B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Surface Treatments & Pavements (Items 400-499)

462Concrete Box Culverts and Drains

TX · 2024 Standard SpecificationsBook pages 727729View official source ↗

Article 1 — Description

Furnish, construct, and install concrete box culverts and drains.

Article 2 — Materials

2.1 General . Furnish materials in accordance with the following.

 Item 420, “Concrete Substructures”  Item 421, “Hydraulic Cement Concrete”  Item 440, “Reinforcement for Concrete”  Item 464, “Reinforced Concrete Pipe” Provide cast -in-place or precast, formed or machine- made, box culverts and drains. Use Class S concrete for top slabs of cast -in-place concrete culverts for culverts with overlay, and a one- to two-course surface treatment or a top slab that is the final riding surface, unless otherwise shown on the plans. Use Class C concrete for the rest of the culvert and for all other cast -in-place boxes. Culverts with fill do not require Class S concrete. Furnish material for precast formed and machine-made box culverts in accordance with DMS -7305 , “Fabr ication and Qualification Procedure for Multi -Project Fabrication Plants of Precast Concrete Drainage Structures .”

2.2 Fabrication .

2.2.1 Cast -in-Place. Meet Item 420 and Item 422, “Concrete Superstructures.”

2.2.2 Precast . Multi- project fabrication plants, as defined in DMS -7305 , for precast formed and machine- made box

culverts must be approved in accordance with DMS -7305 . The Materials and Tests Division maintains a list of approved multi -project precast box culvert fabrication plants on the Department’s MPL. Fabricate precast boxes in accordance with DMS -7305 .

2.3 Testing .

2.3.1 Cast -in-Place. Provide test specimens that meet Item 421.

2.3.2 Precast . Make, cure, and test compressive test specimens for precast formed and machine- made box

culverts in accordance with DMS -7305 .

2.3.3 Testing Equipment . The producer must furnish all equipment required for testing concrete for boxes

produced in a precast plant.

2.4 Lifting Holes . Provide no more than four lifting holes in each section for precast boxes. Lifting holes may be

cast, cut into fresh concrete after form removal, or drilled. Provide lifting holes large enough for adequate lifting devices based on the size and weight of the box section. Use lifting holes no larger than 3 in. in diameter. Cut no more than 5 in. in any direction of reinforcement per layer for lifting holes.

2.5 Marking . Clearly mark each precast unit with the following:

 name or trademark of fabricator and plant location, 718  ASTM designation and product designation (when applicable),  date of manufacture,  box size,  minimum and maximum fill heights,  designation “TX” for precast units fabricated in accordance with DMS -7305 ,  fabricator’s designated approval stamp for each approved unit,  designation “SR” for boxes meeting sulfate- resistant concrete plan requirements (when applicable), and  precast drainage structures used for jacking and boring (when applicable). Mark one end of each box section, for boxes without lifting holes, on the inside and outside walls to indicate the top or bottom as it will be installed. Indent markings into the box section or paint them on each box with waterproof paint.

2.6 Tolerances. Ensure precast sections meet the permissible variations listed in ASTM C1577.

Ensure that the sides of a section at each end do not vary from being perpendicular to the top and bottom by more than 1/2 in. when measured diagonally between opposite interior corners. Deviations from this tolerance will be acceptable if the sections can be fitted at the plant and the joint opening at any point does not exceed 1 in. Use match- marks for proper installation on sections that have been accepted in this manner . Ensure wall and slab thicknesses are not less than shown on the plans except for occasional deficiencies not greater than 3/16 in. or 5%, whichever is greater. If proper jointing is not affected, thicknesse s in excess of plan requirements are acceptable.

2.6.1 Boxes for Jacking Operations. Use boxes for jacking operations as defined in Item 476, “Jacking, Boring,

or Tunneling Pipe or Box,” meeting the following additional requirements:  the box ends must be square such that no point deviates more than 3/8 in. from a plane placed on the end of the box that is perpendicular to the box sides,  the slab and wall thicknesses must not be less than specified on the plans and must not exceed the specified thickness by more t han 1/2 in. , and  variations in laying lengths of two opposite surfaces of the box must not exceed 1/4 in.

2.7 Defects and Repair . Repair precast boxes in accordance with the DMS -7305 Annex. Precast boxes may be

rejected for any of the conditions stated in this Annex.

2.8 Storage and Shipment . Store precast sections on a level surface. Do not place any load on the sections

until design strength is reached and curing is complete. Store and ship precast boxes in accordance with DMS -7305 .

Article 3 — Construction

3.1 Excavation, Shaping, Bedding, and Backfill . Excavate, shape, bed, and backfill in accordance with

Item 400, “Excavation and Backfill for Structures,” except where jacking, boring, or tunneling methods are shown on the plans or permitted. Jack, bore, or tunnel in accordance with Item 476. Immediate backfilling is permitted for all box structures where joints consist of materials other than mortar. Take precautions in placing and compacting the backfill to avoid any movement of the boxes or damage to the joints. Remove and replace boxes damaged by the Contractor at no expense to the Department.

3.2 Placement of Boxes. Place the box sections as shown on the plans or as directed when precast boxes are

used to form multiple barrel structures. Place material to be used between barrels as shown on the plans or as directed. Start the laying of boxes on the bedding at the outlet end and proceed toward the inlet end with the abutting sections properly matched, unless otherwise authorized. Fit, match, and lay the boxes to form a smooth, uniform conduit true to the established lines and grades. Lower the box sections into the trench, for 719 trench installations, without damaging the box or disturbing the bedding and the sides of the trench. Carefully clean the ends of the box before it is placed. Prevent earthen or bedding material from entering the box as it is laid. Remove and re- lay, without extra compensation, boxes that are not in alignment or show excessive settlement after laying. Form and place cast -in-place boxes in accordance with Item 420.

3.3 Jointing. Use any of the jointing materials in accordance with the joint requirements specified in

Item 464, unless otherwise shown on the plans. Box joints for rubber gasketed material may be substituted for tongue and groove joints, provided they meet the requirements of ASTM C1677 for design of the joints and permissible variations in dimensions .

3.4 Connections and Stub Ends . Make connections of boxes to existing boxes, pipes, drains, or drain

appurtenances as shown on the plans. Mortar or concrete the bottom of existing structures if necessary to eliminate any drainage pockets created by the connections. Connect boxes to any required headwalls, wingwalls, safety end treatments or riprap, or other structures as shown on the plans or as directed. Repair any damage to the existing structure resulting from making the connections. Finish stub ends for connections to future work not shown on the plans by installing watertight plugs into the free end of the box. Fill lifting holes with mortar or concrete and cure for precast boxes. Precast concrete or mortar plugs may be used.

3.5 Extending. Break back and extend existing culverts in accordance with Section 420.4.8., “Extending Existing Substructures,” and Section 422.4.5., “Extending Existing Slabs,” as applicable.

Article 4 — Measurement

This Item will be measured by the foot. Measurement will be made between the ends of the culvert or drain along the flow line, not including safety end treatments. Safety end treatments will be measured in accordance with Item 467, “Safety End Treatment.” Measurement of spurs, branches, or new connection box section will be made from the intersection of the flow line with the outside surface of the structure into which it connects. Where inlets, headwalls, wingwalls, catch basins, manholes, junction chambers, or other structures are included in lines of culverts or drains, the length of box section tying into the structure wall will be included for measurement, but no other portion of the structure length or width will be included. The measured length of multiple barrel structures will be the sum of the lengths of the barrels . This is a plans quantity measurement Item. The quantity to be paid is the quantity shown in the proposal , unless modified by Article 9.2., “Plans Quantity Measurement.” Additional measurements or calculations will be made if adjustments of quantities are required.

Article 5 — Payment

The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid for “Concrete Box Culvert” of the size specified. This price is full compensation for constructing, furnishing, and transporting sections; preparation and shaping of the bed; backfill material between box sections; jointing of sections; jointing material; cutting of sections on skew or slope; connections to new or existing structures; breaking back, removing, and disposing of portions of the existing structure and replacing portions of the existing structure as required to make connections; conc rete and reinforcing steel; and equipment, labor, materials, tools, and incidentals. Protection methods for excavations greater than 5 ft. deep will be measured and paid for as required under Item 402, “Trench Excavation Protection,” or Item 403, “Temporary Special Shoring.” Excavation, shaping, bedding, and backfill will be paid for in accordance with Item 400. When jacking, boring, or tunneling is used at the Contractor’s option, payment will be made under this Item. When jacking, boring, or tunneling is required, payment will be made under Item 476.

Source: Texas Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges, 2024 Edition. Pages 727729 of 1,034.