00460.90 393 Section 00460 - Paved Culvert End Slopes
Description
00460.00Scope - This Work consists of constructing portland cement concrete paved culvert end
slopes at locations indicated on the Plans or where designated.
Materials
00460.10Materials - Furnish Materials meeting the following requirements:
Welded Wire Fabric ............................................................................... 02510.40
Construction
00460.40General - Construct paved culvert end slopes according to Section 00440 and the
following:
• Shape the Base on which the concrete is to be placed to the lines and grades established. Water and compact the areas before placing concrete. Finish the surface of the paved culvert end slopes to a smooth, uniform texture by troweling and floating and then brush the surface with a broom or burlap, as directed.
Measurement
00460.80Measurement - The quantities of paved culvert end slopes will be measured on the area
basis. Measurement will be based on the paved end slope area table identified on the Plans . No actual field measurement will be made, except to check the Wor k, unless changes are ordered. No allowance will be made for paved culvert end slopes which are constructed on a skew.
If changes are ordered and made in the Work , those paved culvert end slopes that are changed will be measured in the field. Measurements will be based on the actual surface area of the paved culvert end slope (not including the culvert opening) plus the face area of the cut -off wall.
Payment
00460.90Payment - The accepted quantities of paved culvert end slopes will be paid for at t he
Contract unit price, per square foot, for the item "Paved Culvert End Slopes".
Payment will be payment in full for furnishing and placing all Materials, and for furnishing all Equipment , labor, and Incidentals necessary to complete the Work as specifie d.