SECTION 929 — FIELD OFFICES 900-75 — FIELD OFFICES
929.01 Description.
This work includes providing and maintaining an adequate weatherproof and ADA compliant field office for the exclusive use of the Engineer and his/her staff during both the Contract period and approximately 180 days thereafter.
929.02 General Requirements.
Location. Locate the field office on a site that is both satisfactory to the Engineer and convenient to the Project site with dedicated parking facilities. Minimum Spatial Requirements. Provide a field office laboratory that contains a minimum of 550 sq ft of floor area, at least three rooms, and a 7-ft minimum of headroom for Small Sized Projects (Contract value < $10,000,000). For Projects with a Contract value ≥ $10,000,000, provide a field office that contains a minimum of 1000 sq ft of floor area, at least five rooms, 7 ft minimum of headroom, and a sufficient number of windows to provide at least 27 sq ft of natural light. Other Requirements.
Part 900 — Incidental Construction and Services August 2025
900-76 SECTION 929 — FIELD OFFICES
929.03 Specific Requirements.
Outside Utilities.
Part 900 — Incidental Construction and Services August 2025
SECTION 929 — FIELD OFFICES 900-77 • Have openings that are adequately screened • For windows in sanitary areas, have frosted glass Furnishings and Equipment. For both the field office and materials laboratory, provide the following and ensure that all are new or approved by the Engineer when received by the Department.
Part 900 — Incidental Construction and Services August 2025
900-78 SECTION 929 — FIELD OFFICES
Part 900 — Incidental Construction and Services August 2025
SECTION 929 — FIELD OFFICES 900-79 ● The computer equipment, software, and licenses will become the property of the Department at Contract completion. Provide proper maintenance of computers and all office equipment for the life of the P roject, which includes but is not limited to network support, computer support, and peripheral support. Provide supplies for the Project for both new and existing equipment that includes but is not limited to flash drives, DVDs, toner, binders, folders, paper, dry erase boards, etc. Provide all supplies with the delivery and set -up of the office equipment and as required by the Engineer. ● On delivery of computer equipment to a field office, the Engineer must contact the (DoIT) service desk to arrange for Department inventorying. The Engineer must provide the detailed spec of the computer equipment, location of the field office, and the completion date of the Project. The Engineer must also contact the service desk at the end of the Project to take the computer equipment into the DOT State inventory, or the computer equipment must be moved from one location to another. One 50-in. (minimum) conference room monitor with 3840 × 2160 (minimum) resolution with video conferencing camera (minimum 1080P resolution). Failure to furnish, install, make operational , and maintain the field office equipment and peripheral equipment/accessories specified in this Subsection, will result in delay to the processing of progress payments. Maintenance and Custodial Service. Provide the following maintenance and custodial services.
Part 900 — Incidental Construction and Services August 2025
900-80 SECTION 929 — FIELD OFFICES
929.04 Method of Measurement.
Field Office will be measured by the number of calendar months the facilities are used under the Contract. The Computer Equipment as noted in Subsection 929.03.5(c) will not be measured separately for payment.
929.05 Basis of Payment.
The Department will pay for the completed and accepted quantities as follows: Pay Item Pay Unit Field Office MONTH The price constitutes full compensation for furnishing, maintaining, and subsequently removing the field office, together with all associated costs of equipment and peripherals and supplies, including all costs associated with electrical utility, heating, lighting, air conditioning, water, sewer and telecommunication connections, permits, identification sign, maintenance, custodial services and supplies, and all incidentals required to provide this service, complete and accepted. The Department will give the Contractor 90 days advance notice before it intends to terminate the occupancy of the field office.
Get an email when 929 changes