CONCRETE LINED PIPE INVERT
PART 1 GENERAL
1.1SECTION INCLUDES
A.Concrete lining for corrugated metal pipe invert.
1.2RELATED SECTIONS
A.Section 03055: Portland Cement Concrete
B.Section 03211: Reinforcing Steel and Welded Wire
C.Section 03310: Structural Concrete
D.Section 03390: Concrete Curing
1.3REFERENCES NOT USED
1.4DEFINTIONS NOT USED
1.5SUBMITTALS
A.Include the following information into a single submittal for review for each
drainage pipe to be lined. Use the naming convention used in the plans for each location. Divide information into the sections listed below.
1.Work Area
a.Locations and dimensions of any temporary access roads
b.Locations and dimensions of work area “footprint”
c.Amount of time the footprint will be exposed
d.Written access agreements from property owners when work
area is outside Department Right of Way
2.Preparation
a.Host pipe cleaning
b.Management of flows in the host pipe
c.Initial pipe inspection
3.Installation
a.Method of placing and finishing concrete
b.Curing method, identifying required curing times and
temperatures
Concrete Lined Pipe Invert
c.Any potential for producing contaminant concentrations in
excess of surface water quality standards or ambient groundwater quality standards as applicable
d.Control and disposal of any contaminants from materials or
installation methods during and after installation
e.Final pipe inspection
PART 2 PRODUCTS
2.1CONCRETE
A.Concrete, Class AA(AE), Type V cement. Refer to Section 03055.
B.Obtain approval from the Engineer for an alternate material.
2.2WELDED WIRE REINFORCEMENT
A.Galvanized welded wire reinforcement 6 x 6-W1.4 x W1.4. Refer to
PART 3 EXECUTION
3.1PREPARATION
A.General
1.Perform all work within the limits of the Department right of way
unless written agreements are in place with adjacent property owners.
2.Complete backfill and embankment placement over the pipe before
concrete lining.
3.Provide the necessary controls to prevent pollutants from
being transported downstream.
4.Verify host pipe internal diameter and length before ordering
concrete.
B.Host Pipe Cleaning
1.Remove material to include sediment, rocks, and miscellaneous
debris in order that an inspection and concrete lining can be properly performed.
Concrete Lined Pipe Invert
2.Use a cleaning method and tools that will not cause damage to the
pipe or surrounding roadway features.
a.Notify the Engineer when cleaning could result in damage.
b.Do not cause erosion of surrounding areas from cleaning
operations.
c.Minimize sediment from being transported downstream.
3.Collect and properly dispose of all material removed.
C.Host Pipe Inspection:
1.Perform a visual inspection
2.Inspect the condition of the host pipe and the suitability of the
concrete lined invert installation. Document and notify the Engineer of the following:
a.Collapsed or impassable sections of the pipe
b.Horizontal and vertical alignment deviations
c.Structural concerns
d.Loss of material surrounding the pipe exterior
e.Infiltration of water
f.Repairs required to perform the installation
3.2PLACEMENT
A.Shape and support the welded wire reinforcement to provide 1 inch
clearance from the crest of the metal corrugations.
B.Place concrete at least 4 inches above the crest of the corrugations and to
a width one third of the circumference of a round pipe or the maximum span of an arch pipe.
1.Control the thickness of the concrete by installing non-corrosive
pins, nails, or other gauging devices into the crest of the corrugations, perpendicular to the surface.
C.Finish the concrete to a floated surface finish according to Section 03310.
D.Cure concrete according to Section 03390.
1.Provide a minimum of 48 hours before allowing water to flow
through the pipe after applying the curing compound.
E.Provide adequate control of water in the host pipe when necessary.
1.Repair damage caused as a result of flow control or lack thereof
END OF SECTION
Concrete Lined Pipe Invert