TABLE OF CONTENTS NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Contents Section 600 ................................ ................................ ................................ ................ 4 INCIDENTAL CONSTRUCTION ................................ ................................ ........ 4 SECTION 601 - ARCHITECTURAL PAVEMENTS AND TREATMENTS .................. 4 SECTION 602 - REHABILITATION OF CULVERT AND STORM DRAIN PIPE ....... 5 SECTION 603 - CULVERTS AND STORM DRAINS ................................ ................. 12 SECTION 604 - DRAINAGE STRUCTURES ................................ ............................. 20 SECTION 605 - UNDERDRAINS ................................ ................................ ............... 25 SECTION 606 - GUIDE RAILING, MEDIAN BARRIER, AND CONCRETE BARRIER ................................ ................................ ................................ ................................ ... 28 SECTION 607 - FENCES ................................ ................................ ........................... 51 SECTION 608 - SIDEWALKS, DRIVEWAYS, BICYCLE PATHS, AND VEGETATION CONTROL STRIPS ................................ ................................ .......... 56 SECTION 609 - CURB AND CURB & GUTTER ................................ ........................ 65 SECTION 610 - GROUND VEGETATION - PREPARATION, ESTABLISHMENT AND MANAGEMENT ................................ ................................ ............................... 71 SECTION 611 - PLANTING, TRANSPLANTING AND POST PLANTING CARE ................................ ................................ ................................ ........................... 868680 SECTION 612 (VACANT) ................................ ................................ .................. 929387 SECTION 613 - WILDLIFE AND ECOLOGY ................................ ................... 929387 SECTION 614 - PRUNING, IMPROVING AND REMOVING EXISTING VEGETATION ................................ ................................ ................................ .. 939387 SECTION 615 - LANDSCAPE APPURTENANCES ................................ ........... 979892 SECTION 616 - SOIL BIOENGINEERING ................................ ....................... 979892 SECTION 617 - INVASIVE SPECIES MANAGEMENT ................................ .... 989892 SECTION 618 (VACANT) ................................ ................................ .................. 989892 SECTION 619 - WORK ZONE TRAFFIC CONTROL ................................ ....... 989892 SECTION 620 - BANK AND CHANNEL PROTECTION ............................. 160161153 SECTION 621 - CLEANING CULVERTS, DRAINAGE STRUCTURES AND EXISTING ROADSIDE SECTIONS ................................ ............................ 164165157 SECTION 622 - BUILDINGS AND MISCELLANEOUS STRUCTURES ..... 167168160 SECTION 623 - SCREENED GRAVEL, CRUSHED GRAVEL, CRUSHED STONE, CRUSHED SLAG ................................ ................................ ........................ 167168160 SECTION 624 - PAVED GUTTERS ................................ ............................. 168169161 SECTION 625 - SURVEY OPERATIONS ................................ .................... 171172164 SECTIONS 626 THRU 628 (VACANT) ................................ ........................ 183184176 SECTION 629 - PETROLEUM STORAGE TANK CLOSURE .................... 183184176 SECTION 630 - BARRICADES ................................ ................................ .... 188189181 SECTION 631 (VACANT) ................................ ................................ ............ 189190182 SECTION 632 (VACANT) ................................ ................................ ............ 189190182 SECTION 633 - CONDITIONING EXISTING PAVEMENT PRIOR TO ASPHALT OVERLAY ................................ ................................ ................................ ... 189190182 SECTION 634 (VACANT) ................................ ................................ ............ 193193185 SECTION 635 - CLEANING AND PREPARATION OF PAVEMENT SURFACES FOR PAVEMENT MARKINGS ................................ ................................ ........... 193193185 TABLE OF CONTENTS NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 SECTION 636 (VACANT RESPONSE WORK ) ................................ .......... 195196187 SECTION 637 - ENGINEER’S FIELD OFFICE, LABORATORY AND EQUIPMENT ................................ ................................ ................................ ..................... 199196187 SECTION 638 - WHITE SYNTHETIC RESIN BINDER CONCRETE ......... 209206198 SECTION 639 - CONSTRUCTION CONTRACT MANAGEMENT SYSTEMS ................................ ................................ ................................ ..................... 212209200 SECTION 640 - REFLECTORIZED PAVEMENT MARKING PAINTS ...... 212209201 SECTION 641 - BRIDGE WASHING ................................ ........................... 214211202 SECTION 642 - ROADSIDE MAINTENANCE ................................ ............ 214211203 SECTION 643 - NOISE BARRIERS ................................ ............................. 214211203 SECTION 644 - OVERHEAD SIGN STRUCTURES ................................ .... 215212203 SECTION 645 - SIGNS ................................ ................................ ................ 225222213 SECTION 646 - DELINEATORS, REFERENCE MARKERS AND SNOWPLOWING MARKERS ................................ ................................ ................................ .. 234231223 SECTION 647 - REMOVING, STORING, AND RELOCATING SIGNS, SIGN PANEL ASSEMBLIES, SIGN SUPPORTS, AND FOUNDATIONS ........................... 237234225 SECTION 648 - SUBSURFACE EXPLORATIONS ................................ ...... 240237229 SECTION 649 - AUDIBLE ROADWAY DELINEATORS ............................ 248245236 SECTION 650 - TRENCHLESS INSTALLATION OF CASING .................. 251248239 SECTION 651 - COMMUNICATION FACILITIES ................................ ..... 261258250 SECTION 652 - FURNISHING AND APPLYING SALTS ............................ 261258250 SECTION 653 PAVEMENT RIDE QUALITY ................................ ............. 262259251 SECTION 654 - IMPACT ATTENUATORS - PERMANENT ....................... 264261253 SECTION 655 - FRAMES, GRATES AND COVERS ................................ ... 269266257 SECTION 656 - MISCELLANEOUS METALS ................................ ............ 270267259 SECTION 657 – PAINTING GALVANIZED AND ALUMINUM SURFACES ................................ ................................ ................................ ..................... 271268260 SECTION 658 - WATER WELLS ................................ ................................ 276273264 SECTION 659 - TELECOMMUNICATION UTILITIES .............................. 276273264 SECTION 660 - UTILITIES ................................ ................................ ......... 276273265 SECTION 661 - ELECTRIC UTILITIES ................................ ..................... 277274265 SECTION 662 - GAS, OIL & STEAM UTILITIES ................................ ....... 277274266 SECTION 663 - WATER SUPPLY UTILITIES ................................ ............ 278275266 SECTION 664 - SANITARY SEWER UTILITIES ................................ ........ 289286278 SECTION 665 - WATERWAYS ................................ ................................ ... 290287278 SECTION 666 (VACANT) ................................ ................................ ............ 290287278 SECTION 667 - LOCAL ROAD GRAVEL SURFACE, BASE, AND SUBBASE COURSES ................................ ................................ ................................ .... 290287279 SECTIONS 668 AND 669 (VACANT) ................................ ........................... 293290281 SECTION 670 - HIGHWAY LIGHTING SYSTEM ................................ ...... 293290281 SECTIONS 671 THRU 674 (VACANT) ................................ ........................ 305302293 SECTION 675 - RAILROAD TRACK AND APPURTENANCES ................. 305302294 SECTIONS 676 THRU 679 (VACANT) ................................ ........................ 305302294 SECTION 680 - TRAFFIC SIGNALS ................................ ........................... 305302294 SECTION 681 AND 682 (VACANT) ................................ ............................. 327324316 SECTION 683 - INTELLIGENT TRANSPORTATION SYSTEMS .............. 327324316 TABLE OF CONTENTS NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 SECTION 684 (VACANT) ................................ ................................ ............ 328325316 SECTION 685 - EPOXY REFLECTORIZED PAVEMENT MARKINGS ..... 328325316 SECTION 686 (VACANT) ................................ ................................ ............ 336330319 SECTION 687 - THERMOPLASTIC REFLECTORIZED PAVEMENT MARKINGS ................................ ................................ ................................ ..................... 336330319 SECTION 688 - PREFORMED REFLECTORIZED PAVEMENT MARKINGS ................................ ................................ ................................ ..................... 340334323 SECTION 689 (VACANT) ................................ ................................ ............ 343338327 SECTION 690 - SPECIALTY WORK ................................ .......................... 343338327 SECTIONS 691 THRU 695 - (VACANT) ................................ ...................... 344338327 SECTION 696 - CONTRACTOR CHARGES (for Construction’s use only) .. 344338327 SECTION 697 - FIELD CHANGE PAYMENT ................................ ............. 344338328 SECTION 698 - PRICE ADJUSTMENTS ................................ ..................... 345340329 SECTION 699 - MOBILIZATION ................................ ............................... 350344333
601-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Section 600 INCIDENTAL CONSTRUCTION SECTION 601 - ARCHITECTURAL PAVEMENTS AND TREATMENTS (Last Revised September 2016)
601-1 DESCRIPTION. This work shall consist of the construction, placing, or applying of architectural
pavements and treatments in accordance with the Contract Documents or as directed by the Engineer.
601-2 MATERIALS. Materials shall conform to the following subsections.
Bituminous Materials 702 Bituminous Tack Coat ( SS-1h or CSS-1h) 702-3601 Fine Aggregates 703-01 Mineral Filler 703-08 Precast Concrete Street Pavers 704-23 Water 712-01
601-2.01 Precast Concrete Street Paving.
601-3 Construction.
601-3.01 Precast Concrete Street Paving
602-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 The Contractor shall fill gaps at the edges of the paved area with cut pavers or edge units. The Contractor shall adjust pattern at pavement edges such that cutting of edge pavers is minimized. All cut pavers subject to tire traffic shall be no less than o ne-third (1/3) of a whole unit. After pavers are placed on the adhesive, set them in it with at least one pass of a minimum 300 pound hand roller. Replace any cracked units with whole units and set them with the hand roller. Polymeric sand shall be swept over the precast concrete street pavers until the joints are completely filled. The paver surface shall be swept clean and the joints lightly wetted with water. This joint filling operation shall not be performed if the air te mperature is expected to fall below 40ºF, or there is an expectation of rain within 4 hours of the completion.
601-4 METHOD OF MEASUREMENT. Architectural pavements and treatments will be measured by
the number of square yards placed.
601-5 BASIS OF PAYMENT. The unit price bid per square yard shall include the cost of all labor,
materials and equipment necessary to satisfactorily complete the work, including setting bed material, except that any sawcutting of existing pavement, excavation, concrete base, curb, curb and gutter, and subbase course will be paid for separately. Payment will be made under: Item No. Item Pay Unit 601.01 Precast Concrete Street Paving (Bituminous Setting Bed) Square Yard SECTION 602 - REHABILITATION OF CULVERT AND STORM DRAIN PIPE (Last Revised January 2019)
602-1 DESCRIPTION. Rehabilitate culvert and storm drain pipe in accordance with these
specifications, the contract documents, and as directed by the Engineer.
602-2 Material Requirements.
602-2.01 General. Materials requirements are specified in the following subsections:
Portland Cement Concrete 501 Shotcrete 583 Concrete Repair Material 701-04 Vertical and Overhead Patching Material 701-08 Concrete Repair Material - High Early Strength 701-12 Grout Sand 703-04 Cured in Place Pipe (CIPP) Liner 706-09 Polyvinyl Chloride Pipe (relining) 706-10 (Profile Wall) (Corrugated) High Density Polyethylene Pipe (HDPE) (relining) 706-11 (Profile Wall) (Smooth Wall) Corrugated Steel Pipe 707-02 (Polymer Coated) Tunnel Liner Plate (relining) 707-05 Structural Steel Plate for Pipe, Pipe Arches and Underpasses 707-08 Corrugated Structural Steel Plate for Pipe and Pipe Arches and Underpasses 707-09 Anchor Bolts for Corrugated Culverts 707-20 Zinc Chromate Primer 708-04
602-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Bar Reinforcement, Grade 60 709-01 Wire Fabric for Concrete Reinforcement 709-02 Stud Shear Connectors 709-05 Membrane Curing Compound 711-05 Admixtures 711-08 Lightweight Concrete Fill (Type A or B) 733-01
602-2.02 Grout for Annular Space. Design the grout for the annular space between the existing pipe
and new liner pipe in accordance with the pipe Manufacturer’s recommendations. Grout for the annular space shall be in accordance with 733 -01 Lightweight Concrete Fill (Type B). Calculate the required volume of grout based on the existing culvert/storm drain internal diameter (minus deformations) and the external diameter of liner pipe. All grout components must appear on the Approved List unless approved by the Director, Materials Bureau.
602-3 CONSTRUCTION DETAILS. Provide the Engineer, a minimum of 10 days prior to starting of
the work, a written proposal of how the work will be progressed. The proposal shall include dewatering of the pipe; procedures for maintaining line and grade of the lining pipe, pipe manufa cturer’s recommendations for the assembly of preapproved joints, or joint fusion methods; bracing methods; grout mix design; and void filing techniques. Such proposals are also required, regardless of the rehabilitation method, for shotcreting, concrete, and void filling methods.
602-3.01 Existing Pipe Preparation. Dewater, clean and inspect the existing pipe. Determine the
location of and remove obstructions that may prevent proper installation of the paving or lining material. Inspect small inaccessible pipes, generally less than 48 inches in diameter, using a closed circuit television and camera to provide a visual inspection. Provide strutting and bracing as required to ensure stability of the pipe.
602-3.02 Handling & Installing Lining Materials
602-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 the pipe then upon completion of the anchoring, restore the coating in accordance with §702 -02 Corrugated Steel Pipe, E. Coating restoration is not required where mechanical anchoring of the reinforcement has been utilized.
602-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 a. Hydrostatic Head. The standpipe height must be sufficient to maintain at least the minimum required pressure between the CIPP liner and the existing (host) pipe. The lower end of the liner must extend beyond the outlet end whenever possible. Where changes in elevation may create excessive stresses on the liner felt, the use of bulkheads may be necessary. Alternative installation methods using a hydrostatic head will be subject to approval by the Director, Materials Bureau.
602-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Office.
602-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 additional cost to the state. Grout that fills invert and connected voids is covered in the cost for these items.
602-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 grout into the annular space. Once lining with this item has been completed, apply §603 -3.07 Concrete Paving for Corrugated Structural Plate Pipe and as indicated in the contract documents.
602-3.03 Damaged Pipe and Repair. Repair all damage to the existing host pipe caused that is strictly
obstructing the progress of the relining operation. Repair any damage to the newly installed liner caused during construction, consistent with recommendations of Section 603 - 3.04 Damag ed Pipe and Repair.
602-4 Method of Measurement
602-4.01 Lining with new pipe. This work will be measured as the number of feet along the bottom
centerline, measured to the nearest foot.
602-4.02 Paving inverts. This work shall be measured as the number of square feet determined by the
paved width measured along the pipes interior circumference at the top of the corrugations and the length along the centerline of the pipe measured to the nearest square foot.
602-4.03 Shotcreting. This work shall be measured as the number of square feet determined by the
shotcreted width measured along the pipes interior circumference at the top of the corrugations and the length along the centerline of the pipe measured to the nearest square foo t.
602-5 BASIS OF PAYMENT. Include the cost of furnishing all labor, materials, and equipment
necessary to complete the work in the unit price bid. Include the cost of all fill material needed to fill the annular space between the existing pipe and the liner pipe, dewatering and cleaning of existing pipe, and the removal of any obstructions, intrusions or damaged pipe prior to lining. For Paving Inverts and Shotcreting, include the cost of furnishing all labor, materials and equipment necessary to complete the work for the unit price bid and include all necessary preparations such as dewatering and cleaning to the existing pipe. For Cured in Place Pipe, include the cost of furnishing all labor, materials and equipment necessary to complete the work for the price unit bid and include all necessary preparations such as dewatering and
603-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 cleaning to the existing pipe, all activities involving water treatment as well as water and waste transportation and disposal. The excavation for the resin containment pit, temporary storage of the fill and restoration of the downstream channel will be paid for under 206.04 Trench and Culvert Excavation – O.G. Payment will be made under: Item No. Item Pay Unit 602.2002 Structural Paving of Inverts with Portland Cement Concrete Square Feet 602.2101 Lining Culvert with Shotcrete Square Feet 602.25xx Lining with High Density Polyethylene Pipe Feet 602.26xx Lining with Smooth Wall High Density Polyethylene Pipe Feet 602.27xx Lining with Profile Wall High Density Polyethylene Pipe Feet 602.30xx Lining with Polyvinyl Chloride Pipe Feet 602.36xx Lining with Cured in Place Pipe (CIPP) Feet 602.37xx Lining Concrete pipe with Cured in Place Pipe (CIPP) Feet 602.4xynnn Lining with Structural Steel Plate for Pipe, Pipe Arches and Underpasses Square Feet x – Thickness (2= ½ inch, 3= ¾ inch, 4=1 inch, 5=1⅛ inch, 6=1¼ inch, 7= 1⅜ inch) y- Shape (1= Arch, 2=Box, 3=Horizontal Ellipse, 4=Vertical Ellipse, 5=Round) nnn=serialized pay item 602.51xxxx Lining with Corrugated Steel Structural Plate Pipe with PCC Paved invert Feet 602.53xxxx Lining with Corrugated Steel Structural Plate Pipe Arch with PCC Paved invert Feet 602.550101 Lining with Steel Tunnel Liner Plate 10ga Square Feet 602.550102 Lining with Steel Tunnel Liner Plate 8ga Square Feet 602.550103 Lining with Steel Tunnel Liner Plate 7ga Square Feet 602.550104 Lining with Steel Tunnel Liner Plate 5ga Square Feet 602.550105 Lining with Steel Tunnel Liner Plate 3ga Square Feet 602.75xx Lining with Polymer Coated CSP 12ga, (2 - 2/3”x1/2”) Feet 602.80xx Lining with Polymer Coated CSP 12ga, (3”x1”) or (5”x1”) Feet Refer to Contract Proposal for full Item Number and full description. SECTION 603 - CULVERTS AND STORM DRAINS
603-1 DESCRIPTION. Construct culverts and storm drains in accordance with these specifications, the
contract plans, and the appropriate standard sheets.
603-2 Materials
603-2.01 General. Materials requirements are specified in the following subsections:
Geotextile 207 Corrugated Structural Steel Plate for Pipe, Portland Cement Concrete 501 Pipe-Arches and Underpasses 707-09 Portland Cement 701-01 Galvanized Steel End Sections 707-10 Masonry Cement 701-02 Aluminum End Sections 707-11 Concrete Repair Material 701-04 Corrugated Aluminum Pipe 707-13 Concrete Repair Material – Corrugated Aluminum Structural
603-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 High Early Strength 701-12 Plate for Pipe and Pipe -Arches 707-14 Mortar Sand 703-03 Anchor Bolts for Corrugated Culverts 707-20 Non-Reinforced Concrete Pipe 706-01 Zinc Chromate Primer 708-04 Reinforced Concrete Pipe 706-02 Bar Reinforcement, Grade 60 709-01 Reinforced Concrete Elliptical Pipe 706-03 Wire Fabric for Concrete Reinforcement 709-02 Reinforced Concrete End Sections 706-07 Plastic Coated Fiber Blankets (For Curing) 711-03 Polypropylene Pipe 706-08 Smooth Interior Corrugated Membrane Curing Compound 711-05 Polyethylene Pipe 706-12 Water 712-01 Corrugated Steel Pipe 707-02 Galvanized Coatings and Repair Methods 719-01 Ductile Iron Pipe (Non -Pressure) 707-03
603-3 Construction Details
603-3.01 Excavation. Apply the requirements specified in Section 206, Trench, Culvert and Structure
Excavation, except as modified by the Contract Documents or as directed by the Engineer.
603-3.02 Laying Pipe
603-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 F. Polyethylene and Polypropylene Pipe . Handle, store and assemble all pipe in accordance with the Approved Materials Details except as modified in the Contract Documents or by the Engineer. Joint misalignment resulting in offsets greater than 1/4 inch or joint separations greater than 1/2 b etween adjoining sections of pipe will not be allowed. Field cuts are permitted only at the terminal ends and with a minimum pipe length of 40 inches.
603-3.03 Bedding and Backfilling Pipe. Apply the standards of Section 203, Select Granular Fill and
the appropriate NYSDOT Standard Sheets. Select Granular Fill used to backfill around aluminum or aluminum coated pipes will be free of portland cement unless the pipe sections are thoroughly coated with Zinc Chromate Primer, §708 -04 or an equivalent alternative as approved by the Materials Bureau. 100% of the Select Granular Fill used around Type IR and IIR corrugated aluminum pipe must pass a 2 inch sieve.
603-3.04 Damaged Pipe and Repair
603-3.05 Field Strutting of Corrugated and Structural Plate Pipe. Field strutting of corrugated metal
pipe and structural plate pipe may be done at the Contractor's option and expense to provide added protection from construction equipment and other loads during installation, backfilling and filling above
603-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 the pipe. The method and scheduling of installation and removal of strutting, must be approved by the Engineer. Field strutting shall constitute installation of structurally sound timber sills, compression caps and struts.
603-3.06 Joints
603-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Galvanized Coatings and Repair Methods: Type I for straps and Type II for nuts, bolts, and washers for the steel strap and anchoring hardware. Alternative designs of the restraining device and anchoring hardware will be considered for approval by the Director of the Materials Bureau if they provide equivalent restraining properties and durability. Restraining devices may be placed on either the inside or outside of the pipe. If placed on the inside, the device shall not protrude from the wall to the degree where flow would be obstructed. Only cold bending of the restraining device is allowed. Hole s in the pipe and end sections required for the anchor bolts may be drilled in the field.
603-3.07 Concrete Paving for Corrugated Structural Plate Pipe. Place reinforced Portland Cement
Concrete over the inverts of corrugated structural plate pipe where specified and indicated on the Contract Documents, so as to form a smooth interior. Do not place pavement until the embankment has been completed over the pipe and settlement has been completed to the satisfaction of the Engineer. Pave the bottom 25 percent of the inside circumference for round pipe, the bottom 30 percent of the inside periphery for arch spans of 10 feet 3 inches and shorter and the bottom 35 percent of the inside periphery for arch spans longer than 10 feet 3 inch es unless otherwise specified by the Engineer. A minimum cover of 4 inches is required over all corrugations. Schedule and conduct the diversion of water operations prior to and during the placement of pavement in a manner satisfactory to the Engineer. Pr ior to placing pavement clean and dry the surfaces to be in contact with concrete to the satisfaction of the Engineer. Place the steel fabric reinforcement on the crests of corrugations and securely fasten to the pipe or pipe-arch by welding or by other methods acceptable to the Engineer. Place the reinforcement to provide a 4 inch minimum clearance from the edges of con crete and lap 6 inch minimum. Unless otherwise shown
603-3 08
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 on the plans, the steel fabric reinforcement shall consist of No. 6 gauge wire at 6 inch centers transversely and longitudinally. Finish the pavement to a smooth surface acceptable to the Engineer. Within 18 hours after completion of finishing, protect the surface by either an approved curing cover or an approved membrane curing compound applied at a minimum rate of 1 gallon per 150 square feet. However, any concrete in the invert that would be exposed to sunlight must be cured immediately after the finishing operations have been completed and the surface water has evaporated. Cure the concrete for a minimum period of 48 hours before water is permitted to flow on the invert. If the atmospheric temperature is below 45°F, the requirements of 555 -3.08C, Provisions for Concreting in Cold Weather, shall apply.
603-3.08 Relaying Pipe. Carefully remove, clean, preserve, haul and relay pipe as directed by the
Engineer or as called for in the Contract Documents. The relaid pipe shall be true to line and grade, and have a full, firm, even bearing and be comparable to newly laid pipe. Co nstruct joints of relayed pipe as specified in §603 -3.06. When existing pipe is damaged during removal or relaying, rendering it unfunctional, replace it with new pipe at no additional cost to the State. Existing pipe which is determined by the Engineer t o be unfit for relaying may be destroyed before removal. Apply the requirements of §603 -3.03 for backfill and placement.
603-3.09 Ancho r Bolts. Unless instructed otherwise, use anchor bolts, as specified in §707 -20 to anchor
the ends of corrugated metal pipes, and sectional plate arches to either reinforced or plain concrete headwalls.
603-3.10 Culvert -End Safety Grates. Culvert -end safety grates shall be fabricated in accordance with
the Standard Sheets. The grate shall lay flat on the embankment slope, overlap the opening equally on each side, and at the top as indicated in the contract documents. The Contractor shall perform any necessary excavation, backfill, and final slope shaping and grading to ens ure proper grate support and smooth uniform slopes in the area surrounding the grate. All disturbed areas will be reestablished to the satisfaction of the Engineer.
603-4 Method of Measurement
603-4.01 Pipe. The Engineer will measure the pipe, in feet along the bottom centerline, furnished and
incorporated into the work in accordance with the Contract Documents.
603-4.02 End Sections. The Engineer will count the number of units of each size or diameter furnished
and incorporated into the work in accordance with the Contract Documents.
603-4.03 Relaying Pipe. The Engineer will measure the existing pipe relayed and any new pipe laid and
furnished to replace existing pipe, in feet along the bottom centerline, incorporated into the work in accordance with the Contract Documents.
603-4.04 Concrete Collars. The Engineer will count the number of concrete collars furnished and
incorporated into the work in accordance with the Contract Documents.
603-4.05 Culvert -End Safety Grates. Culvert -end safety grates will be measured in square feet to the
nearest 0.1 square foot of safety -grate installed, using payment areas shown on the Standard Sheet. For sizes that are not shown on the Standard Sheet, the area will be computed as the pro duct of the overall length and width.
603-5 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 603-5 BASIS OF PAYMENT
603-5.01 General. The accepted quantities of all pipe construction and reconstruction will be paid for at
the contract price bid which will include the cost of furnishing all labor, materials and equipment necessary to complete the work including those joints made with o akum, portland cement and mortar or poured caulking compounds. For concrete end sections include the cost of the restraining devices and their installation. If no end sections are specified and restraining devices are required, include the cost of the restraining devices in the unit price bid for the pipe. Include the cost of bituminous coating or concrete paving including steel wire fabric reinforcement, when specified in the unit price bid for the respective pipe items. Include the cost of breaking into existing drainage structures to connect new pipe in the unit bid price for the respective pipe items. Include the cost of anchor bolts, when required, in the unit bid price for pipe items. Progress payment may be made to the extent of 80% of the price bid for pipe items requiring concrete invert paving when the installation is substantially completed and backfilled to a minimum of 24 inch over the top of the pipe plus whatever additional co ver is necessary to protect the installation from construction traffic. The remaining 20% will be paid upon completion of the invert paving. Excavation, granular fill and backfill will be paid for separately under their appropriate items in Sections 203 and 206, as applicable except include the additional costs necessary for the special gradation for Backfill Material for Corrugated Aluminum P ipe-Type IR and the additional cost necessary to assure the backfill material be free of portland cement in the unit bid price for these pipes. Include the cost of adding water for compaction in the price bid, unless items for furnishing water equipment and applying water are included in the proposal. Payment for the geotextile material and its installation is included under the structural pipe arch item.
603-5.02 End Sections. Include the cost of all labor, materials and equipment necessary to complete the
work as specified in the contract documents. The cost of the restraining devices and their installation, required for concrete pipe, shall be included in the unit price bid for the end sections.
603-5.03 Concrete Collars. Include the cost of all labor, materials (including concrete repair material)
and equipment necessary to complete the work as specified in the contract documents.
603-5.04 Culvert -End Safety Grates. The unit price bid shall include the cost of all labor, materials,
and equipment necessary to complete the work, including excavation, topsoil, seeding and mulching. Payment will be made under: Item No. Item Pay Unit 603.0101 Culvert -End Safety Grate Square Foot 603.0102 Culvert -End Safety Grate (Heavy -Duty) Square Foot 603.02xx Non-Reinforced Concrete Pipe Foot 603.05xxxx Corrugated Steel Pipe (2 2/3 x 1/2) Foot 603.06xxxx Corrugated Steel Pipe Paved Invert (2 2/3 x 1/2) Foot 603.07xxxx Corrugated Steel Pipe Fully Paved (2 2/3 x 1/2) Foot 603.08xxxx Corrugated Steel Pipe Arch (2 2/3 x 1/2) Foot 603.09xxxx Corrugated Steel Pipe Arch, Paved Invert (2 2/3 x 1/2) Foot 603.10xxxx Corrugated Steel Pipe Arch, Fully Paved (2 2/3 x 1/2) Foot 603.11xxxx Corrugated Steel Pipe (3 x 1) or (5 x 1) Foot 603.12xxxx Corrugated Steel Pipe Paved Invert (3 x 1) or (5 x 1) Foot 603.13xxxx Corrugated Steel Pipe Fully Paved (3 x 1) or (5 x 1) Foot 603.14xxxx Corrugated Steel Pipe Arch (3 x 1) or (5 x 1) Foot 603.15xxxx Corrugated Steel Pipe Arch Paved Invert (3 x 1) or (5 x 1) Foot 603.17xxxx Galvanized Steel End Sections Pipe (2 2/3 x 1/2) Each
603-5 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 603.18xxxx Galvanized Steel End Sections Pipe Arch (2 2/3 x 1/2) Each 603.20xxxx Galvanized Steel End Sections Pipe Arch (3 x 1) or (5 x 1) Each 603.23xx Corrugated Structural Steel Plate Pipe (60 - 108 Diam.) Foot 603.24xx Corrugated Structural Steel Plate Pipe (114 - 162 Diam.) Foot 603.25xx Corrugated Structural Steel Plate Pipe (168 - 216 Diam.) Foot 603.26xx Corrugated Structural Steel Plate Pipe (222 - 252 Diam.) Foot 603.27xx Corrugated Structural Ste el Plate Pipe PCC Paved Invert (60 - 108 Diam.) Foot 603.28xx Corrugated Structural Steel Plate Pipe PCC Paved Invert (114 - 162 Diam.) Foot 603.29xx Corrugated Structural Steel Plate Pipe PCC Paved Invert (168 - 216 Diam.) Foot 603.30xx Corrugated Structural Steel Plate Pipe PCC Paved Invert (222 - 252 Diam.) Foot 603.31xx Corrugated St ructural Steel Plate Pipe Arch (6 feet 1 inch - 20 feet 7 inch span, 9PI, Corner Plate) Foot 603.32xx Corrugated Structural Steel Plate Pipe Arch, PCC Paved Invert (6 feet 1 inch - 19 feet 8 inch span, 9PI, Corner Plate) Foot 603.35xx Corrugated Structural Steel Plate Underpass Foot 603.40xxxx Round Corrugated Aluminum Pipe (2 2/3 x 1/2) (12 - 30 Diam.) Foot 603.41xxxx Round Corrugated Aluminum Pipe (3 x 1) (36 - 96 Diam.) Foot 603.44xxxx Corrugated Aluminum Structural Plate Pipe (9 x 2 1/2)(60 - 114 Diam.) Foot 603.46xxxx Corrugated Aluminum Structural Plate Pipe (9 x 2 1/2)(120 - 180 Diam.) Foot 603.48xxxx Corrugated Aluminum Pipe -Arch (2 2/3 x 1/2)(17 Span, 13 Rise) to (57 Span, 38 Rise), and (3 x 1) (60 span, 46 R ise to 95 Span, 67 Rise) Foot 603.50xxxx Corrugated Aluminum Structural Plate Pipe -Arch (9 x 2 1/2) (6 ft 1 in Span, 5 ft Rise to 11 ft 5 in Span, 7 f t Rise) Foot 603.52xxxx Corrugated Aluminum Structural Plate Pipe -Arch (9 x 2 1/2) (12 feet 3 in ch Span, 7 f eet 3 in ch Rise to 19 feet 5 in ch Span, 11 f eet 11 in ch Rise) Foot 603.53xxxx Corrugated Aluminum Pipe, Type IIR Foot 603.54xxxx Corrugated Aluminum End Sections Pipe Each 603.55xxxx Corrugated Aluminum End Sections, Pipe Arch Each 603.56xxxx Corrugated Steel Pipe - Type IR Foot 603.58xxxx Corrugated Aluminum Pipe - Type IR Foot 603.59xxxx Corrugated Steel Pipe - Type IIR Foot 603.60xx Reinforced Concrete Pipe Class III Foot 603.61xx Reinforced Concrete Pipe Class IV Foot 603.62xx Reinforced Concrete Pipe Class V Foot 603.66xx Reinforced Concrete Horizontal Elliptical Pipe Class HE II Foot 603.67xx Reinforced Concrete Horizontal Elliptical Pipe, Class HE III Foot 603.68xx Reinforced Concrete Horizontal Elliptical Pipe, Class HE IV Foot 603.69xx Reinforced Concrete Vertical Elliptical Pipe, Class VE IV Foot 603.70xx Reinforced Concrete Vertical Elliptical Pipe, Class VE V Foot 603.71xx Reinforced Concrete Vertical Elliptical Pipe, Class VE VI Foot 603.72xx Reinforced Concrete Cattle Pass Foot 603.73xx Reinforced Concrete Pipe End Sections Each 603.74xx Reinforced Concrete Pipe Class II Foot 603.77 Concrete Collars Each 603.7802xx Polypropylene Pipe (Optional) -Type S, or Type D Foot xx= 12, 15, 18, 24, 30, 36, 42, 48, 60 (denoting pipe diameter in inches) 603.80xxxx Corrugated Steel Pipe -Polymer Coated (2 2/3 x 1/2) Foot 603.81xxxx Corrugated Steel Pipe -Polymer Coated Paved Invert (2 2/3 x 1/2) Foot 603.82xxxx Corrugated Steel Pipe -Arch Polymer Coated (2 2/3 x 1/2) Foot
604-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 603.83xxxx Corrugated Steel Pipe -Arch Polym er Coated Paved Invert (2 2/3 x 1/2) Foot 603.84xxxx Corrugated Steel Pipe -Polymer Coated (3x1) or (5x1) Foot 603.85xxxx Corrugated Steel Pi pe-Polymer Coated Paved Invert (3x1) or (5x1) Foot 603.86xxxx Corrugated Steel Pipe -Arch Polymer Coated (3x1) or (5x1) Foot 603.87xxxx Corrugated Steel Pipe -Arch Polymer Coated Paved Invert (3x1) or (5x1) Foot 603.88xxxx Corrugated Steel Pipe -Aluminum Coated (Type II) (2 2/3 x 1/2) Foot 603.89xxxx Corrugated Steel Pipe -Arch Alum inum Coated(Type II) (2 2/3 x 1/2) Foot 603.90xxxx Corrugated Steel Pipe-Aluminum Coated (Type II)(3x1) or (5x1) Foot 603.91xxxx Corrugated Steel Pipe -Arch Aluminum Coated(Type II)(3x1) or (5x1) Foot 603.92xxxx Corrugated Steel Pipe -Aluminum Coated (Type 2) Type IR Foot 603.93xxxx Corrugated Steel Pipe -Arch Aluminum Coated (Type 2) Type IIR Foot 603.95xx Ductile Iron Pipe Foot 603.96xxxx Smooth Lined Corrugated Aluminum Pipe (2 2/3 x 1/2) Foot 603.97xxxx Smooth Lined Corrugated Aluminum Pipe (3 x 1) Foot 603.98xx Smooth Interior Corr ugated Polyethylene Culvert and Storm Drain Pipe Foot 603.99 Relaying Pipe Foot Refer to Standard Contract Pay Item Catalog for full Item Number and full Description. Numbers in parentheses (without denota tion) are spacing and depth of corrugations in inches. SECTION 604 - DRAINAGE STRUCTURES
604-1 Description
604-1.01 General. This work shall consist of the construction or alteration of drainage structures,
manholes, leaching basins and transverse drainage interceptors in accordance with these specifications, the contract plans and the standard sheets.
604-1.02 Adjustment Rings and Frames for Drainage Structures and Manholes. The Contractor
shall furnish and install prefabricated adjustment rings and frames for drainage structures and manholes. The extensions shall elevate and support drainage structure grates or manhole covers without the necessity of removing the original d rainage structure frame or manhole casting, when the roadway is resurfaced.
604-2 Materials
604-2.01 Drainage Structures and Manholes. Materials used for the construction of drainage structures
and manholes shall be as indicated on the plans, and/or Standard Sheets, and shall conform to the requirements of the following: Cast-in-Place Concrete - Class A 501 Frames and Grates 655 Concrete Repair Material 701-04 Concrete Grouting Material 701-05 Concrete Repair Material - High Early Strength 701 -12 Precast Concrete Driveway and Sidewalk Pavers. 704-13 Premolded Resilient Joint Filler 705-07 Masonry Mortar 705-21 Reinforced Concrete Pipe 706 02 Precast Concrete Drainage Units 706-04 Bar Reinforcement, Grade 60 709-01
604-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Wire Fabric for Concrete Reinforcement 709-02 Cold Drawn Wire for Concrete Reinforcement 709-09 Steps for Manholes 725-02
604-2.02 Transverse Drainage Interceptors. Materials used for the construction of transverse drainage
interceptors shall meet the requirements of §604 -2.01, except that bar reinforcement shall meet the requirements of §709 -04, Epoxy Coated Bar Reinforcement, Grade 60. Transverse drainage interceptors, if precast, shall meet the requirements of §706 -04, Precast Concrete Drainage Units. Dowels shall be fabricated from epoxy coated bar reinforcement conforming to §709 -04.
604-2.03 Leaching Basins . Materials used for the construction of leaching basins shall conform to the
requirements of §604 -2.01 and shall be as indicated on the plans. Concrete for precast units shall conform to the requirements of §706 -04, Precast Concrete Drainage Units.
604-2.04 Adjustment Rings and Frames for Drainage Structures and Manholes. Materials for
prefabricated adjustment rings and frames for drainage structures and manholes shall conform to the following: Prefabricated Adjustment Rings & Frames for Drainage Units & Manholes 715-13
604-2.05 Altering Drainage Structures, Leaching Basins and Manholes. Materials for the repair and
alteration of existing structures shall meet the requirements of §604 -2.01 and shall be as indicated on the contract plans. Structures originally constructed with concrete block, common brick or concrete brick shall be altere d with Precast Concrete Driveway and Sidewalk Pavers, §704 -13, unless indicated otherwise on the contract plans.
604-3 Construction Details
604-3.01 Excavation. Excavation shall be in conformance with the Construction Details of §206 -3
Trench, Culvert and Structure Excavation.
604-3.02 Concrete Drainage Structures and Manholes. Concrete drainage structures and manholes
shall be constructed in accordance with the requirements of these specifications, the Standard Sheets and plans. The Contractor shall have the option of erecting either cast -in-place or precast drainage structure s unless specified otherwise. Cast -in-place drainage structures shall be constructed of Class A concrete and to the requirements of Section 555 Structural Concrete. The Contractor shall have the option of constructing either a rectangular or circular drainage structure when such option is specified and allowed in the contract documents. When the circular structure is selected, it shall conform to the requirements of §706 -04 and will require submission of complete working drawings to the Engineer for review and approval. Contractor proposed changes to drainage structures shown on the Standard Sheets or on the plans, other than minor changes approved by the Engineer, shall require submission of complete working drawings to the Engineer for review and approval. Unless prohibited in the contract documents, the Contractor shall have the option of reducing the size of the drainage structure riser above the uppermost pipe entry in accordance with the requirements of the Standard Sheets. Flat slab reducer designs proposed by the Contractor shall be subject to the review and approval of the Engineer and shall be accompanied by the following:
604-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 B. The design calculations used in the preparation of the working drawings. Acceptance of flat slab tops or platforms for flat slab reducer designs will be on the Basis of Proof -of- Design Test or on the Basis of Rational Design as required by ASTM C478.
604-3.03 Masonry Construction. Masonry construction, when indicated on the plans or standard sheets,
shall consist of concrete pavers laid in full mortar beds. All joints shall be full mortar joints not greater than 1/2 inch wide. When specified, the outside of the masonry constructio n shall be plastered with 1/2 inch thick mortar coat.
604-3.04 Leaching Basins. Leaching basins shall be constructed in accordance with these specifications
and the contract plans.
604-3.05 Pipe Entries. All pipe(s) built into the wall(s) of a drainage structure shall be flush with the
inside face of the drainage structure wall and shall project outside a sufficient distance to allow connection with the adjoining section. The wall knockouts and sealing t he space around the pipe shall be in accordance with the Standard Sheets. The bell of concrete pipe shall be cut off at every pipe entry where the bell enters the drainage structure.
604-3.06 Steps. Drainage structures steps may be cast or bolted in place during construction, mortared
with a concrete grouting material after the structure is completed or attached by friction locking into preformed or drilled holes. The steps shall clear all pipes. Steps in risers and coni cal top sections shall be aligned to form a continuous ladder with rungs equally spaced vertically in the completed structure at a maximum distance of 16 inches. Steps shall be embedded into the walls of the riser or conical top section a minimum of 3 inch es. The rung shall project a minimum clear distance of 4 inches from the walls of the riser or conical sections measured from the point of embedment.
604-3.07 Frames and Grates. Frames and grates shall be as specified in the contract documents. Frames
located in the top slab or top of the uppermost riser shall be secured and held in place by a minimum of 4 stirrups or studs per frame, welded to the frame near the corners. Parallel bar frames shall contain shear stud anchors, for the purpose of transferring loads, as required and detailed on the standard sheet for parallel bar grates and frames. Shear stud anchors, when required, shall replace the frame securing stirrups or studs.
604-3.08 Altering Drainage Structures, Leaching Basins and Manholes. Reconstruction and
adjustment of existing drainage structures shall be as detailed and specified on the contract plans. Construction with cast -in-place concrete shall conform to the requirements of Section 555, Structural Concrete. Frames, grates and covers to be reused shall be removed, cleaned and reset at the required elevations. New frames, grates and manhole covers shall be installed when specified. Upon completion, each structure shall be cleaned of any accumulation of silt, d ebris or foreign matter of any kind and shall be kept clear of such accumulation until final acceptance of the work.
604-3.09 Adjustment Rings and Frames for Drainage Structures and Manholes. Prior to the
placement of the surface course and after the placement of the binder course, when required, the Contractor shall install adjustment rings and frames for manholes and drainage units. The adjustment ring or frame shall be placed so the manhole cover or drainage unit grate will not protrude above the finished surface of the pavement. To assure a firm and secure fit with the adjustment ring or frame, the seat of the existing manhole casting or drainage unit frame shall be free of all foreign material at the time of installation. The entire assembly shall be set on the seat of the exist ing manhole casting or drainage unit frame and the locking
604-3 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 devices shall be tightened evenly. The manhole cover or drainage unit grate shall then be set upon the seat of the adjustment ring or frame. The Contractor shall be responsible for insuring that the adjustment rings and frames are compatible with the existing manhole castings and covers or drainage frames and grates. All rings or frames shall be protected from displacement caused by traffic maintained on the roadway or equipment used in the paving operation. The Contractor shall have the option of removing and resetting the existing manhole casting or drainage unit frames to the required grade where shown on the plans or approved by the Engineer.
604-3.10 Transverse Drainage Interceptors. This work shall consist of the construction of reinforced
concrete transverse drainage interceptors with frames and grates, and dowels as shown on the plans or Standard Sheets. Unless specifically designated on the plans and/or in the proposal, the Contr actor shall have the option of constructing cast -in-place or precast transverse drainage interceptors.
604-3.11 Backfill. No structure shall be backfilled until all the mortar has completely set. The
requirements of Section 203, Select Granular Fill , shall apply.
604-4 Method of Measurement
604-4.01 Drainage Structures, Leaching Basins and Manholes. Drainage structures, leaching basins
and manholes will be measured for payment by the number of linear feet of height measured to the nearest tenth of a foot from the bottom of the base to the top of the masonry, including the top slab.
604-4.02 Transverse Drainage Interceptors
604-4.03 Altering Drainage Structures, Leaching Basins and Manholes. Altering drainage structures,
leaching basins and manholes will be measured by the number of structures altered.
604-4 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 604-4.04 Adjustment Rings and Frames for Drainage Structures and Manholes. This work will be measured by the number of prefabricated adjustment rings or frames furnished and installed.
604-5 Basis of Payment
604-5.01 Drainage Structures, Leaching Basins and Manholes. The unit price bid per linear foot shall
include the cost of all labor, equipment and materials, including bar reinforcement and welded wire fabric, necessary to complete the work, except the following:
604-5.02 Contractor Options. When the specifications allow the Contractor to substitute a precast
circular drainage unit in lieu of a rectangular drainage unit or the Contractor constructs a flat slab reducer design under the provisions of §604 -3.02, the following basis of payment p rovisions will apply :
604-5.03 Altering Drainage Structures, Leaching Basins and Manholes. The unit price bid for each
shall include the cost of all materials, labor and equipment necessary to satisfactorily complete the work including all necessary cleaning, excavation, backfill, and replacement of any pavement, shoulder and sidewalk courses, subcourses, curbs, drives, lawns and any other surface. Frames, covers or grates to be reused that are broken by the Contractor's operations shall be replaced at the Contractor's expense. New frames, covers and grates will be paid for under the appropriat e payment items for Frames and Grates in Section 655.
604-5.04 Adjustment Rings and Frames for Drainage Structures and Manholes. The unit price bid
for each adjustment ring or frame shall include the cost of all material, labor and equipment necessary to satisfactorily install the adjustment rings and frames. If the Contractor elects to reset the existing casting or frames, the co sts of the work involved in the removal and replacement of existing disturbed pavement shall be included in the price bid for the adjustment rings and frames.
604-5.05 Transverse Drainage Interceptors. The price per linear foot bid for this work shall include the
cost of furnishing all labor, materials and equipment necessary to complete the work, except the excavation will be paid for under Trench and Culvert Excavation, and the Underdrain and Underdr ain Filter will be paid for under their respective items. Payment will be made under: Item No. Item Pay Unit 604.01 Leaching Basin Foot 604.06 Transverse Drainage Interceptors Foot
605-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 604.07XXYY Altering Drainage Structures, Leaching Basins and Manholes Each XX = Region (01 through 11) YY = Serialized 01 to 99 * 604.10 Prefabricated Adjustment Rings for Manholes Each 604.11 Prefabricated Adjustment Frames for Drainage Structures Each 604.30XXYY Rectangular Drainage Structure Foot XX = Structure Type ** YY = Frame No. ** 604.31XXYY Rectangular Drainage Structure with Round Option Foot XX = Structure Type ** YY = Frame No. ** 604.32XXYY Rectangular Drainage Structure with Concrete Cap Foot XX = Structure Type ** YY = Frame No. ** 604.40XX Round Precast Manhole Foot XX = Type ** 604.50XXYY Special Drainage Structure Foot XX = Region (01 through 11) YY = Serialized 01 to 99 * * Serialized number identified structure detailed on the plans. ** Structure type and frame number are as defined on the Drainage Structure Details Standard Sheets and the Grate and Frame Standard Sheets. SECTION 605 - UNDERDRAINS
605-1 DESCRIPTION. The work shall consist of constructing underdrain installations in accordance
with these specifications and in conformity with the lines, grades, and cross -sections shown in the contract documents.
605-2 Materials
605-2.01 Underdrain Pipe. Underdrain pipe shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing for the type of pipe specified in the contract documents: Corrugated Steel Pipe - Type III, 16 gage 707-02 Porous Concrete Pipe Underdrain 706-05 Extra Strength Porous Concrete Pipe Underdrain 706-05 Perforated Corrugated Polyethylene Underdrain Tubing 706-13 Corrugated Aluminum Pipe - Type III, 16 gage 707-13 Perforated Polyvinyl Chloride Underdrain Pipe 706-18 Optional underdrain pipe shall meet the requirements of any of the above at the Contractors option except that porous concrete pipe shall not be used in an edge of pavement underdrain installation.
605-2.02 Underdrain Filter. The requirements for Underdrain Filter materials are described below. The
procedure for acceptance or rejection of Underdrain Filter materials shall be in conformance with the procedures contained in the geotechnical control procedure “ Procedure for the Control and Quality Assurance of Granular Materials ”. Underdrain Filter material shall meet the requirements of the following subsections of Section 700 Materials and Manufacturing for the type of underdrain filter material specif ied in the contract documents:
605-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 A. Underdrain Filter Type I. Provide material meeting the requirements of §733 -20 Underdrain Filter, Type 1 .
605-3 Construction Details
605-3.01 Underdrain Pipe. The construction details of Section 603 Culverts and Storm Drains shall
apply. The type of filter material to be used at any location will be as shown in the contract documents. A carefully leveled and compacted bed of this material shall be prepared just prior to the placement of the underdrain pipe. The upgrade end of corrugated polyethylene underdrain pipe shall be closed with a solid plastic cap; the upgrade end of all other types of underdrain pipe shall be closed with a suita ble plug. Unless otherwise shown in the contract documents, the underdrain pipe shall be placed with the perforations down. In the event that the semi -circular option of the Steel Pipe underdrain is utilized, the pipe shall be placed such that the flat sur face is on the top.
605-3.02 Underdrain Filter. After the pipe installation has been inspected and approved, Underdrain
Filter shall be loosely placed around and over the pipe to such a depth that, after compaction, Underdrain Filter shall extend to a level 6 in. above the underdrain pipe or to the next course, whichever is less. Subsequent lifts of Underdrain Filter shall be no more than 6 in. thick prior to compaction and shall be compacted by two passes of a vibrating pad or drum type compactor. The remainder of the install ation shall be in accordance with the applicable standard sheet or as indicated in the contract documents. If the excavation for the underdrain extends outside the payment lines, it shall be backfilled with Underdrain Filter material installed at the Contractor's expense.
605-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Any contaminated underdrain filter material shall be replaced by the Contractor at no additional cost to the State. For corrugated polyethylene underdrain tubing, the filter material shall be placed around and over the tubing to such a depth that, after compaction, the underdrain filter material shall extend to a level 12 in. above the underdrain tubing or to the next course, whichever is less. After placement, the surface of the filter material shall be compacted by three passes of a vibrating pad or drum type compactor. The remainder of the backfill shall be placed in maximum 2 ft. loose lift thicknesses and compacted by three passes of a vibrating pad or drum type compactor after the placement of each lift. In the event that a pipe is not included in this installation, the filter shall be placed in horizontal layers not exceeding 6 in. in thickness prior to compacting. Each lift shall be compacted by two passes of a vibrating pad or drum type compactor. No compaction control tests will be required.
605-4 Method of Measurement
605-4.01 Underdrain Pipe. Underdrain pipe will be measured in feet, measured to the nearest whole
foot, installed in accordance with the contract documents.
605-4.02 Underdrain Filter. Underdrain filter material will be measured in cubic yards, measured to the
nearest whole cubic yard, installed between the payment lines shown in the contract documents. A deduction to the cross sectional area of the underdrain trench will be made for the pipes (based on nominal diameters) when the combined cross -sectional area exceeds 1.0 sq. ft. No deduction will be made for the cross -sectional area of an existing facility.
605-5 Basis of Payment
605-5.01 Underdrain Pipe. The unit price bid per foot shall include the cost of all labor, materials and
equipment necessary to satisfactorily complete the work. The unit price bid per foot for perforated corrugated polyethylene underdrain tubing and perforated PVC underdrain pipe installations that are daylighted through the side slope shall include the shield pipe. Excavation, granular fill and backfill will be paid for separately.
605-5 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 605-5.02 Underdrain Filter. The unit price bid per cubic yard shall include the cost of all labor, materials and equipment necessary to sat isfactorily complete the work. Excavation, granular fill and backfill will be paid for separately. Payment will be made under: Item No. Item Pay Unit 605.04xx Porous Concrete Pipe Underdrain Foot 605.05xx Extra Strength Porous Concrete Pipe Underdrain Foot 605.07xx Corrugated Steel Pipe - Type III Foot 605.08xx Corrugated Aluminum Pipe - Type III Foot 605.0901 Underdrain Filter, Type I Cubic Yard 605.1001 Underdrain Filter, Type II Cubic Yard 605.1101 Underdrain Filter, Type III Cubic Yard 605.15xx Perforated Corrugated Polyethylene Underdrain Tubing Foot 605.16xx Perforated Polyvinyl Chloride Underdrain Pipe Foot 605.17xx Optional Underdrain Pipe Foot Refer to the Standard Contract Pay Item Catalog for full Item Number and full Description. SECTION 606 - GUIDE RAILING, MEDIAN BARRIER, AND CONCRETE BARRIER (Last Revised May 1, 20 23)
606-1 DESCRIPTION. This work shall consist of the construction, reconstruction, removal, disposal,
storage, and resetting of highway barrier systems and component parts in accordance with the specifications, standard sheets, manufacturer’s drawings, manufacturer’s directio ns and contract documents to the lines and grades shown on the plans or established by the Engineer. The types of barrier systems are designated as follows: Cable Guide Railing and Median Barrier. Corrugated Beam Guide Railing and Median Barrier Modified Heavy Post Blocked -Out (HPBO (Mod.)) Corrugated Beam Guide Railing and Median Barrier Box Beam Guide Railing and Median Barrier Concrete Barrier
606-1.01 I-Beam Posts for Existing Highway Barrier. Under this work the Contractor shall furnish and
install I -beam posts and necessary hardware for existing highway barriers in accordance with the plans, specifications, and as directed by the Engineer.
606-1.02 Guide Railing with Extra Long Posts. Under this work the Contractor shall furnish and install
guide railing of the type specified with extra long (7 foot) posts in accordance with the contract documents, and as directed by the Engineer.
606-1.03 Retensioning Existing Cable Guide Railing And Median Barrier. Under this work the
Contractor shall retension existing guide rail and median barrier cables in accordance with the Contract Documents.
606-2 MATERIALS. Materials shall meet the requirements specified in the following subsections of
Section 700 -- Materials and Manufacturing and ASTM Specifications:
606-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Concrete Grouting Material 701-05 Anchoring Materials -Chemically Curing 701-07 Precast Concrete Barrier 704-05 Premo lded Resilient Joint Filler 705-07 Joint Filler ASTM D1056 Wire Fabric For Concrete Reinforcement 709-02 Epoxy Coated Bar Reinforcement, Grade 60 709-04 Wood and Timber Posts and Timber Blockouts 710-13 Galvanized Steel Barrier Posts 710-14 Corrugated Beam Guide Railing End Terminal (Energy -Absorbing) 710-17 HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy -Absorbing) 710-18 HPBO (Mod.) Corrugated Beam Median Barrier End Terminal (Energy -Absorbing) 710-19 Corrugated Beam Guide Railing and Median Barrier 710-20 Box Beam Guide Railing and Median Barrier 710-21 Cable Guide Railing and Median Barrier. 710-22 Box Beam End Assembly Type III and Box Beam Median Barrier End Assembly, Type C 710-24 Plastic and Synthetic Block -Outs for Heavy Post Guiderail Systems 710-26 Anchor Bolts for Guide Railing 710-28 Galvanized Coatings And Repair Methods 719-01 Reflective Sheeting 730-05 (Materials Designation 730 -05.02) Paint for Galvanized Surfaces 708-06 Rolled Steel Channels for Continuity Connections ASTM A36 Steel Plates for Continuity Connections ASTM A36
606-2.01 Steel Hardware. Steel posts, plates, channels, stiffeners, block -outs, angles, brackets, slipbases
and other miscellaneous steel hardware not referenced to or specified by §710 -14, §710 -20, §710 -21, §710 -22, §710 -24 or other sections of this specification shall be fabri cated as shown in the contract plans and documents from steel meeting the requirements of ASTM A36 unless specified otherwise. All components shall be galvanized in accordance with §719 -01, Type I or II. Components shall be fabricated prior to gal vanizing.
606-2.02 Anchor Bolts. For the purpose of the guide railing specifications, the term anchor bolt will be
used when referring to anchor rods, hooks, or studs. Unless otherwise specified, anchor bolts embedded or grouted in concrete for securing post and railing base plates, or transitioning to concrete walls, parapets, and barriers shall meet the requirements of §710 -28. Anchor bolts embedded in concrete anchorage units for terminating guide rail and median barrier systems shall have minimum yield and tensile strength meeting the requirements of ASTM F1554 Grade 36. Anchor bolts, nuts, and washers shall be galvanized in accordance with §719 -01, Galvanized Coatings and Repair Methods, Type II, unless indicated otherwise on the plans or Standard Sheets. Grout for anchor bolts shall conform to the requirements of §701 -07 or §701 -05.
606-2.03 Fasteners. Bolts, nuts and washers shall conform to the following, unless specified otherwise
on the plans, standard sheets, manufacturer’s drawings’, or in the contract documents.
606-2 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Bolts Bolts ASTM A307 Grade A Nuts ASTM A563 Grade A or Better Washers ASTM F436 Bolts, nuts and washers shall be galvanized in accordance with the provisions of §719 -01 Galvanized Coatings and Repair Methods, Type II.
606-2.04 I-Beam Posts for Existing Highway Barrier. I-beam posts for existing highway barrier
shall conform to the requirements of §710 -14 Galvanized Steel Barrier Posts. Posts shall conform to the details shown on the plans or the latest edition of the standard sheet for the guide railing or median barrier affected. Hardware (nuts, bolts, “J” bolts, offset beams or block -outs, back up plates, washers, and shelf angles) necessary shall conform to the requirements of the current specifications and standard sheets for the highway barrier affected.
606-2.05 Extra Long Guide Rail Posts. Extra long Guide Rail Posts shall conform to the requirements
of §710 -14 Galvanized Steel Barrier Posts. The posts shall conform to the details for extra long posts shown on the standard sheets or plans.
606-2.06 Concrete for End Assembly Anchorage Units. Cast-in-place concrete shall meet the
requirements of Class A Concrete in Section 501 Portland Cement Concrete -General. The Contractor may submit, for approval by the Director of the Materials Bureau, a mix at least equivalent to the specified Class A Concrete, with a minimum cement content of 575 lb/cu yd. Precast concrete anchorage units, when selected as an alternate to cast -in-place units by the Contractor, shall meet the requirements of Section 704 -03 Precast Concrete -General.
606-2.07 Concrete Barrier
606-2.08 Resetting Guide Railing, Median Barrier, Anchorage Unit Assemblies and End
Assemblies. The materials comprising the existing system shall be used if they conform to the materials requirements specified for new guide rail systems and are found to be in satisfactory condition as determined by the Engineer. The Contractor shall supply all new hardware (splice tongues, plates, nuts, bolts, washer, etc.) Replacement materials shall meet the material requirements specified for new guide rail systems. Galvanizing of railin g and posts may be repaired in accordance with §719 -01, Galvanized Coatings and Repair Methods. HPBO guide railing and median barrier (pre -2013 design) shall be reset as detailed in the current standard sheets, including 12 inch block -outs.
606-2.09 HPBO (Mod.) Corrugated Beam Guide Railing and Median Barrier. The material
requirements of §710 -20 Corrugated Beam Guide Railing and Median Barrier shall apply except that posts, block -outs, soil plates, anchor bolts, hardware, and fasteners shall be as detailed on the Standard Sheets. The Wood and Timber Posts and Timber Block -Outs shall conform to §710 -13. The Plastic and Synthetic Block -Outs for Heavy Post Guiderail Systems sha ll conform to §710 -26.
606-2 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606-2.10 Corrugated Beam Guide Rail Transition To Bridge Rail, Concrete Barrier and Concrete Parapets. Corrugated beam rail sections shall conform to the requirements of §710 -20 and as detailed on the Standard Sheets or Bridge Detail Sheets. Thrie beam shall conform to the material specifications of 710 -20 and shall be as detailed on the Standard Sheets. . All remaining material shall conform to the requirements of §710 -23 except that:
606-2.11 Vacant.
606-2.12 Vacant
606-2.13 (Vacant)
606-2.14 Transitions Constructed of, or with, Concrete. Concrete transition between concrete
barriers of different shapes and the concrete elements of transitions between metal barriers and concrete barriers shall conform to §606 -2.07 Concrete Barrier, A. Precast Concrete Barrier or, with the permission of the Engineer, B. Cast -in-Place Concrete Barrier.
606-3 Construction Details
606-3.01 General. All barrier systems and transitions described by these specifications shall be subject
to the following requirements.
606-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 D. Erection. Posts, railing, barrier systems, rail transitions, end assemblies, and anchorage units shall be erected as specified in the contract plans or manufacturer’s drawings. Where drilling and grouting is required, Section 586 – Miscellaneous Structural Reconstruction shall apply, unless otherwise approved. Rail mounting height shall be within +/ - 1/4 inch of that indicated on the Standard Sheets and plans. Prior to installing guide rail, median barrier, transitions, or end terminals, the Contractor shall determine the locations of all structures, including underground structures, that may be affected by the installation. If there are conflicts between the proposed installation and other structures, the Contractor shall discuss with and recommend to the Engineer alternative locations or types of barrier, transitions, or end terminals that will not be in conflict with the structure. Posts and foundation tube(s) shall be driven unless otherwise specified by the Engineer. The driving shall be accomplished with approved equipment and methods that will leave the posts and foundation tube(s) in their final position, free of any distortion , burring or other damage. When posts and foundation tube(s) are driven through asphalt concrete or a bituminous treated material, the Contractor shall take care to prevent damage to the paved or treated areas. Large holes and voids caused by driving the p osts and foundation tube(s) shall be filled and compacted with a bituminous treated material or asphalt concrete similar to that damaged. The small area adjacent to the post and foundation tube(s) disturbed during installation or where gaps exist at the po st and foundation tube(s) after pavement repairs shall be sealed with a bituminous material approved by the Engineer. As an alternate to driving posts and foundation tube(s) on unpaved medians and where site conditions are such that driving is not possible, the Contractor shall carefully excavate for all post and foundation tube(s) holes. Post and foundation tube(s) hole s and post and foundation tube(s) foundation structures shall be backfilled and backfilled material compacted in accordance with Section 203, Select Granular Fill . On structures, concrete anchors, and paved medians, base plates for posts shall be anchored as shown in the Contract Documents. Alternate construction methods and equipment for drilling and grouting of holes shall be submitted to the Engineer for approval before operations begin. The work of installing the guide railing system when it abuts stabilized shoulder courses shall be coordinated and progressed to provide the least disturbance between the two phases of the work. All posts shall be aligned to a tolerance of 1/4 inch for plumb and grade line. Box beam to be installed on a curved alignment shall be shop bent or shop curved in accordance with Table 606 -1. TABLE 606 -1 SHOP BENDING AND SHOP MITERING OF BOX BEAM GUIDE RAILING AND MEDIAN BARRIER Barrier Type Shop Bending Required Shop Mitering Required Box Beam Guide Railing Radius over 20 ft and less than 720 ft Radius of 20 ft or less Box Beam Median Barrier Radius over 30 ft and less than 1525 ft Radius of 30 ft or less When shop bending or shop mitering of box beam guide railing or box beam median barrier is required, the rail element shall be shop -worked to the radius that the barrier will be installed on. Corrugated beam guide railing and median barrier shall require shop curving if the radius is equal to or less than 150 feet. When shop curving of corrugated beam is required, the rail element shall be shop -worked to the radius that the barrier will be in stalled on.
606-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 F. End Terminals and Assemblies. Installation of all proprietary products shall follow the manufacturer’s instructions. The following shall apply to end terminals or assemblies to be installed under this section.
606-3.02 Cable Guide Railing and Median Barrier. Beginning with the first post where the rail is
parallel to the edge of pavement, every sixth post in the line of guide rail shall be reflectorized (96 foot spacing for reflectors) except those posts in the approach terminal and intermediate anchorage area , which curve away from the shoulder, or used in a median barrier. The reflector and method of attachment shall be as indicated on the standard sheet.
606-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 For mid -tension cable guide rail, install a turnbuckle on one end of the cable, pull the cable to remove slack, and place a second turnbuckle on the other end. Once the assembly of the run is complete, tension each cable according to temperature from the data in the table on the standard sheets. Measure the tension using a three -point cable tension meter. For high -tension cable systems, follow the manufacturer’s directions.
606-3.03 Box Beam Guide Railing and Median Barrier. Rail sections for tangent runs shall be at least
18 feet long. Rail splices shall be a minimum of 18 inches from the centerline of any post which is to be bolted to the rail.
606-3.04 Weak Post and HPBO (Mod.) Corrugated Beam Guide Railing and Median Barrier In the
erection procedures, the free end of the rail element shall not be allowed to swing free and cantilever around the mounting bolt. The free end shall be supported in a manner approved by the Engineer while the splice bolts a nd mounting bolts are fastened. Rail splicing shall be as shown on the Standard Sheets.
606-3.05 Concrete Barrier. Unless specified otherwise in the contract documents the Contractor shall
have the option of providing precast concrete barrier, cast -in-place concrete barrier, or machine formed barrier. No intermixing in any run of barrier will be permitted unless show n otherwise in the contract documents except that precast transition sections and ends may be used with cast -in-place or machine formed concrete barriers. Unless otherwise specified, excavation shall be performed in accordance with §206 -3. Granular back fill shall conform to Section 304 and shall match the subbase course type used on the adjacent roadway. Half section concrete barrier shall be erected with the appropriate back -up posts and continuity plates as shown on the Standard Sheets and plans.
606-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 A. Precast Concrete Barrier
606-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 formation of uncontrolled shrinkage cracks. Clear curing compound shall be promptly applied to the saw cut.
606-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 8. Placement Adjacent to Cement Concrete Pavement or Shoulders. The barrier shall be separated from the cement concrete pavement or shoulder by a 1/2 inch wide vertical joint extending down to the bottom of the pavement or shoulder. The joint shall b e formed with and contain Premo lded Resilient Joint Filler conforming to the requirements of §705 -07. A recess of approximately one inch shall be provided at the top of the joint for installation of a backer rod and joint sealant. The joint sealant shall be a silicone sealant appearin g on the Department’s Approved List and shall be applied in accordance with the manufacturer’s instructions.
606-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 discharge until approximately two -thirds (2/3) of the load, as determined by the Engineer, has been discharged. After the water addition, the concrete shall be mixed at least 30 revolutions in the mixing range. The slipforming equipment shall have as nearly a continuous forward movement as possible to provide uniform progress with stopping and starting of the equipment held to a minimum. Any edge slump resulting from slipforming operations in excess of 1/4 inch, as measured from the top surface of the median barrier, exclusive of edge rounding, shall be corrected before the concrete has hardened. Concrete supply shall be sufficient to produce a continuous, completely shaped barrier. If concrete placement is interrupted for a period of time where the delay will affect the quality and structural integrity of the barrier, the contractor shall termina te his operations by one of the following procedures. The Engineer shall determine when the slipform operation is to be terminated.
606-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 9. Expansion Joints. Machine formed concrete barriers shall not extend more than 400 feet without an expansion joint. Expansion joints shall be formed no rmal to the pavement with Premo lded Resilient Joint Filler meeting the requirements of §705 -07 and shall provide for expansion of 1/2 inch. The filler material shall be cut to conform to the cross section of the barrier. The expansion joints shall be located at all immovable objects (bridge substructures, etc.), where shown on the plans, and/or as directed by the Engineer. Expansion joints shall not be required at regular intervals unless shown on the plans.
606-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Repaired portions shall exactly match shape requirements. The repaired portion shall withstand a moderate blow from a 16 ounce hammer.
606-3.06 Resetting Guide Railing, Median Barrier and Precast Concrete Barrier. The Contractor
shall remove, store, clean and reset railing, posts, and precast concrete barrier as shown on the plans or as directed by the Engineer. The Contractor shall remove designated existing guide railing, median barrier and precast concrete barr ier and neatly store them at locations approved by the Engineer. The work shall be done in a workmanlike manner so as to salvage all usable parts. The reset guide railing and/o r median barrier shall be placed in accordance with the requirements of §606 -3.01 General and the subsection for each specific system. Unless otherwise specified by the designer, all existing hardware, i.e., post bolts, J - bolts, splice bolts, etc., shall be replaced with new hardware. Cable systems shall be retensioned and all existing splice couplings and wedges shall be replaced. HPBO guide railing and median barrier (pre -2013 design) shall be reset as detailed in the current standard sheets, including 12 inch block -outs. The existing block -outs shall become the property of the Contractor.
606-3.07 Resetting Guide Railing and Median Barrier (New Posts). The construction details of §606 -
3.06 shall apply, except that the Contractor shall furnish and install new posts and remove the old posts from the site.
606-3.08 Removing and Storing Guide Railing, Median Barrier, and Precast Concrete Barrier. The
Contractor shall remove designated existing guide railing, median barrier and precast concrete barrier and neatly store the component parts in separate piles at locations designated for future pick up by Department forces, or its designee. The work s hall be done in a workmanlike manner so as to salvage all usable parts. Unusable material shall be disposed of by the Contractor.
606-3.09 Removing and Disposing of Guide Railing, Median Barrier, Concrete Barrier, Guide
Posts, Guide Rail Posts, and Median Barrier Posts. The Contractor shall remove designated existing guide railing, median barrier, concrete barrier, guide posts, guide rail posts, and median barrier posts and remove them from the site of work. Holes shall be backfilled with a suitable material and compact ed in a manner approved by the Engineer.
606-3.10 I-Beam Posts for Existing Highway Barrier. I-beam posts for existing highway barrier shall
be installed at the locations indicated in the contract documents or where directed by the Engineer. The driving shall be in accordance with the requirements of §606 -3.01 and the applicable standard sheet(s ). All hardware necessary for mounting the rail elements or cable to the post shall be supplied by the Contractor. New heavy post block -outs shall be supplied to replace damaged or unusable block -outs. S3x5.7 posts installed as intermediate posts to reduce post spacing on weak post corrugated beam guide railing and median barrier and on box beam guide railing shall not be attached to the rail element. All reflectors, delineators, reference markers, or other items, which are to remain in place, that are damaged by or during the Contractor's operations shall be replaced by the Contractor unless indicated otherwise on the Standard Sheets or project plans .
606-3 11
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606-3.11 Retensioning Existing Cable Guide Railing and Median Barrier. Cable guide rail and median barrier shall be retensioned in accordance with the cable tensioning requirements of §606 -3.02.
606-3.12 Resetting Anchorage Unit Assemblies and End Assemblies for Guide Rail and Median
Barrier. The Contractor shall remove, store, clean and reset existing anchorage units and terminals for Guide Railing and Median Barrier as shown on the plans or as directed by the Engineer. The anchorage units and terminals shall be reset and placed in accordance with the requirements of §606 -3.01 General. Any anchor blocks that will not remain in use in their existing location are to be removed and the holes backfilled as detailed in §606 -3.13 The Contractor shall take care so reusable parts are not damaged by their operations. Any parts damaged in handling and placing shall be replaced by the Contractor. Unusable material shall be disposed of by the Contractor. Surface areas disturbed during the removal operations shall be reestablished, as nearly as possible, to match the adjacent surfaces to remain.
606-3.13 Removing and Storing Anchorage Unit Assemblies and End Assemblies for Guide Railing
and Median Barriers The construction details of §606 -3.08 shall apply. However, concrete anchor blocks shall be completely removed, and the resulting holes backfilled. If the center of the anchor block is inboard from a line six feet beyond the theoretical shoulder break, the Contractor shall backfill with material meeting the requirements of §733 -04 compacted in 6 -inch lifts. If the center of the anchor block is more than six feet past the shoulder break, the backfill material and compaction shall be replaced in kind, character and condition, compacted in 6 -inch lifts. Other excavation and backfill shall conform to the requirements outlined in §606 -3.01E. Roadway edge drains damaged due to the Contractor’s operations shall be repaired or replaced at no additional cost to the State.
606-3.14 Removing and Disposing Anchorage Unit Assemblies and End Assemblies for Guide
Railing and Median Barriers. The construction details of §606 -3.13 shall apply except the anchor blocks and terminals become the property of the Contractor and shall be removed from the project.
606-3.15 Box Beam Guide Rail Transition to Concrete Barrier. The contractor shall construct a guide
rail transition from concrete barrier to box beam guide rail at the locations indicated and as detailed on the contract plans. The work shall conform to the requirements of §606 -3.01.
606-3.16 Corrugated Beam Guide Rail T ransition to Bridge Rail, Concrete Barrier and Concrete
Parapets. The contractor shall construct corrugated beam guide transitions to bridge rail, concrete barrier and/or concrete parapets at the locations and as detailed on the contract plans. The requirements of §606 - 3.01 shall apply together with the following: Railing shall be erected so that the rails are parallel to the roadway, except in those sections where it is necessary to vertically transition the highway barrier to the bridge railing, or barri er. Bending or curving of rail elements in order to fit alignment requirements in the field shall not be permitted. The Engineer may order some bending or curving to allow for necessary minor adjustments. The Contractor shall exercise care in attaching the guide rail to the bridge rail so as not to damage the rails, posts, or joints, or splices. Any damage to the material attributable to the Contractor's operation shall require that the material be repaired, or replaced. The decision to repair, or replace, shall rest solely with the Engineer.
606-3.17 Vacant.
606-3.18 Vacant
606-3 19
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606-3.19 Transitions Constructed of, or with, Concrete. Transitions constructed of concrete and the concrete elements of transitions constructed of metal components and concrete elements shall be constructed at the locations indicated in the contract documents, or those indicated by the Engineer, in accordanc e with these specifications, the contract documents, and the directions of the Engineer. The shapes indicated on the Standard Sheets are standard. The Deputy Chief Engineer (Design) will consider other shapes for approval. §606 -3.05 Concrete Barrier, A. Precast Concrete Barrier and B. Cast -in-Place Concrete Barrier shall apply.
606-4 Method of Measurement
606-4.01 Cable, Corrugated Beam or Box Beam Guide Railing and Median Barrier. The quantity to
be measured for payment will be in feet to the nearest foot of guide railing or median barrier installed, measured along the axis of the railing and between its pay limits as shown on the plans and/or standard sheets. The quantity to be measured for payment will be in feet to the nearest foot of shop bent or shop mitered guide railin g or median barrier installed. If the guide railing does not terminate at an anchorage unit, end assembly, or transition to another type of barrier, but is anchored to a structure, the railing will be measured up to the structure. When installing new or replacement runs containing stretches with or consisting entirely of reduced post spacings, the following payment factors shall be applied to the prices bid per foot for the normally spaced guide rail. TABLE 606 -2 PAYMENT FACTORS FOR GUIDE RAIL AND MEDIAN BARRIER POST SPACING Payment Factor s >> 1.0 1.1 1.3 1.4 1.6 1.8 1.9 Rail Type s ↓↓ Post Spacing Center to Center in Feet & Inches 3-Cable 16’ 12’ -- 8’ -- -- 4’ Mid-Tension Cable 10’ -- -- 5’ -- -- -- Box Beam 6’ -- 3’ -- -- -- -- Weak -Post Corrugated 12’-6” -- -- 6’-3” 4’-2” -- 3’-1½” HPBO 6’-3” -- -- -- -- 3’-1½”
606-4.02 Anchorage Units, End Assemblies and Transitions for Guide Railing or Median Barrier.
Anchorage units, end assembly units and transitions between various highway guide railing and median barrier systems will be measured by the actual number of units installed in accordance with the plans, standard sheets, manufacturer’s drawings, manufact urer's directions and/or as directed by the Engineer. The payment limits for the Box Beam Guide Rail End Assembly Type III and Box Beam Median Barrier End Assembly, Type C will be separated by a distance of 50 feet extending along the end assembly from the front of the Nose Assembly to a point 50 feet remov ed. These payment limits apply regardless of whether the Type III End Assembly or Type C End Assembly employs crushable fiberglass elements or beam bursting type mandrels to absorb the energy of the impacting vehicle. The limits of payment for the Corrugated Beam Guide Railing End Terminal (Energy -Absorbing) will extend a distance of 100 feet from the outer end of the terminal. At that point, payment will begin for corrugated beam guide railing. The limits of payment for HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy - Absorbing) will extend a distance of 50 feet from the outer end of the terminal. At that point, payment will begin for heavy post blocked -out corrugated beam guide railing. The limits of payment for HPBO (Mod.) Corrugated Beam Median Barrier End Terminal (Energy - Absorbing) will extend a distance of 50 feet from the outer end of the terminal. At that point, payment will begin for heavy post blocked -out corrugated beam median barrier.
606-4 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606-4.03 Concrete Barrier and Terminal Sections. The quantity of concrete barrier sections measured for payment will be the number of feet placed in accordance with the plans and specifications, measured along the axis of the barrier . The quantity of concrete barrier terminals will be measured by the actual number of units installed in accordance with the plans, standard sheets, and/or as directed by the Engineer
606-4.04 Resetting Guide Railing, Median Barrier and Precast Concrete Barrier. The quantity of
reset guide railing or median barrier measured for payment will be the number of feet reset in accordance with the specifications, plans and as directed by the Engineer, exclusive of anchorage units and end assemblies. If the guide railin g is anchored to a structure instead of an anchorage unit or end assembly, measurement will be made up to the structure. The quantity of reset precast concrete barrier measured for payment will be the number of feet placed in accordance with the plans and specifications measured along the axis of the barrier between its extreme outer limits.
606-4.05 Resetting Guide Railing and Median Barrier (New Posts). The Method of Measurement of
§606 -4.04 will apply.
606-4.06 Removing and Storing Guide Railing, Median Barrier and Precast Concrete Barrier. The
quantity of removed and stored guide rail and median barrier measured for payment will be the number of feet removed in accordance with the specifications, plans, and as directed by the Engineer, exclusive of anchorage units and end assemblies. If th e guide rail or median barrier is anchored to a structure, measurement will be made up to the structure. The quantity of removed and stored precast concrete barrier measured f or payment will be the number of feet removed in accordance with the specifications and plans, measured along the axis of the barrier between its extreme outer limits.
606-4.07 Removing and Disposing of Guide Railing, Median Barrier and Concrete Barrier. The
quantity of guide rail and median barrier measured for payment will be the number of feet of railing and posts removed and disposed of in accordance with the specifications and plans, exclusive of anchorage units and end assembly components that would not be used in the middle of a continuous run. The quantity of concrete barrier measured for payment will be the number of feet removed and disposed of in accordance wit h the specifications and plans measured along the axis of the barrier between its extreme outer limits and including any backup posts.
606-4.08 Removing and Disposing of Guide Posts, Guide Rail Posts, and Median Barrier Posts. The
quantity to be measured for payment will be the number of posts removed and disposed of in accordance with the specifications and plans and as directed by the Engineer.
606-4.09 Resetting Anchorage Unit Assemblies and End Assemblies for Guide Railing and Median
Barrier This work shall be measured by the number of anchorage units and/or terminals reset in accordance with the requirements of the contract documents.
606-4.10 Removing and Storing or Disposing of Anchorage Unit Assemblies and End Assemblies
for Guide Railing and Median Barrier. This work shall be measured by the number of Anchorage Units or End Assemblies properly removed and stored for pick up by others or removed and disposed of in accordance with the contract documents and to the satisfaction of the Engineer
606-4.11 Retensioning Existing Cable Guide Railing and Median Barrier . Quantity measured for
payment will be the number of sections retensioned. A section shall consist of the length of cable guide rail or median barrier running between two concrete anchorage units.
606-4.12 Vacant .
606-4 13
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606-4.13 Corrugated Beam Guide Rail Transition to Bridge Rail, Concrete Barrier and Concrete Parapets. Measurement will be taken as the actual number of transition units installed in accordance with the plans and specifications.
606-4.14 Box Beam Guide Rail Transition to Concrete Barrier. Measurement will be taken as the actual
number of transition units installed in accordance with the specifications, plans and standard sheets.
606-4.15 Vacant
606-4.16 I-Beam Posts for Existing Highway Barrier. I-beam posts for existing highway barrier will
be measured by the actual number of posts installed in accordance with the contract documents and as directed by the Engineer.
606-4.17 Transition between Concrete Sections. Transitions will be measured by the actual number of
units installed in accordance with the plans, standard sheets and/or as directed by the Engineer.
606-5 Basis of Payment
606-5.01 Guide Railing, Median Barrier, Concrete Barrier and Terminal Sections; Various Types.
The unit price bid for the above work shall include the cost of all labor, equipment and material necessary to complete the work, including the cost of any repairs required, and the costs of bending any rail element to the required curvature. Payment for corrugated guide rail and median barrier, or bent box beam guide rail, will be determined using the payment factors for the various typical post spacings listed in Table 606 -2. Payment will be the sum of the products obtained by multiplying t he unit price bid for a rail or median barrier by the payment factors listed in Table 606 -2 for the relevant post spacings and multiplying each of those products by the length of rail having that given post spacing. Payment for mitered box beam and median barrier with 6 foot post spacings will be made at the unit prices bid. If a reduced post spacing of 3 feet is used for mitered box beam guide rail, the payment will be determined by multiplying the unit price bid b y a payment factor of 1.1for the length installed. When posts are driven through asphalt concrete or bituminous treated material, any repairs to damage paved or treated areas shall be at the Contractor's expense. Progress payments will be made when the metal railing and/or metal barrier is erected in the position and manner indicated on the standard sheets and in a manner approved by the Engineer, exclusive of bituminous repair and final alignment. Payment will be made, at the unit price bid, for 90% of th e measured quantity erected. The balance of the quantity erected will be paid for upon proper repair to the bituminous surfaces and alignment of the metal railing and/or metal barrier to the specified tolerances.
606-5.02 End Assembly, End Anchorage Units and Transitions for Guide Railing and Median
Barrier. The unit price bid for each end assembly, end anchorage unit or transition shall include the cost of furnishing all labor, materials and equipment necessary to complete the work, including the necessary concrete, excavation, backfill, reflectorization, o bject markers when required at driveways and vehicle openings, and spring cable assembly (compensating device) and/or steel turnbuckle cable end assembly required for c able guide rail.
606-5.03 Resetting; Removing and Storing; Removing and Disposing; of Guide Railing, Median
Barrier and Concrete Barrier. The unit price bid per foot for the above work items shall include the cost of furnishing all labor, equipment and materials necessary to complete the work and restore the system to full operating capacity. Any materials damaged due to Contractor's operation shall be replaced by him and the cost shall be included in the price bid for this item.
606-5 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Payment for resetting guide rail and median barrier shall include the unit price bid multiplied by the measured quantity multiplied by the payment factor for the various typical pos t spacings listed in Table 606-2, except that posts required to reduce the post spacing from the original post spacing shall be paid for under the appropriate I -beam post for existing highway barrier item.
606-5.04 Removing and Disposing of Guide Posts, Guide Rail Posts and Median Barrier Posts. The
unit price bid per post for the above work items shall include the cost of furnishing all labor, equipment and material necessary to complete the work.
606-5.05 Resetting; Removing and Storing; Removing and Disposing; of Anchorage Unit
Assemblies and End Assemblies for Guide Railing and Median Barrier. The unit price bid for each of these items shall include the cost of furnishing all labor, equipment and material necessary to complete the work including excavation and backfill. If the Contractor elects to install new concrete anchors, in lieu of removing and resetting the existing ones, the cost of furnishing and installing the new anchor as well as the cost for necessary adjustments to the existing one shall be included in the p rice bid for these items.
606-5 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 3. The balance of the unit bid price for the quantity of anchorage units reset upon the reestablishment of surface areas disturbed.
606-5.06 Vacant
606-5.07 Corrugated Beam Guide Rail Transition to Bridge Rail, Concrete Barrier and Concrete
Parapets. The unit price bid per guide rail transition shall include the cost of all labor, materials, and equipment necessary to satisfactorily complete the work, including back -up posts, connections and hardware.
606-5.08 Box Beam Guide Rail Transition to Concrete Barrier. The unit price bid per guide rail
transition shall include the cost of all labor, equipment, and material necessary to satisfactorily complete the work, including back -up posts, necessary rail curvature, splices, connections and hardware.
606-5.09 Vacant
606-5.10 I-Beam Posts for Existing Highway Barrier. The unit price bid for I -beam posts for existing
highway barrier shall include the cost of furnishing all labor equipment and material necessary to complete the work. Removal of damaged posts and hardware is included in other items of work. When posts are driven through asphalt concrete or bituminous treated material, any repairs to damaged paved or treated areas shall be at the Contractor's expense.
606-5.11 Retensioning Existing Gable Guide Railing and Median Barrier . The unit price bid for
retensioning a section of cable guide railing or median barrier shall include the cost of all labor, materials and equipment necessary to complete the work.
606-5.12 Transition between Concrete Sections. The unit price bid per concrete transition shall include
the cost of all labor, equipment, and material necessary to satisfactorily complete the work, including back -up posts, connections and hardware. Payment will be made under: Item No. Item Pay Unit 606.01 Cable Guide Railing Foot 606.0101 Cable Guide Railing With Extra Long Posts Foot 606.010605 Mid-Tension Cable Guide Rail – 5-foot Post Spacing Foot 606.010610 Mid-Tension Cable Guide Rail – 10-foot Post Spacing Foot 606.0201 Anchorage Units for Cable Guide Railing Each 606.020101 Mid-Tension Trailing End Cable Terminal Each 606.03 Cable Median Barrier Foot 606.0310 Anchorage Units for Cable Median Barrier Each 606.10 Box Beam Guide Railing Foot
606-5 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606.100002 Box Beam Guide Railing (Shop Bent or Shop Mitered) Foot 606.100003 Box Beam Guide Railing (Shop Mitered) Foot 606.1001 Box Beam Guide Railing With Extra Long Posts Foot 606.100102 Box Beam Guide Railing with Extra Long Posts (Shop Bent or Shop Mitered)Foot 606.100103 Box Beam Guide Railing with Extra Long Posts (Shop Mitered) Foot 606.11 Box Beam Median Barrier Foot 606.110002 Box Beam Median Barrier (Shop Bent or Shop Mitered) Foot 606.110003 Box Beam Median Barrier (Shop Mitered) Foot 606.120101 Box Beam End Piece Each 606.120102 Box Beam Guide Railing End Assembly Type I Each 606.120103 Box Beam Guide Railing End Assembly Type I with 18 ft Extension Each 606.120201 Box Beam Guide Railing End Assembly Type IIA Each 606.1203 Box Beam End Assembly Type III Each 606.1401 Box Beam Median Barrier End Assembly, Type A Each 606.1402 Box Beam Median Barrier End Assembly, Type B Each 606.1403 Box Beam Median Barrier End Assembly, Type C Each 606.17 Corrugated Beam Median Barrier Foot 606.170001 Corrugated Beam Median Barrier (Shop Curved) Foot 606.18 Weak -Post, Corrugated Beam Guide Rail Foot 606.180001 Weak -Post, Corrugated Beam Guide Rail (Shop Curved) Foot 606.1801 Weak -Post, Corrugated Beam Guide Rail With Extra Long Posts Foot 606.180101 Weak -Post, Corrugated Beam Guide Rail With Extra Long Posts (Shop Curved) Foot 606.22 Anchorage Units for Corrugated Beam Guide Railing Each 606.2201 Anchorage Units for Corrugated Beam Guide Railing Buried In Back Slope Each 606.23 Anchorage Units for Corrugated Beam Guide Railing (Driveways, Walkways, and Other Openings) Each 606.24 Anchorage Units for Corrugated Beam Median Barrier Each 606.26 Corrugated Beam Guide Railing End Terminal (Energy -Absorbing) Each 606.27 HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy -Absorbing) Each 606.2701 HPBO (Mod.) Corrugated Beam Guide Railing Foot 606.270101 HPBO (Mod.) Corrugated Beam Guide Railing (Shop Curved) Foot 606.2702 HPBO (Mod.) Corrugated Beam Guide Railing with Extra Long Posts Foot 606.270201 HPBO (Mod.) Corrugated Beam Guide Railing with Extra Long Posts (Shop Curved) Foot 606.2703 Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing Each 606.2704 Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing Buried in Back Slope Each 606.28 HPBO (Mod.) Corrugated Beam Median Barrier End Terminal (Energy -Absorbing) Each 606.2801 HPBO (Mod.) Corrugated Beam Median Barrier Foot 606.280101 HPBO (Mod.) Corrugated Beam Median Barrier (Shop Curved) Foot 606.2802 Anchorage Units for HPBO (Mod.) Corrugated Beam Median Barrier Each 606.3001 Concrete Barrier Type A (Optional) Foot 606.3002 Concrete Barrier Type B (Optional) Foot 606.3003 Concrete Barrier Type C (Optional) Foot 606.3004 Half Section Concrete Barrier (Optional) Foot
606-5 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606.3005 Concrete Barrier - Mounting Block Section Each 606.3011 Concrete Barrier Type A (Precast) Foot 606.3012 Concrete Barrier Type B (Precast) Foot 606.3013 Concrete Barrier Type C (Precast) Foot 606.3014 Half Section Concrete Barrier (Precast) Foot 606.3021 Concrete Barrier Type A (Cast -in-Place) Foot 606.3022 Concrete Barrier Type B (Cast -in Place) Foot 606.3023 Concrete Barrier Type C (Cast -in Place) Foot 606.3024 Half Section Concrete Barrier (Cast -in Place) Foot 606.3031 Concrete Barrier Type A (Machine Formed) Foot 606.3032 Concrete Barrier Type B (Machine Formed) Foot 606.3033 Concrete Barrier Type C (Machine Formed) Foot 606.3034 Half Section Barrier (Machined Formed) Foot 606.3041 Single -Slope Concrete Median Barrier (Optional) Foot 606.3042 Single -Slope Concrete Median Barrier (Precast) Foot 606.3043 Single -Slope Concrete Median Barrier (Cast -in-Place) Foot 606.3044 Single -Slope Concrete Median Barrier (Machine Formed) Foot 606.3051 Single -Slope Concrete Median Barrier - Wide (Optional) Foot 606.3052 Single -Slope Concrete Median Barrier - Wide (Precast) Foot 606.3053 Single -Slope Concrete Median Barrier - Wide (Cast -in-Place) Foot 606.3054 Single -Slope Concrete Median Barrier - Wide (Machine Formed) Foot 606.3061 Single -Slope Concrete Half Section Barrier (Optional) Foot 606.3062 Single -Slope Concrete Half Section Barrier (Precast) Foot 606.3063 Single -Slope Concrete Half Section Barrier (Cast -in-Place) Foot 606.3064 Single -Slope Concrete Half Section Barrier (Machine Formed) Foot 606.3110 Embedded Low-Profile Concrete Barrier , TL-2 Feet 606.3111 Embedded Low -Profile Concrete Barrier, TL -2 – Left Terminal Each 606.3112 Embedded Low -Profile Concrete Barrier, TL -2 – Right Terminal Each 606.311 3 Free-standing Low-Profile Concrete Barrier , TL-2 Feet 606.3114 Free -standing Low -Profile Concrete Barrier, TL -2 – Terminal Each 606.4701 I-Beam Posts for Existing Cable Median Barrier Each 606.48 Retensioning Existing Cable Guide railing or Median Barrier Each 606.4801 I-Beam Posts for Existing Cable Guide Railing Each 606.4803 Extra Long I -Beam Posts for Existing Cable Guide Railing Each 606.4805 I-Beam Posts for Existing Corrugated Beam Guide Railing Each 606.4807 Extra Long I -Beam Posts for Existing Corrugated Beam Guide Railing Each 606.4809 I-Beam Posts for Existing Box Beam Guide Railing Each 606.4811 Extra Long I -Beam Posts for Existing Box Beam Guide Railing Each 606.4813 I-Beam Posts for Existing Corrugated Beam Median Barrier Each 606.4815 I-Beam Posts for Existing Box Beam Median Barrier Each 606.4818 I-Beam posts for Existing HPBO (Mod.) Corrugated Beam Guide Railing Each 606.4820 Extra Long I -Beam Posts for Existing HPBO (Mod.)Corrugated Beam Guide Railing Each 606.4822 I-Beam Posts for Existing HPBO (Mod.) Corrugated Beam Median Barrier Each 606.4824 Extra Long I -Beam Posts for Existing HPBO (Mod.) Corrugated Beam Median Barrier Each 606.50 Resetting Cable Guide Railing Foot 606.5010 Resetting Cable Median Barrier Foot 606.5048 Resetting Cable Guide Railing (New Posts) Foot 606.5049 Resetting Cable Median Barrier (New Posts) Foot 606.51 Resetting Corrugated Beam Guide Railing Foot
606-5 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606.5148 Resetting Corrugated Beam Guide Railing (New Posts) Foot 606.52 Resetting Corrugated Beam Median Barrier Foot 606.5248 Resetting Corrugated Beam Median Barrier (New Posts) Foot 606.53 Resetting Box Beam Guide Railing Foot 606.5348 Resetting Box Beam Guide Railing (New Posts) Foot 606.54 Resetting Box Beam Median Barrier Foot 606.5448 Resetting Box Beam Median Barrier (New Posts) Foot 606.5501 Resetting HPBO Corrugated Beam Guide Railing (New 12 in. Blockouts) Foot 606.5601 Resetting HPBO Corrugated Beam Median Barrier (New 12 in. Blockouts) Foot 606.57 Resetting Precast Concrete Barrier Foot 606.5710 Resetting Precast Concrete Barrier - Half Section Foot 606.58 Resetting HPBO (Mod.) Corrugated Beam Guide Railing Foot 606.5801 Resetting HPBO (Mod.) Corrugated Beam Guide Railing (New Posts) Foot 606.5810 Resetting HPBO (Mod.) Corrugated Beam Median Barrier Foot 606.581001 Resetting HPBO (Mod.) Corrugated Beam Median Barrier (New Posts) Foot 606.5901 Resetting Anchorage Units for Cable Guide railing or Median Barrier Each 606.5910 Resetting Anchorage Units for Corrugated Beam Guide Railing or Median Barrier Each 606.5920 Resetting Box Beam Guide Rail Turned -Down Terminal Each 606.5921 Resetting Box Beam Guide Rail Energy -Absorbing Terminal Each 606.5930 Resetting Box Beam Median Barrier End Assembly --Type A Each 606.5931 Resetting Box Beam Median Barrier End Assembly --Type B Each 606.5941 Resetting Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing Each 606.5946 Resetting Anchorage Units for HPBO (Mod.) Corrugated Beam Median Barrier Each 606.60 Removing and Storing Cable Guide Railing Foot 606.6010 Removing and Storing Cable Median Barrier Foot 606.61 Removing and Storing Corrugated Beam Guide Railing Foot 606.62 Removing and Storing Corrugated Beam Median Barrier Foot 606.63 Removing and Storing Box Beam Guide Railing Foot 606.64 Removing and Storing Box Beam Median Barrier Foot 606.65 Removing and Storing Precast Concrete Barrier Foot 606.6510 Removing and Storing Precast Concrete Barrier -Half Section Foot 606.66 Removing and Storing HPBO (Mod.) Corrugated Beam Guide Railing Foot 606.67 Removing and Storing HPBO (Mod.) Corrugated Beam Median Barrier Foot 606.6910 Removing and Storing Anchorage Units for Corrugated Beam Guide Railing and Median Barriers Each 606.6911 Removing and Storing Weak - and Heavy -Post Corrugated Beam Terminals Each 606.6920 Removing and Storing Box Beam Guide Railing End Assembly Each 606.6932 Removing and Storing Box Beam Median Barrier End Assembly -Type C Each 606.6941 Removing and Storing Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing Each 606.6946 Removing and Storing Anchorage Units for HPBO(Mod) Corrugated Beam Median Barrier Each 606.70 Removing and Disposing Cable Guide Railing Foot 606.7010 Removing and Disposing Cable Median Barrier Foot 606.71 Removing and Disposing Corrugated Beam Guide Railing Foot 606.7101 Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing Foot
606-5 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 606.72 Removing and Disposing Corrugated Beam Median Barrier Foot 606.7201 Removing and Disposing HPBO (Mod.) Corrugated Beam Median Barrier Foot 606.73 Removing and Disposing Box Beam Guide Railing Foot 606.74 Removing and Disposing Box Beam Median Barrier Foot 606.75 Removing and Disposing Concrete Barrier Foot 606.7510 Removing and Disposing Concrete Barrier -Half Section Foot 606.76 Removing and Disposing of Guide Posts, Guide Rail Posts, and Median Barrier Posts Each 606.79 Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier Each 606.7910 Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier Each 606.7911 Removing and Disposing Weak - and Heavy -Post Corrugated Beam Energy -Absorbing Terminals Each 606.7920 Removing and Disposing Box Beam Guide Rail Turned -Down Terminal Each 606.7921 Removing and Disposing Box Beam Energy -Absorbing Terminal Each 606.7930 Removing and Disposing Box Beam Median Barrier End Assembly -Type A Each 606.7931 Removing and Disposing Box Beam Median Barrier End Assembly --Type B Each 606.7932 Removing and Disposing Box Beam Median Barrier End Assembly -Type C Each 606.7941 Removing and Disposing Anchorage Units for HPBO(Mod) Corrugated Beam Guide Railing Each 606.7946 Removing and Disposing Anchorage Units for HPBO(Mod) Corrugated Beam Median Barrier Each 606.8101 Guide Rail Transition Weak -Post Corrugated Beam to Box Beam Guide Rail (One or Two Way Operation) Each 606.8201 Guide Rail Transition Box Beam to Weak -Post Corrugated Beam Guide Rail (One Way Only) Each 606.83 Guide Rail Transition Cable to Box Beam (One or Two Way Operation) Each 606.84 Guide Rail Transition Box Beam to Cable (One Way Only) Each 606.8401 Guide Rail Transition Box Beam to Mid -Tension Cable (One Way Only) Each 606.8501 Median Barrier Transition Weak -Post Corrugated Beam to Box Beam Each 606.86 Guide Rail Transition Corrugated Beam to Thrie Beam Each 606.8701 Corrugated Beam Guide Railing Transition Assembly Two Rail Steel Bridge Railing Each 606.8702 Corrugated Beam Guide Railing Transition Assembly Four Rail Steel Bridge Railing Each 606.8703 Corrugated Beam Guide Railing Transition Assembly Discontinuous Steel Bridge Railing Each 606.8704 Corrugated Beam Guide Railing Transition Assembly Concrete Parapets, or Concrete Barrier Each 606.8801 Transition from Box Beam Guide Rail to Jersey -shaped Concrete Barrier (One - or Two -Way Operation) Each 606.8802 Transition from Jersey -shaped Concrete Barrier to Box Beam Guide Rail (One Way - Trailing End of Barrier) Each 606.8803 Transition Between Box Beam Guide Rail and Single Slope Half Section Concrete Barrier (One or Two Way Operation) Each 606.8804 Transition Between Single Slope Half Section Concrete Barrier and Box Beam Guide Rail (One Way - Trailing End of Barrier) Each 606.8805 Transition Between Box Beam Median Barrier and
607-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Single Slope Concrete Median Barrier Each 606.880 6 Transition from Box Beam Guide Rail to Full -Section Single -Slope Concrete Barrier (One - or Two -Way Operation) Each 606.880 7 Transition from Full -Section Single -Slope Concrete Barrier to Box Beam Guide Rail (One Way - Trailing End of Barrier) Each 606.8901 Transition: HPBO (Mod.) Corrugated Guide Railing to Beam Box Beam Guide Railing Each 606.8902 Transition: HPBO (Mod.) Corrugated Beam Guide Railing to Weak Post Corrugated Beam Guide Railing Each 606.8903 Transition: HPBO (Mod.) Corrugated Beam Guide Railing to Single Slope Concrete Half Section Barrier Each 606.8904 Transition: HPBO (Mod.) Corrugated Beam Median Barrier to Beam Box Beam Median Barrier Each 606.8905 Transition: HPBO (Mod.) Corrugated Beam Median Barrier to Weak Post Corrugated Beam Median Barrier Each 606.8906 Transition: HPBO (Mod.) Corrugated Beam Median Barrier to Single Slope Concrete Median Barrier Each 606.9001 Transition between Standard (NJ) Concrete Barrier and Single -Slope Concrete Barrier Each 606.9002 Transition between Wide and Normal Single Slope Concrete Median Barrier Each 606.9003 Transition between Half -Section and Full -Section Single Each Slope Concrete Barrier (Left Pocket) 606.9004 Transition between Half -Section and Full -Section Single Each Slope Concrete Barrier (Right Pocket) SECTION 607 - FENCES
607-1 DESCRIPTION. This work shall consist of furnishing and erecting fencing and metal fence gates
of the type and size, and at the locations shown on the plans or as directed by the Engineer. Construction of fencing and gates shall be done in accordance with the specifications, the standard sheets, and the plans, and in reasonable close conformity with the lines and grades shown o n the plans or established by the Engineer.
607-1.01 Fence Types. The fence shall be designated as follows:
Optional Chain Link Fence Type I Optional Chain Link Fence Type II Vinyl Coated Chain Link Fence on Plastic Coated Frame Right -of-Way Fencing The options for Type I and Type II chain link fences shall be as follows: TYPE I Fabric Options Frame Options Coated Steel Fence Fabric Mischmetal Alloy Coating (95% Zinc 5% Aluminum - Mischmetal Alloy) (95% Zinc 5% Aluminum) Galvanized Steel Galvanized Steel Aluminum Combined Coating on Steel
607-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Aluminum Coated Steel Aluminum Aluminum Coated Steel TYPE II Fabric Options Frame Options Coated Steel Fence Fabric Mischmetal Alloy Coating (95% Zinc 5% Aluminum - Mischmetal Alloy) (95% Zinc 5% Aluminum) Galvanized Steel Galvanized Steel Vinyl Coated Steel Combined Coating on Steel Aluminum Plastic on Steel Aluminum Coated Steel Aluminum Aluminum Coated Steel Fence gates for Type I and Type II optional fences shall be consistent with the fabric and frame option selected for the contract. Fence frame and fabric selected shall be consistent throughout the contract except where intermixing is permitted by the Engineer.
607-2 MATERIALS. Materials shall conform to the requirements specified in the following subsections
of Section 700 - Materials and Manufacturing : Zinc Chromate Primer 708-04 Aluminum Fence Fabric 710-01 Galvanized Steel Fence Fabric 710-02 Vinyl Coated Steel Fence Fabric 710-03 Aluminum Coated Steel Fence Fabric 710-04 Coated Steel Fence Fabric (95% Zinc 5% Aluminum -Mischmetal Alloy) 710-05 Steel and Iron Posts, Rails, Braces and Fittings for Chain -Link Fence 710-10 Aluminum Posts, Rails, Braces and Fittings for Chain -Link Fence 710-11 Plastic Coated Posts, Rails, Braces and Fittings for Chain -Link Fence 710-12 Right -of-Way Fencing 710-30
607-2.01 Portland Cement Concrete for Bases. Portland Cement concrete used for bases shall be Class
A or C conforming to the requirements of Section 501 Portland Cement Concrete --General except that requirements for automated batching shall not apply.
607-2.02 Right -of-Way Fencing. The Contractor has the option of using posts and braces fabricated
from either high carbon shapes of steel or pressure treated wood meeting the requirements of §710 -30 Right -of-Way Fencing.
607-2.03 Fence Gates. Fence gates for Right -of-Way Fencing shall Conform to the requirements for
Right -of-Way Fence Gates of §710 -30. Fence gates for Chain -Link Fence shall conform to the following:
607-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 3/8 inch nominal diameter diagonal truss rod. Gate leaves over 16 feet shall have both a horizontal brace and a 3/8 inch nominal diameter truss rod.
607-3 Construction Details
607-3.01 General. The Contractor shall perform such clearing and grubbing as may be necessary to
construct the fence to the required grade and alignment. At locations where breaks in a run of fencing are required, or at intersections with existing fences, appropriate adjustment in post spacing shall be made to conform to the requirements for the type of closure indicated. When the plans require that the posts, braces, or anchors be embedded in concrete, the Contractor shall install temporary guys or braces as may be required to hold the posts in proper position until such time as the concrete has set sufficiently to hold t he posts. Unless otherwise permitted, no materials shall be installed on posts or strain placed on guys and bracing set in concrete until seven days have elapsed from the time of placing the concrete. All posts shall be set vertically and to the required grade and alignment. Cutting of the tops of the posts will be allowed only with the approval of the Engineer and under the Engineer's specified conditions. Wire or fencing of the size and type required shall be firmly attached to the posts and braces in the manner indicated. All wire shall be stretched taut and be installed to the required elevations. At each location where an electric transmission, distribution or secondary line crosses any of the types of fences covered by these specifications, the Contractor shall furnish and install a ground conforming to the requirements of Subsection 9 of the Nat ional Electric Safety Code. Fence shall generally follow the contour of the ground, with the bottom of fence fabric no less than 1 inchnor more than 6 inch from the ground surface. Grading shall be performed where necessary to provide a neat appearance. Line posts shall be spaced equidistant in the fence line at the spacing shown on the plans, standard sheets or as directed by the Engineer. End, corner, and intermediate posts shall be placed at the locations indicated on the plans, standard sheets or as directed by the Engineer, and shall be braced as shown on the plans or standard sheets. When chain link fence is on a long curve intermediate posts shall be evenly spaced so that the strain of the fence will not bend the line posts. All end, corner, and intermediate posts shall be set plumb in concrete bases of the depth and diameter shown on the plans or standard sheets. The Contractor shall have the option of setting the line posts in concrete bases or using methods of driving and anchoring specified by the fence manufacturer and approved by the Engineer.
607-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 The concrete bases shall be rough cast in the ground around the posts. The top surfaces shall be domed to shed water and provide a neat workmanlike appearance when completed. Extensions of up 45 minutes for the allowed time for pouring the concrete will b e permitted.
607-3.02 Chain -Link Fencing with Top Rail. Posts shall be set so they are equidistant with a maximum
of 10 foot centers. All top rails shall pass through the base of the post caps and shall form a continuous brace from end to end of each stretch of fence. Top rail lengths shall be joined with sleeve couplings with expansion sleeves provided at 100 foot intervals. Top rails shall be securely fastened to end posts by means of approved rail end connectors. Horizontal braces shall be provided at all intermediate posts, midway between the top rail and ground as shown on the plans or standard sheets. Diagonal truss rods shall be installed with the horizontal braces as indicated on the plans or standard sheets. Fence fabric shall be installed approximately 2 inch above the ground level and securely fastened along the bottom, and to all braces, top rails, line and pull posts, at the intervals indicated on the standard sheets by approved methods. The fabric shall be secured to all end, corner and gate posts with stretcher bars fastened to the posts, with stretcher bands spaced at a maximum of 14 inches and in a manner permitting adjustment of the fabric tension. If the Contractor elects the option of using one piece roll -formed sections, the fence fabric shall be integrally woven into the fabric loops on the end, corner, pull and gate posts. The fabric shall be attached to the top braces and line posts as shown o n the standard sheets.
607-3.03 Chain -Link Fencing with Top Tension Wire. The construction details specified in §607 -3.02
Chain Link Fencing with Top Rail shall apply with the following modifications:
607-3.04 Vinyl Coated Chain -Link Fencing on Plastic Coated Frame. The construction details
specified in §607 -3.02 Chain -Link Fencing with Top Rail or §607 -3.03 Chain -Link Fencing with Top Tension Wire shall apply with the following addition: If any of the resin clad material specified under this item has the protective resin coating damaged so its effectiveness to prevent corrosion of the base material is impaired, the Contractor shall repair such parts by applying one coat of an approved com pound of a color to match original material.
607-3.05 Aluminum Posts. Aluminum posts shall be set in accordance with requirements pertaining to
fence posts of §607 -3.01 General, and §607 -3.02 Chain -Link Fencing with Top Rail or §607 -3.03 Chain - Link Fencing with Top Tension Wire and with the following additional requirement : The portions of aluminum posts that will be in contact with the concrete bases shall be coated with Zinc Chromate Primer conforming to the requirements of §708 -04. The primer shall be thoroughly dry before setting of the post in the concrete.
607-3.06 Right -of-Way . Fencing posts shall be set plumb and firm to the satisfaction of the Engineer in
properly prepared post holes, as indicated on the plans or standard sheet. The concrete for post holes where required shall be placed in accordance with the requirements of §6 07-3.01 General.
607-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 All line posts of the type and size shown on the plans or standard sheets shall be placed equidistant in the fence line. Wood line posts shall be placed on a maximum of 15 foot centers and metal line posts shall be placed on a maximum of 10 foot centers. Intermediate posts and post assemblies, end posts, corner posts, approach spans, and bracing shall be as shown on the plans or standard sheets. The woven wire fencing shall be fastened to all steel line posts with at least 5 galvanized wire fasteners or clamps and to all steel end, intermediate and corner posts with aluminum wire not less than 5/32 inch diameter. The woven wire fencing shall be fastened to all wood posts with either 1 1/2 inch galvanized or aluminum staples. The top and bottom wires and every other in -between wires shall be stapled, alternating the stapling of the in -between wires on successive po sts.
607-3.07 Fence Gates. The Contractor shall construct metal fence gates of the type and size as indicated
on the plans or standard sheets, and in the location shown or ordered by the Engineer.
607-4 Method of Measurement
607-4.01 General. The quantity to be paid for all fencing exclusive of fence gates and fencing of the
types listed in subsequent subsections, will be the number of linear feet of chain -link fencing measured along the top of fencing, center to center of end posts, properly furnished and installed in accordance with the plans, specifications, standard sheets and directions of the Engineer. An allowance of 10 feet will be added for each end post, corner post and pull post installed in accordance with the plan s, specifications, standard sheets and directions of the Engineer.
607-4.02 Right -of-Way Fencing. Right -of-Way Fencing shall be measured as the number of feet along
the top of the fencing from center to center of the end posts, properly furnished and installed in accordance with the plans, specifications, standard sheets and directions of the Enginee r. An allowance of 20 feet will be added for each end post, corner post, intermediate post, and approach post installed in accordance with the plans, specifications, standard sheets and directions of the Engineer.
607-4.03 Fence Gates. Fence gates shall be measured as the number of complete gates furnished and
erected in accordance with the specifications, plans, standard sheets and directions of the Engineer.
607-5 Basis of Payment
607-5.01 General. The unit price bid per linear foot of fencing shall include the cost of furnishing all
labor, materials, tools and equipment necessary to satisfactorily complete the work.
607-5.02 Fence Gates. The unit price bid for each size gate shall cover the cost of furnishing all labor,
materials, tools and equipment necessary to satisfactorily complete the work and shall include all necessary clearing, grubbing, excavation and disposal, fill, concrete, gates, gate posts, lock, bracing and all other necessary materials. Payment will be made under: Item No. Item Pay Unit 607.051X Vinyl Coated Steel Chain -Link Fencing on Plastic Coated Frame with Top Rail Foot 607.052X Vinyl Coated Steel Chain -Link Fencing on Plastic Coated Frame with Top Tension Wire Foot 607.16xx Fence Gate with Vinyl Coated Steel Chain -Link Fencing on Plastic Coated Frame Each
608-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 607.19 Right -of Way Fencing Foot 607.20xx Right -of Way Fence Gates Each 607.30xx Optional Chain -Link Fence, Type I, with Top Rail Foot 607.31xx Optional Chain -Link Fence, Type I, with Top Tension Wire Foot 607.32xx Optional Chain -Link Fence, Type II, with Top Rail Foot 607.33xx Optional Chain -Link Fence, Type II with Top Tension Wire Foot 607.40xx Optional Fence Gates Each Refer to the Standard Contract Pay Item Catalog for full Item Number and full Description. SECTION 608 - SIDEWALKS, DRIVEWAYS, BICYCLE PATHS, AND VEGETATION CONTROL STRIPS (Last Revised January , 2023)
608-1 DESCRIPTION. This work shall consist of the construction of portland cement concrete or asphalt
sidewalks and driveways; asphalt bicycle paths and vegetation control strips; precast concrete paving, brick paving, grouted stone block paving, and detectable warnings on pedestrian facilities in accordance the contract documents and as directed by the Engineer.
608-2 MATERIALS. Provide materials meeting the requirements specified in the following subsections
of Section 700 - Materials and Manufacturing : Portland Cement 701-01 Bituminous Materials 702-00 Fine Aggregates 703-01 Coarse Aggregates 703-02 Mortar Sand 703-03 Cushion Sand 703-06 Concrete Sand 703-07 Mineral Filler 703-08 Brick Sidewalk and Driveway Pavers 704-08 Stone Blocks 704-09 Precast Concrete Driveway and Sidewalk Pavers 704-13 Caulking Compound for Structures 705-06 Premo lded Resilient Joint Filler 705-07 Masonry Mortar 705-21 Wire Fabric for Concrete Reinforcement 709-02 Fibers for Concrete Reinforcement 711-01 Membrane Curing Compound 711-05 Form Insulating Materials for Winter Concrete 711-07 Admixtures 711-08 Water 712-01 Surface -applied Detectable Warning Units 726-01 Embedded Detectable Warning Units 726-02
608-2.01 Portland Cement Concrete Sidewalks and Driveways.
608-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 B. Machine Formed Sidewalks. Provide concrete meeting the requirements for Class J in accordance with Section 501 Portland Cement Concrete -General with the exception that the mix incorporates fibers for concrete reinforcement meeting the requirements of §711 -01 Fibers for Concrete Reinforcement .
608-2.02 Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips. Provide a 9.5
mixture for surface course or 19.0 mixture for any course below the surface designed for < 0.3 million ESALs and produced in accordance with Section 401 using coarse aggregate Type F9. Use a PG 64S -22 binder to produce the asphalt mixture . Alternate PG binder grades may be allowed with the approval of the Regional Materials Engineer. Do not use polyphosphoric acid (PPA) downstate to modify the PG binder properties for mixtures containing limestone, limestone as an aggregate blend component, limestone as a constituent in crushed gravel aggregate, or recycled asphalt pavement (RAP) that includes any limestone. Do not use PPA downstate as a cross -linking agent for polymer modification of mixtures containing limestone, limestone as an aggregate blend component, limestone as a constituent in crushed gravel aggregate, or recycled asphalt pavement (RAP) that includes any limestone. Downstate, as it relates to PG binder is defined as Orange, Putnam, Rockland, Westchester, Nassau, Suffolk Counties and the City of New York. Do not use polyphosphoric acid (PPA) upstate to modify the PG binder properties or as a cross -linking agent for polymer modification, regardless of the type of aggregate. Upstate is defined as all counties not designated as downstate.
608-2.03 Brick Paved Sidewalks and Driveways. Provide brick pavers meeting the requirements of §704 -
08 Brick Pavers , of the size, shape and color specified in the contract documents.
608-2 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 D. Sand -Cement Setting Bed. Provide sand -cement mixture for setting bed consisting of 1 part Portland Cement Type 2 and 6 parts Fine Aggregate, by volume.
608-2.04 Grouted Stone Block Paved Sidewalks and Driveways. Provide stone blocks meeting the
requirements of §704 -09 Stone Blocks of the size, shape and color specified in the contract documents.
608-2.05 Precast Concrete Block Paved Sidewalks and Driveways. Provide precast concrete driveway
and sidewalk pavers meeting the requirements of §704 -13 Precast Concrete Driveway and Sidewalk Pavers of the size, shape and color specified in the contract documents. Provide granular setting bed material consisting of hard, durable; uncoated particles of soil or rock, free from lumps of clay and all deleterious substances in accordance with Table 608 -1 Granular Material Setting Bed Gradation . TABLE 608 -1 GRANULAR MATERIAL SETTING BED GRADATION Sieve Size Percent Passing by Weight 1/4 inch 100 # 10 50-85 # 40 20-45 # 200 3-10
608-2.06 Surface -Applied Detectable Warning Units. Provide surface -applied detectable warning units
meeting the requirements of §726 -01 Surface -applied Detectable Warning Units of the color specified in the contract documents. If no color is specified, the color must be an approximate visual match to the Red color of SAE Standard AMS -STD -595 #31350. Provide setting bed material and/or surface preparation materials in accordance with the manufacturer’s recommendations.
608-2.07 Embedded Detectable Warning Units. Provide embedded detectable warning units meeting the
requirements of §726 -02 Embedded Detectable Warning Units of the color specified in the contract documents. If no color is specified, the color must be an approximate visual match to the Red color of SA E Standard AMS -STD -595 #31350. Provide setting bed material and/or surface preparation materials in accordance with the manufacturer’s recommendations. Provide embedded detectable warning units meeting the requi rements of §726 -02 Embedded Detectable Warning Units of the color specified in the contract documents. Provide setting bed material and/or surface preparation materials in accordance with the manufacturer’s recommendations.
608-3 CONSTRUCTION DETAILS. Construct all pedestrian facilities in accordance with the
requirements of the Proposed Accessibility Guidelines for Pedestrian Facilities in the Public Right Of Way (PROWAG). Not all facilities can be designed to meet the current PROWAG design standards. Features that do not meet PROWAG requirements must be approved by the Department and noted as non standard features in the contract documents. Chapter 2 of the NYS DOT Highway Design Manual provides direction. For facilities that cannot meet the current PROWAG design standards, construct facilities to meet the standards to the greatest extent practicable. Install all work in accordance with the Standard Sheets and the lines and grades shown in the contract documents. Dimension s shown on the Standard Sheets are the
608-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 minimum values in order to be compliant with the PROWAG requirements and for acceptance of the work. Slopes shown on the Standard Sheets are maximum values for design and layout. Ensure constructed facilities do not have construction tolerances that result in work that does not meet the PROWAG requirements.
608-3.01 Portland Cement Concrete Sidewalks and Driveways. Install concrete sidewalks and
driveways in accordance with Section 501 Portland Cement Concrete - General and the contract documents. Start concrete placement operations when the ambient air temperature is 40°F or higher, when measured in the shade, within an accuracy of ± 2°F. Discontinue placement if the ambient air temperature falls below 40°F. Ensure th e surface temperature of the base material is 40°F or higher and that the surface does not have any snow, ice, frost, or standing water on it. Do not place concrete in the rain. Use insulating materials or heating equipment if necessary to prepare base material before placement begins. Form sidewalks and driveways conventionally or by machin e. Install a pr emolded resilient joint filler at all joints between sidewalk and curb, pavement, buildings, or other vertical surfaces, and at all transverse construction joints. Fill any transverse gaps from ½ inch to 1 inch in width with Caulking Compo und for Structures. Ensure workers installing pedestrian facilities are familiar with the requirements for those facilities under the Americans with Disabilities Act . Provide an American Concrete Institute (ACI) Certified Concrete Flatwork Technician to perform all finishing. When the contract includes 10 cubic yards or more of sidewalk and driveway concrete, provide an ACI Certified Concrete Flatwork Finisher to dir ectly supervise all finishing. Provide proof of ACI flatwork certification to the Engineer prior to concrete placement.
608-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 rigid side forms that laterally support the concrete and minimize edge slumping, a full -width finishing pan, and attached internal vibrators capable of consolidating the entire concrete placement. Apply the provisions of §569 -3.05 E. Central and Transit Mixed Concrete to maintain desired slump during the concrete placement. Use fiber reinforcement only, do not use welded wire fabric reinforcement. Make water additions at the point of deposition in accordance with §569 -3.05 E.
608-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 approval by the Director, Materials Bureau. If the ambient air temperature is expected to fall below 40°F anytime during the curing period, provide a supply of form insulating materials capable of maintaining a surface temperature of 55°F at the work site sufficient to cover all concrete placed. Cure all driveways and sidewalks at driveways for a minimum of 3 days prior to opening to vehicle traffic. Place form insulating materials as necessary to prevent the newly placed concrete from being exposed to ambient air temperatures at the concrete su rface below 36°F during the curing period. Secure and overlap the form insulating materials tight to the concrete surface extending a minimum of 12 inches beyond the edge of the concrete to prevent air intrusion beneath the insulation. Maintain form insu lating materials in place for the curing period. If the ambient air temperature falls below 40°F anytime during the curing period, cure conventionally formed sidewalks and driveways and machine formed sidewalks for a minimum of 6 days. If the concrete temperature falls b elow 32°F or the concrete is damaged by cold weather, remove and replace it at no additional cost to the State. Place 4 equally spaced recording surface thermometers between the concrete surface and the insulating material and 12 inch from the outside edge of concrete for each day’s placement. Do not subject the concrete to a temperature drop in excess of 50°F dur ing the first 24 hours after removing the insulation. If saw cutting is necessary, use diamond blade saws equipped with cutting guides, blade guards, water cooling systems, dust controls, and cut depth control capable of making straight cuts to the dimensions required.
608-3.02 Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips. Install asphalt
sidewalks, driveways, bicycle paths and vegetation control strips in accordance with the provisions Section 404 Asphalt Pavements , the Standard Sheets, and the contract documents. Place the number of courses and course thicknesses in accordance with Table 608 -2 Asphalt Pavement Course Thicknesses . Place vegetation control strips using a 9.5 mix with a minimum thickness of 3 inches in one course. Compact the asphalt mixture in accordance with the requirements of §40 4-3.07D. 80 Series Compaction Method . TABLE 608 -2 ASPHALT PAVEMENT COURSE THICKNESSES Thickness 9.5 Mix 12.5 Mix 19.0 Mix Minimum 1 ½ inches 2 inches 2 ½ inches Maximum 2 inches 2 ½ inches 4 inches NOTES:
608-3.03 Brick Paved Sidewalks and Driveways. Install brick pavers to the lines and grades and in the
pattern shown in the contract documents to provide a uniform, even surface. Ensure joints between bricks are hand tight. Do not install or grout brick pavers in freezing weather. After installation, sweep a dry mixture of masonry mortar over the brick pavers until the joints are completely filled, and then lightly wet the joints with water. Clean brick pavers of excess mortar, and finish joints prior to th e mortar setting up. Keep brick paving moist for 4 days after filling the joints with mortar. After the 4 day curing period, remove remaining mortar film using a light acid wash (10% solution of hydrochloric or muriatic acid) followed by flushing clean wit h water or as approved by the Engineer. Avoid the use of acid in areas where runoff could damage trees or other vegetation.
608-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 B. Brick Paved Sidewalks and Driveways (Mortar Setting Bed). Lay brick pavers in a mortar setting bed, a minimum of 1 inch thick over the concrete or bituminous subbase.
608-3.04 Grouted Stone Block Paved Sidewalks and Driveways. Install grouted stone blocks in the
pattern shown in the contract documents to provide a uniform, even surface. Ensure joints between blocks are a maximum of 1 -1/4 inch. Do not lay or grout blocks in freezing weather. After installation, sweep a dry mi xture of masonry mortar over the stone blocks until the joints are completely filled and then lightly wet the joints with water. Clean stone blocks of excess mortar, and finish joints prior to the mortar setting up. Keep grouted stone block paving moist fo r 4 days after filling the joints with mortar. After the four day curing period, remove remaining mortar film using a light acid wash (10% ± solution of hydrochloric or muriatic acid) followed by flushing clean with water, or as approved by the Engineer. Avoid the use of acid in areas where runoff could damage trees or other vegetation.
608-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 2. Lay stone blocks in accordance with B. Grouted Stone Block Paved Sidewalks and Driveways (Mortar Setting Bed) .
608-3.05 Precast Concrete Block Paved Sidewalks and Driveways. Install precast concrete driveway
and sidewalk pavers, in the pattern shown in the contract documents to provide a uniform, even surface. Lay blocks on a setting bed not to exceed 2 inches of uniformly compacted material placed over the specified subbas e. Install the pavers in accordance with the manufacturer's recommended procedures. Ensure joints are hand tight unless otherwise specified. Do not lay pavers in freezing weather. After the pavers are in place, sweep sand joint filler over the pavers until the joints are completely filled.
608-3.06 Surface -Applied Detectable Warning Units. Install surface -applied detectable warning units
on existing curb ramps in accordance with the contract documents and the manufacturer’s recommendations for environmental conditions, surface preparation, installation procedures, curing procedures, and mate rials compatibility. If no color is specified in the contract documents, the color must be an approximate visual match to the Red color of SAE Standard AMS -STD -595 #31350. Ensure the detectable warning un its provide the required contrast, light -on-dark or dark -on-light, with the adjacent sidewalk or ramp.
608-3.07 Embedded Detectable Warning Units. Install embedded detectable warning units in plastic
concrete, directly on existing subbase prior to placing concrete, or inlaid on prepared concrete surfaces in accordance with the contract documents and as directed by the manufacturer. If no color is specified in the contract documents, the color must be an approximate visual m atch to the Red color of SAE Standard AMS - STD -595 #31350. Ensure the detectable warning units provide the required contrast, light -on-dark or dark - on-light, with the adjacent sidewalk or ramp. Follow all applicable manufacturers' recommendations for enviro nmental conditions, surface preparation, installation procedures, curing procedures, and materials compatibility.
608-4 Method of Measurement
608-4.01 Portland Cement Concrete Sidewalks and Driveways. The quantity to be measured for
payment will be in cubic yards to the nearest 0.1 cubic yard of concrete installed.
608-4.02 Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips. The quantity to
be measured for payment will be in tons to the nearest 0.01 tons of asphalt installed. The asphalt produced for these types of applications is considered certified material in accordance with Materials Procedure (MP) 401. A Quality Adjustment Factor (QAF) of 1.00 will be assigned to Material meeting the specification requirement as certified by the Qua lity Control Technician (QCT). A QAF of 0.85 will be assi gned to material that fails to meet the specification as tested by the Quality Assurance Technician (QAT). Quality Units will be determined when there is a disincentive and will be calculated as per §40 4-4, Method of Measurement.
608-4.03 Brick Paved Sidewalks and Driveways. The quantity to be measured for payment will be in
square yards to the nearest 0.1 square yard of brick paving installed.
608-4.04 Grouted Stone Block Paved Sidewalks and Driveways. The quantity to be measured for
payment will be in square yards to the nearest 0.1 square yard of stone block paving installed.
608-4.05 Precast Concrete Block Paved Sidewalks and Driveways. The quantity to be measured for
payment will be in square yards to the nearest 0.1 square yard of precast concrete paving installed.
608-4.06 Surface -Applied Detectable Warning Units. The quantity to be measured for payment will be
in square yards to the nearest 0.1 square yard of surface -applied detectable warning units installed.
608-4 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 608-4.07 Embedded Detectable Warning Units. The quantity to be measured for payment will be in square yards to the nearest 0.1 square yard of embedded detectable warning units installed.
608-5 Basis of Payment
608-5.01 Portland Cement Concrete Sidewalks and Driveways. The unit price bid for concrete
sidewalks and driveways shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including preparing the subgrade, saw cutting and wire fabric reinforcement. Excavation and subbase course will be paid for separately.
608-5.02 Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips. The unit price
bid for asphalt sidewalks, driveways and paths shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including preparing the subgrade, milling, cleaning surfaces, tack coat, saw cut, truing and leveling co urses. Excavation and subbase course will be paid for separately. Payment adjustments will be made when there is a disincentive based on the Quality Units multiplied by the fixed index price for asphalt items listed in the contract documents for the quantit y placed on the day the Quality Adjustment Factor represent.
608-5.03 Brick Paved Sidewalks and Driveways. The price bid for brick paved sidewalks and driveways
shall include the cost of furnishing all labor, materials and equipment necessary to satisfactorily complete the work, including setting bed material. Excavation and subbase course will be paid for s eparately.
608-5.04 Grouted Stone Block Paved Sidewalks and Driveways. The unit bid for grouted stone block
paved sidewalks and driveways shall include the cost of furnishing all labor, materials and equipment necessary to satisfactorily complete the work, including setting bed material. Excavation and subbase course will be paid for separately.
608-5.05 Precast Concrete Block Paved Sidewalks and Driveways. The unit price bid for precast
concrete block paved sidewalks and driveways shall include the cost of all labor, materials and equipment necessary to satisfactorily complete the work, including setting bed material. Excavation and subbase course will be paid for separately.
608-5.06 Surface -Applied Detectable Warning Units. The unit price bid for surface -applied detectable
warning units shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including surface preparation.
608-5.07 Embedded Detectable Warning Units. The unit price bid for embedded detectable warning units
shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including bedding material. No adjustment will be made for concrete removed t o accommodate embedded units. Payment will be made under: Item No. Item Pay Unit 608.0101 Concrete Sidewalks and Driveways Cubic Yard 608.0102 Accelerated Cure Sidewalks and Driveways Cubic Yard 608.020102 Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips Ton 608.000013 Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips Quality Unit 608.03 Brick Paved Sidewalks and Driveways (Sand Setting Bed) Square Yard 608.04 Brick Paved Sidewalks and Driveways (Mortar Setting Bed) Square Yard
609-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 608.05 Brick Paved Sidewalks and Driveways (Bituminous Setting Bed) Square Yard 608.06 Brick Paved Sidewalks and Driveways (Sand -Cement Setting Bed) Square Yard 608.07 Brick Paved Sidewalks and Driveways (Optional Concrete Setting Bed) Square Yard 608.08 Grouted Stone Block Paved Sidewalks and Driveways (Sand Setting Bed) Square Yard 608.09 Grouted Stone Block Paved Sidewalks and Driveways (Mortar Setting Bed) Square Yard 608.10 Grouted Stone Block Paved Sidewalks and Driveways (Sand -Cement Setting Bed) Square Yard 608.11 Grouted Stone Block Paved Sidewalks and Driveways (Optional Concrete Setting Bed) Square Yard 608.12 Precast Concrete Block Paved Sidewalks and Driveways (Granular Material Setting Bed) Square Yard 608.20 Surface -Applied Detectable Warning Units Square Yard 608.21 Embedded Detectable Warning Units Square Yard SECTION 609 - CURB AND CURB & GUTTER (Last Revised January , 2022)
609-1 DESCRIPTION. Construct and place curb, and curb & gutter, and/or reset curb as indicated in
the Contract Documents or established by the Engineer.
609-2 MATERIALS. The materials shall meet the requirements of the following subsections of Section
700 - Materials and Manufacturing. Portland Cement, Type II 701-01 Concrete Repair Material 701-04 Concrete Grouting Material 701-05 Anchoring Material - Chemically Curing 701-07 Concrete Repair Material - High Early Strength 701-12 Coarse Aggregate 703-02 Concrete Sand 703-07 Premolded Resilient Joint Filler 705-07 Masonry Mortar 705-21 Stone Curb Anchor Bars 709-07 Quilted Covers (for Curing) 711-02 Plastic Coated Fiber Blankets (for Curing) 711-03 Polyethylene Curing Covers (White Opaque) 711-04 Membrane Curing Compound 711-05 Stone Curb 714-01 Precast Concrete Curb 714-04
609-2.01 (Vacant)
609-2.02 Concrete for Cast -in-Place Concrete Curb and Curb & Gutter.
609-2 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Admixtures and provides a minimum of 10% reduction of the design water content from the target mix design for Class D.
609-2.03 Stone Curb. Stone curb shall conform to the requirements for Stone under §714 -01.
609-2.04 Curb Anchors. Curb anchors for cast -in-place concrete curb, and curb & gutter shall be
fabricated from material conforming to the requirements for Longitudinal Joint Ties §705 -14 and to the details shown on the Standard Sheet for concrete curb or as indicated in the Con tract Documents.
609-2.05 Concrete for Backing and Bedding Precast Concrete Curb and Stone Curb . The
Contractor shall use any Class Concrete, or a concrete mix as specified in Section 501 proportioned as follows: TABLE 609 -1 POUNDS OF AGGREGATE PER BAG OF CEMENT Specific Gravity of Aggregate 2.60 2.70 2.80 2.90 Concrete Sand 326 337 350 364 Coarse Aggregate, CA 2 Gradation 536 556 558 597
609-3 Construction Details
609-3.01 General. Curb or curb & gutter found to be dirty, damaged , or out of alignment shall be
cleaned, repaired, or replaced as necessary by the Contractor to the satisfaction of the Engineer prior to final acceptance of the work. When the Contract Documents have no reference to placing curb across driveway entrances, no curb shall be placed across driveway entrances.
609-3.02 Setting Precast Concrete Curb or Stone Curb. All precast concrete curb and stone curb,
excluding stone traversable sloped (TRS) curb, shall be set on a 3 -inch thick continuous bed of dry concrete mix, or on a 3 inch thick dry concrete mix bed at the joints as shown on the Standard Sheets and wet concrete mix between the joints, or on a 3 -inch minimum thick ness continuous bed of compacted granular material, at the Contractor's option. Precast concrete curb and stone curb, excluding stone traversable sloped curb and Lean Back curb , shall be backed up with concrete using one of the following methods depending on the type of pavement:
609-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 When the curb is set next to a concrete (rigid) pavement, grout conforming to §701 -04 Concrete Repair Material, §701 -12 Concrete Repair Material - High Early Strength, or §705 -21 Masonry Mortar shall be placed in the joint formed between the curb and the pavement. The grout shall extend from the bottom to the top of the pavement slab. Before proceeding with any further work adjacent to the curb, the curb shall be backfilled with material approved by the Engineer and the backfill material shall be thoroughly tamped as per contract documents .
609-3.03 Stone Curb - Bridge Type. The requirements of §609 -3.02 shall apply with the following
modifications:
609-3.04 Cast -In-Place Concrete Curb and Curb & Gutter. Cast-in-place concrete curb and curb &
gutter shall either be conventionally formed or machine formed to the size and shape shown on the Standard Sheets or as indicated in the Contract Documents. If no width is indicated in the Contract Documents, the w idth shall be the minimum shown on the Standard Sheet. Curb anchors, as required on the Standard Sheets or the Contract Documents, shall not be coated with materials which impair bonding. Curb anchors shall be installed a minimum of 12 inches from the ends of a pavement slab. Curb anchors for new concrete pa vement, when placed simultaneously with pavement concrete, shall be placed by equipment which can demonstrate to the satisfaction of the Engineer placement of the anchors in accordance with these specifications. Curb anchors, when not placed simultaneousl y with pavement concrete, shall be placed rigidly secured by chairs or other supports to prevent displacement of the anchors when pavement concrete is placed. Curb anchors for existing concrete pavement shall be inserted into holes drilled in the side of the existing concrete pavement. The holes shall be thoroughly cleaned and filled with Concrete Grouting Material §701 -05 or Anchoring Materials - Chemically Curing §701 -07 immediately before placing the curb anchor. The curb anchor shall be securely suppo rted in position until the grout has hardened. Curing of the curb and curb & gutter shall comply with the requirements of §502 -3.11 Curing, except that a clear membrane curing compound with fugitive dye conforming to the requirements of Membrane Curing Compound §711 -05 may be used in lieu of the white pigmented membrane curing compound.
609-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 2. Casting Segments. Curb and curb & gutter shall be cast in segments having a uniform length of approximately 10 feet. The joints between segments shall not exceed 1/4 inch in width. When curb and curb & gutter is constructed next to concrete pavement, the curb and curb & g utter joints shall line up with the pavement joints or additional joints shall be provided in the curb and curb & gutter which line up with the pavement joints.
609-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 directed by the Engineer. Expansion joints shall not be required at regular intervals unless otherwise shown in the Contract Documents.
609-3.05 Setting Stone Traversable Sloped Curb. Stone traversable sloped curb (TRS) shall be set on
a continuous trapezoidal shaped wedge bed of dry concrete mix, with 12 inches of wet concrete mix at the front base and 6 inches at the back top as shown on the Standard Sheets. Stone traversable curb shall be set such that the front bottom arris line is at the top of pavement and is on a 1 on 3 slope.
609-3.06 Optional Curb. Under Optional Curb, the Contractor shall have the option of placing precast
concrete curb, or cast -in-place concrete curb, or stone curb. Precast concrete curb or stone curb shall be
609-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 placed in accordance with the requirements of §609 -3.02. Cast -in-place curb shall be placed in accordance with the requirements of §609 -3.04. No intermixing of curb will be allowed without the Engineer's written permission. Optional Lean Back Stone Curb shall be at the contractor’s option.
609-3.07 Resetting Curb. Care shall be taken in removing the curb to be reset so that there will be no
unnecessary breakage. All curb damaged in removing, hauling, storing, or resetting shall be replaced by the Contractor. The curb shall be reset, in accordance with the requirements of §609 -3.02 or §609 -3.03 for resetting bridge type curbs, to the lines and grades specified in the Contract Documents.
609-4 METHOD OF MEASUREMENT. All curb and curb & gutter placed , and curb reset under these
specifications will be measured by the number of linear feet, rounded to the nearest foot. The measurement will be taken along the top front arris line of full height, transition and terminal sections. The measurement will be t aken along the top front arris line of curb reveals across driveway entrances only when placed and not removed.
609-5 Basis of Payment
609-5.01 Concrete Curb, Curb & Gutter, Stone Curb, Optional Curb. The unit price bid per foot
shall include the cost of all labor, materials, equipment, curb anchors , saw-cutting and excavation to place, backfill, concrete, grout ing and caulk ing, curb & gutter in accordance with these specifications. When select backfill is specified, the select backfill will be paid under its respective item. No additional payment will be made to the Contractor when more than the minimum width of curb is placed. No additional payment will be made to the Contractor when curb (including bedding) is removed and replaced across driveway entrance s to facilitate concrete machine forming operations .
609-5.02 Stone Curb - Bridge Type. The unit price bid per foot shall include the cost of furnishing all
labor, equipment, and materials including concrete bedding, mortar for stone curbs, chemically curing anchoring materials, and stone curb anchors required to bed and place stone bridge curb, in accordance with these specifications.
609-5.03 Resetting Curb. The unit price bid per foot shall include the cost of furnishing all labor,
equipment, and materials to remove, haul, store and reset curb, in accordance with these specifications. In addition, the unit price shall also include any re -dressing of tops a nd joints of bridge type curb, as directed by the Engineer, and replacement of curb damaged by the Contractor's operations. Payment will be made under: Item No. Item Pay Unit 609.0212 Stone Curb – Near Vertical Face (NVF) Foot 609.0213 Stone Curb - Optional Lean Back (LB) for HMA pavement Foot 609.0214 Stone Curb – Mountable (MT) Foot 609.0215 Stone Curb – Light Duty (LD) Foot 609.0216 Stone Curb – Traversable Sloped (TRS) Foot 609.021 7 Stone Curb – Traversable (TR) Foot 609.0218 Stone Curb – Roundabout (RD) Foot 609.03 01 Stone Curb – Bridge (Type A ) Foot 609.0302 Stone Curb – Bridge (Type F1) Foot 609.035 0 Stone Bridge Curb (As Detailed) Foot 609.04 Cast-in-Place Concrete Curb (As Detailed) Foot 609.04XX Cast-in-Place Concrete Curb (Various Types as indicated) Foot
610-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 609.05 Cast-in-Place Concrete Curb & Gutter (As Detailed) Foot 609.05XX Cast-in-Place Concrete Curb & Gutter (Various Types as indicated) Foot 609.08XX Precast Concrete Curb (Various Types as indicated) Foot 609.0901 Optional Curb (Precast Concrete Type PVF 6 or Cast -In-Place Concrete Type VF 6 or Stone Type NVF ) Foot 609.0902 Optional Curb (Precast Concrete Type PM 4 or Cast -In-Place Concrete Type M 4 or Stone Type MT) Foot 609.0903 Optional Curb (Precast Concrete Type PT 4 or Cast -In-Place Concrete Type T 4) Foot 609.0904 Optional Curb (Precast Type Pm6 Or Cast -In-Place Type M6 ) Foot 609.15 Resetting Existing Curb Foot SECTION 610 - GROUND VEGETATION - PREPARATION, ESTABLISHMENT AND MANAGEMENT
610-1 Description.
610-1.01 Topsoil. This work shall consist of furnishing, screening, storing, stockpiling and placing
topsoil in accordance with the contract documents and as directed by the Engineer.
610-1.02 Preparation of Subsoil for Turf Establishment. This work shall consist of ground preparation
when topsoil is not included in the work prior to establishment of turf in accordance with the contract documents and as directed by the Engineer.
610-1.03 Turf Establishment. The work shall consist of establishing turf, including sowing seeds,
applying initial watering, mulch and mulch anchorage, and initial mowing (as indicated to meet performance criteria) in accordance with the contract documents and as directed by the Engin eer.The work shall consist of ground preparation and establishing turf in accordance with the contract documents and as directed by the Engineer.
610-1.04 Wildflower Seeding. The work shall consist of ground preparation, furnishing and placing
wildflower seeding materials and caring for wildflower areas in accordance with the contract documents and as directed by the Engineer.
610-1.05 Sod. The work shall consist of ground preparation, furnishing, installing and caring for sod in
accordance with the contract documents and as directed by the Engineer.
610-1.06 Soil Amendments. The work consists of furnishing and placing soil amendments in accordance
with the contract documents and as directed by the Engineer.
610-1.07 Compost. The work consists of furnishing, placing and incorporating compost in accordance
with the contract documents and as directed by the Engineer.
610-1.08 Mulch for Planting. The work consists of furnishing and placing mulch, in accordance with
the contract documents and as directed by the Engineer.
610-1.09 Permeable Weed Control Landscape Fabric. The work consists of furnishing and placing
permeable landscape fabric for weed control, in accordance with the contract documents and as directed by the Engineer.
610-1 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
610-1.10 Watering Vegetation. This work shall include watering turf, sod, wildflower seeding, trees,
shrubs, ground covers, vines, other plants, and filling portable drip irrigation systems in accordance with the contract documents and as directed by the Engineer.
610-1.11 Weed Removal. This work shall consist of removal and disposal of all native and non -native
weeds including roots from newly established turf and sod areas, wildflower seeded areas, tree and shrub pits and plant beds in accordance with the contract documents and as dire cted by the Engineer.
610-1.12 Mowing. This work shall consist of mowing newly established seeded or sodded areas
including the removal and disposal of any debris and litter which has accumulated prior to or between mowings, in accordance with the contract documents and as directed by the Eng ineer.
610-1.13 Mowing Limits Markers. This work consists of furnishing and installing mowing limit
markers in accordance with the contract documents and as directed by the Engineer.
610-1.14 Turf Establishment - Performance. This work consists of turf establishment – performance,
including: soil preparation, topsoil, applying soil amendments, sowing seeds, watering, and mowing in accordance with the contract documents and as directed by the Engineer.
610-2 Materials
610-2.01 Topsoil. The materials shall meet the requirements of the following subsections of Section 700
Materials and Manufacturing . Excavated material from earthwork operations defined in Section 203 Excavation and Embankment that is unsuitable for embankments but conforms to §713 -01 Topsoil is acceptable. Topsoil 713-01
610-2.02 Preparation of Subsoil for Turf Establishment. None specified.
610-2.03 Turf Establishment. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Water 712-01 Seeds 713-04 Mulch For Turf Establishment and Erosion Control 713-11 Mulch anchorage 713-12 Straw 713-19
610-2.04 Wildflower Seeding. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Water 712-01 Seeds 713-04 Mulch For Turf Establishment and Erosion Control 713-11 Mulch anchorage 713-12 Straw 713-19
610-2.05 Sod. The materials shall meet the requirements of the following subsections of Section 700
Materials and Manufacturing .
610-2 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Water 712-01 Topsoil 713-01 Sod 713-14
610-2.06 Soil Amendment. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Water 712-01 Limestone 713-02 Fertilizer 713-03 Mycorrhizal Fungi 713-09 Moisture Retention Additive 713-10 Sulfur 713-17
610-2.07 Compost. The materials shall meet the requirements of the following subsections of Section
700 Materials and Manufacturing . Compost 713-15
610-2.08 Mulch for Planting. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Mulch for Planting 713-05
610-2.09 Permeable Weed Control Landscape Fabric. The materials shall meet the requirements of the
following subsections of Section 700 Materials and Manufacturing . Weed Control Barriers 713-18
610-2.10 Watering Vegetation. The materials shall meet the requirements of the following subsections
of Section 700 Materials and Manufacturing . Water 712-01
610-2.11 Weed Removal. None specified.
610-2.12 Mowing. None specified.
610-2.13 Mowing Limits Markers. The materials shall meet the requirements of the following
subsections of Section 700 Materials and Manufacturing . Materials for the Protection of Plants 713-08
610-2.14 Turf Establishment – Performance. The materials shall meet the requirements of the
following subsections of Section 700 Materials and Manufacturing. Water 712-01 Topsoil 713-01 Limestone 713-02 Seeds 713-04 Mulch for Turf Establishment and Erosion Control 713-11
610-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Mulch Anchorage 713-12 Sulfur 713-17 Straw 713-19 With the following exceptions: Topsoil (§713 -01) excludes the following: • B.2. Topsoil – Lawns • B.3. Topsoil – Special Planting Mix • B.4. Topsoil – Acidic • C. Topsoil – Wetlands The seed mix used shall be one of the standard seed mixes described under §713 -04 (A, B, C, or D) . If a desired standard mix is not specified in the contract documents, the Contractor may select which standard mix to use.
610-3 Construction Details
610-3.01 Topsoil.
610-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 D. Topsoil – On-Site Wetland and Wetland Off -Site or Manufactured. The Contractor shall not use topsoil wetlands materials which exhibit the presence of invasive species. Care shall be taken not to impact wetland areas remaining. On-site wetland topsoil stripping shall be completed prior to starting the general excavation in an area. After stripping, on -site wetland topsoil shall be placed within 24 hours or stored within the contract limits at a location approved by the Engineer.
610-3.02 Preparation of Subsoil for Turf Establishment. Prior to establishment of turf in areas that are
not to receive topsoil or other permanent erosion control measures, the Contractor shall remove all loose stones and other objects over 2 inches in size to a 4 inch depth. The Contractor shall mix compost w ith subsoil in accordance with §610 -3.07 B. Turf Establishment With No Topsoil/ On Subsoil within the areas to be seeded and grade the surface so that the completed work shall conform to the specified finished lines and grades. Compost will be paid for separately.
610-3.03 Turf Establishment. The Contractor shall coordinate establishment of turf with other site and
construction activities.
610-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 crop type is indicated. §610 -3.03 A1, D4, F6, and G7 shall apply to nurse crops. Nurse crops are paid for separately and do not have establishment criteria.
610-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 2. Turf Establishment – Lawns. Areas indicated in the contract documents for Turf Establishment – Lawns or other payment items – as indicated in the contract documents - will be accepted for final payment when the specified, established, permanent turf grass species are:
610-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Payment Item Recommended Acceptance Criteria 610.1601 – Turf Establishment – Roadside §610 -3.03 J10. 1A, 3C, or 4D 610.1602 – Turf Establishment – Lawns §610 -3.03 J10. 2B. 610.1603 – Turf Establishment – Restoration/High Traffic Seed Mix §610 -3.03 J10. 1A, 3C, or 4D 610.1604 – Turf Establishment – Salt Tolerant Seed Mix §610 -3.03 J10. 1A, 3C, or 4D 610.1605 – Turf Establishment – Performance §610 -3.14 J10. 8H.
610-3.03 Turf Establishment. The Contractor shall coordinate establishment of turf with other site and
construction activities. The Contractor shall clean all equipment involved in turf establishment to remove plants, seeds and propagules prior to commencement of work. Any work to clean equipment shall be at no additional cost to the State. The Contractor shall apply the seed mix at one and one half to two times the manufacturer’s recommended rate. Any method of sowing that does not injure the seeds and achieves even coverage in the process of spreading will be acceptable. The Contractor shall perform the initial watering and shall spread straw uniformly in a continuous blanket to hide the soil from view or mulch Types I – V as specified in the contract documents. Rolled Erosion Control products shall be installed according to manufacturer’s recommendations and paid for separately. Mulch anchorage shall be applied. The Contractor shall water, mow, and weed the turf establishment areas for the duration of the contract or until turf areas are accepted. Watering, mowing, and weeding to care for the turf will be paid for separately. Any work required to correct initial seeding (installation) shall be done at no additional cost to the State.
610-3.04 Wildflower Seeding. The Contractor shall clean all equipment involved in wildflower seeding
to remove plants, seeds and propagules prior to commencement of work at no additional cost to the State.
610-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 The Contractor shall install wildflower seeding materials in accordance with the contract documents. Any method of sowing that does not injure the seeds and provides soil contact in the process of spreading will be acceptable. The Contractor shall apply the seed mix at twice the seed supplier’s recommended rate. The Contractor shall perform the initial watering and spread straw or mulch Types I – V as specified in the contract documents, uniformly at a rate consistent with seed supplier recommendations. Mulch anchorage is required unless otherwise specified in the contract documents. Wildflower seeding areas will be accepted after the seeding operation is complete. Any work required to correct initial seeding (installation) shall be do ne at no additional cost to the State. The Contractor shall water the wildflower seeding areas for the duration of the contract. Watering to care for the wildflower seeding areas will be paid for separately.
610-3.05 Sod. The Contractor shall generally place sod during the seasons identified in Table 610 -1
Sodding Seasons . The Contractor may request extension of seasons, provided the other conditions are met. TABLE 610 -1 SODDING SEASONS Geographic locations Spring Fall R1-Essex, Warren (north of towns of Bolton & Warrensburg), R2-Hamilton, Herkimer (towns of Ohio and Webb) R7-Lewis, St. Lawrence, Franklin, Clinton, Jefferson (east of Rte 81) 4/15-6/30 8/15-10/15 R1– Greene, Rensselaer, Schenectady, Saratoga, Washington, Albany, Warren (towns of Bolton & Warrensburg & south) R2- Montgomery, Fulton, Oneida, Madison, Herkimer (south of town of Ohio) R3,6,9 – All counties R7- Jefferson (west of Route 81) 4/1-6/15 8/15-10/31 R4, 5 & 8 - All counties 4/1 – 5/31 8/15 – 10/31 R10, 11 - All counties 3/1-4/30 8/21-11/15 The subgrade of areas to be sodded shall be excavated and firmed to a sufficient depth below the finished grade of the sod to accommodate the tamped or rolled thickness of topsoil and sod. No frozen sod shall be placed nor shall sod be placed on frozen gro und surface. The Contractor shall exercise care to retain the soil existing on the roots of the sod during transporting, handling and transplanting operations. Sod shall be placed on a minimum of 3 inches of moist topsoil. The topsoil will be paid for separately. The finished sod soil surface shall be flush with surface of the adjacent soil and adjacent structures. It shall meet the finished grades as shown in the contract documents. Sod will be accepted when:
610-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
610-3.06 Soil Amendments. The Contractor shall place, apply or incorporate fertilizer, limestone,
mycorrhizal fungi, sulfur and/or moisture retention additive where shown in the contract documents. When mycorrhizal fungi are specified, application rates for turf shall ensure an even distribution of 100,000 propagules minimum per acre for drill seeding and 1,000,000 propagules minimum per acre for hydroseeding. Application rates for planting and Tree Root Zone Treatment, as well as any other aspects of distributing and/or incorporating mycorrhizal fungi, shall be in accordance with the manufacturer’s recommendations. All other amendments shall be mixed with topsoil prior to placing, spread evenly over the surface of turf, wildflower or sod areas, applied within shrub saucers or applied over the plant beds as appropriate, at the rates recommended by the manufacturer or as specified in the contract documents. The method of application shall ensure an even distribution. When hydraulic application is used, the minimum rate of water application shall be in accordance with manufacturer’s recommendation. Trees shall be fertilized using Method No. 1, No. 2 or No. 3 in accordance with the contract documents.
610-3.07 Compost.
610-3 08
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 610-3.08 Mulch for Planting. The Contractor shall apply mulch consisting of wood chips, pine nuggets or shredded bark to the surface of the beds and tree pit areas in accordance with the contract documents. The Contractor shall apply mulch to a uniform depth of 3 inches over the sh rub bed and tree pit areas and 2 inches over groundcover beds. The mulch shall be distributed so as to create a smooth, level cover over the exposed soil. Mulch shall not cover plants or be in contact with tree root flare, tre e trunks, and plant stems.
610-3.09 Permeable Weed Control Landscape Fabric. Areas where landscape fabric is to be installed
shall be smooth, firm, stable and free of rocks, clods, foliage, roots, trash, debris or other material that will prevent the matting from lying in direct contact with the soil surface. The landscape fabric shall be placed where shown in the contract documents and as required by the manufacturer.
610-3.10 Watering Vegetation. The Contractor shall provide water without damage to plants, mulch,
stakes, plant saucers, sod, or other areas to be watered. Damage resulting from watering operations shall be repaired at no additional cost to the State. Watering shall be applied in accordance with §610 -3.03 Turf Establishment , §610 -3.04 Wildflower Seeding , §610 -3.05 Sod, or §611 -3.01 General . Watering for existing vegetation shall be as specified in the contract documents. Watering shall be applied at the following rates:
610-3.10 Watering Vegetation. The Contractor shall provide water without damage to plants, mulch,
stakes, plant saucers, sod or other areas to be watered. Damage resulting from watering operations shall be repaired at no additional cost to the State. Watering shall be applied in accordance with §610 -3.03 Turf Establishment , §610 -3.04 Wildflower Seeding , §610 -3.05 Sod or §611 -3.01 General . Watering for existing vegetation shall be as specified in the contract documents. Watering shall be applied at the following rates:
610-3 11
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
610-3.11 Weed Removal. The Contractor shall perform weed removal in accordance with the contract
documents. The Contractor shall remove and dispose of weeds including roots prior to flowering and seed formation by manual, chemical or mechanical means. Any method of weed remova l that leaves live roots in the soil will not be permitted. An appropriately licensed applicator is required for chemical weed control methods. The Contractor shall ensure the preservation of desirable vegetation. Treatment and remov al of invasive species will be paid for separately.
610-3.12 Mowing. The schedule may be modified to accommodate prevailing or forecast weather
conditions. The Contractor shall be responsible, prior to each mowing, for the removal and disposal of any debris and litter which has accumulated since the last mowing. Care shall be taken to avoid damage to existing plant materials.
610-3.13 Mowing Limits Markers. The Contractor shall install mowing limit markers plumb to a depth
in accordance with the manufacturer’s instruction.
610-3.14 Turf Establishment – Performance. Shall be §610 -3.03 Turf Establishment, with the
following exceptions.
610-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 a. not thinly or sparsely establishment, resulting in bare ground greater than one foot in diameter.
610-4 Method of Measurement
610-4.01 Topsoil. The quantity to be measured for payment will be in cubic yards of each type of topsoil
measured to the nearest whole cubic yard of topsoil placed, from payment lines shown in the contract documents. Cross sectioning, for the purpose of determining quantities for payment, will be employed only where payment lines are not shown on the Plans and cannot be reasonably established by the Engineer.
610-4.02 Preparation of Subsoil for Turf Establishment. The quantity to be measured for payment
will be in square yards on slope to the nearest whole square yard of subsoil area prepared for turf establishment.
610-4.03 Turf Establishment. The work will be measured as the number of square yards on slope to the
nearest whole square yard on slope of turf established. For Turf Establishment – Nurse Crops, the work will be measured as the number of square yards on slope to the nearest whole square yard on slope of nurse crop sown.
610-4.03 Turf Establishment. The quantity to be measured for payment will be in square yards on slope
to the nearest whole square yard of turf established.
610-4.04 Wildflower Seeding. The quantity to be measured for payment will be in square yards on slope
to the nearest whole square yard of wildflower seeding.
610-4.05 Sod. The quantity to be measured for payment will be in square yards on slope to the nearest
whole square yard of sod placed.
610-4.06 Soil Amendments. The quantity to be measured for payment will be in pounds to the nearest
whole pound or in gallons to the nearest whole gallon of soil amendments (fertilizer, limestone, mycorrhizal fungi, sulfur and/or moisture retention additive) applied.
610-4.07 Compost. The quantity to be measured for payment will be in cubic yards to the nearest whole
cubic yard of compost placed or incorporated.
610-4.08 Mulch for Planting. The quantity to be measured for payment will be in cubic yards to the
nearest whole cubic yard of mulch placed.
610-4.09 Permeable Weed Control Landscape Fabric. The quantity to be measured for payment will
be in square yards on slope to the nearest whole square yard.
610-4 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 610-4.10 Watering Vegetation. The quantity to be measured for payment will be in 1000 gallons (MGal) to the nearest MGal of water applied, determined from approved measuring devices, or by measurement in tanks or containers of known capacity.
610-4.11 Weed Removal. The quantity to be measured for payment will be in square yards on slope
weeded per occurrence to the nearest whole square yard.
610-4.12 Mowing. The quantity to be measured for payment will be the number of square yards on slope
mowed per occurrence to the nearest whole square yard.
610-4.13 Mowing Limits Markers. The quantity to be measured for payment will be by the number of
complete markers satisfactorily installed.
610-4.14 Turf Establishment – Performance. The work will be measured as the number of square
yards on slope to the nearest whole square yard on slope of turf established - performance.
610-5 Basis of Payment
610-5.01 Topsoil. The unit price bid shall include the cost of all labor, materials and equipment
necessary to satisfactorily complete the work, including the handling, storing, stockpiling, and placement.
610-5.02 Preparation of Subsoil for Turf Establishment. The unit price bid shall include the cost of all
labor, materials and equipment necessary to satisfactorily complete the work
610-5.03 Turf Establishment.
The unit price bid per square yard on slope for turf establishment shall include the cost of all labor, materials and equipment as necessary to satisfactorily complete the work. Except as noted below, a progress payment – in an amount not to exceed forty percent (40%) of the unit price bid - for work satisfactorily performed may be paid after the seed has been sown, and the initial watering and mulch application have been complete d. The final payment of sixty percent (60%) of the unit price bid may be paid once the acceptance criteria have been met. No progress payments will be assessed for nurse crops, which are paid in full upon acceptance of sowing. The unit price bid shall include the cost of all labor, materials and equipment including initial water, mulch and mulch anchorage as necessary to satisfactorily complete the work.
610-5.04 Wildflower Seeding. The unit price bid shall include the cost of all labor, materials and
equipment including initial water, mulch and mulch anchorage necessary to satisfactorily complete the work.
610-5.05 Sod. The unit price bid shall include the cost of all labor, materials and equipment including
initial water, necessary to complete the work. Topsoil bed placed under the sod shall be paid for separately.
610-5.06 Soil Amendments. The unit price bid shall include the cost of all labor, materials and
equipment necessary to satisfactorily complete the work, including water for hydraulic application.
610-5.07 Compost. The unit price bid shall include the cost of all labor, materials and equipment
necessary to satisfactorily complete the work
610-5 08
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 610-5.08 Mulch for Planting. The unit price bid shall include the cost of all labor, materials and equipment necessary to satisfactorily complete the work.
610-5.09 Permeable Weed Control Landscape Fabric. The unit price bid shall include the cost of all
labor, materials, and equipment necessary to satisfactorily complete the work.
610-5.10 Watering Vegetation. The unit price bid shall include the cost of all labor, materials and
equipment necessary to satisfactorily complete the work.
610-5.11 Weed Removal. The unit price bid shall include the cost of labor, materials, and equipment
necessary to satisfactorily complete the work.
610-5.12 Mowing. The unit price bid shall include the cost of all labor, materials, and equipment
necessary to satisfactorily complete the work.
610-5.13 Mowing Limits Markers. The unit price bid shall include the cost of all labor, materials, and
equipment necessary to satisfactorily complete the work.
610-5.14 Turf Establishment – Performance. The unit price bid per square yard on slope for turf
establishment – performance shall include the cost of all labor, materials and equipment as necessary to satisfactorily complete the work. A progress payment - in an amount not to exceed forty percent (40%) of the unit price bid - for work satisfactorily performed may be paid after the seed has been sown, and the initial watering and mulch applications have been completed. The final payment of sixty percent (60%) of the unit price bid may be paid once the acceptance criteria have been met. Payment will be made under: Item No Item Pay Unit 610.0501 Fertilizer Pound 610.0502 Fertilizer Gallon 610.06 Limestone Pound 610.0701 Mycorrhizal Fungi Pound 610.0702 Mycorrhizal Fungi Gallon 610.08 Moisture Retention Additive Pound 610.0901 Sulfur Pound 610.0902 Sulfur Gallon 610.10 Compost Cubic Yard 610.1101 Mulch for Planting Type A, B & D Wood Chips and Shredded Bark Cubic Yard 610.1102 Mulch for Planting Type C – USDA -APHIS Protocol Wood Chips Cubic Yard 610.1103 Mulch for Planting Type E – Pine Nugget Cubic Yard 610.1201 Permeable Weed Control Landscape Fabric Squar e Yard 610.1202 Permeable Weed Control Landscape Fabric with Herbicide Square Yard 610.13 Weed Removal Square Yard 610.1401 Topsoil – Reuse On -Site Materials Cubic Yard 610.1402 Topsoil - Roadside Cubic Yard 610.1403 Topsoil - Lawns Cubic Yard 610.1404 Topsoil - Special Planting Mix Cubic Yard 610.1405 Topsoil – Acidic Cubic Yard 610.1406 Topsoil – On-Site Wetland Materials Cubic Yard 610.1407 Topsoil – Wetland Materials Cubic Yard
611-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 610.15 Preparation of Subsoil for Turf Establishment Square Yard 610.1601 Turf Establishment - Roadside Square Yard 610.1602 Turf Establishment -Lawns Square Yard 610.1603 Turf Establishment – Restoration/High Traffic Square Yard 610.1604 Turf Establishment – Salt Tolerant Square Yard 610.1605 Turf Establishment – Performance Square Yard 610.1606 Turf Establishment – Nurse Crops Square Yard 610.17 Wildflower Seeding Square Yard 610.18 Sodding Square Yard 610.19 Watering Vegetation 1,000 Gallons 610.1901 Watering Vegetation – As Specified 1,000 Gallons 610.21 Mowing Square Yard 610.22 Mowing Limits Markers Each SECTION 611 - PLANTING, TRANSPLANTING AND POST PLANTING CARE
611-1 Description .
611-1.01 General. Vacant
611-1.02 Planting. This work consists of furnishing, and planting trees, shrubs, vines, groundcovers and
other plants in accordance with the contract documents and as directed by the Engineer.
611-1.03 Transplanting. This work consists of transplanting existing plants from existing locations to
new locations in accordance with the contract documents and as directed by the Engineer.
611-1.04 Portable Drip Irrigation System. This work shall consist of furnishing, delivering, placing
and removing Portable Drip Irrigation System (PDIS) for watering around newly planted trees and other vegetation in accordance with the contract documents and as directed by the Engineer.
611-1.05 Post-Planting Care. This work consists of the care of newly planted and transplanted trees,
shrubs, vines, groundcovers and other plants in accordance with the contract documents and as directed by the Engineer.
611-1.06 Rodent Guards. This work shall consist of furnishing, delivering and placing rodent guards
around newly planted trees and other vegetation in accordance with the contract documents and as directed by the Engineer.
611-2 Materials
611-2.01 General . Materials shall meet the requirements of the following subsections of Section 700
Materials and Manufacturing . Water 712-01 Topsoil 713-01 Mulch for Landscape Bedding 713-05 Materials for the Protection of Plants 713-08 Compost 713-15
611-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 611-2.02 Planting. Trees, shrubs, vines, groundcovers and other plants shall be as specified under '§713-06 and as further specified in the contract documents.
611-2.03 Transplanting . Plants shall be existing plants in accordance with §'713-06.
611-2.04 Portable Drip Irrigation System. The materials shall meet the requirements of the following
subsections of Section 700 Materials and Manufacturing. Materials may be new or previously used that meet the following material requirements. Materials for the Protection of Plants 713-08
611-2.05 Post Planting Care. Materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Pesticides 713-13
611-2.06 Rodent Guards. Materials shall meet the requirements of the following subsections of Section
700 Materials and Manufacturing . Materials for the Protection of Plants 713-08
611-3 Construction
611-3.01 General. Locations for plants shall be as specified in the contract documents. All plants for
planting and transplanting shall be protected from damage and drying out, including during transportation, handling or while in temporary storage. No planting or trans planting shall be done when the soil is frozen, saturated (except in wetland conditions) or otherwise in an unsatisfactory condition for working. Planting seasons represent average times of suitable conditions between weather extremes. In general, planting or transplanting shall occur during these seasons. The Contractor may request an extension of the planting seasons. TABLE 611 -1 PLANTING SEASONS Planting Seasons Spring Fall Geographic locations (NYSDOT Regions and Counties) Deciduous & Evergreen B&B Deciduous & Evergreen Container Grown Evergreen B&B Deciduous B&B Deciduous & Evergreen Container Grown (USDA 3b -4a) R1- Essex, Warren (north of towns of Warrensburg & Bolton) R2-Hamilton, Herkimer (towns of Ohio & Webb) R7-Lewis, St. Lawrence, Franklin, Clinton, Jefferson (east of Route 81) 4/15-5/31 4/15-5/31 8/15-9/30 9/15-10/31 8/15 - 10/31 (USDA 4a -5a) R1–Greene, Rensselaer, Schenectady, Saratoga, Washington, Albany, 4/1-5/15 4/1 – 5/31 8/15-9/30 9/15-11/15 8/15-11/15
611-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Warren (towns of Bolton & Warrensburg & south) R2- Montgomery, Fulton, Oneida, Madison, Herkimer (south of town of Ohio) R3,6,9 – All counties R7- Jefferson (west of Route 81) (USDA 5a -6a) R4, 5 & 8 - All counties 3/15-5/15 3/15 – 5/31 8/15-10/15 9/15-11/30 8/15-11/30 (USDA 6b -7a) R10, 11 - All counties 3/1-5/15 3/1 – 5/31 8/15-10/31 10/1-12/15 8/15-12/15 All Locations Bare Root stock shall be planted while dormant Locations for plants and outlines of areas to be planted shall be staked or marked out on the ground by the Contractor and approved by the Engineer before any plant pits or plant beds are dug. Where non - movable underground obstructions are encountered, the plant pits shall be relocated as approved by the Engineer. Existing vegetation shall be removed from all new planting beds. Where an impervious layer of soil (hardpan, fragipan and soils with greater than 20% clay content) is encountered during the excavation of plant pits or beds, all such soil shall be removed up to a depth of one foot beyond required plant pit depth in orde r to provide adequate drainage for the plant. The pits or beds shall be backfilled with topsoil. Any additional excavation required to properly plant or transplant in impervious soils will be considered extra work. Planting soil shall be unamended existing soil excavated from the plant pit unless otherwise specified. Watering shall accompany backfilling of plant. The Contractor shall perform the initial watering for backfilling plant so that no voids occur in the plant pit. No tree shall be staked, guyed or anchored unless otherwise specified in the contract documents. Mulch shall Type A or B unless otherwise specified in the contract documents and shall be placed at the time of planting or transplanting. The Contractor shall water, weed and maintain mulch at no cost to the state until the newly planted or transplanted material is accepted. Plants will be accepted when all specified plants meet the following conditions:
611-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 611-3.02 Planting. The Contractor shall notify the Engineer at least four calendar days before intended delivery of plants or planting materials to the site. The Contractor shall furnish the Engineer legible copies of the certificates of inspection of plant materials and do cumentation for each shipment showing point of origin, sizes, scientific names, quantities, and kinds of materials supplied. Planting shall be in accordance with ANSI A300 Part 1, 2 and 3 Standard Practices . Pruning at the time of planting shall be limited to the removal of dead, conflicting and broken branches; and to other pruning consistent with good horticultural practice in accordance with ANSI A300 Part 1 Standard Practices .
611-3.03 Transplanting. Transplanting shall be in accordance with ANSI A300 Part 1, 2, 3 and 6
Standard Practices and accomplished by a digging method intended to preserve the root system intact to the extent practicable. Planting soil shall be unamended existing soil excavated from the plant pit unless otherwise specified. Transplanted stock shall be pruned prior to transplanting in accordance with ANSI A300 Part 1 Standard Practices . The Contractor shall take appropriate measures to avoid damage to plant during the transplanting operation including:
611-3.04 Portable Drip Irrigation System (PDIS). After the requirements for planting under Section
611 Planting, Transplanting and Post Planting Care are completed; the Contractor shall supply and install the required number and size of PDIS as recommended by the manufacturer for the trees planted. Watering shall be performed as required in Section 610 -3.09 Watering Vegetation and paid for separately. All PDIS that are damaged and or missing shall be replaced at no added cost to the State. The Contractor shall remove PDIS in the fall prior to the first frost. The PDIS shall remain the property of the Contractor.
611-3.05 Post-Planting Care. If specified, the Contractor shall care for planting as needed for one year
following the satisfactory completion of all of the planting and/or transplanting or for the duration of the contract, which ever is later. The contractor shall prepare and submit a post -planting care work schedule for approval. Post-planting care shall consist of:
611-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 D. Pruning (ANSI A300 Part 1) - once to prune dead or damaged branches.
611-3.06 Rodent Guards. Vacant
611-4 Method of Measurement.
611-4.01 Planting. The quantity to be measured for payment will be the number of plants placed.
611-4.02 Transplanting. The quantity to be measured for payment will be the number of plants placed.
611-4.03 Portable Drip Irrigation System (PDIS). The quantity of PDIS to be measured for payment
will be the number of PDIS placed. The quantity of Removal of Portable Drip Irrigation System to be measured for payment will be the number of PDIS removed.
611-4.04 Post-Planting Care. The quantity to be measured for payment will be the number of plants
cared for or nearest whole square yard on slope of plants cared for.
611-4.05 Rodent Guards. The quantity to be measured for payment will be the number of rodent guards
placed.
611-5 Basis of Payment.
611-5.01 Planting. The unit price bid for each plant shall include the cost of all labor, materials, and
equipment, including initial watering and mulch, compost, plants and plant protection materials and topsoil necessary to satisfactorily complete the work.
611-5.02 Transplanting. The unit price bid for each plant shall include the cost of all labor, materials,
and equipment, including initial watering, mulch, compost, plant and plant protection materials and topsoil necessary to satisfactorily complete the work.
611-5.03 Portable Drip Irrigation System. The unit price bid shall include the cost of all labor,
materials, and equipment, necessary to satisfactorily complete the work.
611-5.04 Post-Planting Care. The unit price bid for each plant shall include the cost of all labor,
materials, and equipment necessary to satisfactorily complete the work. Progress payments for work satisfactorily performed may be paid at the mid point of the post -planting care in a mounts not to exceed forty percent (40%) of the unit price bid for the respective work.
611-5.05 Rodent Guards. The unit price bid shall include the cost of all labor, materials, and equipment,
necessary to satisfactorily complete the work. Payment will be made under: Item No. Item Pay Unit 611.011x Planting - Major Deciduous Trees – size as specified Each 611.012x Planting - Major Deciduous Trees – 1 ¼ inch Caliper Each
611-5 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 611.013x Planting - Major Deciduous Trees – 1 ½ inch Caliper Each 611.014x Planting - Major Deciduous Trees – 1 ¾ inch Caliper Each 611.015x Planting - Major Deciduous Trees – 2 inch Caliper Each 611.016x Planting - Major Deciduous Trees – 2 ½ inch Caliper Each 611.017x Planting - Major Deciduous Trees – 3 inch Caliper Each 611.018x Planting - Major Deciduous Trees – 3 ½ inch Caliper Each 611.019x Planting - Major Deciduous Trees – 4 inch Caliper Each 611.021x Planting - Minor Deciduous Trees – size as specified Each 611.022x Planting - Minor Deciduous Trees – 3 foot height Each 611.023x Planting - Minor Deciduous Trees – 4 foot height Each 611.024x Planting - Minor Deciduous Trees – 5 foot height Each 611.025x Planting - Minor Deciduous Trees – ¾ inch Caliper Each 611.026x Planting - Minor Deciduous Trees – 1 inch Caliper Each 611.027x Planting - Minor Deciduous Trees – 1 ¼ inch Caliper Each 611.028x Planting - Minor Deciduous Trees – 1 ½ inch Caliper Each 611.029x Planting - Minor Deciduous Trees – 1 ¾ inch Caliper Each 611.020x Planting - Minor Deciduous Trees – 2 inch Caliper Each 611.031x Planting - Coniferous Trees – size as specified Each 611.032x Planting - Coniferous Trees – 2 ½ foot height Each 611.033x Planting - Coniferous Trees – 3 foot height Each 611.034x Planting - Coniferous Trees – 4 foot height Each 611.035x Planting - Coniferous Trees – 5 foot height Each 611.036x Planting - Coniferous Trees – 6 foot height Each 611.037x Planting - Coniferous Trees – 7 foot height Each 611.038x Planting - Coniferous Trees – 8 foot height Each 611.039x Planting - Coniferous Trees – 9 foot height Each 611.041x Planting - Deciduous Shrubs –As Specified Each 611.042x Planting - Deciduous Shrubs – 15 inch Height/Spread Each 611.043x Planting - Deciduous Shrubs – 18 inch Height/Spread Each 611.044x Planting - Deciduous Shrubs – 2 foot Height/Spread Each 611.045x Planting - Deciduous Shrubs – 3 foot Height/Spread Each 611.046x Planting - Deciduous Shrubs – 4 foot Height/Spread Each 611.047x Planting - Deciduous Shrubs – 5 foot Height/Spread Each 611.048x Planting - Deciduous Shrubs – 6foot Height/Spread Each 611.051x Planting - Evergreen Shrubs – As Specified Each 611.052x Planting - Evergreen Shrubs – 15 inch Height/Spread Each 611.053x Planting - Evergreen Shrubs – 18 inch Height/Spread Each 611.054x Planting - Evergreen Shrubs – 2 foot Height/Spread Each 611.055x Planting - Evergreen Shrubs – 2 ½ foot Height/Spread Each 611.056x Planting - Evergreen Shrubs – 3 foot Height/Spread Each 611.057x Planting - Evergreen Shrubs – 3 ½ foot Height/Spread Each 611.058x Planting - Evergreen Shrubs – 4 foot Height/Spread Each 611.059x Planting - Evergreen Shrubs – 5 foot Height/Spread Each x= Root Specification 1= Ball & Burlap, Field Potted or Field Boxed, 2 = Container or Box Grown, 3 = Bare Root, 4 = In Ground Fabric Bag Grown 611.061y Planting – Vines, Groundcovers – As Specified Each 611.062y Planting – Vines, Groundcovers – Number SP3 Container Each 611.063y Planting – Vines, Groundcovers – Number SP4 Container Each
613-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 611.064y Planting – Vines, Groundcovers – Number SP5 Container Each 611.065y Planting – Vines, Groundcovers – Number 1 Container Each 611.066y Planting – Vines, Groundcovers – Number 2 Container Each 611.071y Planting - Herbaceous Plants – As Specified Each 611.072y Planting - Herbaceous Plants – Number SP4 Container Each 611.073y Planting - Herbaceous Plants – Number SP5 Container Each 611.074y Planting - Herbaceous Plants – Number 1 Container Each 611.075y Planting - Herbaceous Plants – Number 2 Container Each y = Type Specification 1 = Container Grown, 2 = Bare Root 3 = Field Potted, 611.10 Transplanting 0 to 48 inch in height Each 611.11 Transplanting over 48 inch to 72 inches in height Each 611.12 Transplanting, over ¾ inch to 3 inches Diameter at Breast Height Each 611.13 Transplanting, over 3 inches to 6 inches Diameter at Breast Height Each 611.14 Transplanting over 6 inches to 12 inches Diameter at Breast Height Each 611.15 Transplanting Vines, Groundcovers, Each 611.16 Transplanting Herbaceous Plants Each 611.17 Portable Drip Irrigation System Each 611.18 Removal of Portable Drip Irrigation System Each 611.19 Post-Planting Care Each 611.20 Post-Planting Care Square yard 611.21 Rodent Guard Each Refer to the Contract Proposal for full item number and full description SECTION 612 (VACANT) SECTION 613 - WILDLIFE AND ECOLOGY
613-1 Description .
613-1.01 Terrestrial Habitat. This w ork shall consist of the protection, preservation, restoration and
management of terrestrial habitat.
613-1.02 Aquatic Habitat. This w ork shall consist of the protection, preservation, restoration and
management of aquatic habitat.
613-1.04 Wetlands. This w ork shall consist of the protection, preservation, restoration and management
of wetlands.
613-1.06 Streams and Riparian Zones. This w ork shall consist of the protection, preservation,
restoration and management of rivers, streams and riparian zones.
613-2 MATERIALS. As specified in the special specifications.
613-3 CONSTRUCTION DETAILS. As specified in the special specifications.
613-4 METHOD OF MEASUREMENT. As specified in the special specifications.
614-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 613-5 BASIS OF PAYMENT. As specified in the special specifications. SECTION 614 - PRUNING, IMPROVING AND REMOVING EXISTING VEGETATION
614-1 Description .
614-1.01 Pruning Existing Trees. This work shall consist of pruning existing trees as shown in the
contract documents and as directed by the Engineer.
614-1.02 Improvement of Vegetated Areas. This work shall consist of cutting, disposing of all wood
and debris, stump removal, or mechanical or chemical treatment of specified trees and woody vegetation within the area shown in the contract documents and as directed by the Engineer.
614-1.03 Tree Removal. The work shall consist of felling trees over 4 inch in diameter at breast height,
disposing of all wood and debris, and may require topping, stump removal and other work as shown in the contract documents and as directed by the Engineer.
614-1.04 Existing Stump Removal. The work shall consist of removing existing stumps, disposing of all
wood and debris, as shown in the contract documents and as directed by the Engineer.
614-1.05 Tree Root Zone Treatment (Vertical Mulching/Aeration). This work shall consist of treating
the root zone of trees through aeration and/or mulching of the roots as shown in the contract documents and as directed by the Engineer.
614-1.06 Tree Root Pruning. This work shall consist of cleanly pruning, existing tree roots severed
during construction operations, typically related to linear excavation, as shown in the contract documents and as directed by the Engineer.
614-2 Materials
614-2.01 Pruning Existing Trees. The materials shall meet the requirements of the following
subsections of Section 700 Materials and Manufacturing . Water 712-01
614-2.02 Improvement of Vegetated Areas. The materials shall meet the requirements of the following
subsections of Section 700 Materials and Manufacturing . Topsoil 713-01 Pesticides 713-13
614-2.03 Tree Removal. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Topsoil 713-01
614-2.04 Existing Stump Removal. The materials shall meet the requirements of the following
subsections of Section 700 Materials and Manufacturing . Topsoil 713-01
614-2.05 Tree Root Zone Treatment (Vertical Mulching/Aeration). The materials shall meet the
requirements of the following subsections of Section 700 Materials and Manufacturing . Mortar Sand 703-03
614-2 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Mycorrhizal Fungi 713-09 Compost 713-15
614-2.06 Tree Root Pruning. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Water 712-01
614-3 Construction Details
614-3.01 Pruning Existing Trees
614-3.02 Improvement of Vegetated Areas. All trees and shrubs specified for removal will be
designated by the Engineer either by separate marking, marking in sample areas, or otherwise. Unless otherwise specified, all stumps shall be cut to a height of about 6 inches above the ground. Unless otherwise specified, an approved herbicide shall be applied to all live stumps in accordance with the manufacturer's recommendations. An approved dye shall be added to the herbicide mixture to identify treated stumps a nd stubble. Where stump removal is specified, all stump holes shall be backfilled with topsoil, unless otherwise specified in the contract documents, and backfill shall be compacted. Unless otherwise specified in the contract documents, grass shall be est ablished on stump holes and will be paid for separately. Care shall be taken in the felling of trees and the operation of equipment to prevent injury to trees and shrubs which are to be preserved. All injuries to the limbs, bark and roots of such plants shall be repaired in accordance with ANSI A300 Part 1 Standard Practices Pruning and ANSI Z133.1 Arboricultural Operations Safety. Improvement of vegetated areas shall be completed in any area before any planting, seeding or other landscape work is begun in that area unless otherwise approved. All wood, stumps, brush and other debris resulting from the work shall be disposed of as specified in Section 201 Clearing and Grubbing .
614-3.03 Tree Removal. No tree shown in the contract documents or listed for removal shall be cut until
it is approved by the Engineer. The contractor shall be responsible to coordinate all work involving utilities with the respective utility company. All trees shall be topped and limbed before felling unless
614-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 otherwise approved. All injuries to the limbs, bark and roots of plants to remain shall be repaired in accordance with ANSI A300 Standard Practices Pruning and ANSI Z133.1 Arboricultural Operations Safety . The Contractor shall field measure all trees at 4 ½ feet above the ground, commonly referred to as Diameter Breast Height (DBH) before they are cut. Stumps of trees removed under this item for removal shall be grubbed, cut, ground to the depth of six inches below grade or as specified in the contract documents. All stump holes shall be backfilled with topsoil, unless otherwise specified in the contract documents and backfill shall be compacted. Unless otherwise specified in the contract documents, grass shall be established on stump holes and will be paid for separately.
614-3.04 Existing Stump Removal. Existing stumps listed for removal in the contract documents shall
be ground to the depth of 6 inches below grade unless otherwise specified in the contract documents. Stumps shall include all visible wood and roots. Backfill to finished grade with topso il, unless otherwise specified in the contract documents. The backfill shall be compacted. Unless otherwise specified in the contract documents, grass shall be established on stump holes and will be paid for separately.
614-3.05 Tree Root Zone Treatment (Vertical Mulching/Aeration). Locations of work shall include
areas within the dripline or wider root zone of existing trees to be preserved as shown on the contract documents . Appropriate drilling tools shall be used for drilling of holes for root zone restoration. Drilling equipment shall be hand held or light weight devices (no heavy machinery) so as to avoid further impact to tree roots through compaction. Holes shall be drilled and existing soil removed within a zone beginning 3 feet from the trunk of the specified tree and extending to its dripline on an approximately 2 foot x 2 foot grid. Dimensions of holes or drill size shall be approximately 2 inches i n diameter and a minimum of 12 inches deep. Efforts should be made to minimize drilling through large tree roots (especially near the trunk). When woody roots are encountered, the drill hole shall be moved to avoid root damage. The hole shall be completely filled to original grade as follows:
614-3.06 Tree Root Pruning. Existing tree roots greater than 1 inch in diameter, measured at the edge of
excavation, shall be pruned within 24 hours of the time they have been damaged by construction activity. The severed root shall be pruned at the edge of excavation, or 1 inch bey ond the entire damaged portion of the tree root if damaged root extends beyond the edge of excavation into undisturbed soil. Pruning shall be in accordance with ANSI A300 Part 1 Standard Practices Pruning and ANSI Z133.1 Arboricultural Operations Safety . All cuts shall be cleanly made with sharp tools. The cutting surfaces of all tools, ladders, ropes, soles of workers shoes and other objects coming into contact with the tree roots shall be washed with a disinfectant at the start of any work on a tree to pr event the spread of plant diseases.
614-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 The excavated area around the existing tree roots shall be backfilled as soon as construction activities permit with the specified or approved materials. If the excavated area around the existing tree roots is not backfilled within 24 hours, all roots sha ll be kept moist, to prevent dessication.
614-4 Method of Measurement
614-4.01 Pruning Existing Trees. The quantity to be measured for payment will be the number of trees
pruned.
614-4.02 Improvement of Vegetated Areas. The quantity to be measured for payment will be in square
yards measured to the nearest whole square yard of area improved.
614-4.03 Tree Removal. The quantity to be measured for payment will be the number of trees, including
their stumps if specified.
614-4.04 Pre-Existing Stump Removal. The quantity to be measured for payment will be the number of
pre-existing stumps removed.
614-4.05 Tree Root Zone Treatment (Vertical Mulching/Aeration). The quantity to be measured for
payment will be in square yards treated within the zone, measured to the nearest square yard.
614-4.06 Tree Root Pruning. The quantity to be measured for payment will be in feet to the nearest
whole foot, along excavation line.
614-5 Basis of Payment
614-5.01 Pruning Existing Trees. The unit price bid shall include the cost of labor, materials, and
equipment necessary to satisfactorily complete the work.
614-5.02 Improvement of Vegetated Areas. The unit price bid shall include the cost of labor, materials,
and equipment necessary to satisfactorily complete the work.
614-5.03 Tree Removal. The unit price bid shall include the cost of labor, materials, and equipment
necessary to satisfactorily complete the work. When trees are specified in the contract documents for removal, payment for each tree removal will include removal of the stump.
614-5.04 Existing Stump Removal. The unit price bid shall include the cost of labor, materials, and
equipment necessary to satisfactorily complete the work.
614-5.05 Tree Root Zone Treatment. The unit price bid shall include the cost of labor, materials,
equipment and incidentals necessary to complete the work. Mycorrhizal Fungi and mulch will be paid for separately.
614-5.06 Tree Root Pruning. The unit price bid shall include the cost of labor, materials, equipment and
incidentals necessary to complete the work. Payment will be made under: Item No. Item Pay Unit 614.0411 Care of Trees up to 12” Diam. at Breast Height – Pruning Each
614-5 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 614.0421 Care of Trees Over 12” to 24” Diam. at Breast Height - Pruning Each 614.0431 Care of Trees Over 24” to 36” Diam. at Breast Height - Pruning Each 614.0441 Care of Trees Over 36” to 48” Diam. at Breast Height – Pruning Each 614.0451 Care of Trees Over 48” to 60” Diam. at Breast Height – Pruning Each 614.0461 Care of Trees Over 60” Diam. at Breast Height – Pruning Each 614.05 Improvement of Vegetated Areas Square Yard 614.0601nn Tree Removal Over 4” to 6” Diam. Breast Height Each 614.0602nn Tree Removal Over 6” to 12” at Breast Height Each 614.0603nn Tree Removal Over 12” to 18” at Breast Height Each 614.0604nn Tree Removal Over 18” to 24” at Breast Height Each 614.0605nn Tree Removal Over 24” to 36” at Breast Height Each 614.0606nn Tree Removal Over 36” to 48” at Breast Height Each 614.0607nn Tree Removal Over 48” to 60” at Breast Height Each 614.0608nn Tree Removal Over 60” to 72” at Breast Height Each nn = Stump Treatment 01 = Stumps Cut to Above Grade , 02 = Stumps Cut Flush , 03 = Stumps Cut to Below Grade , 04 = Stumps Grubbed 614.0701 Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade Each 614.0702 Pre-Existing Stump Removal over 24” to 48” diameter at 6 inches above grade Each 614.0703 Pre-Existing Stump Removal over 48” diameter at 6 inches above grade Each 614.08 Tree Root Zone Treatment (Vertical Mulching/Aeration) Square Yard 614.09 Tree Root Pruning Feet SECTION 615 - LANDSCAPE APPURTENANCES
615-1 DESCRIPTION. The work in this section shall include all work required for furnishing, placing,
and/or special construction of landscape appurtenances.
615-2 MATERIALS. As specified in the special specifications.
615-3 CONSTRUCTION DETAILS. As specified in the special specifications.
615-4 METHOD OF MEASUREMENT. As specified in the special specifications.
615-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 616 - SOIL BIOENGINEERING
616-1 DESCRIPTION . This section shall include work required for soil bioengineering
616-2 MATERIALS. As specified in the special specifications.
616-3 CONSTRUCTION DETAILS. As specified in the special specifications.
616-4 METHOD OF MEASUREMENT. As specified in the special specifications.
616-5 BASIS OF PAYMENT. As specified in the special specifications.
619-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 SECTION 617 - INVASIVE SPECIES MANAGEMENT
617-1 DESCRIPTION . This work shall consist of the control, eradication and management of invasive
species.
617-2 MATERIALS. As specified in the special specifications.
617-3 CONSTRUCTION DETAILS. As specified in the special specifications.
617-4 METHOD OF MEASUREMENT. As specified in the special specifications.
617-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 618 (VACANT) SECTION 619 - WORK ZONE TRAFFIC CONTROL (Last Revised May , 2023)
619-1 Description
619-1.01 General. Work zone traffic control shall consist of all work necessary to provide for the safe
and efficient movement of traffic through or around work zones, and to protect workers and the public from damage to person and property which may result, directly or indirectly, from any construction work. Work zone traffic control shall be completed under the direction of a trained, competent person, as shown in the contract documents, the MUTCD and as directed by the Engineer. The duration of this work shall be from the date any work is started on the contract site, including mobilization of equipment, signs, offices, and shops until the date of contract final acceptance. Temporary materials and components that are furnished by the Contractor shall remain the property of the Contractor. See Figures 619 -1A and 619 -1B Component Parts of a Typical Highway Work Zone for definitions of terms. Work shall be categorized based on the following work durations:
619-1 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
619-1.02 Basic Work Zone Traffic Control. Work shall consist of controlling traffic over a reasonably
smooth traveled way which shall be marked by signs, delineators, channelizing devices, pavement markings, and other devices as shown in the contract documents or as directed by the Engineer. Work after sunset and before sunrise shall include additional requirements for nighttime operations including, but not limited to, a written plan for nighttime operations, additional worker and equipment protection, additional channelizing devices and contract site patrol. The Contractor shall conduct its operations to ensure the safety and convenience of travelers and abutting property owners as well as the safety of all workers on the contract. Travelers include, but may not be limited to motorists, motorcyclists, bicyclists, and pedestrians. Work shall be scheduled to keep the time and distance that existing pavement is removed or substantially disturbed to a minimum and consistent with the physical requirements of the contract. Unless otherwise indicated in the contract documents, the distance over which traffic is maintained on an unpaved surface shall not exceed 1/2 mile at any one time. During seasonal shutdown periods, no part of the highway shall be closed to traffic unless provided for in the contract documents, or the Contractor has submitted , and the Engineer has approved a detailed schedule of operations reflecting a proposal to close the highway to traffic. Basic work zone traffic control shall include the following:
619-1 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
619-1 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 L. Flagging and Traffic Control. Work shall consist of furnishing the necessary traffic control equipment and flaggers for adequate traffic control. Portable traffic signal systems authorized by the Engineer may be utilized only on a highway designated as a Restricted Highway.
619-1.03 Basic Work Zone Traffic Control (Daily Operations). Work shall consist of controlling and
protecting traffic during a single work shift as shown in the contract documents, or as directed by the Engineer. The Contractor will not be required to repair or maintain the surface of the traveled way and other roadway features not part of the work, except to repair damage resulting from the Contractor’s operations.
619-1.04 Temporary Business Signs. Work shall consist of furnishing, installing, moving, covering,
maintaining, and removing temporary business signs as shown in the contract documents or as directed by the Engineer.
619-1.05 Covering or Removal of Pavement Markings. Work shall consist of removing or covering
existing permanent pavement markings, interim pavement markings, and temporary pavement markings including, but not limited to: edge lines, lane lines, center lines, crosswalks, stop bars, arrows, symbols, and dia gonal markings in gores and medians as shown in the contract documents or as directed by the Engineer.
619-1.06 Temporary Pavement Markings. Work shall consist of furnishing and applying temporary
pavement markings as shown in the contract documents or as directed by the Engineer. The work for removable pavement tape, removable wet -night reflective tape, temporary overlay markers and removable raised pavement markers shall include removal. Temporary pavement markings are intended for use on any new pavement or milled surface until the subsequent course is placed or interim pavement markings or final pavement markings are installed .
619-1.07 Interim Pavement Markings. Work shall consist of furnishing, applying, and maintaining,
interim pavement markings as shown in the contract documents or as directed by the Engineer. Interim pavement markings are intended for use in diversions, temporary pavement realignments and crossovers, lane shifts and closures, and other traf fic patterns associated with construction activities. Interim pavement markings are intended for use for a given phase or season, for a maximum of 1 year.
619-1.08 Temporary Rumble Strips. Work shall consist of installing, maintaining, and removing
temporary rumble strips at the locations shown in the contract documents or as directed by the Engineer.
619-1.09 Interim Tubular Markers. Work shall consist of furnishing, installing, moving, and
maintaining interim tubular markers attached to the pavement as shown in the contract documents or as directed by the Engineer. Interim tubular markers are typically used for 2 -way, 2 -lane freeway w ork zones and long -term closures where available width is limited.
619-1.10 Portable Variable Message Signs (PVMS) and Truck Mounted Variable Message Signs
(TMVMS).
619-1 11
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 A. Portable Variable Message Signs (PVMS). Work shall consist of furnishing, installing, operating, maintaining, relocating, and removing PVMS as shown in the contract documents or as directed by the Engineer. PVMS with a pay unit of each shall be provided for the duration of the contract at the general locations specified in the contract documents and in accordance with the Special Note Requirements for Portable Variable Message Signs (PVMS). PVMS with a pay unit of weeks shall be provided at general locat ions and durations in accordance with the Special Note Requirements for Portable Variable Message Signs (PVMS) and the contract documents. PVMS are intended to supplement other traffic control devices by displaying symbolic or word messages but are not to be used alone to replace conventional traffic control devices.
619-1.11 Type III Construction Barricades. Work shall consist of furnishing, installing, moving,
maintaining, and removing Type III construction barricades, with warning lights where specified, as shown in the contract documents or as directed by the Engineer.
619-1.12 Temporary Positive Barrier. Work shall consist of furnishing, installing, moving, maintaining,
and removing approved temporary positive barrier (concrete or steel), including barrier warning lights and transitions to and from guide rail where specified, as shown in the contract documents or as directed by the Engineer.
619-1.13 Temporary Glare Screen. Work shall consist of furnishing, installing, moving, maintaining,
and removing glare screen mounted on a concrete barrier as shown in the contract documents or as directed by the Engineer.
619-1.14 Temporary Impact Attenuator. Work shall consist of furnishing, installing, maintaining,
repairing, moving, and removing temporary impact attenuators as shown in the contract documents or as directed by the Engineer.
619-1.15 Temporary Sand Barrel Arrays. Work shall consist of furnishing, installing, maintaining,
relocating, and removing temporary sand barrel arrays as shown in the contract documents or as directed by the Engineer.
619-1.16 Vehicle Arresting Barrier. Work shall consist of providing vehicle arresting barriers (net -type)
and their anchorages as shown on the Standard Sheets to prevent errant vehicles from entering a closed work area as shown in the contract documents or as directed by the Engineer.
619-1.17 Maintain or Modify Traffic Signal Equipment. Work shall consist of modifying or
maintaining in proper operation, existing, relocated, modified, or newly installed traffic signals as shown in the contract documents or as directed by the Engineer.
619-1.18 Temporary Traffic Signals. Work shall consist of furnishing, installing, moving, maintaining,
and removing temporary traffic signals and necessary components as shown in the contract documents or
619-1 19
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 as directed by the Engineer. Temporary signals shall be installed only on a highway designated as a Restricted Highway.
619-1.19 Nighttime Operations. Work shall consist of developing a Nighttime Operations and Lighting
Plan; furnishing, installing, operating, maintaining, moving, and removing lighting equipment for nighttime construction operations; constructing devices and adapting equipment to be comp atible with lighting equipment; and furnishing nighttime safety apparel and devices as shown in the contract documents or as directed by the Engineer. Balloon lights, or equivalent lighting, shall be used on nighttime moving operations and are defined as a light source inside a translucent material that produces a low-glare, 360 -degree, diffuse light.
619-1.20 Traffic Control Supervisor. Work shall consist of providing a full -time traffic control
supervisor having adequate training, experience, and authority to implement and maintain all traffic control operations, as shown in the contract documents or as directed by the Engineer.
619-1.21 Temporary Structures and Approaches. Work shall consist of designing, constructing,
maintaining, inspecting, relocating, and removing temporary structures, their approaches and any required appurtenances at the location(s) shown in the contract documents.
619-1.22 Pavement Patching. Work shall consist of providing and installing pavement patching
materials to maintain pavements open to traffic in acceptable condition as shown in the contract documents or as directed by the Engineer.
619-1.23 Mailboxes. Work shall consist of relocating or replacing postal route mailboxes and/or mailbox
supports consistent with U.S. Postal Service requirements, as shown in the contract documents or as directed by the Engineer.
619-1.24 Portable Temporary Rumble Strips. Work shall consist of furnishing, installing, maintaining,
and removing Portable Temporary Rumble Strip (PTRS) Arrays in accordance with the contract documents and as directed by the Engineer.
619-1.25 Automated Flagger Assistance Devices (AFAD). Work shall consist of furnishing, installing,
maintaining, and removing Automated Flagger Assistance Devices (AFAD) in accordance with the contract documents and as directed by the Engineer.
619-1 25
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 FIGURE 619-1A COMPONENT PARTS OF A TYPICAL HIGHWAY WORK ZONE WITH PROTECTIVE VEHICLE
619-1 25
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 FIGURE 619 -1B COMPONENT PARTS OF A TYPICAL HIGHWAY WORK ZONE WITHOUT PROTECTIVE VEHICLE
619-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 619.2 MATERIALS.
619-2.01 General. All materials used shall comply with the requirements of the following subsections of
Section 700 Materials and Manufacturing , or as established by this section, the applicable Standard Sheets, and the contract documents. Concrete Grouting and Anchoring Material 701-05 Precast Concrete Barrier 704-05 Epoxy Polysulfide Grout 721-03 Traffic Signal Heads 724-04 Removable Raised Pavement Markers 727-02 Epoxy Paint 727-03 Permanent Pavement Tape 727-04 Glass Beads for Pavement Markings 727-05 Removable Pavement Tape 727-06 Removable Wet-Night Reflective Tape 727-07 Permanent Wet-Night Reflective Tape 727-08 Traffic Paint 727-09 Drums 729-01 Cones 729-02 Temporary Tubular Markers 729-03 Vertical Panels 729-04 Stop/Slow Paddles 729-05 Type III Construction Barricades 729-08 Temporary Sign Supports 729-09 Temporary Impact Attenuators - Redirective 729-10 Temporary Impact Attenuators - Gating 729-11 Truck -Mounted and Trailer Mounted Impact Attenuators 729-12 Temporary Sand Barrels 729-13 Vehicle Arresting Systems 729-14 Arrow Panels 729-15 Portable Variable -Message Signs 729-16 Temporary Glare Screens 729-17 Warning Lights 729-18 Automated Flagging Assistance Devices 729-19 Portable Traffic Signals 729-20 Temporary Overlay Markers 729-21 Truck Mounted Variable Message Signs 729-22 Aluminum Sign Panels 730-01 Temporary Plywood Sign Panels 730-02 Temporary Rigid Lightweight Sign Panels 730-03 Retro -Reflective Sign Sheeting 730-05 Temporary Wooden Sign Posts 730-19 Stiffeners, Overhead Brackets and Miscellaneous Hardware 730-22 Fiberglass Reinforced Plastic Sign Panels 730-23 Type A Sign Supports 730-24 Type B Sign Posts 730-25 Note: Signs and panels supplied before March 1, 2023, may be fabricated with NYSDOT approved ASTM D4956 Type III/IV and/or IX retro -reflective sign sheeting based on the sign type.
619-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 619-2.02 Basic Work Zone Traffic Control.
619-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 1. TMIAs manufactured after December 31, 2019 shall be Manual for Assessing Safety Hardware (MASH) compliant.
619-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 a. Rigid Sign Panels. Rigid sign panels shall be aluminum, fiberglass, plywood, or lightweight plastic. All construction sign faces on rigid panels shall conform to §730 -05 Retro -Reflective Sign Sheeting NYSDOT Class A sheeting. Characters including letters, numerals, route shi elds, symbols, logos, and borders shall conform to §645 -2.02 Sign Panels -
619-2 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 N. Contract Site Patrol . (None Specified)
619-2.03 Basic Work Zone Traffic Control (Daily Operations). (None Specified)
619-2.04 Temporary Business Signs . Temporary business signs shall conform to the MUTCD. Sign
panels shall be in accordance with 619 -2.02H.1. Sign Panels, except that the panels shall be white on a blue background. Supplemental arrows, as required, shall be white on a blue background (M5 -1 to M6 -2). Temporary business signs shall be mounted on temporary sign supports .
619-2.05 Covering or Removal of Pavement Markings . Tape used to cover existing pavement
markings shall be non -reflective, pavement marking masking tape, substantially similar in color to the pavement surface, in accordance with §727 -06 Removable Pavement Tape.
619-2.06 Temporary Pavement Markings . Temporary pavement markings shall consist of removable
raised pavement markers in accordance with §727 -02 Removable Raised Pavement Markers, or removable pavement tape in accordance with §727 -06 Removable Pavement Tape , or removable wet-night reflective tape in accordance with §727 -07 Removable Wet -Night Reflective Tape , or traffic paint in accordance with §727 -09 Traffic Paint and §727 -05 Glass Beads for Pavement Markings, or temporary overlay markers in accordance with §729 -21 Temporary Overlay Markers.
619-2.07 Interim Pavement Markings . Interim pavement markings shall consist of traffic paint in
accordance with §727 -09 Traffic Paint and §727 -05 Glass Beads for Pavement Markings , epoxy paint in accordance with §727 -03 Epoxy Paint and §727 -05 Glass Beads for Pavement Markings , removable pavement tape in accordance with §727 -06 Removable Pavement Tape , removable wet-night reflective tape in accordance with §727 -07 Removable Wet -Night Reflective Tape. Interim pavement markings shall be supplemented, where specified, with removable raised pavement markers in accordance with §727 -02 Removable Raised Pavement Markers.
619-2.08 Temporary Rumble Strips.
619-2 09
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 F. Removing Temporary Rumble Strips. Rumble strip depressions shall be filled in with a 6.3 or a 9.5 asphalt pavement meeting the requirements of Section 40 4, Asphalt Pavements.
619-2.09 Interim Tubular Markers. Interim tubular markers shall be in accordance with §729 -03
Temporary Tubular Markers .
619-2.10 Portable Variable -Message Signs (PVMS) & Truck Mounted Variable Message Signs
(TMVMS). Portable Variable -Message Signs shall be in accordance with §729 -16 Portable Variable - Message Signs (PVMS) . Truck Mounted Variable Message Signs (TMVMS) shall be in accordance with §729 -22 Truck Mounted Variable Message Signs. When a TMVMS is used as an arrow board, it shall comply with 729-15 Arrow Panels .
619-2.11 Type III Construction Barricades. Type III construction barricades shall be fabricated in
accordance with §729 -08 Type III Construction Barricades . All barricades used at night shall be equipped with warning lights in accordance with §729 -18 Warning Lights .
619-2.12 Temporary Positive Barrier. Temporary positive barrier segments shall be precast concrete
units in accordance with the Standard Sheets or steel or concrete barrier meeting the approved Materials Details of the products on the Department’s Approved List. All temporary positive barrier supplied after January 1, 2015, shall be produced in accordance with the requirements of §704 -05 Precast Concrete Barrier and shall have a legible permanent marking. Temporary positive barrier supplied prior to January 1, 2015, which was not produced in accordance with the requirements of §704 -05 Precast Concrete Barrier, shall be material certified in accordance with specific Standard Sheets or Materials Details used for fabrication. Warning lights for temporary barrier shall be in accordance with §729 -18 Warning Lights. Where warning lights are not required, temporary barrier segments shall be delineated using reflective panels covered with §730 -05 Retro -Reflective Sign Sheeting NYSDO T Class A sheeting, approximately 3 x 6 inch, having a minimum area of 18 square inches. Where warning lights are required, barrier need not be delineated with panels. Reflective pavement marking material applied to the face of the barrier shall not, by itself, be considered acceptable delineation. Where transitions between Temporary Positive Barrier and box beam are required, the box beam shall be in accordance with the requirements of §710 -21 Box Beam Guide Railing and Median Barrier. Where required, the Transition End Pieces shall be precast concrete units in accordance with the Standard Sheets and shall be produced in accordance with the requirements of §704 -05 Precast Concrete Barrier with a legible permanent marking. Where transitions between Temporary Concrete Barrier and Corrugated Beam are required, the corrugated beam shall be in accordance with the requirements of §710 -20 Corrugated Beam Guide Railing and Median Barrier
619-2.13 Temporary Glare Screen. Temporary glare screen shall be in accordance with §729 -17
Temporary Glare Screens .
619-2.14 Temporary Impact Attenuator. Temporary impact attenuators shall be in accordance with
§729 -10 Temporary Impact Attenuators - Redirective or §729 -11 Temporary Impact Attenuators - Gating.
619-2.15 Temporary Sand Barrel Arrays. Temporary sand barrels shall meet the requirements of
§729 -13 Temporary Sand Barrels . Sand fill shall meet the material requirements of §703 -06 Cushion Sand or §733 -15 Sand Backfill . Deicing material shall meet the requirements of §712 -03 Sodium Chloride .
619-2.16 Vehicle Arresting Barrier (VAB). Vehicle arresting barriers shall meet the requirements of
§729 -14 Vehicle Arresting Systems . Portland Cement Concrete used for bases shall be Class A or C, in
619-2 17
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 accordance with §501 Portland Cement Concrete – General, except that requirements for automated batching shall not apply.
619-2.17 Maintain or Modify Traffic Signal Equipment. All traffic signal hardware, including but not
limited to wire, cable, conduit, pull boxes, switch packs, modules and relays, detectors, signal heads, poles, and pedestrian push buttons used to maintain proper operation, shall meet the applicable requirements of §680 Traffic Signals . Materials which will be permanently incorporated into the work shall be in accordance with §680 Traffic Signals .
619-2.18 Temporary Traffic Signals. Equipment for temporary traffic signals shall meet the
requirements of Section §680 Traffic Signals , except that used equipment in good operating condition may be furnished, and for which material certifications are not required. All span wire, inductance -loop wire, shielded lead -in cable, traffic signal cable, and other wire used for temporary traffic signals shall be new material. Portable traffic signals shall be in accordance with §729 -20 Portable Traffic Signals . All other equipment for temporary traffic signals shall meet the requirements of §680 Traffic Signals except for the following modifications:
619-2.19 Nighttime Operations. (None Specified)
619-2.20 Traffic Control Supervisor . (None Specified)
619-2.21 Temporary Structures and Approaches . When specific details and materials are shown in the
contract documents for temporary structures and approaches, substitutions or alterations may be permitted if approved by Deputy Chief Engineer (Structures) (DCES). When specific materials are not shown in the contract documents, the Contractor shall assume all liability and responsibility for certifying that all materials required to complete the work conform to the AASHTO Standard Specifications for Highway Bridges or NYSDOT Load and Resistance Factor Design (LRFD) Bridge Design Specifications or NYSDOT Standard Specification, Construction and Materials, unless otherwise approved by the DCES. If the Contractor proposes to fabricate/construct the temporary structure with used materials, the Contractor shall include with his submittal for the temporary structure, documentation that all primary member material meets the physical properties required by the design. In the absence of record plans, or other valid material certification for the used materials, physical testing shall be performed. The type of physical testing and the results of the testing shall be documented and submitted with the design computations. Excluded from the documentation and testing of physical properties provision are proprietary structures.
619-2 22
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Used material shall not be furnished for fracture -critical members. Mill certifications shall be provided for all fracture critical material. Excluded from these fracture -critical provisions are pedestrian and pre-engineered (fabricated) proprietary structures .
619-2.22 Pavement Patching . In general, asphalt is suitable for all pavement surfaces. During winter
months when asphalt mixture is not available, a bituminous cold-patch material shall be used.
619-2.23 Mailboxes . Materials used shall meet the requirements of the U.S. Postal Service.
619-2.24 Portable Temporary Rumble Strips (PTRS ). PTRS material shall consist of thermoset cast
urethane, engineered polymers, or rubber materials and shall be manufactured for use at temperatures from 0 to 180°F. PTRSs shall be able to withstand vehicles up to 80,000 pounds with minimal dislocation or lateral movement. PTRSs shall be less than one inch in height and consist of a single segment or multiple interlocking sections. Each PTRS shall be capable of being installed without adhesives or bolts. The face of PTRS shall have a non -slip textured surface. PTRS shall be black in color.
619-3 Construction Details
619-3.01 General . The Contractor shall designate a work zone traffic control competent person who has
the primary responsibility and sufficient authority for implementing the work zone traffic control plan and other safety and mobility aspects as necessary. The Contractor’s work zone traffic control competent person shall be appropriately experienced and adequately trained in traffic control operations by recog nized training programs, including the American Traffic Safety Services Association (ATSSA) “Traffic Control Supervisor”, the National Safety Council, unions, or construction industry associations, or by an individual instructor from such a program in acco rdance with the level of decisions that the individual will be required to make, reflecting current industry practices and Department requirements. The Contractor shall generally maintain a traveled way suitable for moving traffic, in accordance with the contract documents and ensure construction equipment, vehicles, and materials are safely stored beyond the clear zone or behind protective barrier du ring non -working hours so as not to constitute a hazard to vehicles, bicycles and pedestrians. Construction operations shall be conducted to ensure a minimum of delay to traffic. Stopping traffic for more than 5 minutes shall not be permitted unless specif ically authorized in the contract documents or in writing by the Engineer. All operations shall be carried out in a manner that provides workers with safe access to the worksite and protects workers, pedestrians, and bicyclists from moving traffic. If the work zone affects the movement of pedestrians, pedestrian access and walkways shall be provided. If the work zone affects an accessible and detectable pedestrian facility, the accessibility and detectability shall be maintained along the alternate pedestri an route. The work zone traffic control competent person shall routinely inspect all work zone traffic control equipment and devices to make sure they are in a safe operating condition in accordance with §619 -3.02N Contract Site Patrol . Unless otherwise noted, temporary items supplied in accordance with this section shall remain the property of the Contractor. Where pedestrians are not prohibited from the street or highway, pedestrian traffic shall be maintained to allow their safe passage as shown in the contract documents. Where sidewalks, walkways, or shoulders must be temporarily closed to facilitate constru ction operations, safe pedestrian passage shall be maintained on at least one side of the roadway at all times, unless other temporary pedestrian accommodations are provided in the contract documents or are approved by the Engineer. Where pedestrian access is prohibited, workers shall not cross or enter travel lanes open to traffic . The requirements in this section refer to posted speed limits. If prevailing or operating speeds for a highway exceed the preconstruction posted limits, the contract documents may direct the Contractor to assume that the preconstruction posted speed limits are different than posted.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 619-3.02 Basic Work Zone Traffic Control . The Contractor shall control traffic so that a person who has no knowledge of conditions may safely and with a minimum of discomfort and inconvenience ride, drive, or walk, day or night, over all or any portion of the highway and/or structure under constru ction where traffic is to be maintained. The Contractor shall cease operations and restore the traveled way to safe operating condition during any specific periods listed in the contract documents, at such times as traffic renders conditions unsafe to continue work, and during periods of darkness (before sunrise or after sunset), fog, snow or rain, high winds, or other inclement weather that renders conditions unsafe to continue work, for either the traveling public or the workers. The Engineer will determine when traffic or weather conditions ren der work operations unsafe.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 For expressways where the posted speed limit is 45 mph or higher, the Contractor shall not leave milled or grooved pavement for more than 7 calendar days before placement of the next pavement course. The Contractor shall keep the traveled way, sidewalks, and walkways free of construction materials and foreign objects that fall from vehicles or equipment. Materials spilled by, dropped from, or tracked by traffic or by any vehicle used in the Contractor’s operations along or across any public traveled way shall be removed immediately. The Contractor shall keep all surface drainage facilities operative at all times. Positive drainage shall be provided at all times, even during grading operations and periods of accumulated plowed snow, to adequately drain the traveled way and the remainder of the right -of-way areas. Maintaining positive drainage shall include cleaning of drainage grates on roadway pavements. Cleaning of drainage structures and drainage pipes of material not deposited due to the Contractor’s operations will be paid for separately. Repair of drainage structures will be paid for separately. Dust control measures shall be applied to control dust resulting from traffic on unpaved surfaces and from Contractor operations on or adjacent to the roadway. Dust control shall be adequate to prevent dust which hinders driver visibility, or which creates a nuisance condition for property owners and residents adjacent to the contract. Dusty conditions resulting from the Contractor’s operations may be corrected by the use of calcium chloride and/or water. If used, water shall be distributed uniformly using a suitable spray head or spray bar. TABLE 619-1 REQUIRED TREATMENT FOR TRANSVERSE BUMPS Height of Bump (in) Anticipated Exposure Time (Calendar Days) Posted Speed ≤ 45 mph Posted Speed > 45 mph 1 to 6 ≤ 7 6:1 10:1 > 7 15:1 30:1
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 pedestrian facilities, temporary sidewalks or walkways, or alternate paths. Where a sidewalk is closed, it shall be marked with a Type III construction barricade and a SIDEWALK CLOSED (R9 -9) sign. Advance warning signs and directional guidance shall be provided to direct pedestrians to alternate paths and crosswalks and to alert motorists. Where bus service is maintained, the Contractor shall provide suitable areas or locations for the loading and unloading of passengers. Potentially hazardous areas adjacent to sidewalks, walkways, or other areas used by pedestrians shall be protected to prevent pedestrian intrusion in accordance with §107 -05F. Restricted Areas . Open sidewalks and walkways shall be maintained and kept smooth and free from holes, obstructions, and tripping hazards. Surfaces shall consist of pavement, firmly compacted granular material, or other surfaces noted in the contract documents or approved by the Engineer. The width of the temporary facility shall match that of the existing facility where practicable. When it is not possible to meet the minimum width of 5 ft. for the entire length of the facility, a 5 ft. by 5 ft. passing space should be prov ided every 200 ft. Construction materials, vehicles, equipment, debris, temporary sign supports, or other materials shall not be placed or stored on open sidewalks or walkways unless expressly shown in the contract documents or approved by the Engineer. Where bicycles are not prohibited from the highway, adequate accommodations for bicyclists shall be maintained in the travel lanes, on the shoulder, or on alternate paths or facilities.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 pedestrian traffic is maintained, unless a temporary barrier is installed, or other means are used to ensure that vehicles, bicyclists, and pedestrians are not exposed to the unprotected edge of a bridge. During non -work hours when traffic is being maintained on the facility, all temporary ends (free ends) of guide rail, median barrier and bridge rail shall be temporarily terminated and marked with a channelizing drum or object marker equipped with a Type A flashing warning light. Corrugated beam guide rail and median barrier, and heavy -post, blocked -out, corrugated beam guide rail and median barrier shall be temporarily terminated by having the exposed ends (free ends) dropped to the ground and pinned. The approach ends of box beam guide rail, median barrier and bridge rail shall be temporarily terminated with box beam guide rail end assemblies utilizing two splice plates and the proper number of bolts per connection. No posts for anchorages will be required. Special temporary splice plates are required to adapt box beam guide rail end assemblies to box beam median barriers. During any overnight period when existing guide rail or median barrier is temporarily removed, the Contractor shall install channelizing devices in the location where the guide rail or median barrier was removed in accordance with §619 -3.02J.6. Removed Existing Guide Rail or Median Barrier .
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 a. More Than One Hour Operation. Barrier vehicles used in a stationary operation that occupies a location for more than one hour should be unoccupied . The u noccupied vehicle shall be positioned parallel to traffic, parking brake set, placed in 2nd gear (Manual transmissions /engine off) or Park / Neutral (Automatic transmissions) and have the front wheels aligned with the lane striping and lane to maintain la ne discipline and to stay in lane if struck. ba. One Hour or Less Operation. Barrier vehicles used in a stationary operation that occupies a location for one hour or less shall be occupied . For an occupied vehicle, the operator shall remain in the vehicle with the safety belt and headrest properly adjusted, parking brake set whenever possible, keep the wheels aligned with the lane striping and lane to maintain lane discipline and to stay in lane if struck. cb. Use of Protective Vehicle Light (PVL) as a Barrier Vehicle. The use of a Protective Vehicle Light (PVL) as a Barrier Vehicle(s) is limited to Non -freeway roadways where the posted speed limit is ≤ 40 mph. dc. Use of Protective Vehicle Heavy (PVH) as a Barrier Vehicle. The use of a Protective Vehicle Heavy (PVH) as a Barrier Vehicle(s) is appropriate on all roadway types. A Protective Vehicle Heavy (PVH) shall be used on roadways with a posted speed limit ≥ 45 mph. Barrier vehicles shall be moved, if necessary, as the work progresses. The roll ahead distance (distance a vehicle is located in advance of the first workers or hazard) shall be based on Table
011-04 Roll Ahead Distance for Protective Vehicles as shown on Standard Sheet 619 -011.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 covered or removed when they no longer indicate actual conditions. The Contractor shall provide measures to protect workers during placement and removal of construction signs adequate for the prevailing speed, volume of traffic and roadway geometry where the work is to occur. Such protection may include, but is not limited to, the use of flaggers, spotters, and shadow vehicles equipped with truck -mounted or trailer mounted attenuators. Where pedestrian access is prohibited, workers shall not cross or enter travel lanes open to traffic. All signs shall be kept clean, mounted at the required height on acceptable supports, and installed in the proper position, alignment, and orientation so as to give maximum visibility. Construction signs will be evaluated for acceptability in accordance with the American Traffic Safety Services Association (ATSSA) Quality Guidelines for Work Zone Traffic Control Devices . When auxiliary panels are mounted above or below a warning or regulatory sign, they shall not cover any part of the warning or regulatory sign. Signs shall be placed so that each sign is visible at night, at the desired distance, without being obscured b y another sign, existing features on the highway, or foliage. The faces of stored signs shall not be visible to traffic in any direction, regardless of the orientation of the sign.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 mounting. Rigid sign panels shall have a minimum mounting height of 5 feet, or a minimum mounting height of 7 feet, where pedestrians or parked vehicles are present. For signs incorporating an auxiliary panel below the primary panel, the minimum mounting heights shall be 4 feet and 6 feet, respectively. For pedestrian, regulatory, and guide signs the minimum mounting height shall be 4 feet. Flexible panel and lightweight rigid panel signs shall be mounted at the same height as rigid panel signs, except they may be mounted, when approved by the Engineer, as low as 1 foot when all the following conditions are met:
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 5. Special Use Work Zone Signs. Special use work zone signs shall be installed in accordance with the contract documents. Reduced regulatory speed limits in work zones shall be posted in accordance with contract documents with SPEED LIMIT signs (R2 -1) supplemented with WORK ZONE plaques (G20 - 5aP) of the same width mounted above the speed limit signs. The work zone plaques shall be placed on the same post and as the speed limit signs. REDUCED SPEED LIMIT AHEAD sign(s) (W3-5) shall be posted in advance of the first speed limit sign reducing the speed limit in a work zone. All reduced regulatory speed limit signs shall be installed on both sides of expressways and freeways. When traffic is reduced to a single lane, reduced regulatory speed limit signs should be installed only on the right side of the highway. Reduced regulatory speed limit signs shall be placed within the work zone activity area at a maximum spacing of ½ mile. Reduced regulatory speed limit signs shall be completely covered or removed, and preconstruction posted speed limit signs shall be uncovered or replaced, after a work zone activity area is restored. A work zone plaque shall not be mounted above preconstruction posted speed limit signs within a work zone. The END WORK ZONE SPEED LIMIT signs (R2 -12) or the preconstruction posted speed limit sign (R2 -1) shall be posted 100 ft beyond the end of a work zone activity area having a reduced regulatory speed limit. An END HIGHER FINES sign (R2 -11) shall be placed 200 feet beyond the END WORK ZONE SPEED LIMIT sign. If the regulatory speed is maintained throughout the work activity area, an END ROAD WORK (G20 -2) sign shall be placed a minimum of 80’ and a maximum of 400’ past the end of the downstream taper. For short, intermediate, and long term operations, and where shown in the contract documents, the Contractor shall install BE PREPARED TO STOP (W3 -4) signs to inform oncoming traffic of potential stopped, queued or very slow conditions. Each BE PREPARED TO STOP sign shall be mounted on a temporary sign support. For approaches on expressways and freeways with three lanes or more, both sides of the approach shall be signed unless the median is too narrow to fit the sign and the support. When used for a short or intermediate term operation, the BE PREPARED TO STOP (W3-4) sign shall be placed halfway between the first two advance warning signs. A PVMS may be used to supplement but not replace the required sign. For long term operations, the BE PREPARED TO STOP signs shall be posted approximately ½ mile in advance of the anticipated end of the queue. If the end of the queue is beyond the sign, the sign location shall be adjusted for the subsequent work day until the desired advance warning reflects typical conditions for that location. If the resulting adjustment places the sign in advance of the first warning sign, the Contractor shall also furnish and place a ROAD WORK (W20 -1) sign approximately 1,000 feet in advance of the BE PREPARED TO STOP signs. XX miles is the total expected length of work to be completed within a work day. A supplement distance plaque W7 -3a NEXT XX MILES shall be used with the first advance warning sign when the distance between the advance warning signs and the work area becomes greater than 2 miles as a result of the following situations:
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 G20- 1 sign shall be placed every two miles indicating the distance to the farthest work location.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Channelizing device application is summarized in Table 619 -2A Channelizing Device Application for Short -Term Stationary Work Zones and Table 619 -2B Channelizing Device Application for Intermediate -Term and Long -Term Stationary Work Zones . Where permitted, the Contractor may opt to substitute interim tubular markers or Type III construction barricades for other channelizing devices at no additional cost to the State.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 4. Roadway Intersections and Commercial Driveway Radii. The Contractor shall use drums, or extra tall cones to delineate roadway intersections and commercial driveways. The Contractor may also use standard cones, tall cones, and temporary tubular markers for short term work zones during daylight hours only. The spacing between channelizing devices shall not exceed 6 feet. Reduced spacing near roadway intersections and commercial driveways may be necessary to provide clear guidance. Vertical panels oversized vertical panels, and Type III barricades shall not be used. A non -signalized intersecting roadway shall be delineated by a new series of channelizing devices, and the series will start with one drum equipped with a Type A flashing warning light, placed along the primary roadway after the intersection.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 TABLE 619 -2A CHANNELIZING DEVICE APPLICATION FOR SHORT -TERM STATIONARY WORK ZONES Maximum Device Spacing (center to center) MUTCD compliant Channelizing Device Work Zone Provisions Drums Standard Cones Tall Cones Extra Tall Cones Temporary Tubular Markers Interim Tubular Markers Vertical Panels Oversized Vertical Panels Type III Barricades Short -Term Stationary Work Zones involve daytime work that occupies a location for more than one hour and up to a single daylight period Shoulder/Merging/Shifting Tapers < 40 mph 20 ft. X X X X X X ≥ 40 mph 40 ft. X X X X X X One-Lane Taper for Alternating Two-Way Traffic 20 ft. X X X X X X Longitudinal Lane or Shoulder Closure w/Workers 40 ft. X X X X X X Longitudinal Lane or Shoulder Closure w/No Workers 80 ft. X X X X X X Freeway / Expressway Gores 20 ft. X X X X X X O Marking for Transverse Bumps 1 N/A X2 X2 X2 Transverse Device within Closed Traffic Lane and/or 800 ft X X X X X X O Roadway edge exposed with no Edgeline or Permanent Delineators 200 ft. X X X X X O Roadway Intersection or Commercial Driveway Radii 6 ft. X X X X X Residential Driveway Radii 6 ft X X X X X Removal of existing guide rail Shoulder width ≥ 4 ft. 80 ft. X X X X X X O Shoulder width < 4 ft. 40 ft. Pavement Drop offs > 2 in. and < 24 in. See Table 619-3 Drop off ≥ 24 in. within 10 ft. of active travel way; Posted speed ≤ 45 mph; Drop off Length ≤ 100 ft.; Not to last longer than 1 work shift 20 ft. X X X Closed Roads N/A X Closed Sidewalks N/A X NOTES: X = Allowed Blank = Not Allowed O = Optional at Contractor's expense 1 - A Type 1 Object Marker may be used in lieu of channelizing device 2 - Channelizing devices shall be equipped with a flashing warning light
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 TABLE 619 -2B CHANNELIZING DEVICE APPLICATION FOR INTERMEDIATE -TERM AND LONG -TERM STATIONARY WORK ZONES Maximum Device Spacing (center to center) MUTCD compliant Channelizing Device Work Zone Provisions Drums Standard Cones Tall Cones Extra Tall Cones Temporary Tubular Markers Interim Tubular Markers Vertical Panels Oversized Vertical Panels Type III Barricades Intermediate -term and Long -Term Stationary Work Zones involve work that occupies a location for more than 1 daylight period or nighttime work that occupies a location for more than 1 hour Shoulder/Merging/Shifting Tapers <40 mph 20 ft. X X ≥ 40 mph 40 ft. X X One-Lane Taper for Alternating Two-Way Traffic 20 ft. X X Longitudinal Lane or Shoulder Closure w/Workers 40 ft. X X X X Longitudinal Lane or Shoulder Closure w/No Workers 80 ft. X X X X Freeway / Expressway Gores 20 ft. X X X X O Marking for Transverse Bumps 1 N/A X2 X2 X2 Transverse Device within Closed Traffic Lane and/or 800 X X X X X O Roadway edge exposed with no Edgeline or Permanent Delineators 200 ft. X X X X X O Roadway Intersection or Commercial Driveway Radii 6 ft. X X Residential Driveway Radii 6 ft. X X Removal of existing guide rail shoulder width ≥ 4 80 ft. X X X X X X O shoulder width < 4 40 ft. Pavement Drop offs > 2 in. and < 24 in. See Table 619-3 Drop off ≥ 24 in. within 10 ft. of active travel way; Posted speed ≤45 mph; Drop off Length ≤ 100 ft.; Not to last longer than 1 work shift 20 ft. X X X Two-Lane Two -Way Operations on expressways and freeways at along curves 20 ft. X X O along tangents 40 ft. Two-Lane Two -Way Operations on expressways and freeways between Crossovers 40 ft. X X X X X X Closed Roads N/A X Closed Sidewalks N/A X NOTES: X = Allowed Blank = Not Allowed O = Optional at Contractor's expense 1 - A Type 1 Object Marker may be used in lieu of channelizing device. 2 - Channelizing devices shall be equipped with a flashing warning light.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 K. Pavement Edge Drop -Off Protection. A drop -off is an abrupt difference in surface elevation of more than 2 inches at approximately 1V:3H or steeper. In the absence of adequate Traffic Control Plans in the contract documents, the Contractor shall submit alternate Traffic Control Plans to the Engineer for approval at least 30 calendar days prior to proposed work which will create a drop -off of over 24 inches within 10 feet from the edge of the traveled way for durations longer than one shift. The Contractor shall provide pavement edge drop -off protection in accordance with Table 619 -3 Pavement Edge Drop -Off Protection. Channelizing devices used to mark drop -offs shall be placed, as practicable, to not reduce the available travel lane width, at the elevation of the open travel lane in order to provide maximum target value and visibility for motorists. A drop -off of greater than 24 inches within 10 feet from the edge of the traveled way to remain at the end of the work shift shall be separated from traffic with temporary or permanent barrier. For posted speed limit of 45 mph and less, a drop -off of great er than 24 inches within 10 feet from the edge of the traveled way that is 100 feet or less in length will be allowed with channelizing devices consisting of drums, extra tall cones, or oversized vertical panels only at a maximum spacing of 20 feet for sho rt durations not to exceed one work shift. Unless otherwise noted in the contract documents, the Contractor shall begin work to eliminate unprotected drop -offs created by contract work within 7 calendar days of the completion of the work creating the drop -off. Work shall continue in a timely manner until such time as the unprotected drop - off condition is eliminated. Where pavement edge lines are not provided, channelizing devices shall be preceded by a NO SHOULDER (W8 -23) sign, repeated at all ramps and roadway intersections. Signs shall be repeated every ½ mile and supplemented with a NEXT [X] MILES (W7 -3aP) plaque w here applicable. Where pavement edge lines are provided, channelizing devices shall be preceded by SHOULDER DROP -OFF (W8 -17) signs, repeated at all ramps and roadway intersections. Signing shall be repeated every ½ mile and supplemented with NEXT [X] MILES (W7 -3aP) plaque where applicable. TABLE 619 -3 PAVEMENT EDGE DROP -OFF PROTECTION Drop -Off Height Edge Line Pavement Markings Drum Spacing (feet) Vertical Panel Spacing (feet) Tubular Marker Spacing (feet) Tall Cone Spacing (feet) Signs DROP -OFF AT OR WITHIN SHOULDER AREA Within 4 ft. from Travel Lane 2 – 6 in. Yes 100 100 N/A N/A Shoulder Drop -off No 40 40 N/A N/A No Shoulder 6 - 24 in. Yes 40 40 N/A N/A Shoulder Drop -off No 20 20 N/A N/A No Shoulder More than 4 ft. from Travel Lane 2 – 6 in. Yes 200 200 100 100 Shoulder Drop -off No 100 100 40 40 No Shoulder
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 6 - 24 in. Yes 40 40 N/A N/A Shoulder Drop -off No 40 40 N/A N/A No Shoulder DROP -OFF OUTSIDE OF SHOULDER EDGE Shoulder width ≤ 4 ft. 2 – 6 in. Yes 100 100 N/A N/A Shoulder Drop -off No 100 100 N/A N/A No Shoulder 6 - 24 in. Yes 40 40 N/A N/A Shoulder Drop -off No 40 40 N/A N/A No Shoulder Shoulder width > 4 ft. 2 – 6 in. Yes 200 200 100 100 Shoulder Drop -off No 100 100 40 40 No Shoulder 6 - 24 in. Yes 100 100 40 40 Shoulder Drop -off No 40 40 N/A N/A No Shoulder
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 equipped with an emergency air horn to alert workers of errant vehicles or other dangerous situations. Where flaggers are not within sight of each other, each flagger shall be equipped with a communication device, such as portable phone or two -way radio. T he communication device shall only be used to communicate with other flaggers, other workers, or supervisor(s) regarding the flagging operations. Where the distance between flaggers is more than ½ mile or where shown in the contract documents, the Contract or shall use pilot cars to lead lines of vehicles through the work zone. The standard signaling device for flagging operations, where one or more flaggers are controlling a single stream of traffic or two alternating streams of traffic in opposite directions, shall be STOP/SLOW signal paddles. Red signal flags may be used where display of the STOP and SLOW faces in opposite directions may be inappropriate or misleading.
619-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 A minimum of 7 calendar days prior to initial deployment of the AFAD system, the Contractor shall submit a traffic control plan to the Engineer, for review and approval, detailing AFAD operation including a list of competent flaggers trained to operate the AFAD. AFADs shall be used only on two -lane two -way or single lane one -way roadways. AFADs shall not be used where there are intersections and/or commercial driveways or where construction operations within the controlled highway segment frequently disrupt traffic flow. Appropriate flagger apparel and equipment shall be maintained near each AFAD to facilitate flagging in the event of a malfunction or operational need due to frequent disruptions of traffic flow. The Contractor shall immediately provide traff ic control with flaggers if a AFAD malfunctions; fails to properly or adequately control traffic; creates congestion, queues or gridlock which cannot be remedied by timely on -site adjustments to the signal operation; or is otherwise inadequate. A competent flagger, who has been trained on the operation of the AFAD, shall operate and not leave the AFAD(s) unattended at any time. The flagger shall have an unobstructed view of the AFAD(s) and approaching traffic in both directions at all times. The distance between AFADs shall not exceed ½ mile. Work zones utilizing AFADs shall comply with Standard Sheet 619-309. Red/Yellow lens AFAD shall have a STOP HERE ON RED (R10 -6) sign installed on the right - hand shoulder at least 8 ft in advance of the AFAD wh ere vehicles are expected to stop. A portable traffic signal may be used, at the Contractor’s option, as an AFAD. A Signal Ahead symbol (W3 -3) sign shall replace the BE PREPARED TO STOP sign. An 18 inch wide removable stop line with a STOP HERE ON RED (R10 -6) sign shall be installed at inte nded stopping point. The Engineer may waive the requirement for a stop line if the roadway is unpaved or it is otherwise impractical to install a stop line and the STOP HERE ON RED sign is in place. When the work no longer necessitates use of the AFAD or portable traffic signal, the units shall be removed or turned off and moved out of view from the traveled way. Specified AFAD’s may be replaced with human flaggers for a time period of no longer than 24 hours.
619-3.03 Basic Work Zone Traffic Control (Daily Operations). The Contractor shall control traffic in
accordance with §619 -3.02 Basic Work Zone Traffic Control paragraphs A. Surface Condition; C. Maintain Public Access; D. Maintain Existing Roadside Signs; F. Construction Vehicles; G. Barrier/Shadow Vehicles; H. Construction Signs; I. Arrow Panels; J. Channelizing Devices; L. Flagging;
619-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 obstructions including traffic control devices, construction equipment, and materials at the end of each work shift.
619-3.04 Temporary Business Signs. The Contractor shall provide temporary business signs (NYI8 -4)
mounted on temporary sign supports to identify business entrances in accordance with the contract documents. Entrances shall be identified by only a single sign. Temporary business signs shall be mounted at a minimum height of 7 feet, and at a location that will guide traffic seeking access to the business, but where they will not interfere with traffic flow or other traffic control devices.
619-3.05 Covering or Removal of Pavement Markings. The Contractor shall remove or cover existing
permanent pavement markings, interim pavement markings and temporary pavement markings, as indicated in the contract documents or directed by the Engineer, to accommodate traffic pattern changes by covering the mar kings with preformed removable pavement marking masking tape, or by removing the markings. Masking tape shall be placed in blocks to prevent the underlying shape of pavement marking symbols or letters from being confused with existing markings.
619-3.06 Temporary Pavement Markings. The Contractor shall install and maintain temporary
pavement markings in accordance with the contract documents, using patterns and colors shown in the MUTCD to establish temporary traffic pattern(s) during construction on any pavement, including milled or grooved surface, resurfaced, new pavement, or other paved surface without pavement markings, for a maximum of 14 calendar days. Within 14 calendar days after placement, the Contractor shall either (1) install the succeeding pavement course or (2) install the remaining temporary pavement markings including edge lines, stop bars, and simple crosswalks, with no hatching. Pavements whi ch will be open to traffic shall be properly
619-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 marked before being opened, before nightfall, or before the end of the work day, whichever is soonest, except areas that are open during the work shift and delineated with channelizing devices or flaggers. Traffic paint need not be removed before placing a subsequent course. Removable pavement tape, removable wet -night reflective tape, temporary overlay markers and removable raised pavement markers shall be removed before placing a subsequent course at no ad ditional cost to the State. Temporary pavement marking stripes shall be a minimum of 4 inches in width. Temporary pavement markings shall be applied to a clean, dry pavement in accordance with the manufacturer’s recommendations. Hatch lines and symbols will not be required as tempora ry pavement markings unless required by the contract documents. Traffic paint pavement markings shall be applied at a minimum wet film thickness of 20 mil, immediately followed by an application of glass beads, at a rate of 6 lb/gal of paint. Where specified, removable raised pavement markers shall be used to supplement line pavement markings. The raised markers shall not be a substitute for line pavement markings, letters, or symbols. Removable raised pavement markers spaced every 5 feet may be used to supplement line pavement markings. Two removable raised pavement markers spaced at each end of the 2 foot marking may be used to supplement a 2 foot broken line pavement marking. If unanticipated weather or other conditions prevent the application of temporary pavement markings, the Contractor shall apply 2 foot removable pavement tape markings or temporary overlay markers at 40 foot spaces at no additional cost to the State, for a maximum of 3 days until such time as temporary pavement markings may be applied, or the next pavement course is installed.
619-3.07 Interim Pavement Markings. Work shall consist of furnishing, applying, and maintaining
interim pavement markings as shown in the contract documents or as directed by the Engineer. The work for removable tape, removable wet -night reflective tape, temporary overlay markers and removable raised
619-3 08
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 pavement markers shall include removal. Interim pavement markings are intended for use in diversions, temporary pavement realignments and crossovers, lane shifts and closures, and other traffic patterns associated with construction activities. Interim pave ment markings are intended for use for a given phase or season, for a maximum of 1 year.
619-3.08 Temporary Rumble Strips. The Contractor shall install temporary rumble strips in three sets
of 6-strip patterns with 10 foot between individual strips. The type of strip installed will be at the Contractor’s option, except that sawcut or milled -in strips shall not be installed on new top course surfaces or existing surfaces that will not be paved over. Where there is no usable shoulder, or the shoulder is less than 3 feet wide, the rumble strips s hould be ended 3 feet short of the edge of usable pavement. On curbed roadways, rumble strips should end a minimum of 3 feet from the curb in order not to interfere with drainage. Rumble strips shall typically be placed in advance of each of the last three long-term advance warning signs such that drivers are alerted in time to see and read the signs. Rumble strips will typically be installed for a minimum of one week.
619-3 09
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
619-3.09 Interim Tubular Markers. The Contractor shall install interim tubular markers in accordance
with the contract documents. The Contractor shall attach interim tubular markers to the pavement in a manner that prevents them from being moved or dislodged by traffic. Interim tubular mar kers shall be installed on pavement that has been cleaned to remove pavement markings, oil, dirt, or other debris or substances that may interfere with a proper bond. Attachment to the pavement shall be by mechanical faste ner or by adhesive, in accordance with the manufacturer’s recommendations. Bonding agents shall be of sufficient amount or size to ensure proper bonding of the base to the pavement. Interim tubular markers removed or damaged by the Contractor’s operations or by traffic shall be replaced immediately, so that positive separation is maintained between opposing lanes of traffic at all times. Damaged reflective sheeting on interim tubular markers shall be replaced before nightfall as necessary to maintain adequate visibility of the markers. In cases where only isolated individual markers
619-3 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 are lost or damaged, and adequate visibility is maintained by the remaining markers, replacement will not be required until more than 3 consecutive markers, or 25 percent of all markers within ½ mile have been damaged or lost. The replacement of markers da maged or lost by traffic, where the Contractor has demonstrated reasonable effort to collect the costs from the person(s) responsible for damage will be considered extra work.
619-3.10 Portable Variable Message Signs (PVMS) and Truck Mounted Variable Message Signs
(TMVMS). The Contractor shall provide, operate, and maintain PVMS & TMVMS as indicated in the contract documents until the progress of work no longer requires their use. The Contractor shall relocate or reorient PVMS with a pay unit of each, if necessary, up to 4 t imes per year as conditions dictate, at no additional cost to the State. The Contractor shall provide, operate, and maintain PVMS with a pay unit of weeks at the general locations and duration stated in the contract documents and in accordance with the Special Note Requirements for Portable Variable Message Signs (PVMS). There shall be no extra payment due for each relocation or reorientation of TMVMS. On the P VMS & TMVMS, the message to be displayed shall be as required by the contract documents and may change on a daily basis or more frequently as conditions dictate. NYSDOT’s Variable Message Sign Guidelines shall be reviewed to ensure compliance with Chapter 5 - Messages. If the contract requires a NTCIP compliant PVMS, the Contractor shall provide the Engineer with the model, manufacture date and manufacturer of the NTCIP compliant PVMS the Contractor plans to use from the Approved List. After delivery to the work site, th e Contractor shall allow the Regional Transportation Management Center (TMC) to conduct operations and communications tests on one or more samples supplied by the Contractor. The testing will determine if the proposed PVMS meets the TMC’s operational requi rements by demonstrating remote communications to and from the TMC using NTCIP compliant operating software. TMVMS do not require NTCIP compliant communications. The message to be displayed shall be as required by the contract documents or as directed by t he Engineer. PVMS specified with cellular communications shall be equipped with control software compatible with the current computer operating system used in the Engineer’s Field Office. PVMS with Cellular Communications Option shall have cellular telephone service pr ovided by the Contractor. The Contractor shall supply the Engineer with two copies of operating instructions for the PVMS and the control software. The Contractor shall supply the Engineer with a copy of control software a minimum of 14 calendar days prior to installation of the first unit. Electronic copies of software instructions are acceptable. PVMS shall be placed so that the base of the message panel is at least 7 feet above the adjacent pavement surface and aligned to provide optimum viewing by approaching motorists. The Contractor shall supply the Engineer with an accurate log of the text of all messages and times messages were displayed monthly, not later than the 15th of the following month. The log of messages may be either a listing in a manual register or printouts from the control software. The Contractor shall inform the Engineer of PVM S and TMVMS locations and update as they are relocated and removed. The PVMS shall be protected from unauthorized use. All cabinet doors shall be secured and/or padlocked, and default manufacturer’s passwords shall be changed. Additional security measures shall be implemented as needed.
619-3.11 Type III Construction Barricades. Type III construction barricades shall be installed at all
locations where a highway, bridge, ramp, or other segment of the roadway is closed to traffic. Type III construction barricades shall be maintained upright, in proper alignment and orientation. If ballast is used to maintain alignment and position of the barricade, it shall consist of dry sand contained in a closed waterproof bag and shall be placed at ground level. Barricade rails shall be oriented such that the stripes slope downward toward the side on which traffic is to pass. If traffic may pass to either side, adjacent barricades shall be arranged such that the stripes slope downward toward each side starting at the center. Where no passage is intended or permitted, the stripes shall slope downward toward the center of the barricade or barricades.
619-3 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 At night, each Type III construction barricade used to close a roadway, a segment of a roadway or a sidewalk shall be equipped with one flashing warning light.
619-3.12 Temporary Positive Barrier. Temporary Positive Barriers are categorized by their standard
MASH TL -3 (pickup truck) deflection and their deflection reduction measures (pinning and or box -beam - stiffening). The barriers that satisfy a given deflection category are shown on the Departme nt’s Approved List for Temporary Positive Barriers. The system chosen and the segment length used must be capable of meeting the curvatures indicated in the Plans. The Engineer will inspect temporary barrier segments upon delivery. Any barrier segment having damage and/or defects in the segment and/or joint connections will be rejected if the performance of the barrier may be affected. Temporary positive barrier segments shall be fastened together to form a continuous string. When joined together, the barrier segments shall form a smooth and continuous barrier. Any segments damaged or misaligned shall be corrected or replaced. The connec tions shall conform to the approved details for the particular barrier. Tapered end sections shall not be used in traversable medians, gores, or other areas where impacts on a tapered end section could allow vehicles to penetrate opposing or adjacent lanes of traffic. Where the posted speed limit is 45 mph or higher, a tempora ry impact attenuator or temporary sand barrel array shall be provided on approach ends of temporary positive barrier when the offset from the edge of the traveled way to end of the barrier is less than 12 feet and will be paid for separately. Where space is available, approach ends of the barrier string shall be flared away from the traveled way at the taper rate shown in Table 619 -4 Flare Rates for Positive Barrier and terminated in a tapered end section, embedded in a slope, or otherwise prot ected against impact by errant vehicles. The Contractor shall install temporary barrier where indicated, and of the deflection Category indicated in the contract documents. Where pinning is indicated for the given barrier, the pinning shall be in conformance with the pinning requirements indicate d in the Approved List. Where pins extend above the top surface of the barrier anchor recess, they shall be covered with plastic or rubber. TABLE 619-4 FLARE RATES FOR TEMPORARY POSITIVE BARRIER POSTED PRECONSTRUCTION SPEED LIMIT (mph) 30 40 50 55 65 TEMPORARY POSITIVE BARRIER 8:1 11:1 14:1 16:1 20:1 BOX BEAM OR HEAVY POST CORRUGATED BEAM 7:1 9:1 11:1 12:1 15:1 TABLE 619-5 GUIDE RAIL AND NYSDOT TEMPORARY CONCRETE BARRIER STANDARD** DEFLECTION DISTANCES BARRIER TYPE POST SPACING (ft) DEFLECTION DISTANCE (ft) CABLE GUIDE RAIL 16 11.0* 12 9.5* 8 8.0* 4 7.0* CORRUGATED W -BEAM (WEAK POST) GUIDE RAIL 12.5 8.0 6.25 6.0 4.16 5.0 CORRUGATED W -BEAM (HEAVY POST BLOCKED OUT) 6.25 4.0 3.12 2.0 BOX BEAM GUIDE RAIL 6.0 5.0 3.0 4.0 CORRUGATED W -BEAM 12.5 7.0
619-3 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 (WEAK POST) MEDIAN BARRIER 6.25 5.0 CORRUGATED W -BEAM (HEAVY POST) MEDIAN BARRIER 6.25 2.0 BOX BEAM MEDIAN BARRIER 6.0 3.0 NYSDOT TEMPORARY CONCRETE BARRIER Unpinned 3.25** Box-Beam -Stiffened 2.2** Pinned 0.8** * Note: NCHRP 350 Standard Deflection caused by a 4,400 -lb test vehicle traveling 62 mph impacting the barrier at a 25° angle **Note: Standard Deflections are those assumed to occur with a Standard TL-3 Impact. MASH Standard Impact is produced by a 5,000 -lb test pickup traveling 62 mph impacting the barrier at a 25° angle. The temporary concrete barrier stiffened with box beam shall be installed at least 50 feet prior to, be continuous through, and extend at least 50 feet beyond the area requiring limited deflection, wherever practicable. Where space limits extending the string of barrier stiffened with box beam, one segment at either end of the string shall be pinned with 4 pins on the construction, or non -traffic, side. At any transition between pinned and unpinned portions of a temporary positive barrier run, to provide a gradual change in fixity, one piece of barrier shall be partially pinned using 2 pins on the construction side of the barrier. The partially pinned pi ece shall be included in the measurement of pinned barrier. Pins shall have the following minimum embedment lengths: • Bridge Decks and Cement Concrete Pavement 5 in. • Flexible Pavement 18 in. • Unpaved Areas 30 in. After removal of the barrier, pin holes created in the surface shall be filled, unless that area will be further disturbed. Holes in flexible pavement shall be filled with warm or cold mix top course asphalt material rodded in 3” lifts. Holes in portland cement concrete pavement or structural decks shall be filled with material meeting the requirements of §701 -05 Concrete Grout Material or §721 -03 Epoxy Polysulfide Grout . Holes in unpaved area shall be filled with sand backfill.
619-3 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 All warning lights shall be kept clean, properly aligned, and in operating condition. Batteries shall be replaced as necessary. Where channelizing devices with Type A flashing warning lights are not provided immediately preceding a run of barrier to be marked with warning lights, the first warning light on that run of barrier shall be a Type A warning light.
619-3 13
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Standard Sheets or shall provide an overlap of corrugated beam extending upstream past four segments of the downstream end of the Temporary Concrete Barrier. When corrugated beam is required to be bolted to the Temporary Concrete Barrier, or the Contractor elects to do so, the necessary positions for the bolts shall be located on the Temporary Concrete Barrier and drilled in the field. The terminal rail piec es or W -Beam End Pieces thus bolted shall be removed and become the Contractor’s property when the Temporary Concrete Barrier is removed. After removal of the Temporary Concrete Barrier, any rail and posts removed to facilitate placement of the Temporary C oncrete Barrier transition shall be promptly replaced with new posts and new or acceptable reset corrugated beam guide rail
619-3.13 Temporary Glare Screen. Temporary glare screen shall be installed in accordance with the
manufacturer’s instructions. All components of the glare screen shall be maintained in a safe and functional condition. Damaged components shall be repaired or replaced. If blades are utilized, the blades shall be spaced and angled to provide approximately a 22E headlight cutoff angle. The screen shall not overhang the face of the barrier and shall not cover delineation or lights. The screen shall be kept plumb and properl y positioned on the barrier, with reflectorization securely affixed to the screen. Cleaning of the reflectorization shall be by a method that does not damage the paddles, reflectorization or barrier, and is not hazardous to traffic. The Contractor shall remove and dispose of the temporary glare screen upon completion of the contract or when it is no longer required. Upon removal of the temporary glare screen, there shall be no protrusions remaining on the top face of the barrier. Bolt holes or other damage to permanent barrier from glare screen installation shall be repaired by the Contractor at no additional cost to the State.
619-3.14 Temporary Impact Attenuator. The Contractor shall install temporary impact attenuators in
accordance with the contract documents, the manufacturer’s instructions, and materials details. The Contractor shall provide the Engineer a copy of the manufacturer’s materials details and instal lation instructions a minimum of 7 calendar days prior to use, to allow verification of the attenuator supplied and proper installation. The selection of the manufacturer and model of temporary impact attenuator shall be at the Contractor’s option, provided the attenuator supplied is of the type indicated, gating or redirective; shields the hazard; and fits in the location without encroachment into travel lanes or required offsets. The Contractor shall maintain temporary impact attenuators for continuous operation. If an attenuator is out of operation, the Contractor shall immediately mark the hazard with drums, vertical panels and or extra tall cones until repairs are made or a new attenuator is installed. The Contractor shall promptly begin repairs to damaged attenuators, and shall complete repairs to a damaged attenuator or mitigate the hazard within 1 work day. Attenuators damaged beyond repair shall be replaced within 3 work days . When temporary impact attenuators are removed or moved to another location, the Contractor shall restore the location to match the surrounding area.
619-3.15 Temporary Sand Barrel Arrays. The Contractor shall install sand barrel arrays in accordance
with the patterns shown on the Standard Sheet or a NCHRP 350 approved pattern and fill the barrels with sand to provide the desired module weight, plus or minus 5 percent. Units that will be in use between November 1 and March 31 shall have sodium chloride, as dry rock salt, equal to 3% - 5% by weight of the sand, thoroughly mixed into the sand to prevent fr eezing. The sand shall be placed in the modules loose, not in bags or sacks. If the contract documents indicate that the site necessitates securing of the modules, the work shall be performed as recommended by the manufacturer. The Contractor shall maintain sand barrel arrays for continuous 24 hour operation. If an array is out of operation, the Contractor shall immediately mark the hazard with drums, vertical panels and or extra tall cones until repairs are made or new module(s) are installed. The Contractor shall promptly begin
619-3 16
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 repairs to damaged arrays, and shall complete repairs to a damaged array or mitigate the hazard within one work day.
619-3.16 Vehicle Arresting Barrier (VAB). Vehicle arresting barriers (VAB) shall be installed in
accordance with the contract documents and the manufacturer's instructions and materials details. The Contractor shall provide the Engineer a copy of the manufacturer’s materials details and installation instructions a minimum of 5 work days prior to use, to allow verification of the barrier supplied and proper insta llation. The deceleration area behind the VAB shall be kept clear of workers, vehicles, or stored materials. The Contractor shall provide for periodic surveillance of each VAB by workers or by electronic device. The Contractor shall maintain vehicle arresting barrier for continuous operation. If a barrier is out of operation, the entire barrier shall be restored within 4 hours after the incident, or prior to the next shift the barrier will be used. No work may be progressed in an unprotected area, and the hazard shall be eliminated or minimized, until restorations have been completed. The VAB, except anchorages, shall be dismantled and removed prior to reopening the road to traffic. After the last day of use, if directed by the Engineer, temporary anchorages shall be removed, and disturbed areas shall be restored to match the surroundin g area.
619-3.17 Maintain or Modify Traffic Signal Equipment. Traffic signals shall be maintained in proper
operation, including the maintenance of all features of the traffic signal operation in effect and operating at the time any work begins on the contract. Traffic -actuated phases shall remain actuated, and signa ls operating within signal systems shall remain coordinated with the remainder of the system unless otherwise approved by the Engineer. Except for emergencies, no changes in the signal operation or timi ng shall be made without prior approval by the Engineer. If emergency conditions dictate a change in the operation, the Engineer shall be notified by the start of the next work day. Unless otherwise approved by the Engineer, an altered signal operation mus t be returned to the original signal operation within 24 hours. The Contractor shall maintain in operation all equipment including signal heads, supports, cable, wiring, span -wire-mounted signing, controllers, master controllers, detector systems, conflict and current monitors, relays, switch packs, and all other acces sory and necessary equipment. Maintenance shall also include the repair and replacement of existing detector loops, paid for separately. The Contractor shall have capable traffic signal repair personnel on call 24 hours a day, seven days a week, and shall provide to the Engineer a single telephone number for contacting them. If for any reason a signal is not functioning properly, the Contra ctor shall commence work on the signal within 2 hours of notification. If directed by the Engineer, the Contractor shall notify the appropriate police agency for traffic control operations. If the police agency cannot or will not provide traffic control, t he Contractor shall provide flaggers at locations specified by the Engineer within the 2 -hour time period. The Contractor shall continue the flagger services until the signal is in proper operation. A flagger warning (W20 -7 or W20 -7a) sign shall be used on all approaches to an intersection controlled by flaggers. If the malfunction is in the equipment supplied by the State, due to an area wide power outage, or due to a localized power outage beyond the Contractor’s control, the Contractor shall notify the Engineer and, if directed by the Engineer, provide flaggers until the malfunction is corrected or State personnel take over. Such flagging operations in excess of 4 hours for the first call and for any subsequent call will be considered extra work. The Contractor shall provide the Engineer, on a monthly basis, with a record of all maintenance calls received and responded to, as well as a record of all corrective action taken by the Contractor.
619-3 18
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
619-3.18 Temporary Traffic Signals. The Contractor shall install temporary traffic signals in
accordance with the contract documents and the MUTCD. The Contractor shall maintain traffic signal systems, including traffic detectors, in proper operation until approved removal, and be responsibl e for its continuous 24 -hour operation except for reasonable shutdown during relocation and transfer operations. Substitution of temporary traffic signals for flaggers shall be at no additional cost to the State. If for any reason a signal does not function as required, the Contractor shall commence repair work on this signal within 2 hours after notification of a malfunction. In the event flashing operation occurs, all signal faces shall show flashing red indicati ons. Flashing operation of a signal is considered a malfunction. The Contractor shall provide an adequate number of flaggers to control traffic at each malfunctioning traffic signal, in accordance with '619 -3.02L. Flagging and Traffic Control until the sig nal is restored to proper operation. If the malfunction is due to an area wide power outage or due to a localized power outage beyond the Contractor’s control, the Contractor shall notify the Engineer and, if directed by the Engineer, provide flaggers until the malfunction is corrected or Sta te personnel take over. Flagging operations in excess of 4 hours for the first maintenance call shall be paid for as extra work.
619-3.19 Nighttime Operations . Work occurring after sunset and before sunrise will be considered
nighttime operations. A nighttime operations meeting shall be held prior to the start of any nighttime operations. For static and moving operations, the Contractor shall implement a lighting plan and provide illumination throughout the work areas. For moving operations, the Contractor shall mount lighting to construction equipment that consists of balloon lights, or equivalent lighting that illuminates the work area with low glare for oncoming traffic and enhances visibility of the equipment from al l directions. The Contractor should maintain traffic in a single lane during nighttime moving operations on freeways.
619-3 19
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 All workers involved in nighttime operations shall wear protective helmets and nighttime apparel in accordance with §107 -05A. High Visibility Apparel at all times. All signs, Stop/Slow paddles, and red flags used to warn/alert/control traffic shall be retr oreflective. Flaggers shall use a flashlight with red glow cone/ red LED baton for flagging in non -illuminated flagger stations during nighttime operations. Where the Contractor implements a mobile lighting plan, PPE shall meet ANSI Class 3. The Contractor shall equip workers on foot with a personal active safety system which enhances the visibility of the worker from all directions, such as a powered hardhat light ring or an illuminated safety vest. ANSI Class E gaiters or pants are required to meet ANSI Class 3 if ANSI Class 2 vests are used. The Contractor shall provide the Department with the same personal active safety systems and ANSI Class 3 garments for Department inspectors and pertinent field office staff. When workers on foot are passing between illuminated work areas, the Contractor shall provide personal headlamps or flashlights producing a minimum of 5 foot -candles at the ground to navigate their p ath if hardhat light rings do not provide this function and illumination. Vehicles operating on the pavement of a closed roadway or travel lane shall display rotating amber beacons or flashing LED beacons at all times. Vehicles using headlights, except for rollers and vehicles retrieving channelizing devices, shall travel facing in the same direction as adjacent traffic in order to avoid glare and confusion to drivers. The Contractor shall meet the following additional requirements for work zone traffic control during nighttime operations.
619-3 19
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 8. Means to ensure visibility of personnel and equipment involved with the set -up and removal of work zone traffic control devices.
619-3 19
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 directions, to sufficiently illuminate the work area, enhance visibility of the equipment from all directions, and to carry out the work safely and accurately: all rollers, pavers, milling machines, material transfer vehicles, crack and seat equipment, and other miscellaneous equipment utilized for the moving operation that could be a hazard if not illuminated. There shall be a minimum of one balloon light mounted to each piece of equipment. Pavers and large milling machines should be equipped with a minimu m of two balloon lights. Mechanical sweepers shall have forward -facing lights and tack trucks shall have rearward - facing lights, consisting of balloon lights, or equivalent low glare lighting visible from all directions, supplemented with flood lights as r equired. Balloon lighting, or equivalent, equipment shall be sufficiently ballasted and durable to withstand the anticipated weather conditions and vibrations from the host equipment.
619-3 19
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 a. Illumination for moving operations . Equipment -mounted balloon lights, or equivalent low glare lighting visible from all directions, shall provide illumination to a minimum of 5 foot - candles measured at the work surface for 20 feet from the equipment on sides where workers generally work. Bal loon lights or equivalent lighting shall be located to optimally illuminate the work area and enhance equipment visibility, mounted at a minimum height of 10 feet above the ground, and temporarily relocated as necessa ry to not interfere with overhead obstructions. Other types of equipment -mounted light sources shall be used as supplemental illumination around the equipment, where necessary, to carry out the work safely and adequately. The hopper, auger, and screed area s of pavers shall be uniformly illuminated. The operator’s controls on all machines shall be illuminated. Tack shall be illuminated as it is applied. In areas throughout the entire zone of mobile operations without existing roadway lighting, light towers shall be located at maximum intervals of 500 feet. The Contractor shall provide illumination to a minimum of 5 foot-candles at locations where miscellaneous or incidental tasks, such as saw cutting, are performed. The illumination shall be accomplished via floodlights or balloon lights (or equivalent) mounted to a truck, cart, or terrain vehicle, tow behind trailer lights, lights on light stands, or other suitable means. No tasks shall be performed without adequate illumination. The Contractor shall furnish adequate illumination for Department construction inspection and quality assurance. The illumination shall be accomplished via floodlights or balloon lights (or equivalent) mounted to a truck, cart, or terrain vehicle, tow behi nd trailer lights, lights on light stands, or other suitable means. The Contractor shall furnish and maintain illumination equipment. The Contractor shall provide a minimum of 10 foot -candles in locations where the Department’s representatives will perform tasks such as core drilling, density testing, and concrete testing.
619-3 20
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
619-3.20 Traffic Control Supervisor. When indicated in the contract documents, the Contractor shall
provide a dedicated traffic control supervisor having adequate training, experience, and authority to implement and maintain all traffic control operations. The traffic control supervisor shall not be assigned other duties that interfere with performance as a traffic control supervisor. The traffic control supervisor shall be adequately trained in traffic control operations by recognized training programs, including the American Traffic Safety Services Association “Traffic Control Supervisor”, the National Safety Council, unions, or const ruction industry associations, or by an individual instructor from such a program. Traffic control supervisors not competent to the satisfaction of the Engineer shall be replaced immediately. During setup and removal of lane closures and other traffic control setups, the traffic control supervisor shall be assisted by additional workers as necessary. The traffic control supervisor shall patrol the contract area to ensure that conditions on the site are adequate for public safety and convenience at all times, to monitor worker safety from intrusions into the work area, and to ensure that the work adheres to the provisions for work zone traffic control. The traffic control supervisor shall ensure signs, channelizing devices, barricades, barrier, impact attenuators and other traffic control devices are adjusted and maintained as necessary. The Contractor shall provide workers to install, maintain, adjust, and remove traffic control devices as requir ed by the work operations. When the work does not require closure of an active lane, roadway, or ramp; when no construction operations occur within 30 feet of active traffic lanes; and when there is no delivery of materials or equipment; the Engineer may waive the requirements for a traffic control supervisor.
619-3.21 Temporary Structures and Approaches. The Contractor shall design, construct, maintain,
relocate, and remove temporary structures and their approaches at the location(s) shown in and in accordance with the contract documents. The Contractor shall install temporary structures and their approach es, including any required earth support structures and any necessary appurtenances, in a manner and sequence that interference with and inconvenience to the traveling public and abutting properties is kept to a minimum. The Contractor shall be responsible for the workmanship, upkeep, and safety of all temporary structures and approaches.
619-3 21
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 When specific details are not included in the contract documents, or when the Contractor receives approval to deviate from the contract documents, the Contractor shall design all elements of the temporary structure and approaches including the railing syst em, on the structure and its approaches. The design of temporary structures and their approaches shall be in conformance with the NYSDOT Load and Resistance Factor Design (LRFD) Bridge Design Specifications, the only design live load shall be HL -93, in addition to any anticipated construction or pedestrian loading. Alternatively, the design shall be in conformance with the NYSDOT Standard Specifications for Highway Bridges, the minimum design live load shall be AASHTO HS 20. Exception, any structure, and approaches that are expected to be in servi ce for more than 5 years, shall be designed as a permanent structure in accordance with the NYSDOT Load and Resistance Factor Design (LRFD) Bridge Design Specifications. The bridge rail shall be designed for loads commensurate with those specified for TL -2 unless a higher level is shown in the project plans. The Contractor shall also be responsible for designing, furnishing, and installing the transition from bridge rail t o highway rail for the temporary structure. All design computations and associated working drawings shall bear the stamp and signature of a Professional Engineer and shall be submitted to the DCES for review. Design for non -highway temporary bridges shall be in accordance with AASHTO specifications for the design codes, loading, railing/barrier, ADA requirements and vertical clearance it is intended to serve or as specified in the project plans. All fabrication and construction of a temporary structure shall conform to the AASHTO Standard Specifications for Highway Bridges, Division II or the AASHTO LRFD Bridge Construction Specifications, except as modified herein. Fabrication shall be performed by a fabricator that is certified by AISC for the type of work being performed. For fracture -critical member (FCM) work, the fabricator shall also have an FCM endorsement through AISC. The Contractor shall notify the DCES of the fabrication schedule at lea st 21 calendar days prior to commencement of any non -pre-engineered proprietary shop fabrication. All welding required for the fabrication of temporary steel structures shall be performed in accordance with the provisions of the NYS Steel Construction Manual. The Contractor is responsible for furnishing and installing any stone fill slope protection in accordance with Section 620 used to guard against erosion and/or scour of the end slopes and all temporary substructures. The type of the fill slope protection shall be as shown in the contract plans and paid under Item 619.05nn. If the bridge connects sidewalk at each end of the bridge, payment for all approach sidewalk and earthwork necessary to connect the temporary structure with the existing sidewalk system shall be as shown in the contract plans and paid under Item 619.05nn. Load rating calculations for the temporary structure shall bear the stamp and signature of a professional Engineer and shall be submitted to the DCES for review. Load ratings shall be computed using the Load Factor Design (LFD) or Allowable Stress Design (ASD) methodology. The Inventory and Operation load ratings shall be based on an AASHTO HS -20 live loading. Additionally, if the structure was designed using the NYSDOT LRFD Bridge Design Specifications, the load ratings shall also be computed by the Load a nd Resistance Factor Rating (LRFR) method. LRFR ratings shall be provided at the Inventory and Operating levels as rating factors of the AASHTO HL -93 live load. All Load Ratings shall be calculated in accordance with AASHTO’s The Manual for Bridge Evaluation . Prior to beginning construction of any temporary structure designed by the Contractor, the Contractor shall submit detailed plans and calculations to the DCES for review and approval in accordance with §585 -3.03 Working Drawings . The review by the DCES, does not and shall not relieve the Contractor of the responsibility for the adequacy and design of the temporary structures and approaches. Prior to opening a temporary structure to traffic, the structure shall be inspected by a Professional Engineer who shall certify in writing to the Engineer that the structure was constructed in accordance with the design. The Contractor shall have the temporary structure inspected, under the direction of a Professional Engineer, by a person familiar with bridge construction at least once a month. On or before each anniversary of the opening of a temporary structure that has been open to traffic for
619-3 22
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 one year or more, the structure shall be inspected by a Professional Engineer, who shall certify in writing that:
619-3.22 Pavement Patching. The Contractor shall place paving materials suitable to provide temporary
pavement patches on paved surfaces where vehicular, bicycle or pedestrian traffic is to be maintained, including the traveled way, shoulders, sidewalks, and other paved surfaces damaged by traffic or environmental factors and not by Contractor operations. During periods of active work on the contract, the C ontractor shall complete needed patches on a daily basis. During periods of winter shutdown, the Engineer will inspect the pavement on frequent and regular intervals and will notify the Contractor of areas to be patched. The Contractor shall install paveme nt patching, at locations identified by the Engineer, within 24 hours of notification. The Contractor shall place pavement patches to provide a relatively smooth, uniform driving surface suitable for safe travel at the posted speed limit. Pavement patches shall be placed to repair surface irregularities including, but not limited to, holes, depressions, cracks, and uneven joints. Areas to be patched shall be adequately cleaned and tack -coated if necessary, and patching material shall be thoroughly compacted by hand or by roller.
619-3.23 Mailboxes. In the event the original mounting post has been lost, damaged, is unusable, or is
not consistent with U.S. Postal Service requirements, the Contractor shall furnish and install a new mounting post and/or mailbox with mounting post at the designated locati on and at the proper height in accordance with the requirements of the U.S. Postal Service. The replacement mailbox shall be of a similar or larger size than the original. Where the mailbox will be placed over a guide rail and/or ot her location where the postal patron will have easiest access to the rear of the mailbox, the replacement mailbox shall be one having a door on each end.
619-4 Method of Measurement
619-4.01 General . (None Specified.)
619-4.02 Basic Work Zone Traffic Control . The work under basic work zone traffic control will be
measured for payment on a lump sum basis.
619-4.03 Basic Work Zone Traffic Control (Daily Operations). The work under basic work zone traffic
control (daily operations) will be measured for payment on a lump sum basis.
619-4.04 Temporary Business Signs. The quantity to be measured for payment will be in square feet to
the nearest 0.1 square feet of business signs installed.
619-4 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
619-4.05 Covering or Removal of Pavement Markings . The quantity to be measured for payment will
be in feet to the nearest whole foot along the centerline of the pavement stripes covered or removed. No measurement will be made for the gaps between broken and dotted line segments. If preformed tape is used to cover an existing line, payment will be based on the width of the line covered. Measurement for covering or removal of striping with a width greater than 4 inches will be made by the following method: Width of Striping (in) x Number of Feet 4 (in) Letters and symbols will be measured by each unit covered or removed. A unit will consist of one letter or one symbol except that a double -headed arrow will be measured as two units and triple headed arrow will be measured as three units. Example: "SCHOOL" would be measured as six units. Each R in a railroad crossing marking will be measured as a single unit, but the "X" will be measured by the number of feet of 4 inch stripe.
619-4.06 Temporary Pavement Markings . The quantity to be measured for payment will be in feet to the
nearest whole foot along the centerline of the pavement stripes installed, and will be based on a 4 inch wide stripe. No measurement will be made for the length of skips in the dashed line. M easurement for installation of striping with a width greater than 4 inches will be made by the following method: Width of Striping (in) x Number of Feet 4 (in)
619-4.07 Interim Pavement Markings . The quantity to be measured for payment will be in feet to the
nearest whole foot along the centerline of the pavement stripes installed, and will be based on a 4 inch wide stripe. No measurement will be made for the length of skips in the dashed line. Measurement for installation of striping with a width greater than 4 inches will be made by the following method: Width of Striping (in) x Number of Feet 4 (in) Letters and symbols will be measured by each unit installed. A unit will consist of one letter or one symbol except that a double -headed arrow will be measured as two units and triple headed arrow will be measured as three units. Example: “SCHOOL” would be measured as six units. Each R in a railroad crossing marking will be measured as a single unit, but the “X” will be measured by the number of feet of 4 inch stripe.
619-4.08 Temporary Rumble Strips . The quantity to be measured for payment will be in feet to the nearest
whole foot of individual temporary rumble strip installed, measured transverse to the direction of traffic flow.
619-4.09 Interim Tubular Markers . The quantity to be measured for payment will be the number of
interim tubular markers installed.
619-4.10 Portable Variable -Message Signs (PVMS) and Truck Mounted Variable Message Signs
(TMVMS). The quantity of PVMS or TMVMS with a pay unit of each to be measured for payment will be the number of signs provided. The quantity of PVMS or TMVMS with a pay unit of weeks to be measured for payment will be in weeks to the nearest whole week.
619-4.11 Type III Construction Barricades . The quantity to be measured for payment will be the number
of barricade units installed.
619-4 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 619-4.12 Temporary Positive Barrier . . The quantity to be measured for payment of temporary positive barrier will be in feet to the nearest foot along the centerline of temporary positive barrier installed. The quantity to be measured for payment of Box Beam to Flared Temporary Concrete Barrier Transition will be the number of such transitions installed. The quantity to be measured for payment of Box Beam to Unflared Temporary Concrete Barrier Transition will be the number of such transitions installed. The quantity to be measured for payment of Temporary Concrete Barrier Face to Box Beam Transition will be the number of such transitions installed. The quantity to be measured for payment of Temporary Concrete Barrier Back to Box Beam Transition will be the number of such transitions installed. The quantity to be measured for payment of Corrugated Beam to Flared Temporary Concrete Barrier Transition will be the number of such transitions installed. The quantity to be measured for payment of Temporary Concrete Barrier Face to Corrugated Beam Transition will be the number of such transitions installed. The quantity to be measured for payment of Temporary Concrete Barrier Back to Corrugated Beam Transition will be the number of such transitions installed. The quantity to be measured for payment of temporary positive barrier will be in feet to the nearest foot along the centerline of temporary positive barrier installed .
619-4.13 Temporary Glare Screen . The quantity to be measured for payment will be in feet to the nearest
whole foot along the length of the temporary glare screen installed.
619-4.14 Temporary Impact Attenuator . The quantity to be measured for payment will be the number of
temporary impact attenuators installed.
619-4.15 Temporary Sand Barrel Arrays . The quantity to be measured for payment will be the number
of individual sand barrel modules installed.
619-4.16 Vehicle Arresting Barrier . The quantity to be measured for payment will be the number of
barriers installed.
619-4.17 Maintain or Modify Traffic Signal Equipment . The quantity of signalized intersections
maintained to be measured for payment will be in months to the nearest 1/4 month. The quantity of traffic signal equipment modified to be measured for payment will be on an each location basis.
619-4.18 Temporary Traffic Signals . The work under temporary traffic signals will be measured for
payment on an each location basis.
619-4.19 Nighttime Operations . The work under nighttime operations will be measured for payment on a
lump sum basis.
619-4.20 Traffic Control Supervisor . The work under traffic control supervisor will be measured for
payment on a monthly basis to the nearest 1/4 month.
619-4.21 Temporary Structures and Approaches . The work performed under temporary structures and
approaches will be measured for payment on a lump sum basis.
619-4.22 Pavement Patching . The work under Pavement Patching, Winter will be measured for payment
on a Dollars -Cents basis.
619-4 23
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 619-4.23 Mailboxes. The quantity to be measured for payment will be the number of mailboxes installed in accordance with the contract documents or as directed by the Engineer. Mailboxes installed for the Contractor’s convenience or due to damage during the contract period wi ll not be compensated for.
619-4.24 Portable Temporary Rumble Strips (PTRS). PTRS arrays will be measured by Device -Day.
When measured by Device -Day the quantity will be the number of devices (PTRS arrays) used each calendar day which are satisfactorily furnished, installed, maintained, and operated at each work zone location. If P TRS arrays are utilized at more than one work zone location on the same day, the total number of PTRS array -days measured for payment will be the total number of PTRS arrays setup on that day. For the purpose of this specification, one Device -Day is defined as one PTRS array, set up and in use in a calendar day exceeding one hour. Two Device -Days is one PTRS array over two days or two PTRS arrays used on one day. A PTRS array relocated within th e same work zone on the same day or same shift will count as one PTRS array.
619-4.25 Automated Flagger Assistance Devices (AFAD). The quantity measured for payment will be
the number of AFAD’s used each day which are satisfactorily furnished, installed, maintained, and operated at each work zone location. If AFAD’s are operated at more than one work zone location on the same day, the total number of AFAD -days measured for payment will be the total number of AFAD setup on that day, however no additional payment will be made for AFAD’s relocated within the same work zone on the same day. Work shifts spanning over two consecutive calendar days will be considered to occur on the “same day”. For the purpose of this specification, one AFAD -Day is defined as two AFAD’s, set up and in use for a portion of a day exceeding one hour.
619-5 Basis of Payment
619-5.01 General. The price bid shall include all labor, materials, and equipment necessary to complete
the work. No payment will be made for damage caused by vehicle accidents, vandalism, or any other similar causes.
619-5 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 C. Major Non -Conformance. Where major non -conformance with the requirements of this specification is noted by the Engineer, and prompt Contractor compliance is deemed not to be obtainable, the Engineer may stop contract work. Where major non -conformance with the requirements of this specification is noted by the Engineer, and the Contractor fails to correct deficiencies for a period of 24 hours, the Department may correct the adverse conditions by any means deemed appropriate a nd will deduct the cost of the corrective work from any monies due the Contractor. The cost of this corrective work will be in addition to the non - payment for basic work zone traffic control, non -payment of any other items of work under this section and li quidated damages assessed.
619-5.02 Basic Work Zone Traffic Control . The lump sum price bid for basic work zone traffic control
shall include all labor, materials, and equipment necessary to complete the work. Construction signs; arrow panels; warning lights on signs, barricades, and channelizing devices; the cost of temp orarily terminating guide rail, median barrier, or bridge rail during non -work hours; work required to maintain drainage facilities during construction operations; and dust control shall be included in the lump sum p rice bid for basic work zone traffic control. Removal of debris from drainage features that was present at the time of contract award shall be paid for separately. Progress payments will be made at 10 percent of the lump sum price when the initial construction sign installation is complete, as determined by the Engineer, and an additional 10 percent of the lump sum price bid when 10 percent of the contract work, excl uding basic work zone traffic control, contingency items, and mobilization, has been completed. The remaining 80 percent will be paid in subsequent contract payments, in proportion to the amount of other contract work completed, less any non -payment for de ficient work zone traffic control. If the contract completion date is extended, no additional payment will be made for basic work zone traffic control.
619-5.03 Basic Work Zone Traffic Control (Daily Operations). The lump sum price bid for basic work
zone traffic control (daily operations) shall include all labor, materials, and equipment necessary to complete the work. Construction signs; arrow panels; warning lights on signs, barricades, and channelizing devices ; and the cost of temporarily terminating guide rail, median barrier, or bridge rail during non -work hours; shall be included in the lump sum price bid for basic work zone traffic control (daily o perations). Progress payments will be made at 10 percent of the lump sum price when the initial construction sign installation is complete, as determined by the Engineer, and an additional 10 percent of the lump sum price bid when 10 percent of the contract work, excl uding basic work zone traffic control, contingency items, and mobilization, has been completed. The remaining 80 percent will be paid in subsequent contract payments, in proportion to the amount of other contract work completed, less any non -payment for de ficient work zone traffic control. If the contract completion date is extended, no additional payment will be made for basic work zone traffic control.
619-5.04 Business Signs. The unit price bid for temporary business signs shall include the cost of labor,
materials, and equipment necessary to complete the work, including sign supports.
619-5.05 Covering or Removal of Pavement Markings. The unit price bid for the covering or removal
of pavement markings shall include the cost of all labor, materials, and equipment necessary to complete the work, including the costs of any repairs or replacement of damaged pavement or existing pavement markings resulting from pavement marking removal operations.
619-5.06 Temporary Pavement Markings. The unit price bid for temporary pavement markings shall
include the cost of furnishing all labor, materials, and equipment necessary to complete the work. Payment shall be provided each time temporary pavement markings are first applied on a pavement course in accordance with the contract requirements.
619-5 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 No additional payment shall be provided for the installation of construction signs, temporary delineators, and channelizing devices necessitated by the Contractor’s failure to place temporary pavement markings before the pavement is opened to traffic, or f or temporary roadside pavement channelization, until edge lines are placed. No additional payment shall be provided for markings required because the Contractor failed to place the next pavement course or the final pavement markings within 14 calendar days.
619-5.07 Interim Pavement Markings . The unit price bid for interim pavement markings shall include
the cost of furnishing all labor, materials, and equipment necessary to complete the work. The work to remove traffic paint or epoxy paint will be paid for separately.
619-5.08 Temporary Rumble Strips . The unit price bid for temporary rumble strips shall include the cost
of all labor, materials, and equipment necessary to complete the work. Payment will include the cost of pavement cleaning, asphalt concrete, and other materials used to form or fill in the rumble strips and tack coat. On multiyear contracts where it is desired to have rumble strips in place for more than one construction season, the rumble strips will be paid for separately each year they are installed.
619-5.09 Interim Tubular Markers. The unit price bid for interim tubular markers shall include the cost
of furnishing all labor, materials, and equipment necessary to complete the work, including removal and the cost of replacing damaged markers. Interim tubular markers that are in satisf actory condition may be relocated. When interim tubular markers are relocated, payment will be made for another interim tubular marker.
619-5.10 Portable Variable -Message Signs (PVMS) and Truck Mounted Variable Message Signs
(TMVMS). The unit price bid for PVMS or TMVMS shall include the cost of all labor, materials, testing and equipment necessary to complete the work, including cellular telephone service initial start -up and monthly charges for the cellular communications option. Th e TMVMS does not require cellular communications service. Progress payments for PVMS or TMVMS with a pay unit of each will be made for 90 percent of the unit price bid when each unit has been satisfactorily installed and is operational at the first location. The remaining 10 percent will be paid upon removal.
619-5.11 Type III Construction Barricades. The unit price bid for Type III construction barricades shall
include all labor, materials, and equipment necessary to complete the work, including lighting when required. When barricades are relocated or the diagonal stripes are changed to allow traffic to pass on the other side of the barricade, additional payment will be made for another barricade. Movements of the barricade from one side of the roadway to the other side, movements within 100 feet of the initial location, or daily replacement to approximately the same location, not requiring any change in the diagonal stripes, will not be considered as relocation, and will not be paid for as additional barricades. No payment will be made for Type III construction barricades used at the option of the Contractor in lieu of channelizing devices.
619-5.12 Temporary Positive Barrier. The unit price bid for temporary positive barrier shall include all
labor, materials, and equipment necessary to satisfactorily complete the work, including any required connection devices, end treatments, end section pinning, temporary delineation and rep air of pavement after removal of temporary positive barrier. Temporary impact attenuators, if required, will be paid for separately. When temporary positive barriers are relocated, except movements necessary to maintain, realign, or replace damaged units and daily relocat ion of segments to allow access to the work area which are restored at the end of the work shift, additional payment for the relocation will be made for additional length of temporary concrete barrier.
619-5 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 The unit price bid for temporary positive barrier – Category X shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including pinning. The unit price bid for warning lights on temporary positive barrier with shall include the cost of furnishing all labor, materials, equipment, and electrical power necessary to complete the work. Should a barrier that is equipped with warning lights be moved to a new location where temporary concrete barrier with warning lights is required, payment will be made for additional warning lights on temporary positive barrier. The unit price bid for Box Beam to Flared Temporary Concrete Barrier Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting of exi sting rail; placement and removal of the temporary berm; seeding of the disturbed area; and replacement of rail with holes in its face. No separate payment will be made for box beam used to provide an overlap. The unit price bid for Box Beam to Unflared Temporary Concrete Barrier Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting of e xisting rail: furnishing of Transition End Pieces, rub rail heavy posts and blockouts; and replacement of rail with holes in its face. The unit price bid for Temporary Concrete Barrier Face to Box Beam Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting of exist ing rail and furnishing of box beam tapered end piece. The unit price bid for Temporary Concrete Barrier Back to Box Beam Transition shall include the cost of furnishing all labor, materials, and equipment necessary to complete the work, including removal and replacement or resetting of existing rail and re placement of rail with holes in its face. No separate payment will be made for box beam used to provide an overlap. The unit price bid for Corrugated Beam to Flared Temporary Concrete Barrier Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting of existing rail; placement and removal of the temporary berm; seeding of the disturbed a rea; and furnishing and removal of terminal rail section. No separate payment will be made for corrugated beam used to provide an overlap. The unit price bid for Temporary Concrete Barrier Face to Corrugated Beam Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting o f existing rail and furnishing and removal of W beam end piece. The unit price bid for Temporary Concrete Barrier Back to Corrugated Beam Transition shall include the cost of furnishing all labor, materials, and equipment necessary to complete the work, including removal and replacement or resetting of existing rail and furnishing and removal of terminal rail section. No separate payment will be made for corrugated beam used to provide an overlap. Progress payments will be made at the unit price bid for 90 percent of the quantity, after placement and demonstration of satisfactory operation. The remaining 10 percent will be paid upon removal. No payment will be made for temporary concrete barrier installed at the Contractor’s option, required solely due to a delay caused by the Contractor’s operations, or installed to protect pavement edge drop -offs, unless required in the contract documents. The unit price bid for temporary positive barrier shall include all labor, materials, and equipment necessary to satisfactorily complete the work, including any required connection devices, end treatments, end section pinning, temporary delineation and rep air of pavement after removal of temporary positive barrier. Temporary impact attenuators, if required, will be paid for separately. When temporary positive barriers are relocated, except movements necessary to maintain, realign, or replace damaged units a nd daily relocation of segments to allow access to the work area which are restored at the end of the work shift, additional payment will be made for additional length of temporary positive barrier. The unit price bid for pinned temporary positive barrier shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including pinning.
619-5 13
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 The unit price bid for temporary positive barrier stiffened with box beam shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including the box beam. The unit price bid for temporary positive barrier with warning lights shall include the cost of furnishing all labor, materials, equipment, and electrical power necessary to complete the work. Should a barrier that is equipped with warning lights be moved to a new location where temporary positive barrier with warning lights is required, payment will be made for additional length of temporary positive barrier with warning lights. The unit price bid for Box Beam to Flared Temporary Positive Barrier Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting of existi ng rail: placement and removal of the temporary berm; seeding of the disturbed area; and replacement of rail with holes in its face. No separate payment will be made for box beam used to provide an overlap. The unit price bid for Box Beam to Unflared Temporary positive Barrier Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting of exis ting rail: furnishing of Transition End Pieces, rub rail heavy posts and blockouts; and replacement of rail with holes in its face. The unit price bid for Temporary Positive Barrier Face to Box Beam Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting of existing rail and furnishing of box beam tapered end piece. The unit price bid for Temporary Positive Barrier Back to Box Beam Transition shall include the cost of furnishing all labor, materials, and equipment necessary to complete the work, including removal and replacement or resetting of existing rail and repla cement of rail with holes in its face. No separate payment will be made for box beam used to provide an overlap. Progress payments will be made at the unit price bid for 90 percent of the quantity, after placement and demonstration of satisfactory operation. The remaining 10 percent will be paid upon removal. No payment will be made for temporary positive barrier ins talled at the Contractor’s option, required solely due to a delay caused by the Contractor’s operations, or installed to protect pavement edge drop -offs, unless required in the contract documents.
619-5.13 Temporary Glare Screen . The unit price bid for temporary glare screen shall include all labor,
materials, and equipment necessary to complete the work. When glare screens are relocated, except movements necessary to maintain, realign, or replace damaged units and daily relocation of temporary positive barrier segments with glare screen attached to allow access to the work area which are restored at the end of the work shift, additional payment will be made for the length of glare screen relocated. No payment will be made for repair or replacement of damaged components.
619-5.14 Temporary Impact Attenuator. The unit price bid shall include the cost of all labor, materials,
and equipment necessary to complete the work, including the connection to temporary or existing barrier, the back -up system, the pad, if indicated, and any excavation or backfill. When atte nuators are relocated, payment will be made for a new temporary impact attenuator, except minor movements within a site, such as movements to maintain, realign, or adjust an attenuator. No payment will be made to repai r, restore or replace an attenuator damaged by public traffic or by the Contractor’s operations. Progress payments will be made based on the unit price bid as follows: 90 percent when the attenuator is adequately installed and operational; the remaining 10 percent will be paid upon removal .
619-5.15 Temporary Sand Barrel Arrays. The unit price bid for temporary sand barrel arrays shall
include the cost of all labor, materials and equipment necessary to complete the work, including the cost of the sand fill and salt additive. Replacement of individual modules damaged by public tra ffic will be paid for at the unit price bid for each temporary sand barrel. Relocation of barrels to a new location will be paid for as a new installation.
619-5 16
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Progress payments will be made based on the unit price bid as follows: 90 percent when the barrels are adequately installed and operational; the remaining 10 percent will be paid upon removal.
619-5.16 Vehicle Arresting Barrier . The unit price bid for vehicle arresting barrier shall include the cost
of all labor, materials, and equipment necessary to complete the work. No payment will be made to repair, restore, or replace an attenuator damaged by public traffic or by the Contra ctor’s operations.
619-5.17 Maintain or Modify Traffic Signal Equipment. The unit price bid for maintaining traffic signal
equipment shall include the cost of all labor, materials, and equipment necessary to perform the work, with the exception of inductance loop replacement, if necessary, which will be paid for separately. Th e cost of the electric power shall be the responsibility of the original maintaining agency. No payment will be made during any period for which the Contractor has been granted an extension of time with engineering charges. The unit price bid for modifying traffic signal equipment per location shall include the cost of all labor, materials, and equipment necessary to perform the work.
619-5.18 Temporary Traffic Signals . The unit price bid for temporary traffic signals per location shall
include the cost of all labor, materials, and equipment necessary to complete the work, including the cost of electric power necessary to operate the signal until its removal is approved or directed by the Engineer. A location may be an intersection, a work zone with two or more signal faces interconnected and operating together, or other limits as defined in the contract documents. Portable or temporary traffic signals used at the Contractor’s option in lieu of flaggers shall be included in the lump sum price bid for basic work zone traffic control. Progress payments will be made at 50 percent of the unit price bid for each location after installation and demonstration of satisfactory operation. The remaining 50 percent will be paid in progress payments per week of temporary traffic signal provided. T he amount of such weekly payment will be determined by dividing 50 percent of the unit price bid by the number of weeks the temporary traffic signal is to remain in operation, as shown on the approved progress schedule.
619-5.19 Nighttime Operations . The lump sum price bid for portable lighting shall include all labor,
materials, and equipment necessary to complete the work, including the cost to adapt equipment and provide power to light sources. Progress payments will be made based on the lump sum price bid as follows: 20 percent when the Nighttime Operations and Lighting Plan has been accepted and satisfactory lighting of nighttime operations has begun; the remaining 80 percent will be paid in progress payments per week of nighttime operations completed. The amount of such weekly payment will be determined by dividing 80 percent of the lump sum amount bid by the number of weeks of nighttime operations in the approved Nighttime Operations and Lighting Plan.
619-5.20 Traffic Control Supervisor . The unit price bid for traffic control supervisor shall include the
cost of furnishing all labor, materials, equipment, training, and direct supervision necessary to provide and support the activities of a traffic control supervisor.
619-5.21 Temporary Structures and Approaches . The lump sum price bid for temporary structures and
approaches shall include the cost of all labor, materials, and equipment necessary to complete the work including design preparation, submittals, and inspection of the structure. Progress payments will be made at the unit price bid for 90 percent of the quantity after the temporary structures and approaches are complete and operable. The remaining 10 percent will be paid upon removal.
619-5.22 Pavement Patching . Payment shall include the cost of furnishing all labor, materials, and
equipment necessary to patch pavement during periods of winter shutdown when work on the contract is inactive, or when asphalt material is not available, including mobilization of wor k crews and work zone
619-5 23
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 traffic control. The cost of all work associated with providing and installing suitable pavement patching materials to maintain pavements open to traffic in acceptable condition when work on the contract is active, or when asphalt material is available, wi ll be paid under an asphalt sidewalk item if that item is in the contract, or alternatively, under a top course paving item, regardless of the material actually used. Payment for winter patching will be based on force account records submitted to the Engin eer, plus 10% overhead and 10% profit in accordance with §109 -05.
619-5.23 Mailboxes . The unit price bid for mailboxes shall include all labor, materials, and equipment
necessary to complete the work. Only one payment for each mailbox will be made regardless of the number of times it is moved or replaced and shall be made when the mailbox has been placed in its final location. Where multiple mailboxes are installed on a single post, payment will be based upon the number of individual mailboxes so installed.
619-5.24 Portable Temporary Rumble Strips (PTRS). The price bid shall include the cost of furnishing
all labor, materials, and equipment necessary to satisfactorily complete the work. Pavement cleaning, if necessary, shall be included.
619-5.25 Automated Flagger Assistance Devices (AFAD). The unit price bid shall include the cost of all
labor, materials, and equipment necessary to satisfactorily complete the work. The cost of advance warning signs shall be included in the unit bid price for Item 619.01 – Basic Work Zone Traffic Control. Payment will be made under: Item No. Item Pay Unit 619.01 Basic Work Zone Traffic Control Lump Sum 619.0101 Basic Work Zone Traffic Control (Daily Operations) Lump Sum 619.04 Type III Construction Barricades Each 619.05nn Temporary Structures and Approaches Lump Sum 619.0701 Temporary Business Signs Square Feet 619.0801xx Remove Pavement Marking Stripes Feet 619.0802xx Remove Pavement Marking Letters or Symbols Each xx = Material 01 = Traffic Paint, 02 = Epoxy Paint, 06 = Permanent Pavement Tape 619.0803 Cover Existing Pavement Marking Stripes (Removable Tape) Feet 619.0804 Cover Existing Pavement Marking Letters or Symbols (Removable Tape) Each 619.09xx Temporary Pavement Markings, Stripes Feet xx = Material 01= Traffic Paint, 03= Removable Tape, 04= Removable Wet Reflective Tape 619.1001xx Interim Pavement Markings, Stripes Feet 619.1002xx Interim Pavement Markings, Symbols Each 619.1003xx Interim Pavement Markings, Letters Each xx = Material 01= Traffic Paint, 02= Epoxy Paint, 03= Removable Tape,
619-5 25
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 04= Removable Wet Reflective Tape, 05= Traffic Paint Supplemented with Raised Markers 619.1105XY Portable Variable Message Sign (PVMS) Standard size – Full Matrix (LED) Each 619.1106XY Portable Variable Message Sign (PVMS) Standard size – Full Matrix (LED) Week 619.1107XY Portable Variable Message Sign (PVMS) Large size - Full Matrix (LED) Each 619.1108XY Portable Variable Message Sign (PVMS) Large size - Full Matrix (LED) Week 619.1109XY Portable Variable Message Sign (PVMS) Small size - Full Matrix (LED) Each 619.1110XY Portable Variable Message Sign (PVMS) Small size - Full Matrix (LED) Week 619.1111XY Portable Variable Message Sign (PVMS) Standard size – Line or character matrix (LED) Each 619.1112XY Portable Variable Message Sign (PVMS) Standard size – Line or character matrix (LED) Week XY = Options X= Equipment Options Y= Cellular Communication Options 1 = No optional equipment specified 1 = No Cellular Communications required 2= Radar 2 = Cellular Communications 3= CCTV Camera 3 = Cellular Communication with NTCIP compliance 4= Radar & CCTV Camera 619.1113 Truck Mounted Variable Message Signs (TMVMS) Each 619.1114 Truck Mounted Variable Message Signs (TMVMS) Week 619.12 Temporary Glare Screen Feet 619.13nn Temporary Traffic Signals Each Location 619.14 Automated Flagger Assistance Device (AFAD) DVDY 619.1611 Maintain Traffic Signal Equipment (Requirement A) Intersection Month 619.1612 Maintain Traffic Signal Equipment (Requirement B) Intersection Month 619.1613 Maintain Traffic Signal Equipment (Requirement C) Intersection Month 619.1614nn Modify Existing Traffic Signal Equipment (Temporary) Each Location 619.1711 Temporary Positive Barrier – Category 1 (Pinning Prohibited) Feet 619.1712 Temporary Positive Barrier – Category 2 (Pinning Permitted) Feet 619.1713 Temporary Positive Barrier – Category 3 (Pinning Prohibited) Feet 619.1714 Temporary Positive Barrier – Category 4 (Pinning Permitted) Feet 619.1715 Temporary Positive Barrier – Category 5 (Pinning Prohibited) Feet 619.1716 Temporary Positive Barrier – Category 6 (Pinning Required) Feet 619.1717 Temporary Positive Barrier – Category 7 (Pinning and Box -Beam -Stiffening Required) Feet 619.1719 Warning Lights on Temporary Positive Barriers Each 619.1720 Box Beam to Flared Temporary Concrete Barrier Transition Each 619.1721 Box Beam to Unflared Temporary Concrete Barrier Transition Each 619.1722 Temporary Concrete Barrier Face to Box Beam Transition Each 619.1723 Temporary Concrete Barrier Back to Box Beam Transition Each 619.1724 Corrugated Beam to Flared Temporary Concrete Barrier Transition Each 619.1725 Temporary Concrete Barrier Face to Corrugated Beam Transition Each 619.1726 Temporary Concrete Barrier Back to Corrugated Beam Transition Each
620-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 619.1802 Temporary Impact Attenuator - Redirective (Test Level 2) Each 619.1803 Temporary Impact Attenuator - Redirective (Test Level 3) Each 619.1812 Temporary Impact Attenuator - Gating (Test Level 2) Each 619.1813 Temporary Impact Attenuator - Gating (Test Level 3) Each 619.20 Interim Tubular Markers Each 619.21 Temporary Sand Barrel Module Each 619.22 Temporary Rumble Strips Feet 619.2202 Portable Temporary Rumble Strips DVDY 619.23 Vehicle Arresting Barrier Each 619.24 Nighttime Operations (Entire Project) Lump Sum 619.24nn Nighttime Operations Lump Sum 619.25 Traffic Control Supervisor Month 619.2601 Pavement Patching, Winter Dollars -Cents 619.27 Mailboxes Each NOTE: nn denotes a serialized pay item. DVDY denotes Devices per Day SECTION 620 - BANK AND CHANNEL PROTECTION (Last Revised May 1, 201 9)
620-1 DESCRIPTION. This work shall consist of furnishing all labor, equipment, and materials to place
a protective covering of erosion -resistant material in the locations indicated in the contract documents or as directed by the Engineer. The work shall be done in accordan ce with these specifications and in conformity with the lines, grades, thicknesses, and typical sections shown in the contract documents or established by the Engineer.
620-1.01 Vacant .
620-1.02 Stone Filling. Stone filling shall consist of a layer of well graded stone.
620-1.03 Dry Rip -Rap. Dry rip -rap shall consist of a fitted layer of shaped and graded stone.
620-1.04 Grouted Rip -Rap. Grouted rip -rap shall consist of a layer of stone, similar to dry rip -rap, with
the spaces between the stones filled with cement grout.
620-1.05 Bedding Material. Bedding material shall consist of a layer of granular material placed to
prevent underlying finer material from passing into and through the stone filling or rip -rap.
620-1.06 Concrete Block Paving. Concrete block paving shall consist of concrete blocks placed on
embankment slopes under structures as protection against erosion.
620-1.07 Gabions. Gabions shall consist of open wire mesh baskets, filled with stones.
620-2 Materials
620-2.01 General. The requirements for bank and channel protection materials are described below. The
procedure for acceptance or rejection of stone filling and rip -rap materials shall be in conformance with the procedures contained in the geotechnical control procedure “ Procedure for the Control of Stone Filling and Rip -Rap Items ”.
620-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 620-2.02 Stone Filling. Provide material meeting the requirements of §733 -21 Stone Filling for the type of stone filling specified in the contract documents.
620-2.03 Dry Rip -Rap. Provide material meeting the requirements of §733 -22 Rip-Rap, except for §733 -
22D Grout.
620-2.04 Grouted Rip -Rap. Provide material meeting the requirements of §733 -22 Rip-Rap.
620-2.05 Bedding Material. Bedding material shall meet the requirements of the following subsections
of Section 700 Materials and Manufacturing for the type of bedding material specified in the contract documents:
620-2.06 Concrete Block Paving. Provide concrete blocks meeting the requirements of §704 -04
Concrete Block (Slope Paving) . The blocks shall conform to the dimensions identified in Table 620 -1 Concrete Block Dimensions : TABLE 620 -1 CONCRETE BLOCK DIMENSIONS Nominal Dimension Standard Dimension Length 16 to 20 in. 15 ⅝ to 19 ⅝ in. (± ⅛ in.) Thickness 6 in. (solid) 5 ⅝ in. (± ⅛ in.) Width 8 in. 7 ⅝ in. (± ⅛ in.) The size of block used shall be consistent throughout any continuously paved area, and only one nominal length shall be used in any contract. All units shall be sound and free from cracks or other defects that would interfere with the proper placing of the blocks or impair the strength, permanence and appearance of the construction. Cushion sand for concrete block paving shall meet the requirements of §703 -06 Cushion Sand . Grout, where used, shall conform to Table 620 -2 Concrete Block Grout Requirements . TABLE 620 -2 CONCRETE BLOCK GROUT REQUIREMENTS Material Subsection Grout Mix Portland Cement Type 2 §701-01 1 part Mortar Sand §703 -03 2 parts
620-2.07 Gabions. Provide materials meeting the requirements of §712 -15 Gabions .
620-3 Construction Details
620-3.01 General. The ground surface on which bank or channel protection is to be placed shall be free
of brush, trees, stumps, and other objectionable material and shall be dressed to a smooth surface. All soft or spongy material shall be removed to the depth shown in the contract documents and replaced with approved material. Filled areas shall be compacted in accordance with applicable provisions of Section 203. Protection for structure foundations shall be provided as early as the foundation constructio n permits. The type of protection shall be placed in accordance with these specifications and the contract documents.
620-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 620-3.02 Stone Filling. Stone filling shall be placed in a manner that will produce a reasonable well - graded mass of stone with smaller stone fragments filling the space between the larger ones, so as to result in the minimum practicable percentage of voids. The final section of stone filling shall be in conformance with the lines, grades, and thicknesses shown in the contract documents. Stone filling used for bank or channel protection shall be placed to its full course thickness in one operation, unless specified in the special provisions, and in such a manner that the underlying material will not be displaced or worked into the layer of stone filling. Placement of stone upon finished bedding material, when used, shall be carefully controlled to avoid disr uption and damage to the layer of bedding material. The stone shall be so placed and distributed that there will be no pockets of uniform size material. The desired distribution of the various sizes of stone throughout the mass shall be obtained by selective loading of the material at the quarry or other source; by controlled dumping of successive loads during final placing; or by other methods of placement which will produce the specified results. Rearranging of individual stones by mechanical equipment or by hand will be r equired to the extent necessary to secure the specified results. When stone filling is dumped under water, methods shall be used that will minimize segregation.
620-3.03 Dry Rip -Rap. The stones shall be placed so that the dimension approximately equal to the layer
thickness is perpendicular to the slope surface and that the weight of the stone is carried by the underlying material and not by the adjacent stones. On slopes, the largest stones shall be placed at the bottom of the slope. The dry rip -rap shall be properly aligned and placed so as to minimize void spaces between the adjacent stones. The spaces between the stones shall be filled with spalls of suitable s ize.
620-3.04 Grouted Rip -Rap. The procedure of placing the stones shall be the same as described in §620 -
3.03 Dry Rip -Rap except that the space between stones shall be filled with grout rather than spalls. Material upon which the grouted rip -rap is laid shall not be allowed to occupy the space between the stones. When the stones are in place, the spaces between them shall be completely filled with grout and the surface of the stones cleaned to remove accumulation of grout. Rip -rap shall not be grouted in freezing weather. The grouted rip -rap shall be kept moist for seven days after grouting. A suitable curing compound may be employed, if approved by the Engineer. The Engineer may direct that occasional spaces be left ungrouted for relief of hydrostatic pressure. The ungrouted spaces shall be chinked with spalls of suitable size.
620-3.05 Bedding Material. Where called for in the contract documents, stone filling and dry rip -rap
shall be placed on bedding material. The bedding material shall be placed on the prepared area to the full specified thickness of each layer in one operation, using methods which wil l not cause segregation of particle sizes. Contamination of bedding material by natural soils or other materials shall be prevented. Bedding material that becomes contaminated shall be removed and replaced with uncontaminated bedding material at no additional cost to the State.
620-3.06 Concrete Block Paving. Blocks shall be laid on a 3 in. bed of cushion sand in running bond
with the long dimension transverse to the slope and all joints tight. Blocks shall be set slightly higher than their final position and carefully hand tamped into their final position to p rovide a uniformly even surface and solid bedding under each block. In the areas where grouting is called for, the block shall be laid in running bond with the length parallel to the slope and with ¼ in. joints. Following the laying of blocks, in the area to be grouted, sufficient mortar sand shall be spread over the surfa ce and swept into the joints to fill the latter to 4 in. from the surface. The block shall be wetted before any grout is placed. The joints shall be filled with grout from the bottom flush with the top of the block.
620-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 After grouting has been completed and the grout has sufficiently hardened, the blocks shall be wetted, covered and cured with curing covers for the first seven days after grouting. Grout shall not be poured during freezing weather.
620-3.07 Gabions. Each gabion unit shall be assembled by binding together all vertical edges with wire
ties on approximately 6 in. spacing or by a continuous piece of connecting wire stitched around the vertical edges with a coil about every 4 in. Empty gabion units shall b e set to line and grade as shown in the contract documents. For structural integrity, wire ties or connecting wire shall be used to join the gabions together along the perimeter of all contact surfaces according to the manufacturer's inst ructions. Internal tie wires shall be uniformly spaced and securely fastened in each outside cell of the structure in accordance with the manufacturer's instructions or where ordered by the Engineer. When gabions are being placed as slope protection, the c ross-connecting wire may be deleted if directed by the Engineer. A fence stretcher, chain fall, or iron rod may be used to stretch the wire baskets and hold alignment. The gabions shall be filled with stone, carefully placed by hand or machine, to ensure alignment and avoid bulges with a minimum of voids. After a gabion has been filled, the lid shall be bent over until it meets the side and edges. The lid shall then be s ecured to the sides, ends, and diaphragms with wire ties or connective wire in the same manner described above for assembly.
620-4 Method of Measurement
620-4.01 General. Vacant .
620-4.02 Stone Filling. Stone filling will be measured in cubic yards, measured to the nearest whole
cubic yard, computed from the payment lines shown in the contract documents.
620-4.03 Dry Rip -Rap. Dry rip -rap will be measured in cubic yards, measured to the nearest whole cubic
yard, computed from the payment lines shown in the contract documents.
620-4.04 Grouted Rip -Rap. Grouted rip -rap will be measured in cubic yards, measured to the nearest
whole cubic yard, computed from the payment lines shown in the contract documents.
620-4.05 Bedding Material. Bedding material will be measured in cubic yards, measured to the nearest
whole cubic yard, computed from the payment lines shown in the contract documents.
620-4.06 Concrete Block Paving. Concrete block paving will be measured in square yards, measured to
the nearest whole square yard, computed from the payment lines shown in the contract documents.
620-4.07 Gabions. Gabions will be measured in cubic yards, measured to the nearest whole cubic yard,
computed from the payment lines shown in the contract documents.
620-5 Basis of Payment
620-5.01 General. Vacant .
620-5.02 Stone Filling. The unit price bid shall include the costs of furnishing all labor, material and
equipment necessary to complete the work except that any necessary excavation will be paid for separately.
620-5.03 Dry Rip -Rap. The unit price bid shall include the costs of furnishing all labor, material and
equipment necessary to complete the work except that any necessary excavation will be paid for separately.
620-5 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
620-5.04 Grouted Rip -Rap. The unit price bid shall include the costs of furnishing all labor, material and
equipment necessary to complete the work except that any necessary excavation will be paid for separately.
620-5.05 Bedding Material. The unit price bid shall include the costs of furnishing all labor, material and
equipment necessary to complete the work except that any necessary excavation will be paid for separately.
620-5.06 Concrete Block Paving. The unit price bid shall include the costs of furnishing all labor,
material and equipment necessary to complete the work except that any necessary excavation will be paid for separately.
620-5.07 Gabions. The unit price bid shall include the costs of furnishing all labor, material and
equipment necessary to complete the work except that any necessary excavation will be paid for separately. Payment will be made under: Item No. Item Pay Unit 620.02 Stone Filling (Fine) Cubic Yard 620.03 Stone Filling (Light) Cubic Yard 620.04 Stone Filling (Medium) Cubic Yard 620.05 Stone Filling (Heavy) Cubic Yard 620.06 Dry Rip -Rap Cubic Yard 620.07 Grouted Rip -Rap Cubic Yard 620.08 01 Bedding Material , Type 1 Cubic Yard 620.08 02 Bedding Material , Type 2 Cubic Yard 620.09 Concrete Block Paving Square Yard 620.10 Galvanized Gabions Cubic Yard 620.11 P.V.C. Coated Galvanized Gabions Cubic Yard SECTION 621 - CLEANING CULVERTS, DRAINAGE STRUCTURES AND EXISTING ROADSIDE SECTIONS
621-1 Description
621-1.01 General. This work shall consist of cleaning and keeping clean, existing culverts, closed
drainage systems, drainage structures, and existing roadside sections as shown in the contract documents.
621-1.02 Definitions. The following general definitions shall be used in conjunction with this section:
621-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
621-2 MATERIALS. None specified.
621-3 Construction Details
621-3.01 General. Provide appropriate control and discharge practices for all water throughout the
cleaning process. Include methods and schedules to be consistent with the soil erosion and sediment control plan in accordance with §209 -3.01 General and perform all work in accordance with §107 -12 Water Quality Protection.
621-3.02 Cleaning Culverts . Culvert locations identified in the contract documents shall be cleaned.
Materials removed shall be disposed of in accordance with §203 -3.02 B. Disposal of Surplus Excavated Materials . Removal of contaminated material shall be disposed of in accordance with Section 205 Contaminated Soil . It is not guaranteed that placement of surplus materials of spoil will be allowed within the right of way. Additionally, disposal of turbid water generated via the cleaning process shall be subject to appropriate environmental regulations.
621-3.03 Cleaning Closed Drainage System . Closed drainage systems identified in the contract
documents shall be cleaned. Materials removed shall be disposed of in accordance with §203 -3.02 B. Disposal of Surplus Excavated Materials . Removal of contaminated material shall be disposed of in accordance with Section 205 Contaminated Soil . It is not guaranteed that placement of surplus materials of spoil will be allowed within the right of way. Additionally, disposal of turbid water generated via the cleaning process shall be subject to appropriate environmental regulations.
621-3.04 Cleaning Drainage Structures . Drainage structures identified in the contract documents shall
be cleaned. Materials removed shall be disposed of in accordance with §203 -3.02 B. Disposal of Surplus Excavated Materials. Removal of contaminated material shall be disposed of in accordance with Section 205 Contaminated Soil . It is not guaranteed that placement of surplus materials of spoil will be allowed within the right of way. Additionally, disposal of turbid water generated via the cleaning process shall be subject to appropriate environmental regulations.
621-3.05 Cleaning, Grading and Shaping Existing Roadside Section . The Contractor shall remove
earth, turf, brush and debris, or provide necessary fill material to restore adequate roadside drainage. Ditches shall be shaped as shown in the contract documents. Material removed shall be disposed of in conformance with the p rovisions of §203 -3.02 B. Disposal of Surplus Excavated Materials . Removal of contaminated material shall be disposed of in accordance with Section 205 Contaminated Soil .
621-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 The Contractor shall protect all fences, markers, culverts, underground structures, utilities and other appurtenances adjacent to the work area. Any damaged facilities and/or disturbed areas shall be replaced in kind at no additional cost to the state.
621-4 Method of Measurement
621-4.01 General. None specified.
621-4.02 Cleaning Culverts . Cleaning culverts will be measured in linear feet of culvert cleaned,
measured along the invert, to the nearest foot. Multiple barrel culverts will be measured along each individual barrel.
621-4.03 Cleaning Closed Drainage System . Cleaning closed drainage systems will be measured in
linear feet of pipe cleaned, measured along the invert of the pipe, from the inside wall surface of the drainage structure to the inside wall surface of the next drainage structure, measured to the neare st foot.
621-4.04 Cleaning Drainage Structures . Cleaning drainage structures will be measured as the number
of drainage structures cleaned.
621-4.05 Cleaning, Grading and Shaping Existing Roadside Section . Cleaning, grading, and shaping
existing roadside section will be measured as the number of linear feet along the edge of the adjacent roadway.
621-5 Basis of Payment
621-5.01 General. None specified.
621-5.02 Cleaning Culverts. The unit price bid shall include the cost of all labor, materials, and
equipment necessary to satisfactorily complete the work including the cost of managing and disposing the materials used to clean and the materials removed from the culverts. Payment fo r cleaning culverts will be made only for those facilities designated in the contract documents. Only one payment for each length of facility will be made regardless of the number of times it is cleaned.
621-5.03 Cleaning Closed Drainage System. The unit price bid shall include the cost of all labor,
materials, and equipment necessary to satisfactorily complete the work including the cost of managing and disposing the materials used to clean and the materials removed from the closed drainage sys tem. Payment for cleaning closed drainage systems will be made only for those facilities designated in the contract documents. Only one payment for each facility will be made regardless of the number of times it is cleaned. Cleaning intermediate drainage structures at junction points within a closed drainage system shall be paid for under its respective item.
621-5.04 Cleaning Drainage Structures. The unit price bid for each shall include the cost of all labor,
materials and equipment necessary to satisfactorily complete the work including the cost of managing and disposing the materials used to clean and the materials removed from the drainage st ructures. Payment for cleaning drainage structures will be made only for those facilities designated in the contract documents. Only one payment for each facility will be made regardless of the number of times it is cleaned.
621-5 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 621-5.05 Cleaning, Grading and Shaping Existing Roadside Section . The unit price bid shall include the costs of furnishing all labor, material and equipment necessary to complete the work including the cost of disposing the materials removed from the roadside section and/or fill material to restore the shape. Payment will be made under: Item No. Item Pay Unit 621.01 Cleaning Culverts with Span of 50 in. or Less Linear Foot 621.02 Cleaning Culverts with Span of More Than 50 in. Linear Foot 621.03 Cleaning Closed Drainage Systems Linear Foot 621.04 Cleaning Drainage Structures Each 621.05 Clean, Grade and Shape Existing Roadside Section Linear Foot 621.11 Cleaning Culverts (Contaminated Material) with Span of 50 in. or Less Linear Foot 621.12 Cleaning Culverts (Contaminated Material) with Span of More Than 50 in. Linear Foot 621.13 Cleaning Closed Drainage Systems (Contaminated Material) Linear Foot 621.14 Cleaning Drainage Structures (Contaminated Material) Each 621.15 Clean (Contaminated Material), Grade and Shape Existing Roadside Sectio n Linear Foot SECTION 622 - BUILDINGS AND MISCELLANEOUS STRUCTURES
622-1 DESCRIPTION . This work shall consist of special construction, reconstruction and maintenance
of rest areas/comfort stations; pump houses; elevators; shade structures & canopies; construction, furnishing and placing bus shelters, kiosks and other miscellaneous structures.
622-2 MATERIALS. Materials shall be as specified in the special specifications.
622-3 CONSTRUCTION DETAILS. As specified in the special specifications.
622-4 METHOD OF MEASUREMENT. As specified in the special specifications.
622-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 623 - SCREENED GRAVEL, CRUSHED GRAVEL, CRUSHED STONE, CRUSHED SLAG
623-1 DESCRIPTION. This work shall consist of furnishing and placing, as shown on the plans or
directed by the Engineer, screened gravel, crushed gravel, crushed stone, or crushed slag.
623-2 MATERIALS. The materials shall meet the requirements of §703 -02, Coarse Aggregates, unless
otherwise indicated, and shall be furnished in the sizes or combination of sizes indicated on the plans or ordered by the Engineer.
623-3 CONSTRUCTION DETAILS. Screened gravel, crushed gravel, crushed stone or crushed slag
shall be placed as shown on the plans or as directed by the Engineer.
623-4 Method of Measurement
623-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 623-4.01 Measurement by Weight. The quantity to be paid for shall be the number of tons, loose measure, incorporated into the work conforming to the requirements of these specifications and in accordance with the lines, grades, and cross -sections shown on the plans or as directed by t he Engineer.
623-4.02 In-Place Measure. The quantity to be paid for shall be the number of cubic yards of material
placed, measured in the completed work, within the payment lines, as shown on the plans or as ordered by the Engineer.
623-5 BASIS OF PAYMENT. The unit price bid shall include costs of all labor, material and
equipment necessary to properly complete the work. Payment will be made under: Item No. Item Pay Unit 623.01 Screened Gravel (By Weight) Ton 623.02 Crushed Gravel (By Weight) Ton 623.03 Crushed Stone (By Weight) Ton 623.04 Crushed Slag (By Weight) Ton 623.10 Screened Gravel (In -Place Measure) Cubic Yard 623.11 Crushed Gravel (In -Place Measure) Cubic Yard 623.12 Crushed Stone (In -Place Measure) Cubic Yard 623.13 Crushed Slag(In -Place Measure) Cubic Yard SECTION 624 - PAVED GUTTERS
624-1 DESCRIPTION. This work shall consist of the construction of asphalt pavement , precast,
conventionally formed or machine formed Portland Cement concrete, or cobblestone gutters in accordance with these specifications and in reasonably close conformity with the lines and grades indicated in the Contract Documents and/or as directed by the Engineer.
624-2 Materials
624-2.01 Asphalt Gutters. The materials for asphalt gutters shall meet the requirements specified for a
9.5 mixture designed for <0.3 million Equivalent Single Axle Loads, ESALs using coarse aggregate Type F9.
624-2.02 Conventionally Formed Concrete Gutters. The materials and manufacture of concrete for
this work shall meet the requirements for Class A concrete specified in Section 501 Portland Cement Concrete - General.
624-2.03 Precast Concrete Gutters. Precast concrete gutters shall comply with the requirements of
§714 -07, Precast Concrete Gutters.
624-2.04 Cobble Gutters. Cobble gutters shall be made of rounded “Hardheads,” 6 inch to 10 inch in
diameter.
624-2.05 Machine Formed Concrete Gutter. The material requirements, mix preparation and
manufacturing of concrete shall comply with the requirements for Class I concrete, as specified in Section 501 Portland Cement Concrete -General.