02861Precast Retaining/Noise Walls

UT · 2026 Standard Specifications✓ Full text on BuildSpecRev. June 28, 2018Book pages 749–755 Save this section

Ask about Section 02861

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

PRECAST RETAINING/NOISE WALLS

PART 1 GENERAL

1.1SECTION INCLUDES

A.Precast Noise Walls and Precast Retaining/Noise Walls.

1.2RELATED SECTIONS

A.Section 02056: Embankment, Borrow, and Backfill
B.Section 02075: Geotextiles
C.Section 03055: Portland Cement Concrete
D.Section 03056: Self-Consolidating Concrete (SCC)
E.Section 03152: Concrete Joint Control
F.Section 03211: Reinforcing Steel and Welded Wire
G.Section 03390: Concrete Curing
H.Section 09981: Concrete Coating

1.3REFERENCES

A.AASHTO M 251: Plain and Laminated Elastomeric Bridge Bearings
B.ASTM D 1621: Compressive Properties of Rigid Cellular Plastics
C.ASTM D 1777: Thickness of Textile Materials
D.ASTM D 6364: Determining Short-Term Compression Behavior of

Geosynthetics

E.UDOT Quality Management Plan

1.4DEFINITIONS Not Used

Precast Retaining/Noise Walls

1.5SUBMITTALS

A.Working Drawings
1.Detailed shop drawings of lifting devices for review.
a.Provide the seal of a Professional Engineer (PE) or

Professional Structural Engineer (SE) licensed in the State of Utah.

b.Include supporting engineering calculations.
B.Samples of the specified surface texture architectural treatments for

review before casting of the panels.

1.Refer to the plans for the required surface texture architectural

treatments.

C.Casting and Shipping Schedules
1.A tentative casting schedule for information at least 14 calendar

days in advance to make inspection and testing arrangements.

2.A tentative shipping schedule for information at least 14 calendar

days before shipping precast elements to the job site.

PART 2 PRODUCTS

2.1MATERIALS

A.Concrete
1.Precast Panels and Posts
a.Concrete Class AAA(AE) according to Section 03055.

1) 28-day minimum compressive strength of 5,000 psi. 2) Self-Consolidating Concrete (SCC) may be used at the Contractor’s option. Refer to Section 03056.

2.Post Holes
a.Concrete Class B. Refer to Section 03055.
B.Reinforcing Steel
1.Coated – Refer to Section 03211.
C.Welded Wire Fabric
1.Coated – Refer to Section 03211.
D.Form-Liner Materials
1.Refer to SW Series Standard Drawings.
2.Use a form-liner that produces uniform texture and patterns and

releases the sculpted concrete surface without damage.

3.Provide solid backing and form supports so that the form-liners

remain in place during concrete placement. Precast Retaining/Noise Walls

4.Use a form release agent that meets the following:
a.A manufacturer’s recommended liquid-release agent that will

not bond with, stain, or adversely affect precast concrete surfaces and will not impair subsequent surface or joint treatments of precast concrete.

b.A non-petroleum release agent meeting all EPA

requirements.

c.A release agent that is not detrimental to concrete strength

or durability and that does not impart color, tint, or texture to the finished product.

E.Lifting Devices
1.Use the number, type, and size necessary to lift the largest precast

panel used on the project and tilt it from a horizontal position to a vertical position.

2.Use a galvanized flush-type that does not project beyond the edge

of the panels.

3.Design for the shear factor of safety 2.66:1 for lifting from a flat

position and a tension factor of safety 4:1 for lifting from a vertical position.

4.Design for shear so that the panels can be lifted from either side.
5.Provide waterproof caps.
F.Free Draining Granular Backfill
1.Refer to Section 02056.
G.Elastomeric Bearing Pad
1.Refer to AASHTO M 251.
2.Use 60 durometer hardness (Shore A), Grade 3 elastomer.
H.Backer Rod
1.Refer to Section 03152.
I.Construction Adhesive
1.According to wall manufacturer’s recommendation.
J.Wood Shims
1.Use any grade fir.
K.Composite Drainage Material
1.Use a two-layer geocomposite sheet drain consisting of drainage

geotextile bonded to one side of a three-dimensional drainage core.

a.Drainage geotextile – Refer to Section 02075.
b.Drainage core:

1) High strength rigid plastic.

Precast Retaining/Noise Walls

2) Minimum compressive strength – 15,000 lbs/ft2. Refer to ASTM D 1621 or ASTM D 6364. 3) Minimum thickness – 0.40 inches. Refer to ASTM D 1777. 4) Capable of multidirectional flow.

L.Drainage Geotextile
1.Refer to Section 02075.
M.Concrete Coating System
1.Water Repellent – Refer to Section 09981.
2.Tinted Concrete Sealer – Refer to Section 09981.

2.2PRECAST NOISE AND RETAINING/NOISE WALLS

A.Refer to SW Series Standard Drawings.

2.3FABRICATION

A.Use a Department pre-qualified supplier of precast concrete products

according to the UDOT Quality Management Plan 505 - Precast/Prestressed Concrete Structures.

B.Precast Concrete Posts
1.Cast posts in metal forms. Cast pilasters in metal or wood forms.
2.Permanently mark each post with the date of casting and the post

identification number supplied by the inspector.

a.Place markings in fresh concrete near the bottom of the

post.

3.Apply water repellent according to Section 09981 before shipping.
a.Water repellent may be applied at the project site after

installation when authorized by the Engineer.

4.Verify sides do not deviate from a straight line by more than ⅛ inch

in 10 ft.

5.Replace posts that are not permanently marked.
C.Precast Concrete Panels
1.Cast the panels to dimensional tolerances according to Precast

Concrete Institute (PCI) or National Precast Concrete Association (NPCA), and as shown.

a.Cast in metal forms.
b.Do not use coloring additives.
c.Achieve uniformity of appearance, color, texture, and

pattern.

d.Produce a concrete panel with smooth, solid surfaces free of

voids and air pockets. Precast Retaining/Noise Walls

2.Permanently mark each panel with the casting date and the panel

identification number supplied by Engineer on the panel end near the top.

3.Provide the surface texture architectural treatment on both sides of

noise panels as shown. Provide the surface texture architectural treatment as shown on the exposed side of retaining panels. Remove all residue from panel surfaces.

a.Use a concrete form-liner to achieve the specified concrete

texture.

b.Provide panel faces that are free of joint marks, grain, and

other obvious defects. Provide corners including false joints that are uniform, straight, and sharp.

4.Apply water repellent according to Section 09981 before shipping.
a.Water repellent may be applied at the project site after

installation when authorized by the Engineer.

5.Replace panels that:
a.Do not match in contrast.
b.Are not permanently marked.
c.Show discoloration from release agents.
6.Use a single, full-height noise panel between posts for all noise

walls. Use a single noise panel and a single retaining panel between posts for retaining/noise walls.

a.The noise and retaining panels may be cast as a single

panel when there is less than 3 ft of soil provided that the portion of the panel retaining soil meets all retaining panel requirements.

D.Curing
1.Cure according to Section 03390.

2.4QUALITY CONTROL

A.Precast Posts and Panels
1.Document all test results. The quality control file will contain at

least the following information:

a.Element identification
b.Date and time of casting
c.Concrete cylinder test results
d.Quantity of the used concrete and the batch printout
e.Form-stripping date and repairs if applicable
f.Location or number of blockouts and lifting inserts
g.Temperature and moisture of curing period
h.Lifting device details, requirements, and inserts
i.Side deviation measurement for precast posts, refer to this

Section, Article 2.15, paragraph B4.

Precast Retaining/Noise Walls

PART 3 EXECUTION

3.1DELIVERY, HANDLING, AND STORAGE

A.Store units with adequate dunnage and bracing.
1.Protect units to prevent contact with soil and staining.
2.Prevent cracking, distortion, warping, and other physical damage.
B.Place stored units so identification marks are clearly visible and units can

be inspected.

C.Place non-staining resilient spacers of even thickness between each unit.
D.Support units during shipment on non-staining shock absorbing material.

3.2POST HOLES

A.Place edge of post holes no closer than 2 ft from underground utilities.

3.3CONCRETE POSTS

A.Set true to line and grade. Replace posts more than ¼ inch out of plumb

in 10 ft of exposed length.

B.Replace posts that do not adequately support or accept insertion of the

precast panels.

3.4PRECAST CONCRETE PANELS

A.Refer to SW Series Standard Drawings.
B.Set elevations in the field for the Engineer’s observation. Stake elevations

to the bottom of the bottom panel. Align as shown.

C.Apply construction adhesive to wood shims and drive tightly into place.

Locate as shown.

1.Cut off shim flush with post face.
D.Retaining Walls
1.Elastomeric bearing pad
a.Attach to concrete posts using construction adhesive as

shown.

b.Attach to top of retaining panel using construction adhesive

as shown.

Precast Retaining/Noise Walls

2.Composite Drainage Material
a.Place behind the retaining panels at each weep hole

location.

b.Place the fabric side of the material against the fill.

1) Extend the length of the material from the bottom of the retaining panel to the top of the fill.

c.Attach to panels using construction adhesive.
d.Follow manufacturer’s recommendations.
3.Drainage Geotextile
a.Place around the back side of the posts as shown.
b.Extend the material from the bottom of the retaining panel to

the top of the fill.

c.Attach to posts using construction adhesive.
d.Follow manufacturer’s recommendations.
4.Free Draining Granular Backfill
a.Place and tamp down behind the retaining panels, between

the posts to the fill height and length, and at the locations shown.

3.5LIFTING DEVICES

A.Place waterproof caps in the lifting devices after the panels are

permanently placed.

3.6CONCRETE COATING SYSTEM

A.Apply tinted concrete sealer to exposed concrete surfaces of panels and

posts after installation is complete and as shown. Refer to Section 09981.

B.Coat concrete surfaces to 6 inches below finished grade.

END OF SECTION

Precast Retaining/Noise Walls

Get an email when 02861 changes

Utah revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Utah Standard Specifications for Road and Bridge Construction, 2026 Edition. Pages 749–755 of 1,331. View official source ↗

Ask about this section

Scoped to Utah Standard Specifications, Section 02861 — Precast Retaining/Noise Walls. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.