00715.10 725 Section 00715 - Multiple Application Emulsified Asphalt Surface Treatment Description
00715.00 Scope - This Work consists of applying multiple layers of Emulsified Asphalt and graded
Aggregates, applied in successive spreads, to form a firm, finished surface as shown or directed. The surface treatment design will be designated on the Plans or in the Special Provisions. Materials
00715.10 Aggregates - Furnish Aggregates meeting the following requirements:
00715.11 Emulsified Asphalt - Furnish polymer -modified Emulsified Asphalt or
non-polymer -modified Emulsified Asphalt as specified for the multiple application Emulsified Asphalt surface treatment design designated in the Plans or Special Provisions. When non-polymer -modified Emulsified Asphalt is designated, the Contractor may elect to substitute a polymer -modified Emulsified Asphalt , however, selection of the polymer -modified Emulsified Asphalt will not be cause for additional compensation.
00715.16 Acceptance of Aggregate - The Contractor ’s quality control tests will be used for
acceptance of Aggregates if verified by the Q uality Assurance Program. The Agency will perform Aggregate production quality assurance according to the following:
00715.20 Equipment - Provide a pressure distributor, hauling vehicles, chip spreader, compactors,
power brooms, and other necessary Equipment to ensure efficient operation and construction to meet specified results. Provide Equipment in sufficient number and capacities that will provide coordinated and uniform progress of the Work . Provide two way radio communication between the asphalt distributor and chip spreader.
00715.21 Asphalt Distributor - Provide an asphalt distributor designed, equipped, maintained and
operated so the Emulsified Asphalt Material is applied uniformly at even heat. The distributor shall be capable of applying the asphalt on variable surface widths up to 16 feet, at readily determined and controlled rates from 0.05 - 2.0 gallons per square yard, and with uniform pressure. T he variation allowed from any specified rate shall not exceed 0.02 gallons per square yard. Provide distributor Equipment that includes a tachometer, pressure gauges, accurate volume measuring devices and a thermometer for measuring temperature of tank contents. Provide distributors equipped with a positive power unit for the asphalt pump, and full circulation spray bars adjustable both laterally and vertically. Set the bar height for triple lap coverage. 00715.22
00715.22 Chip Spreaders - Provide self -propell ed chip spreaders equipped with a mechanical
device that will spread the Aggregate at a uniform rate across the full width of the chip spreaders. Provide chip spreaders equipped with an Aggregate segregator assembly. Chip spreaders without an Aggregate segregator assembly may be allowed if approved by the Engineer. Provide chip spreaders of adequate width to provide full coverage of the specified P anel and without placing joints in the travel lanes.
00715.23 Compactors - Provide self -propelled, pneumatic -tired or steel -wheeled rollers in good
condition and capable of operating at speeds compatible with the multiple application Emulsified Asphalt surface treatment operation. A minimum of two pneumatic -tired rollers and one steel -wheeled roller is requi red.
00715.24 Power Brooms - Provide pickup or non- pickup type power broom s equipped with a
positive means to control vertical pressure. Labor
00715.30 Quality Control Personnel - Provide a technician hav ing a CAgT technical certification.
Construction
00715.40 Season and Weather Limitations - Do not apply Emulsified Asphalt when the Pavement
temperature is below 70 °F, or if the humidity is higher than 75 percent. Complete the application of the Emulsified Asphalt and the Aggregate 3 hours before sunset. Remove by milling, or other methods approved by the Engineer, and replace all surface treatments damaged by weather during the first 24 hours after application at no additional cost to the Agency. The placing of multiple application Emulsified Asphalt surface treatments is not allowed before July 1 or after August 31.
00715.41 Preparation of Underlying Surfaces - Prepare underlying surfaces according to the
following:
00715.42 Sequence of Operations and Application Rates - Construct the number of spreads, the
size of Aggregates, and the application rates for both Emulsified Asphalt and Aggregates for the multiple application Emulsified Asphalt surface treatment design specified according to Table 00715-1. Vary the rates of spread as directed during the progress of the Work to produce the 00715.42 best results. Surface treatment is not required for guardrail flares, driveways, or other irregular areas as directed. Table 00715-1 Multiple Surface Treatment Design Spreading Order and Fine Double Medium Double Type E-9 Type E-11 Rates of Spread* Chip Seal Chip Seal Oil Mat Oil Mat First Course Emulsified Asphalt 0.20 0.25 0.30 0.30 1" - 1/2" Aggregate – – – 0.015 3/4" - 1/2" Aggregate – – 0.014 – 1/2" - 1/4" Aggregate – 0.010 – – 3/8" - No. 8 Aggregate 0.008 – – – Second Course Emulsified Asphalt 0.30 0.30 0.35 0.35 1" - 1/2" Aggregate – – – 0.015 1/2" - 1/4" Aggregate – – 0.010 – 3/8" - No.8 Aggregate 0.006 0.007 0.002 0.002 Third Course Emulsified Asphalt – – 0.30 0.35 1/2" - 1/4" Aggregate – – – 0.010 3/8" - No. 8 Aggregate – – 0.007 0.003 Fourth Course Emulsified Asphalt – – – 0.30 3/8" - No. 8 Aggregate – – – 0.007 Total Quantities Emulsified Asphalt 0.50 0.55 0.95 1.30 Aggregates 0.014 0.017 0.033 0.052 * The rates of spread are in the following units: Emulsified Asphalt - gallons per square yard Aggregates - cubic yards per square yard
00715.43 Applying Emulsified Asphalt - Apply Emulsified Asphalt at the rates specified
in 00715.42 and according to the following: • Apply Emulsified Asphalt, working toward the Aggregate stockpile at all times, unless otherwise approved. • Leave a minimum of 200 gallons of Emulsified Asphalt in the distributor tank at all times. • Do not apply Emulsified Asphalt to more than one-half the width of the travel way at one time with the remaining width remaining open to traffic. Do not close the open lane until traffic controlled by pilot car is operating on the new surface treatment. Apply the surface treatment, weather permitting, to both sides of the travel way so that the end of the Work is squared up 3 hours before sunset. • Do not apply Emulsified Asphalt a greater distance than can be immediately covered by Aggregates before the emulsion breaks. • Place building paper over the treated surface at the beginning of each spread to ensure that the nozzles are operating properly before the uncovered surface is reached. Remove and dispose of building paper in a manner satisfactory to the Engineer. • If requested by the Engineer, demonstrate that the distribution of the Emulsified Asphalt does not vary between the individual nozzles by more than 15 percent transversely from the average, and no more than 10 percent longitudinally from the specified rate of application. • Apply the Emulsified Asphalt at a temperature between 140 °F and 185 °F as recommended by the manufacturer.
00715.44 Hauling and Spreading Aggregates - Spread Aggregates at the rates specified
in 00715.42. Do not operate hauling and spreading Equipment on uncovered Emulsified Asphalt. During the first hour after application of the Emulsified Asphalt and Aggregate, operate at speeds no more than 10 mph and after the first hour, not more than 15 mph until otherwise allowed by the Engineer. Carefully operate hauling Equipment at all times, at moderate speeds that will not damage the new surface treatment or create a hazard to the traveling public. Route hauling Equipment and pilot lines as uniformly as possible over the full width of the new surface in place. Calibrate the gate opening, gear selection and engine RPM of the chip spreaders for the various sizes of Aggregate to be used. Following calibration, verify the rate of application by a method acceptable to the Engineer. Immediately cover the Emulsified Asphalt surface with Aggregate unless otherwise authorized by the Engineer. Maintain the rate of spread of this Aggregate within 10 percent of specified rate. Using approved methods, remove or repair Emulsified Asphalt that has set or "broke" before being covered with Aggregate, at no additional cost to the Agency. Aggregates shall be surface damp at the time of application. Excess free water (water not adhering to the Aggregate surface) on the Aggregate is not allowed. 00715.60 Do not operate the chip spreader at speeds which cause the chips to roll over after striking the emulsion covered surface. Provide Coverage without gaps or overlapping adjacent Coverages. Do not construct longitudinal joints within the travel lanes. Construct neat transverse cut off of Aggregates and remove any excess Aggregates from the surface prior to resuming operations. Stagger cut-offs of successive Courses a minimum of 16 feet prior to the end of a proceeding Course.
00715.45 Shaping and Compacting - After the Aggregates have been placed on the Emulsified
Asphalt and spread, remove all piles, ridges or uneven distribution to ensure against rough spots in the final surface. Compact the surface with a minimum of four complete Coverages immediately behind the chip spreader. Perform additional Coverages as directed by the Engineer until the Material is interlocked, firm, and partially bound with the underlying Emulsified Asphalt. The sequence of rollers will be as directed by the Engineer. Operate rollers at speeds that do not damage the surface. Do not exceed rolling speeds of 5 mph. In the event Aggregates begin to pick up under traffic or from the rolling operation, immediately cover and roll the area with additional quantities of Aggregate. Begin rolling at the low side of the Cross Section and progress with Passes parallel to the Roadway centerline. Overlap each preceding Pass by at least one half the width of the roller. Along curbs, walls and at all other places not accessible to specified rollers, thoroughly compact the Aggregate with mechanical tampers or hand tampers. Provide hand tampers with a weight of not less than 50 pounds and a tamping face of not more than 0.7 square foot. Correct irregularities in Emulsified Asphalt distribution, surface smoothness, non-uniformity of texture, segregation of materials, dirt pockets, spots of excess asphalt and other deficiencies and defects. Accomplish this by the removal, replacement, addition of Material, repetition of construction operations or other suitable means, as directed or approved by the Engineer. Maintenance
00715.60 Establishment - During periods when partial construction is open to traffic and
for 7 Calendar Days following original completion of the final Course throughout the entire length of the Project, perform the following operations: • Maintain the surface to correct bleeding of asphalt, keep the surface free of ravel, traffic grooves, holes and other deformations, and eliminate other defects that may appear. • Roll and compact the surface to maintain or restore firmness and stability to the Materials. • Broom the surface to ensure that the surface is free of loose Aggregate. Discontinue brooming if the operation damages the surface. In curbed areas, use a pick up type power broom. On Bridges, sidewalks and other areas off the Roadway, remove all loose Aggregates to the satisfaction of the Engineer. Perform the above operations under traffic and at frequencies which the Engineer determines as being necessary to develop and establish the Course to uniform firmness and stability throughout. 00715.70 Finishing and Cleaning Up
00715.70 Surface Tolerance - Provide a finished surface, after brooming, that does not vary by more
than 1/2 inch either transverse or perpendicular to centerline when tested with a 12-foot straightedge. Furnish and operate the straightedge under the observation of the Engineer.
00715.71 Correction of Surface Deficiencies - Correct all deficiencies in surface tolerance in a
manner acceptable to the Engineer. Perform all corrective work within 14 Calendar Days following notification at no additional cost to the Agency. Measurement
00715.80 Measurement - The quantities of Aggregate will be measured on the weight basis or on
the volume basis in the hauling vehicle. The quantities of Emulsified Asphalt will be measured on the weight basis. The quantities of asphalt surface treatment of approaches will be measured on the unit basis for each street connection and road approach. Payment
00715.90 Payment - The accepted quantities of Work performed under this Section will be paid for
at the Contract unit price, per unit of measurement, for the following items: Pay Item Unit of Measurement