubic yard of compost placed or incorporated.
610-4.08 Mulch for Planting. The quantity to be measured for payment will be in cubic yards to the
nearest whole cubic yard of mulch placed.
610-4.09 Permeable Weed Control Landscape Fabric. The quantity to be measured for payment will
be in square yards on slope to the nearest whole square yard.
610-4 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 610-4.10 Watering Vegetation. The quantity to be measured for payment will be in 1000 gallons (MGal) to the nearest MGal of water applied, determined from approved measuring devices, or by measurement in tanks or containers of known capacity.
610-4.11 Weed Removal. The quantity to be measured for payment will be in square yards on slope
weeded per occurrence to the nearest whole square yard.
610-4.12 Mowing. The quantity to be measured for payment will be the number of square yards on slope
mowed per occurrence to the nearest whole square yard.
610-4.13 Mowing Limits Markers. The quantity to be measured for payment will be by the number of
complete markers satisfactorily installed.
610-4.14 Turf Establishment – Performance. The work will be measured as the number of square
yards on slope to the nearest whole square yard on slope of turf established - performance.
610-5 Basis of Payment
610-5.01 Topsoil. The unit price bid shall include the cost of all labor, materials and equipment
necessary to satisfactorily complete the work, including the handling, storing, stockpiling, and placement.
610-5.02 Preparation of Subsoil for Turf Establishment. The unit price bid shall include the cost of all
labor, materials and equipment necessary to satisfactorily complete the work
610-5.03 Turf Establishment.
The unit price bid per square yard on slope for turf establishment shall include the cost of all labor, materials and equipment as necessary to satisfactorily complete the work. Except as noted below, a progress payment – in an amount not to exceed forty percent (40%) of the unit price bid - for work satisfactorily performed may be paid after the seed has been sown, and the initial watering and mulch application have been complete d. The final payment of sixty percent (60%) of the unit price bid may be paid once the acceptance criteria have been met. No progress payments will be assessed for nurse crops, which are paid in full upon acceptance of sowing. The unit price bid shall include the cost of all labor, materials and equipment including initial water, mulch and mulch anchorage as necessary to satisfactorily complete the work.
610-5.04 Wildflower Seeding. The unit price bid shall include the cost of all labor, materials and
equipment including initial water, mulch and mulch anchorage necessary to satisfactorily complete the work.
610-5.05 Sod. The unit price bid shall include the cost of all labor, materials and equipment including
initial water, necessary to complete the work. Topsoil bed placed under the sod shall be paid for separately.
610-5.06 Soil Amendments. The unit price bid shall include the cost of all labor, materials and
equipment necessary to satisfactorily complete the work, including water for hydraulic application.
610-5.07 Compost. The unit price bid shall include the cost of all labor, materials and equipment
necessary to satisfactorily complete the work
610-5 08
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 610-5.08 Mulch for Planting. The unit price bid shall include the cost of all labor, materials and equipment necessary to satisfactorily complete the work.
610-5.09 Permeable Weed Control Landscape Fabric. The unit price bid shall include the cost of all
labor, materials, and equipment necessary to satisfactorily complete the work.
610-5.10 Watering Vegetation. The unit price bid shall include the cost of all labor, materials and
equipment necessary to satisfactorily complete the work.
610-5.11 Weed Removal. The unit price bid shall include the cost of labor, materials, and equipment
necessary to satisfactorily complete the work.
610-5.12 Mowing. The unit price bid shall include the cost of all labor, materials, and equipment
necessary to satisfactorily complete the work.
610-5.13 Mowing Limits Markers. The unit price bid shall include the cost of all labor, materials, and
equipment necessary to satisfactorily complete the work.
610-5.14 Turf Establishment – Performance. The unit price bid per square yard on slope for turf
establishment – performance shall include the cost of all labor, materials and equipment as necessary to satisfactorily complete the work. A progress payment - in an amount not to exceed forty percent (40%) of the unit price bid - for work satisfactorily performed may be paid after the seed has been sown, and the initial watering and mulch applications have been completed. The final payment of sixty percent (60%) of the unit price bid may be paid once the acceptance criteria have been met. Payment will be made under: Item No Item Pay Unit 610.0501 Fertilizer Pound 610.0502 Fertilizer Gallon 610.06 Limestone Pound 610.0701 Mycorrhizal Fungi Pound 610.0702 Mycorrhizal Fungi Gallon 610.08 Moisture Retention Additive Pound 610.0901 Sulfur Pound 610.0902 Sulfur Gallon 610.10 Compost Cubic Yard 610.1101 Mulch for Planting Type A, B & D Wood Chips and Shredded Bark Cubic Yard 610.1102 Mulch for Planting Type C – USDA -APHIS Protocol Wood Chips Cubic Yard 610.1103 Mulch for Planting Type E – Pine Nugget Cubic Yard 610.1201 Permeable Weed Control Landscape Fabric Squar e Yard 610.1202 Permeable Weed Control Landscape Fabric with Herbicide Square Yard 610.13 Weed Removal Square Yard 610.1401 Topsoil – Reuse On -Site Materials Cubic Yard 610.1402 Topsoil - Roadside Cubic Yard 610.1403 Topsoil - Lawns Cubic Yard 610.1404 Topsoil - Special Planting Mix Cubic Yard 610.1405 Topsoil – Acidic Cubic Yard 610.1406 Topsoil – On-Site Wetland Materials Cubic Yard 610.1407 Topsoil – Wetland Materials Cubic Yard
611-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 610.15 Preparation of Subsoil for Turf Establishment Square Yard 610.1601 Turf Establishment - Roadside Square Yard 610.1602 Turf Establishment -Lawns Square Yard 610.1603 Turf Establishment – Restoration/High Traffic Square Yard 610.1604 Turf Establishment – Salt Tolerant Square Yard 610.1605 Turf Establishment – Performance Square Yard 610.1606 Turf Establishment – Nurse Crops Square Yard 610.17 Wildflower Seeding Square Yard 610.18 Sodding Square Yard 610.19 Watering Vegetation 1,000 Gallons 610.1901 Watering Vegetation – As Specified 1,000 Gallons 610.21 Mowing Square Yard 610.22 Mowing Limits Markers Each SECTION 611 - PLANTING, TRANSPLANTING AND POST PLANTING CARE
611-1 Description .
611-1.01 General. Vacant
611-1.02 Planting. This work consists of furnishing, and planting trees, shrubs, vines, groundcovers and
other plants in accordance with the contract documents and as directed by the Engineer.
611-1.03 Transplanting. This work consists of transplanting existing plants from existing locations to
new locations in accordance with the contract documents and as directed by the Engineer.
611-1.04 Portable Drip Irrigation System. This work shall consist of furnishing, delivering, placing
and removing Portable Drip Irrigation System (PDIS) for watering around newly planted trees and other vegetation in accordance with the contract documents and as directed by the Engineer.
611-1.05 Post-Planting Care. This work consists of the care of newly planted and transplanted trees,
shrubs, vines, groundcovers and other plants in accordance with the contract documents and as directed by the Engineer.
611-1.06 Rodent Guards. This work shall consist of furnishing, delivering and placing rodent guards
around newly planted trees and other vegetation in accordance with the contract documents and as directed by the Engineer.
611-2 Materials
611-2.01 General . Materials shall meet the requirements of the following subsections of Section 700
Materials and Manufacturing . Water 712-01 Topsoil 713-01 Mulch for Landscape Bedding 713-05 Materials for the Protection of Plants 713-08 Compost 713-15
611-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 611-2.02 Planting. Trees, shrubs, vines, groundcovers and other plants shall be as specified under '§713-06 and as further specified in the contract documents.
611-2.03 Transplanting . Plants shall be existing plants in accordance with §'713-06.
611-2.04 Portable Drip Irrigation System. The materials shall meet the requirements of the following
subsections of Section 700 Materials and Manufacturing. Materials may be new or previously used that meet the following material requirements. Materials for the Protection of Plants 713-08
611-2.05 Post Planting Care. Materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Pesticides 713-13
611-2.06 Rodent Guards. Materials shall meet the requirements of the following subsections of Section
700 Materials and Manufacturing . Materials for the Protection of Plants 713-08
611-3 Construction
611-3.01 General. Locations for plants shall be as specified in the contract documents. All plants for
planting and transplanting shall be protected from damage and drying out, including during transportation, handling or while in temporary storage. No planting or trans planting shall be done when the soil is frozen, saturated (except in wetland conditions) or otherwise in an unsatisfactory condition for working. Planting seasons represent average times of suitable conditions between weather extremes. In general, planting or transplanting shall occur during these seasons. The Contractor may request an extension of the planting seasons. TABLE 611 -1 PLANTING SEASONS Planting Seasons Spring Fall Geographic locations (NYSDOT Regions and Counties) Deciduous & Evergreen B&B Deciduous & Evergreen Container Grown Evergreen B&B Deciduous B&B Deciduous & Evergreen Container Grown (USDA 3b -4a) R1- Essex, Warren (north of towns of Warrensburg & Bolton) R2-Hamilton, Herkimer (towns of Ohio & Webb) R7-Lewis, St. Lawrence, Franklin, Clinton, Jefferson (east of Route 81) 4/15-5/31 4/15-5/31 8/15-9/30 9/15-10/31 8/15 - 10/31 (USDA 4a -5a) R1–Greene, Rensselaer, Schenectady, Saratoga, Washington, Albany, 4/1-5/15 4/1 – 5/31 8/15-9/30 9/15-11/15 8/15-11/15
611-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Warren (towns of Bolton & Warrensburg & south) R2- Montgomery, Fulton, Oneida, Madison, Herkimer (south of town of Ohio) R3,6,9 – All counties R7- Jefferson (west of Route 81) (USDA 5a -6a) R4, 5 & 8 - All counties 3/15-5/15 3/15 – 5/31 8/15-10/15 9/15-11/30 8/15-11/30 (USDA 6b -7a) R10, 11 - All counties 3/1-5/15 3/1 – 5/31 8/15-10/31 10/1-12/15 8/15-12/15 All Locations Bare Root stock shall be planted while dormant Locations for plants and outlines of areas to be planted shall be staked or marked out on the ground by the Contractor and approved by the Engineer before any plant pits or plant beds are dug. Where non - movable underground obstructions are encountered, the plant pits shall be relocated as approved by the Engineer. Existing vegetation shall be removed from all new planting beds. Where an impervious layer of soil (hardpan, fragipan and soils with greater than 20% clay content) is encountered during the excavation of plant pits or beds, all such soil shall be removed up to a depth of one foot beyond required plant pit depth in orde r to provide adequate drainage for the plant. The pits or beds shall be backfilled with topsoil. Any additional excavation required to properly plant or transplant in impervious soils will be considered extra work. Planting soil shall be unamended existing soil excavated from the plant pit unless otherwise specified. Watering shall accompany backfilling of plant. The Contractor shall perform the initial watering for backfilling plant so that no voids occur in the plant pit. No tree shall be staked, guyed or anchored unless otherwise specified in the contract documents. Mulch shall Type A or B unless otherwise specified in the contract documents and shall be placed at the time of planting or transplanting. The Contractor shall water, weed and maintain mulch at no cost to the state until the newly planted or transplanted material is accepted. Plants will be accepted when all specified plants meet the following conditions:
611-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 611-3.02 Planting. The Contractor shall notify the Engineer at least four calendar days before intended delivery of plants or planting materials to the site. The Contractor shall furnish the Engineer legible copies of the certificates of inspection of plant materials and do cumentation for each shipment showing point of origin, sizes, scientific names, quantities, and kinds of materials supplied. Planting shall be in accordance with ANSI A300 Part 1, 2 and 3 Standard Practices . Pruning at the time of planting shall be limited to the removal of dead, conflicting and broken branches; and to other pruning consistent with good horticultural practice in accordance with ANSI A300 Part 1 Standard Practices .
611-3.03 Transplanting. Transplanting shall be in accordance with ANSI A300 Part 1, 2, 3 and 6
Standard Practices and accomplished by a digging method intended to preserve the root system intact to the extent practicable. Planting soil shall be unamended existing soil excavated from the plant pit unless otherwise specified. Transplanted stock shall be pruned prior to transplanting in accordance with ANSI A300 Part 1 Standard Practices . The Contractor shall take appropriate measures to avoid damage to plant during the transplanting operation including:
611-3.04 Portable Drip Irrigation System (PDIS). After the requirements for planting under Section
611 Planting, Transplanting and Post Planting Care are completed; the Contractor shall supply and install the required number and size of PDIS as recommended by the manufacturer for the trees planted. Watering shall be performed as required in Section 610 -3.09 Watering Vegetation and paid for separately. All PDIS that are damaged and or missing shall be replaced at no added cost to the State. The Contractor shall remove PDIS in the fall prior to the first frost. The PDIS shall remain the property of the Contractor.
611-3.05 Post-Planting Care. If specified, the Contractor shall care for planting as needed for one year
following the satisfactory completion of all of the planting and/or transplanting or for the duration of the contract, which ever is later. The contractor shall prepare and submit a post -planting care work schedule for approval. Post-planting care shall consist of:
611-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 D. Pruning (ANSI A300 Part 1) - once to prune dead or damaged branches.
611-3.06 Rodent Guards. Vacant
611-4 Method of Measurement.
611-4.01 Planting. The quantity to be measured for payment will be the number of plants placed.
611-4.02 Transplanting. The quantity to be measured for payment will be the number of plants placed.
611-4.03 Portable Drip Irrigation System (PDIS). The quantity of PDIS to be measured for payment
will be the number of PDIS placed. The quantity of Removal of Portable Drip Irrigation System to be measured for payment will be the number of PDIS removed.
611-4.04 Post-Planting Care. The quantity to be measured for payment will be the number of plants
cared for or nearest whole square yard on slope of plants cared for.
611-4.05 Rodent Guards. The quantity to be measured for payment will be the number of rodent guards
placed.
611-5 Basis of Payment.
611-5.01 Planting. The unit price bid for each plant shall include the cost of all labor, materials, and
equipment, including initial watering and mulch, compost, plants and plant protection materials and topsoil necessary to satisfactorily complete the work.
611-5.02 Transplanting. The unit price bid for each plant shall include the cost of all labor, materials,
and equipment, including initial watering, mulch, compost, plant and plant protection materials and topsoil necessary to satisfactorily complete the work.
611-5.03 Portable Drip Irrigation System. The unit price bid shall include the cost of all labor,
materials, and equipment, necessary to satisfactorily complete the work.
611-5.04 Post-Planting Care. The unit price bid for each plant shall include the cost of all labor,
materials, and equipment necessary to satisfactorily complete the work. Progress payments for work satisfactorily performed may be paid at the mid point of the post -planting care in a mounts not to exceed forty percent (40%) of the unit price bid for the respective work.
611-5.05 Rodent Guards. The unit price bid shall include the cost of all labor, materials, and equipment,
necessary to satisfactorily complete the work. Payment will be made under: Item No. Item Pay Unit 611.011x Planting - Major Deciduous Trees – size as specified Each 611.012x Planting - Major Deciduous Trees – 1 ¼ inch Caliper Each
611-5 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 611.013x Planting - Major Deciduous Trees – 1 ½ inch Caliper Each 611.014x Planting - Major Deciduous Trees – 1 ¾ inch Caliper Each 611.015x Planting - Major Deciduous Trees – 2 inch Caliper Each 611.016x Planting - Major Deciduous Trees – 2 ½ inch Caliper Each 611.017x Planting - Major Deciduous Trees – 3 inch Caliper Each 611.018x Planting - Major Deciduous Trees – 3 ½ inch Caliper Each 611.019x Planting - Major Deciduous Trees – 4 inch Caliper Each 611.021x Planting - Minor Deciduous Trees – size as specified Each 611.022x Planting - Minor Deciduous Trees – 3 foot height Each 611.023x Planting - Minor Deciduous Trees – 4 foot height Each 611.024x Planting - Minor Deciduous Trees – 5 foot height Each 611.025x Planting - Minor Deciduous Trees – ¾ inch Caliper Each 611.026x Planting - Minor Deciduous Trees – 1 inch Caliper Each 611.027x Planting - Minor Deciduous Trees – 1 ¼ inch Caliper Each 611.028x Planting - Minor Deciduous Trees – 1 ½ inch Caliper Each 611.029x Planting - Minor Deciduous Trees – 1 ¾ inch Caliper Each 611.020x Planting - Minor Deciduous Trees – 2 inch Caliper Each 611.031x Planting - Coniferous Trees – size as specified Each 611.032x Planting - Coniferous Trees – 2 ½ foot height Each 611.033x Planting - Coniferous Trees – 3 foot height Each 611.034x Planting - Coniferous Trees – 4 foot height Each 611.035x Planting - Coniferous Trees – 5 foot height Each 611.036x Planting - Coniferous Trees – 6 foot height Each 611.037x Planting - Coniferous Trees – 7 foot height Each 611.038x Planting - Coniferous Trees – 8 foot height Each 611.039x Planting - Coniferous Trees – 9 foot height Each 611.041x Planting - Deciduous Shrubs –As Specified Each 611.042x Planting - Deciduous Shrubs – 15 inch Height/Spread Each 611.043x Planting - Deciduous Shrubs – 18 inch Height/Spread Each 611.044x Planting - Deciduous Shrubs – 2 foot Height/Spread Each 611.045x Planting - Deciduous Shrubs – 3 foot Height/Spread Each 611.046x Planting - Deciduous Shrubs – 4 foot Height/Spread Each 611.047x Planting - Deciduous Shrubs – 5 foot Height/Spread Each 611.048x Planting - Deciduous Shrubs – 6foot Height/Spread Each 611.051x Planting - Evergreen Shrubs – As Specified Each 611.052x Planting - Evergreen Shrubs – 15 inch Height/Spread Each 611.053x Planting - Evergreen Shrubs – 18 inch Height/Spread Each 611.054x Planting - Evergreen Shrubs – 2 foot Height/Spread Each 611.055x Planting - Evergreen Shrubs – 2 ½ foot Height/Spread Each 611.056x Planting - Evergreen Shrubs – 3 foot Height/Spread Each 611.057x Planting - Evergreen Shrubs – 3 ½ foot Height/Spread Each 611.058x Planting - Evergreen Shrubs – 4 foot Height/Spread Each 611.059x Planting - Evergreen Shrubs – 5 foot Height/Spread Each x= Root Specification 1= Ball & Burlap, Field Potted or Field Boxed, 2 = Container or Box Grown, 3 = Bare Root, 4 = In Ground Fabric Bag Grown 611.061y Planting – Vines, Groundcovers – As Specified Each 611.062y Planting – Vines, Groundcovers – Number SP3 Container Each 611.063y Planting – Vines, Groundcovers – Number SP4 Container Each
613-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 611.064y Planting – Vines, Groundcovers – Number SP5 Container Each 611.065y Planting – Vines, Groundcovers – Number 1 Container Each 611.066y Planting – Vines, Groundcovers – Number 2 Container Each 611.071y Planting - Herbaceous Plants – As Specified Each 611.072y Planting - Herbaceous Plants – Number SP4 Container Each 611.073y Planting - Herbaceous Plants – Number SP5 Container Each 611.074y Planting - Herbaceous Plants – Number 1 Container Each 611.075y Planting - Herbaceous Plants – Number 2 Container Each y = Type Specification 1 = Container Grown, 2 = Bare Root 3 = Field Potted, 611.10 Transplanting 0 to 48 inch in height Each 611.11 Transplanting over 48 inch to 72 inches in height Each 611.12 Transplanting, over ¾ inch to 3 inches Diameter at Breast Height Each 611.13 Transplanting, over 3 inches to 6 inches Diameter at Breast Height Each 611.14 Transplanting over 6 inches to 12 inches Diameter at Breast Height Each 611.15 Transplanting Vines, Groundcovers, Each 611.16 Transplanting Herbaceous Plants Each 611.17 Portable Drip Irrigation System Each 611.18 Removal of Portable Drip Irrigation System Each 611.19 Post-Planting Care Each 611.20 Post-Planting Care Square yard 611.21 Rodent Guard Each Refer to the Contract Proposal for full item number and full description SECTION 612 (VACANT) SECTION 613 - WILDLIFE AND ECOLOGY
613-1 Description .
613-1.01 Terrestrial Habitat. This w ork shall consist of the protection, preservation, restoration and
management of terrestrial habitat.
613-1.02 Aquatic Habitat. This w ork shall consist of the protection, preservation, restoration and
management of aquatic habitat.
613-1.04 Wetlands. This w ork shall consist of the protection, preservation, restoration and management
of wetlands.
613-1.06 Streams and Riparian Zones. This w ork shall consist of the protection, preservation,
restoration and management of rivers, streams and riparian zones.
613-2 MATERIALS. As specified in the special specifications.
613-3 CONSTRUCTION DETAILS. As specified in the special specifications.
613-4 METHOD OF MEASUREMENT. As specified in the special specifications.
614-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 613-5 BASIS OF PAYMENT. As specified in the special specifications. SECTION 614 - PRUNING, IMPROVING AND REMOVING EXISTING VEGETATION
614-1 Description .
614-1.01 Pruning Existing Trees. This work shall consist of pruning existing trees as shown in the
contract documents and as directed by the Engineer.
614-1.02 Improvement of Vegetated Areas. This work shall consist of cutting, disposing of all wood
and debris, stump removal, or mechanical or chemical treatment of specified trees and woody vegetation within the area shown in the contract documents and as directed by the Engineer.
614-1.03 Tree Removal. The work shall consist of felling trees over 4 inch in diameter at breast height,
disposing of all wood and debris, and may require topping, stump removal and other work as shown in the contract documents and as directed by the Engineer.
614-1.04 Existing Stump Removal. The work shall consist of removing existing stumps, disposing of all
wood and debris, as shown in the contract documents and as directed by the Engineer.
614-1.05 Tree Root Zone Treatment (Vertical Mulching/Aeration). This work shall consist of treating
the root zone of trees through aeration and/or mulching of the roots as shown in the contract documents and as directed by the Engineer.
614-1.06 Tree Root Pruning. This work shall consist of cleanly pruning, existing tree roots severed
during construction operations, typically related to linear excavation, as shown in the contract documents and as directed by the Engineer.
614-2 Materials
614-2.01 Pruning Existing Trees. The materials shall meet the requirements of the following
subsections of Section 700 Materials and Manufacturing . Water 712-01
614-2.02 Improvement of Vegetated Areas. The materials shall meet the requirements of the following
subsections of Section 700 Materials and Manufacturing . Topsoil 713-01 Pesticides 713-13
614-2.03 Tree Removal. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Topsoil 713-01
614-2.04 Existing Stump Removal. The materials shall meet the requirements of the following
subsections of Section 700 Materials and Manufacturing . Topsoil 713-01
614-2.05 Tree Root Zone Treatment (Vertical Mulching/Aeration). The materials shall meet the
requirements of the following subsections of Section 700 Materials and Manufacturing . Mortar Sand 703-03
614-2 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Mycorrhizal Fungi 713-09 Compost 713-15
614-2.06 Tree Root Pruning. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Water 712-01
614-3 Construction Details
614-3.01 Pruning Existing Trees
614-3.02 Improvement of Vegetated Areas. All trees and shrubs specified for removal will be
designated by the Engineer either by separate marking, marking in sample areas, or otherwise. Unless otherwise specified, all stumps shall be cut to a height of about 6 inches above the ground. Unless otherwise specified, an approved herbicide shall be applied to all live stumps in accordance with the manufacturer's recommendations. An approved dye shall be added to the herbicide mixture to identify treated stumps a nd stubble. Where stump removal is specified, all stump holes shall be backfilled with topsoil, unless otherwise specified in the contract documents, and backfill shall be compacted. Unless otherwise specified in the contract documents, grass shall be est ablished on stump holes and will be paid for separately. Care shall be taken in the felling of trees and the operation of equipment to prevent injury to trees and shrubs which are to be preserved. All injuries to the limbs, bark and roots of such plants shall be repaired in accordance with ANSI A300 Part 1 Standard Practices Pruning and ANSI Z133.1 Arboricultural Operations Safety. Improvement of vegetated areas shall be completed in any area before any planting, seeding or other landscape work is begun in that area unless otherwise approved. All wood, stumps, brush and other debris resulting from the work shall be disposed of as specified in Section 201 Clearing and Grubbing .
614-3.03 Tree Removal. No tree shown in the contract documents or listed for removal shall be cut until
it is approved by the Engineer. The contractor shall be responsible to coordinate all work involving utilities with the respective utility company. All trees shall be topped and limbed before felling unless
614-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 otherwise approved. All injuries to the limbs, bark and roots of plants to remain shall be repaired in accordance with ANSI A300 Standard Practices Pruning and ANSI Z133.1 Arboricultural Operations Safety . The Contractor shall field measure all trees at 4 ½ feet above the ground, commonly referred to as Diameter Breast Height (DBH) before they are cut. Stumps of trees removed under this item for removal shall be grubbed, cut, ground to the depth of six inches below grade or as specified in the contract documents. All stump holes shall be backfilled with topsoil, unless otherwise specified in the contract documents and backfill shall be compacted. Unless otherwise specified in the contract documents, grass shall be established on stump holes and will be paid for separately.
614-3.04 Existing Stump Removal. Existing stumps listed for removal in the contract documents shall
be ground to the depth of 6 inches below grade unless otherwise specified in the contract documents. Stumps shall include all visible wood and roots. Backfill to finished grade with topso il, unless otherwise specified in the contract documents. The backfill shall be compacted. Unless otherwise specified in the contract documents, grass shall be established on stump holes and will be paid for separately.
614-3.05 Tree Root Zone Treatment (Vertical Mulching/Aeration). Locations of work shall include
areas within the dripline or wider root zone of existing trees to be preserved as shown on the contract documents . Appropriate drilling tools shall be used for drilling of holes for root zone restoration. Drilling equipment shall be hand held or light weight devices (no heavy machinery) so as to avoid further impact to tree roots through compaction. Holes shall be drilled and existing soil removed within a zone beginning 3 feet from the trunk of the specified tree and extending to its dripline on an approximately 2 foot x 2 foot grid. Dimensions of holes or drill size shall be approximately 2 inches i n diameter and a minimum of 12 inches deep. Efforts should be made to minimize drilling through large tree roots (especially near the trunk). When woody roots are encountered, the drill hole shall be moved to avoid root damage. The hole shall be completely filled to original grade as follows:
614-3.06 Tree Root Pruning. Existing tree roots greater than 1 inch in diameter, measured at the edge of
excavation, shall be pruned within 24 hours of the time they have been damaged by construction activity. The severed root shall be pruned at the edge of excavation, or 1 inch bey ond the entire damaged portion of the tree root if damaged root extends beyond the edge of excavation into undisturbed soil. Pruning shall be in accordance with ANSI A300 Part 1 Standard Practices Pruning and ANSI Z133.1 Arboricultural Operations Safety . All cuts shall be cleanly made with sharp tools. The cutting surfaces of all tools, ladders, ropes, soles of workers shoes and other objects coming into contact with the tree roots shall be washed with a disinfectant at the start of any work on a tree to pr event the spread of plant diseases.
614-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 The excavated area around the existing tree roots shall be backfilled as soon as construction activities permit with the specified or approved materials. If the excavated area around the existing tree roots is not backfilled within 24 hours, all roots sha ll be kept moist, to prevent dessication.
614-4 Method of Measurement
614-4.01 Pruning Existing Trees. The quantity to be measured for payment will be the number of trees
pruned.
614-4.02 Improvement of Vegetated Areas. The quantity to be measured for payment will be in square
yards measured to the nearest whole square yard of area improved.
614-4.03 Tree Removal. The quantity to be measured for payment will be the number of trees, including
their stumps if specified.
614-4.04 Pre-Existing Stump Removal. The quantity to be measured for payment will be the number of
pre-existing stumps removed.
614-4.05 Tree Root Zone Treatment (Vertical Mulching/Aeration). The quantity to be measured for
payment will be in square yards treated within the zone, measured to the nearest square yard.
614-4.06 Tree Root Pruning. The quantity to be measured for payment will be in feet to the nearest
whole foot, along excavation line.
614-5 Basis of Payment
614-5.01 Pruning Existing Trees. The unit price bid shall include the cost of labor, materials, and
equipment necessary to satisfactorily complete the work.
614-5.02 Improvement of Vegetated Areas. The unit price bid shall include the cost of labor, materials,
and equipment necessary to satisfactorily complete the work.
614-5.03 Tree Removal. The unit price bid shall include the cost of labor, materials, and equipment
necessary to satisfactorily complete the work. When trees are specified in the contract documents for removal, payment for each tree removal will include removal of the stump.
614-5.04 Existing Stump Removal. The unit price bid shall include the cost of labor, materials, and
equipment necessary to satisfactorily complete the work.
614-5.05 Tree Root Zone Treatment. The unit price bid shall include the cost of labor, materials,
equipment and incidentals necessary to complete the work. Mycorrhizal Fungi and mulch will be paid for separately.
614-5.06 Tree Root Pruning. The unit price bid shall include the cost of labor, materials, equipment and
incidentals necessary to complete the work. Payment will be made under: Item No. Item Pay Unit 614.0411 Care of Trees up to 12” Diam. at Breast Height – Pruning Each
614-5 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 614.0421 Care of Trees Over 12” to 24” Diam. at Breast Height - Pruning Each 614.0431 Care of Trees Over 24” to 36” Diam. at Breast Height - Pruning Each 614.0441 Care of Trees Over 36” to 48” Diam. at Breast Height – Pruning Each 614.0451 Care of Trees Over 48” to 60” Diam. at Breast Height – Pruning Each 614.0461 Care of Trees Over 60” Diam. at Breast Height – Pruning Each 614.05 Improvement of Vegetated Areas Square Yard 614.0601nn Tree Removal Over 4” to 6” Diam. Breast Height Each 614.0602nn Tree Removal Over 6” to 12” at Breast Height Each 614.0603nn Tree Removal Over 12” to 18” at Breast Height Each 614.0604nn Tree Removal Over 18” to 24” at Breast Height Each 614.0605nn Tree Removal Over 24” to 36” at Breast Height Each 614.0606nn Tree Removal Over 36” to 48” at Breast Height Each 614.0607nn Tree Removal Over 48” to 60” at Breast Height Each 614.0608nn Tree Removal Over 60” to 72” at Breast Height Each nn = Stump Treatment 01 = Stumps Cut to Above Grade , 02 = Stumps Cut Flush , 03 = Stumps Cut to Below Grade , 04 = Stumps Grubbed 614.0701 Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade Each 614.0702 Pre-Existing Stump Removal over 24” to 48” diameter at 6 inches above grade Each 614.0703 Pre-Existing Stump Removal over 48” diameter at 6 inches above grade Each 614.08 Tree Root Zone Treatment (Vertical Mulching/Aeration) Square Yard 614.09 Tree Root Pruning Feet SECTION 615 - LANDSCAPE APPURTENANCES
615-1 DESCRIPTION. The work in this section shall include all work required for furnishing, placing,
and/or special construction of landscape appurtenances.
615-2 MATERIALS. As specified in the special specifications.
615-3 CONSTRUCTION DETAILS. As specified in the special specifications.
615-4 METHOD OF MEASUREMENT. As specified in the special specifications.
615-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 616 - SOIL BIOENGINEERING