Part 1 — General
1.1 Section Includes
A.Requirements for dust control and pre-wetting.
1.2 RELATED SECTIONS Not Used
1.3 REFERENCES Not Used
1.4 DEFINITIONS Not Used
1.5 SUBMITTALS Not Used
Part 2 — Products
2.1 Water
A.Free of dirt, silt, and other detrimental matter in adequate quantities for dust control and watering requirements.
2.2 Equipment
A.Water distribution system – Self-propelled, pressure distributor with a spray system, equipped with a positive shut-off control.
1.Pressure pump must have the capacity to apply the whole load uniformly.
B.Water truck – 1,000 U.S. gallons minimum capacity, with the capacity clearly and permanently marked on the tank.
1.Engineer may require Contractor to verify capacity.
Part 3 — Execution
3.1 Application
A.Apply water for dust control in quantities and locations as needed to maintain environmental compliance and pre-wet base materials.
1.Dust control may be required at any time.
2.Do not waste water.
Get an email when 01572 changes
Utah revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.
Source: Utah Standard Specifications for Road and Bridge Construction, 2025 Edition. Pages 206–207 of 1,311. View official source ↗