General Conditions

00960Common Provisions for Electrical Systems

OR · 2024 Standard SpecificationsBook pages 991994View official source ↗

00960.10 925 Section 00960 - Common Provisions for Electrical Systems

Description

00960.00Scope - This Work consists of furnishing and installing Materials for electrical systems and

for modifying existing systems.

00960.01Regulations, Standards, and Codes - All electrical Materials and workmanship shall

conform to the following standards where applicable:

• American National Standards Institute (ANSI) • International Municipal Signal Association (IMSA) • Underwriter's Laboratories, Inc. (UL) • National Electrical Manufacturers Association (NEMA) • National Electrical Safety Code (NESC) • National Electrical Code, Oregon Amended (NEC) • Standards of the American Society for Testing and Materials (ASTM) • Local laws

Use the code, order, or standard in effect on the date the Project is advertised unless otherwise shown.

Safe wiring labels normally required by the Department of Consumer and Business Services, Building Codes Division will not be required for traffic management systems listed on the Red Sheets (see

00160.00) as allowed by ORS 479.540 and OAR 918-261- 0037. The Red Sheets may be viewed on

ODOT's web site.

00960.02Equipment List and Drawing Submittals - Within 30 Calendar Days after execution of

the Contract, submit the Blue Sheets (see 00160.00 and 00160.07) and the Green Sheets (see

and 00160.07) according to 00150.37 for all Materials the Contractor proposes to install

Blue Sheets and Green Sheets contain submittal instructions and will be made available to the Contractor by the Engineer.

Within 14 Calendar Days after receipt of submittals, the Engineer will review the submittals and designate them in writing as "approved", "approved as noted", or "returned for correction". Do not proceed with the Work before receiving written approval of the submittals from the Engineer.

00960.03Permits - Provide the Engineer with copies of all required electrical permits prior to

performing any work.

Materials

00960.10Materials - Furnish Materials meeting the following requirements :

Delineators ..................................................................... 00840.10 and 00840.11 Selected General Backfill ...................................................................... 00330.13 Selected Granular Backfill ..................................................................... 00330.14

00960.30 926 Furnish electrical Materials that have been approved through the Blue Sheet and Green Sheet submittal process in 00960.02.

Anchor rods shall conform to 02560.30 and to the types and sizes shown.

Use commercially available 30 pound nonperforated asphalt -saturated felt where shown.

Use commercially available No. 10 - 0 Sand when sand blanket is required.

Use commercially available UL listed insulating vinyl plastic tape where shown.

Use commercially available UL listed silicon bronze (or copper alloy) split bolt where shown.

Use commercially available galvanized steel weatherproof compression fittings where shown.

Labor

00960.30Licensed Electricians - According to the Oregon Administrative Rule 918-282-0120(1),

no person or Entity shall allow any individual to perform electrical work for which the individual is not properly registered or licensed . Every person who installs electrical systems on the Project shall submit a copy of their electrical license or apprentice registration to the Engineer prior to performing any Work . They must be licensed as an S or a J under Oregon Administrative Rule 918-282.

Construction

00960.40Excavation - Remove and replace sidewalks, curbs, paved surfaces, and other materials

as needed. Replace and finish all surfaces to correspond with the existing surfaces. Restore all disturbed landscaping and underground systems to original condition.

Excavate trenches, foundations, and junction boxes to locations, Neat Lines, grades and Cross Sections as shown or as established or approved. Furnish, place, and remove any shoring required to prevent caving of walls.

Dispose of all excavated materials according to 00290.20.

00960.41Horizontal Directional Drilling - Drilling shall not "hump" or deform the Pavement and

shall be guided. Keep drilling pits at least 2 feet from the edge of Pavement. Do not use water to the extent that the Pavement might be undermined or Subgrade softene d. Sand bedding and marking tape are not required with this method.

If jointed conduit is used, verify the joints have not separated by pulling a mandrel through the conduit after installation.

00960.42Conduit :

(a)Cleaning New Conduit - Before cable and wire installation, clean all new conduit with

cylindrical mandrel of the proper size for that conduit and blo w out with compressed air. Mechanical pulling methods may be used for conduit cleaning.

(b)Cleaning Existing Conduit - Before installation of new cable(s) or wire(s) in an existing

conduit, temporarily remove all existing cable(s) and wire(s). Clean e xisting conduit with cylindrical mandrel of the proper size for that conduit and blow out with compressed air. Mechanical pulling methods may be used for conduit cleaning. Stop W ork and notify the Engineer immediately if there are any difficulties cleani ng the existing conduit. Reinstall existing cable(s) and wire(s) in existing conduit unless otherwise shown. 00960.45 927

00960.43Foundations : Construct foundations for pedestals, posts, and cabin ets according to

Directly against the sides of the excavation in undisturbed or well -compacted material or place in forms. With a continuous pour. To the elevation shown or directed. With conduit ends and anchor rods held securely in proper vertical position, to proper height, using a manufacturer's recommended template until the concrete sets.

Maintain rebar clearances during concrete pour.

Make no adjustments of anchor rods after concrete has set.

Set forms square and true to line and grade. Construct forms of rigid materials that remain in position until removed.

Remove forms and place subsequent loading according to Table 00540-1.

Finish tops of foundations to Roadway, sidewalk or curb grade, or as directed.

Finish exposed concrete foundations to present a smooth, neat appearance. Fill all holes.

00960. 45 Grounding and Bonding :

(a)General - Make all ground rods, metal conduit, metal poles, grounding wire, metallic junction

boxes, metallic junction box covers, and cabinets mechanically and electrically secure to form a continuous, effectively grounded and bonded system.

(b)Grounding/Bonding Wire - Use a THWN No. 6 AWG stranded copper grounding/bonding

wire in conduit or as shown. Use an un- insulated No. 4 AWG stranded copper grounding/bonding wire o utside of conduit or as shown.

(c)Ground Rods - Ground each above ground metallic Structure with a separate ground rod.
(1)Located in Junction Box - Install ground rod in a junction box if shown. Drive ground rods

into the ground with the top of the ground rod 2 inches to 3 inches above the bottom of the junction box to allow for an accessible clamp.

(2)Located in Foundation - Install ground rod in a foundation if shown, with the ground rod

2 inches to 3 inches above the top of the foundation to allow for an accessible clamp.

(d)Services and Cabinets - Bond the neutral conductor, the control cabinets, and the metal base

to the grounding electrode system.

(e)Nonmetallic Conduit - In all nonmetallic conduit, run a ground/bond wir e continuously

between all poles, pedestals, posts, and cabinets. Bond wires are not required in conduit that only contains circuits that operate at less than 25 volts.

00960.46 928 00960.46 Service Cabinet and Electrical Energy - Install service cabinet and associated Equipment , then arrange for the Utility providing power to have the service cabinet inspected and make the electrical hook -up prior to field testing. Field test according to 00990.70(g) for traffic signals, or according to 00970.70 for illumination.

Bill e lectrical energy costs to the Agency for permanent installations.

Maintenance

00960.60Maintenance, Operation and Power Costs - The Agency will continue normal

maintenance and operations of the existing systems including the furnishing of electrical energy. Do not use for construction purposes electrical energy billed to the Agency or other agencies.

Finishing and Cleaning Up

00960.71As -Built Plans - Upon c ompletion of the installation, submit a red- lined copy of the original

Plans noting all changes made. The information furnished shall include all modifications made and shall represent the material installed and in operation. It shall be sufficiently det ailed to enable maintenance forces to replace or repair any part of the Project under routine or emergency maintenance by direct reference.

Source: Oregon Standard Specifications for Construction, 2024 Edition. Pages 991994 of 1,268.