B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Incidental Construction (600-699)

658WATER WELLS

NY · 2024 Standard SpecificationsBook pages 749748View official source ↗

659-3 01

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 *nnnn Serialized number identified structure detailed in contract documents. SECTION 658 - WATER WELLS

658-1 DESCRIPTION. The work in this section shall include work required for well drilling

658-2 MATERIALS. Materials shall be as specified in the special specifications.

658-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be

covered by special specifications in the contract documents.

658-4 METHOD OF MEASUREMENT. As specified in the special specifications.

658-5 BASIS OF PAYMENT. As specified in the special specifications.

SECTION 659 - TELECOMMUNICATION UTILITIES

659-1 DESCRIPTION. The work in this section shall include special construction required for

telecommunications service utilities, including telephone, cellular telephone and cable television that are publicly, privately or cooperatively owned. The extent of work and construction specifications will be covered by special provisions in the contract documents.

659-2 MATERIALS. Materials shall meet the requirements specified by the respective utility company.

659-3 Construction Details

659-3.01 General. The installation and testing procedures shall conform to the requirements specified

by the utility company.

659-3.02 Schedule of Work. Work shall be scheduled for minimum interruption of service and must

meet the approval of the utility company and the Engineer. A specified advance notice period must be given to the utility company and Engineer prior to interruption of services for co nstruction.

659-3.03 Excavation. The requirements specified in Section 206, Trench, Culvert and Structure

Excavation, shall apply.

659-3.04 Backfill. The requirements specified in Section 203, Select Granular Fill , shall apply.

659-4 METHOD OF MEASUREMENT. As specified in the special specifications.

659-5 BASIS OF PAYMENT. As specified in the special specifications.

SECTION 660 - UTILITIES

660-1 DESCRIPTION. The work in this section shall include special construction required for service

utilities that are publicly, privately or cooperatively owned. The extent of work, and construction specifications will be covered by special provisions in the contract documents.

660-2 MATERIALS. Materials shall meet the requirements specified by the respective utility company.

660-3 Construction Details

Source: New York Standard Specifications, 2024 Edition. Pages 749748 of 1,264.