Page 146240 OBLITERATING OLD ROADS

240.1 Description

This work consists of scarifying, plowing, grading, and harrowing of abandoned roads outside the limits of the new construction.

240.2 MATERIALS (Not Specified)

240.3 Construction Requirements

After opening the new road to traffic the portion of the road to be obliterated will be graded to a contour which will blend with the contour of the adjoining land. Obliteration and removal will include flattening the backslopes and embankment slopes so farm cultivation work could be done to the satisfaction of the Engineer. Portions of the obliterated road surface to be covered with less than 1 foot of earth will be scarified to a depth of not less than 6 inches. In areas of rock or rough topography not adaptable to cultivation, the desired obliteration and disposal will be detailed on the plans.

240.4 Method of Measurement

The item of obliterating old roads will be measured to the nearest station of 100 feet along the centerline of the old road.

240.5 Basis of Payment

Payment for obliterating old roads will be made at the contract unit price per station inclusive of all labor and equipment required. Page 147250 INCIDENTAL WORK

250.1 Description

This work includes all incidental items listed in the contract which must be performed to complete the contract.

250.2 MATERIALS (Not Specified)

250.3 Construction Requirements

Incidental work will be listed in detail in the plans. This work will be performed in a skillful manner to properly facilitate the whole of the work and as directed.

250.4 Method of Measurement

Field measurement for the item of incidental work will not be required.

250.5 Basis of Payment

Incidental work will be paid for at the contract lump sum price unless changes in work are ordered by the Engineer. Payment will be full compensation for labor, equipment, and materials necessary to complete the work.

Referenced in this section

Get an email when 240 changes

South Dakota revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: South Dakota Standard Specifications for Roads and Bridges, 2025 Edition. Pages 146–146 of 596. View official source ↗

Ask about this section

Scoped to South Dakota 2025 Standard Specifications for Roads & Bridges, Section 240 — OBLITERATING OLD ROADS. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.