C.Limit Localized Roughness greater than 15 ft in length according to Table 1 .
1.The Department will c alculate localized roughness using the most recent version of ProVAL with the following parameters:
a.Analysis Type: Continuous
b.Ride Quality Index: IRI
c.Segment Length (ft): 25
2.Measure localized roughness for the following locations regardless of length:
c.Two way left turn lanes 8 ft and wider
e.Shoulders wider than 4 ft
g.Structures and approach slabs with the final riding surfaces placed as part of the contract
3.Localized Roughness requirements do not apply to micro- surfacing.
4.Include profile deviations from bridge decks, approach slabs and transitions, manholes, valves, and other facilities in the profile when the contract requires the adjustment, new construction or reconstruction of these facilities.
5.Exclude profile deviations from bridge decks, approach slabs and transitions, manholes, valves, and other facilities in the profile when the contract does not include adjustment, new construction or reconstruction of these facilities.
6.The Engineer may waive areas of Localized Roughness for Category 2 Pavement Sections due to existing conditions.
a.Provide an explanation for each location where existing conditions prevent the requirements from being met.
b.Do not remove these areas from the profile for incentive/disincentive calculations. Table 1 Localized Roughness Limits (inch/mile) Interstate including ramps ≤ 190 Bridge decks, approach slabs & transitions, manholes and valves ≤ 250 Non-interstate ≤ 190 Urban roadways with speed limits less than 45 mph ≤ 190 Shoulders and Bike Lanes ≤ 250 (single profile)
D.The Department applies Incentive/Disincentive for Category 1 Pavement Sections, Category 2 Pavement Sections, micro-surfacing Pavement Sections, Grinding Pavement Pavement Sections and Structure Sections based on the MRI of the final surface .
1.The Department will calculate MRI using the most recent version of ProVAL with the following parameters:
a.Analysis Type: Fixed Interval
b.Ride Quality Index: MRI
c.Segment Length (ft): 528
2.The Department does not apply Incentives/Disincentives to:
a.Traffic lanes and turn lanes shorter than 528 ft
d.Two way left turn lanes narrower than 8 ft
e.Horizontal curves with a centerline curvature radius less than 900 ft and areas within the super elevation transitions to these short radius curves
g.Surfaces within 12.5 ft of bridge decks and approach slabs not constructed as part of the contract
3.The Department will apply Incentives/Disincentives to S tructure Sections regardless of length.
4.The Department will determine Incentives/ Disincentives before placement of a chip seal or micro- surfacing.
a.The Department will appl y separate Incentives/D isincentive after placement of micro- surfacing.
5.The Department will prorate Incentives/Disincentives for partial Pavement Sections and partial Structure Sections.
6.Category 1 P avement Sections and Structures Sections with localized roughness requiring corrective action at the time of acceptance testing are not eligible for incentives.
7.Category 2 Pavement S ections with localized roughness , not waived by the Engineer , requiring correction action at the time of acceptance testing are not eligible for incentives.
8.The Department applies Incentive/Disincentive for Category 1 Pavement Sections according to T able 2 .
a.The Engineer may accept a Pavement Section requiring corrective action at a $1000 disincentive per Pavement Section. Table 2 Incentives and Disincentives for Category 1 Pavements MRI Range (inch /mile by pavement section) Dollars/Pavement Section Asphalt Material Portland Cement Concrete ≤ 40.0 $500 $1000