Article 1 — Description
Furnish and place waterproofing membranes on concrete and steel bridge decks of railroad and other types of structures .
Article 2 — Materials
2.1 Materials to be Furnished . Furnish waterproofing materials listed below in accordance with DMS -6300 ,
“Waterproofing”: asphalt for mopping above ground, asphalt for mopping below ground, asphaltic primer, treated cotton fabric, self-adhering polyethylene, coal-tar modified urethane, rubberized asphalt with pre- formed board membrane, asphalt plank, asphalt mat, rubberized asphalt with plastic film, asphaltic panels, plastic cement, and cold asphalt base emulsion. Furnish butyl rubber membrane and ethylene- propylene- diene terpolymer (EPDM) sheeting in accordance with ASTM D6134. Deliver materials requiring sampling and testing to the worksite at least 3 weeks before use. Test and obtain approval for waterproofing materials before delivery to the worksite when authorized.
2.2 Types. Provide the following types of waterproofing as shown on the plans or as directed.
2.2.1 Type 1. Butyl rubber membrane applied to a surface with a proper adhesive without protective planking and
as shown on the plans. Provide a minimum thickness of 1/16 in. unless otherwise shown on the plans.
2.2.2 Type 2. A single asphaltic primer coat and one mopping of asphalt.
2.2.3 Type 3. A single asphaltic primer coat and two moppings of asphalt. Supplement wit h two layers of treated
cotton fabric with a third mopping of asphalt placed over the outer layer of fabric at construction joints of foundation structures as shown on the plans.
2.2.4 Type 4. Self -adhering polyethylene with a rubberized asphalt mastic material.
2.2.5 Type 5. Single -component, coal -tar modified urethane coating.
2.2.6 Type 6. Self -adhering built -up membrane of rubberized asphalt formed on a pre- formed board with
cold-applied asphaltic primer. 704 2.2.7. Type 10. Any of Type 1, 4, 5, or 6 waterproofing.
2.2.8 Type RR -1. Butyl rubber or EPDM membrane with a protective course of asphalt plank or asphalt mat of the
specified thickness, as shown on the plans.
Article 3 — Construction
3.1 General . Store waterproofing material in a manner that will prevent damage. Keep material dry, and store in
a warm area before using in cold weather and out of direct sunlight in hot weather. Store asphalt planks, asphalt mats, and asphaltic panels in a manner that will prevent warping and breaking. Provide a wood float finish to concrete decks and other unformed concrete surfaces to be waterproofed. Cure concrete surfaces to be waterproofed for at least 7 days before applying waterproofing, or as directed by the waterproofing materials manufacturers. Ensure steel or concrete deck surfaces to be waterproofed are cl ean; dry; smooth; and free of fins, sharp edges, and loose material. Use grinders, if necessary, to remove protrusions that would puncture waterproofing membrane. Ensure surfaces are free of contaminants such as form -release agents, wax -base curing compounds, oil, and grease. Remove any contaminants by abrasive blast cleaning. Ensure there are no depressions or pockets in horizontal surfaces of finished waterproofing. Fill expansion joints and other grooves with plastic cement in accordance with DMS -6300 , unless otherwise shown on the plans. Ensure joints are dry and clean when filled. Overfill slightly to allow for shrinkage in dryin g. Sweep, vacuum, or air -blow the area to be waterproofed thoroughly to remove dust, dirt, and loose foreign material. Maintain the deck in a clean condition until completion of waterproofing. Do not allow vehicular or equipment traffic on the bridge after the deck waterproofing work has started or until after the work is complete, cover sheets are in place, and an adequate ballast cushion has been placed on the deck. Protect the waterproofing against damage from any source. Use asphalt for mopping below ground in accordance with DMS -6300 when asphalt waterproofing is shown as a protection for back of abutments, retaining walls, or footings. Use asphalt for mopping above ground in accordance with DMS -6300 for waterproofing on bridge decks.
3.2 Type 1. Do not apply waterproofing in wet weather or when the ambient temperature is below 50°F. Ensure the rubber membrane is free of punctures, pockets, or folds.
Turn the membrane into drainage holes and castings without break. Take special care to make the waterproofing effective along the sides and ends of members to be waterproofed. Install the butyl rubber membrane by first applying the adhesive as recommended by the membrane manufacturer. Apply the adhesive to the surface to be waterproofed and at necessary splices, in a solid area extending approximately 36 in. back from the edges. Apply the membrane by pressing it firmly and uniformly in place against the previously applied adhesive, avoiding wrinkles and buckles. Make splices, laps, and flashing in conformance with the membrane manufacturer ’s recommended procedures.
3.3 Type 2. Place the asphalt primer at least 24 hr. before the asphalt mopping. Ensure the primer is dry before
the mopping. Work in the primer to give a uniform coating. Heat the asphalt for mopping in kettles equipped with armored thermometers, but do not heat above 350°F. Stir the asphalt frequently while heating. Apply the mop coating at a rate of at least 4 gal. per 100 sq. ft. of surface. Apply additional coatings, if imperfections appear, until corrected.
3.4 Type 3. Place the asphalt primer at least 24 hr. before the asphalt mopping. Ensure the primer is dry before
the mopping. Work in the primer to give a uniform coating. Heat the asphalt for mopping in kettles equipped 705 with armored thermometers, but do not heat above 350°F. Stir the asphalt frequently while heating. Use a minimum coverage rate for each mop coating of 4 gal. per 100 sq. ft. of surface. Apply additional coatings, if imperfections appear, until corrected. Mop the surfaces to be waterproofed in sections at construction joints. Lay a 15- in. wide strip of cotton fabric on the first mopping while the asphalt is still hot and press into place. Apply subsequent moppings to completely cover and seal the cotton fabric. Make the end laps of the cotton fabric at least 12 in. unless otherwise shown on the plans.
3.5 Type 4. Unwrap the roll of waterproofing and press the adhesive surface into contact with the concrete horizontally. Secure the free end and then unroll slowly, using hand pressure to smooth the membrane into
place and help make a tight bond with the concrete. Overlap adjacent strips at least 1 in. over the previously laid strip. Backfilling may be started as soon as the initial horizontal strip has been applied.
3.6 Type 5. Apply waterproofing in two coats to produce a minimum cured film thickness of 1/16 in. Apply using
a roller, a squeegee, a brush, or spray equipment unless otherwise shown on the plans. Apply the second coat within 16 hr. after the initial coat. Follow the manufacturer’s instructions pertinent to the maximum time allowed between coats and any treatment of the initial coat require d if this maximum time is exceeded. The minimum ambient temperature at the time of waterproofing application is 40°F. Do not begin backfilling until the second coat of waterproofing has cured enough to prevent damage by the backfilling operation.
3.7 Type 6. A pply the primer at a rate of 1 gal. per 100 sq. ft. of surface or at the rate recommended by the
manufacturer if different. Allow to dry to a tacky surface before placing the waterproofing membrane. Apply the primer and waterproofing membrane board panels only when the substrate temperature is above 50°F. Seal joints by centering 6- in. gusset tape over the joint and pressing firmly into position. Roll in the panels and jointing tape with enough pressure to assure maximum adhesion, conformance to substrate, and elimination of air bubbles. Follow the manufacturer’s recommendations for installation. Begin backfilling as soon as the application of the waterproofing is complete. Complete backfilling within 48 hr. after the waterproofing material is applied to a non- horizontal surface.
3.8 Type RR -1. Apply waterproofing to dry surfaces and only when the ambient temperature is above 50°F.
Ensure the butyl rubber or EPDM membrane is free of punctures, pockets, or folds. Turn the membrane into drainage castings without br eak. Take special care to make the waterproofing effective along the sides and ends of girders and at stiffeners and gussets. Fill grooves with plastic cement. Install the butyl rubber or EPDM membrane by first applying the adhesive as recommended by the membrane manufacturer to ballast retainers, to ends of deck, and at necessary splices in a solid area extending from the edges back approximately 36 in. or as shown on the plans. Apply the membrane and press it firmly and uniformly in place against the prev iously applied adhesive, avoiding wrinkles and buckles. Make splices, laps, and flashing in conformance with the membrane manufacturer ’s recommended procedures. Place the protective cover as soon as practicable after placement of the membrane. Clean the membrane surface of dirt and other foreign material before placing the cover material. Apply a coating of cold asphalt emulsion over the membrane at a minimum rate of 4 gal. per 100 sq. ft. of surface. Place the asphalt plank or mat on the coating of cold asphalt emulsion. Provide a minimum thickness of protection of 1 in., consisting of asphalt plank or asphalt mat , unless otherwise shown on the plans. Coat the edges and ends of adjacent planks already laid with cold asphalt emulsion as successive planks are laid. Lay the planks tightly against those previously laid so the emulsion will completely fill the joints and be squeezed out the top. Fill any joints not completely full after planks have been laid with emulsion. Offset the vertical joints of the second layer at least 4 in. transversely and 1 ft. longitudinally from the joints in the lower layer when two layers of planks are used to obtain the required 1- in. cover thickness. 706 Apply asphalt mat protection in the same manner , except stagger the longitudinal butt joints in a single layer by approximately 2 ft. Follow the same procedure with all vertical joints offset by at least 1 ft. when more than one thickness of asphalt mat is required. Place a follow -up coating of asphalt emulsion approximately 6 in. wide over all joints of the top layer. Use asphalt for mopping above ground as defined in DMS -6300 where deck waterproofing is carried over the back wall and down the back of the abutment for only several feet to provide a proper flashing for the deck waterproofing.
Article 4 — Measurement
When waterproofing is shown on the plans to be a pay item, measurement will be by the square yard.
Article 5 — Payment
Unless otherwise shown on the plans, the work performed, materials furnished, equipment, labor, tools, and incidentals will not be paid for directly, but will be subsidiary to pertinent Items. When waterproofing is specified as a pay item, the work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid for “Waterproofing,” of the type specified. This price is full compensation for materials furnished, equipment, labor , tools, and incidentals .