01891Move Malbox Assemblies

UT · 2026 Standard SpecificationsRev. June 8, 2023Book pages 229230View official source ↗

Move Mailbox Assemblies MOVE MAILBOX ASSEMBLIES

Part 1 — General

1.1 Section Includes

A.Materials and procedures for moving or reconstructing mailbox supports.

1.2 Related Sections

A.Section 03055: Portland Cement Concrete

1.3 References

A.AASHTO M 232: Zinc Coating (Hot -Dip) on Iron and Steel Hardware
B.ASTM A 513: Electric Resistance Welded Carbon and Alloy Steel Mechanical Tubing

1.4 DEFINITIONS Not Used

1.5 SUBMITTALS Not Used

Part 2 — Products

2.1 Concrete

A.Use B(AE) concrete mix. Refer to Section 03055.

2.2 Mailbox Mounting Hardware

A.Provide all material necessary to meet the GW Series Standard Drawings.
B.Post – welded mechanical tubing. Refer to ASTM A 513.
C.Galvanize all hardware. Refer to AASHTO M 232. Move Mailbox Assemblies

Part 3 — Execution

3.1 Move Mailbox Or Mailbox Assembly

A.Furnish and install new post, shelf, and brace.
1.Firmly attach box to the support.
B.Install temporary post and mailbox if needed until permanent assemblies are installed.
1.Remove when no longer needed.
C.Remove and dispose of existing post and mounting hardware.
D.Fill and compact the hole created by removing post.
1.Compact to density of adjacent material.
Source: Utah Standard Specifications for Road and Bridge Construction, 2026 Edition. Pages 229230 of 1,331.