02216Test-Hole Utility

UT · 2026 Standard Specifications✓ Full text on BuildSpecRev. February 28, 2019Book pages 255–256 Save this section

Ask about Section 02216

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

TEST-HOLE UTILITY

PART 1 GENERAL

1.1SECTION INCLUDES

A.Procedure for test-hole operations to identify and locate utilities during

construction activities.

1.2RELATED SECTIONS

A.Section 01721: Survey

1.3REFERENCES

A.CI/ASCE 38-02: Standard Guideline for the Collection and Depiction of

Existing Subsurface Utility Data

1.4DEFINITIONS Not Used

1.5SUBMITTALS

A.Provide records to the Engineer within 5 working days of test-hole

operations.

PART 2 PRODUCTS Not Used

PART 3 EXECUTION

3.1PREPARATION

A.Identify locations of possible conflicts including excavation, pipe culvert

extensions, catch basins, and other construction elements to test-hole as requested by the Contractor and as determined by the Engineer.

B.Coordinate and cooperate with the utility companies to protect their

facilities.

C.Request permission to test-hole from the Engineer at least 24 hours prior

to excavation. Test-Hole Utility

3.2EXPLORATION

A.Use vacuum excavation or other methods that protect the integrity of the

utility.

B.Perform test-hole operations to provide Quality Level A per CI/ASCE 38-

02.

3.3RECORDS

A.Measure and record utility location according to CI/ASCE 38-02.
1.Measure and record horizontal and vertical location in project

coordinate system per Standard Specification 01721.

2.Measure and record depth from grade, outside diameter, orientation,

material composition, and configuration of non-encased, multi- conduit systems.

3.4BACKFILL AND RESTORATION

A.Backfill test-hole excavation according to utility owner’s specifications

when outside of roadway prism.

1.Backfill according to the most restrictive of either the Department’s

or the utility owner’s specifications if test-hole excavation is within the roadway prism.

2.Backfill within 24 hours or as otherwise determined.
B.Backfill test-hole excavation to the same depths and grades with

equivalent or better materials of surrounding pavement or terrain.

END OF SECTION

Test-Hole Utility

Get an email when 02216 changes

Utah revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.