SECTION 829 — BRIDGE SCUPPER PIPING — BRIDGE SCUPPER PIPING
829.01 Description.
This work includes providing polyvinyl chloride (PVC) scupper piping on bridges at the required locations.
829.02 Materials.
Polyvinyl Chloride Scupper Piping.
829.03 Construction Methods.
Polyvinyl Chloride (PVC) Scupper Piping.
829.04 Method of Measurement.
Polyvinyl Chloride Scupper Piping will be measured by the number of linear feet of each type of drainpipe installed.
Part 800 — Bridge Structures August 2025
SECTION 829 — BRIDGE SCUPPER PIPING 800-175
829.05 Basis of Payment.
The Department will pay for the completed and accepted quantities as follows. Pay Item Pay Unit Polyvinyl Chloride Scupper Piping LF The price constitutes full compensation for all labor, materials and equipment, including straps, hardware, bolts and all incidentals required to finish the work, complete and accepted.