00536.00 468 Section 00536 - Internal Shear Anchors Description
00536.00 Scope - This Work consists of constructing internal shear anchors in existing concrete
beams that includes drilling and preparing holes, inserting epoxy resin, inserting steel rods, and repairing, patching, and finishing the concrete surface.
00536.02 Plans - Plans of t he existing Structure are available from the Engineer . Prints of these
plans are available upon request.
00536.03 Submittals - Submit the following for approval at least 12 Calendar Day s before beginning
internal shear anchor Work : • The manufacturer's recommended Materials. • Describe the M aterial s to be used including the properties of each Material and the Specifications to which the M aterial s comply. Published manufacturer data is acceptable. • Proposed changes to the required installation procedure. Materials
00536.10 Epoxy Resin - Furnish crack injection epoxy products from the QPL.
00536.11 Threaded Shear Anchors - Furnish fully threaded shear anchor rods meeting the
requirements of ASTM A449 or ASTM A193 (Grade B7). Furnish one extra anchor r od from each separate lot for check testing.
00536.12 Concrete Repair - Furnish PCC repair Material meeting the requirements of
Section 02015 that is compatible with the epoxy resin.
00536.13 Epoxy Resin Manufacturer's Recommendations - Submit the following manufacturer's
recommendations to the Engineer before beginning installation: • Confirmation that the proposed products are suitable for the internal shear anchor application. • Confirmation that the proposed products can be installed according to 00536.41 and 00536.42 or, if not, the manufacturer's recommended changes to the installation procedures. • The estimated time it will take the epoxy resin to reach a minimum compressive strength of 3,000 psi at the anticipated installation temperatures. Construction
00536.40 General - Mark anchor locations on the bridge member for each entire span before drilling
anchor holes for that span. Obtain the Engineer's approval of each span, before drilling the holes. Install the epoxy resin according to the manufacturer's recommendations and the following: • Install epoxy resin and anchors when the ambient air temperature is above 50 ºF. • Complete installation of the internal shear anchors within 12 Calendar Day s of dril ling the holes. 00536.41 469 00536.41 Internal Shear Anchors - Bottom :
00536.42 Internal Shear Anchors - Top - Unless otherwise approved, use the following procedure
to install internal shear anchors from above: • Lay out and mark proposed anchor locations. • Locate existing reinforcement by using an electronic rebar mapping device or drill an 8 inch deep hole using a carbid e bit rotary hammer. If existing reinforcement is encountered, stop drilling and adjust the hole location. Unless shown of approved, adjust the hole location up to 3 inches in any direction. If existing reinforcement is not encountered, drill hole to the required depth using a diamond bit core drill. • Clean and scarify the hole with a high-pressure water system that has a rotating tipped wand and can deliver water at a water pressure of approximately 17,000 psi. • Vacuum the hole with a minimum 30 hp vacuum . Attach a PVC pipe or other type of extension to the end of the vacuum hose to reach the bottom of the hole. • Tie a sponge or rag to a section of scrap rebar. Test the drilled hole for standing water and debris by touch the bottom of hole with the sponge or rag. Repeat vacuuming until no evidence of water or debris is observed on the sponge or rag. • Plug the hole until epoxy resin is installed. • Before installing the anchor rod and epoxy resin, remove the plug and perform testing and cleaning described above. • Inject the epoxy resin into the hole to cover the top of the anchor rod. • Insert the anchor rod and twist it at least 360 degrees during the insertion process. • Remove excess liquid epoxy resin from the top of the hole. • Repair the deck with a PCC repair material . Remove all loose material according to the manufacturer's recommendations for patch preparation. Provide a patched surface finish that matches the appearance of adjacent deck sections. • Cure the epoxy resin to the manufacturer's recommended time to reach 3,000 psi compressive strength and cure the PCC repair material as recommended by the manufacturer before opening the section to traffic. Measurement
00536.80 Measurement - The quantities of Work performed under this Section will be measured
according to the following:
00536.90 Payment - The accepted quantities of Work performed under this Section will be paid for
at the Contract unit price, per unit of measurement, for the following items: Pay Item Unit of Measurement