B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
General Conditions

00815Bollards

OR · 2024 Standard SpecificationsBook pages 923923View official source ↗

00815.90 857 Section 00815 - Bollards

Description

00815.00Scope - This Work consists of furnishing and installing bollards at locations shown or as

directed.

Materials

00815.10Materials - Furnish Materials meeting the following requirements:

Granular Drain Backfill .......................................................................... 00430.11 Reflective Sheeting (Type III and Type IV) .......................................... From QPL

00815.11Posts and Sleeves - Use Schedule 40 steel pipe for the posts and either Schedule 40 or

Schedule 80 steel pipe for the sleeves , as shown. Use st eel pipe conforming to ASTM A53, Type E, Grade A.

00815.12Plates, Shapes, Fasteners, and Hardware - Use plates and shapes conforming to

ASTM A36. Use fasteners and hardware conforming to ASTM A449.

00815.13Galvanizing - Hot-dip galvanize all metal components after fabrication according to

AASHTO M 111 ( ASTM A123) or AASHTO M 232 ( ASTM A153), as applicable.

00815.14PVC Pipe - Use Schedule 40 PVC pipe

00815.15Painting Bollards - Paint the exposed portion of designated bollards with one coat of the

type and color of coating, as shown or specified.

Construction

00815.40Bollards - Install bollards as shown or as directed

Measurement

00815.80Measurement - The quantities of bollards will be measured on a unit basis

Payment

00815.90Payment - The accepted quantities of bollards will be paid for at the Contract unit price,

per unit of measurement, for the following items:

Pay Item Unit of Measurement

(a)Bollards ................................................................................................. Each
(b)Removable Bollards .............................................................................. Each
(c)Hydrant Bollards ................................................................................... Each

Payment will be payment in full for furnishing and placing all Materials, and for furnishing all Equipment , labor, and Incidentals necessary to complete the Work as specified.

No separate or additional payment will be made for excavation, backfill, or painting.

Source: Oregon Standard Specifications for Construction, 2024 Edition. Pages 923923 of 1,268.