Division 800 — Section 804
800-11 Section 804 — Riprap and Slope Protection
804.1 Description 1 Construct a protective layer of broken stone, polyvinyl chloride (PVC) coated wire enclosed rock gabions, or concrete slope protection. 804.2 Materials 804.2.1 Stone for Riprap 1 Provide hard quarry stone or fieldstone that does not disintegrate on exposure to water or weathering. Ensure that the stone has a sodium sulfate content less than or equal to 15% as tested according to AASHTO T 104 . Use stone that is suitable for the purpose intended and obtained from a source on Qualified Product s List 2 . 2 Provide riprap conforming to the gradation classes in the following table. Riprap Class Rock Size (Feet) Rock Size(1) (lb) Percent of Riprap Smaller Than A 0.75 37 100 0.50 11 50 0.20 0.7 15 B 1.33 200 100 1.0 75 85 0.75 37 50 0.42 5 10 C 1.80 500 100 1.30 200 50 0.40 5 10 D 2.25 1000 100 1.80 500 50 0.95 75 10 E 2.85 2000 100 2.25 1000 50 1.80 500 5 F 3.60 4000 100 2.85 2000 50 2.25 1000 5
Get an email when 804 changes
South Carolina revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.