General Provisions (00100-00999)

884MILLED, RECLAIMED, AND SALVAGED MATERIAL

SD · 2025 Standard SpecificationsBook pages 533535View official source ↗

884 Page 533884 MILLED, RECLAIMED, AND SALVAGED MATERIAL

884.1GENERAL REQUIREMENTS

The material will conform to the specifications for the particular material required by the contract. The specific requirements contained in Section 884.2 will apply to the specified material at the time of use or incorporation into the final product. The milled, reclaimed, and salvaged material will not contain clay balls or organic debris.

884.2SPECIFIC REQUIREMENTS

A.Cold Milled Asphalt Concrete: Cold milled asphalt concrete material will conform to the gradation requirements for the specified use of the cold milled asphalt concrete material. B.Cold Milled Asphalt Concrete and Placing Cold Milled Material: Cold milled asphalt concrete material placed directly from the cold milling operation into the final product as indicated by the bid item will conform to the following gradation: Sieve Size Percent Passing 1½ inch 100 C.Reclaimed Asphalt Pavement (RAP): Prior to incorporation, RAP will be processed over a 1½ inch screen to remove large chunks. Material screened off will be crushed and reincorporated into the process. Scalping of the cold milled asphalt concrete stockpile to generate material meeting the RAP requirements will not be allowed. 1.RAP in Asphalt Concrete: RAP used in asphalt concrete production will conform to the following gradation: Sieve Size Percent Passing 1½ inch 100 1 inch 95 - 100 2.RAP in Cold in Place Recycling: The RAP used in cold in place recycling will conform to the following gradation: Sieve Size Percent Passing 1¼ inch 100 1 inch 95 - 100 D.Salvaged Material: Prior to incorporation, salvaged material will be processed over a 1½ inch screen to remove large chunks. Material screened off will be crushed and reincorporated into the process. Scalping of the salvaged material stockpile will not be allowed. 1.Subbase, Salvaged: Subbase, salvaged will conform to the following gradation: Sieve Size Percent Passing 1½ inch 100 1 inch 95 - 100 884 Page 5342.Base Course, Salvaged: Base course, salvaged will conform to the following gradation: Sieve Size Percent Passing 1½ inch 100 1 inch 95 - 100 3.Base Course, Salvaged Asphalt Mix Material: Base course, salvaged asphalt mix material will conform to the following gradation: Sieve Size Percent Passing 1½ inch 100 1 inch 95 - 100 4.Gravel Cushion, Salvaged: Gravel cushion, salvaged will conform to the following gradation: Sieve Size Percent Passing 1½ inch 100 1 inch 95 - 100 5.Gravel Surfacing, Salvaged: Gravel surfacing, salvaged will conform to the following gradation: Sieve Size Percent Passing 1½ inch 100 1 inch 95 - 100 6.Salvage and Stockpile Asphalt Mix Material: Asphalt mix material salvaged and placed into a stockpile will conform to the following gradation: Sieve Size Percent Passing 1½ inch 100 1 inch 95 - 100 7.Salvage and Stockpile Asphalt Mix and Granular Base Material: Asphalt mix and granular base material salvaged and placed into a stockpile will conform to the following gradation: Sieve Size Percent Passing 1½ inch 100 1 inch 95 - 100 8.Salvage and Stockpile Granular Material: Granular material salvaged and placed into a stockpile will conform to the following gradation: Sieve Size Percent Passing 1½ inch 100 1 inch 95 - 100 884 Page 535E.Full Depth Reclamation (FDR): The asphalt mix and granular base material will meet the following gradation: Sieve Size Percent Passing 2 inch 100 1 inch 95 - 100

884.3SAMPLING AND TESTING

Sampling ............................................................................................................... SD 201 Gradation ............................................................................................................... SD 202 890 Page 536890 ASPHALT MATERIAL

890.1GENERAL REQUIREMENTS

Transporting conveyances for asphalt material will be free of contaminating material. A record of material hauled the previous load in truck transport tanks will be furnished as a prerequisite to loading. A determination will be made if the previously hauled material is compatible with the material to be loaded or if cleaning of the tank is required to prevent contamination. All sampling will be performed in accordance with SD 301. If the material is to be used prior to testing by the Department, the asphalt material supplier will furnish two copies of a Certificate of Compliance for each tank car, truck tank, or other individual conveyance. The Certificate of Compliance will show all information contained on Form DOT-62 and a properly executed certification statement. Temperatures to provide kinematic viscosities of 300 centistokes and 150 centistokes for mixing application and 200 centistokes and 50 centistokes for spray application will be furnished with the first load of each type of asphalt material delivered to the project on or along with the Certificate of Compliance. Upon presentation of a Certificate of Compliance, the Engineer may permit incorporation into the work the asphalt material covered by the certificate. Permission by the Engineer to use asphalt material will not be construed as an acceptance of the material. Acceptance of asphalt material will be based on test results from the samples obtained. Asphalt material tested and accepted for use on a project and transferred by the Contractor to another project, may be accepted for use in the terminating project on the basis of the test results of the originating project. The Contractor must request and receive from the Engineer of the originating project, prior to transfer, a letter of transfer covering the material. (DOT-70)

890.2SPECIFIC REQUIREMENTS

A.Rapid Curing Cut-back Asphalt will conform to AASHTO M 81. B.Medium Curing Cut-back Asphalt will conform to AASHTO M 82. C.Slow Curing Cut-back Asphalt will conform to the following requirements. 1.The oil will be uniform in appearance and consistency and will show no foaming when heated to the application temperature. The residue of specified penetration will be smooth and homogeneous in appearance. 2.The grade of liquid asphaltic material specified will conform to the requirements shown in the following table.

Source: South Dakota Standard Specifications for Roads and Bridges, 2025 Edition. Pages 533535 of 596.