Effective with the December 2018 Letting 506 2019 Standard Spec ifications Section 671 Intelligent Transportation Systems - Conduit
671.1Description
markers along a path of any fiber optic cabling and new or exis ting manholes.
671.2Materials
671.2.1 Conduit
underground use conforming to ASTM F2160. Use the size the plans show with a size-to-diameter ratio (SDR) of 11 and conforming to the following: NOMINAL INSIDE DIAMETER NOMINAL OUTSIDE DIAMETER 1.25 inches 1.660 inches 2 inches 2.375 inches 3 inches 3.50 inches
standards.
duct manufacturer’s installation recommendations. Furnish anodi zed aluminum reverse threaded couplers sized as appropriate. 671.2.2 Woven Pull Tape
duct cutting resistant, tensile strength of greater than 1100 p ounds, nominal width of 1/2 inch, and maximum allowable elongation under pulling tension of 10 percen t. 671.2.3 Fiber Optic Cable Marker
671.2.4 Tracer Wire
Connect the tracer wire using a wire nut at each pull box, manh ole, or other access point. Alternatively, use a single wi re through the access points.
671.3Construction
671.3.1 Installing Conduit
edges or corners, over or around obstructions, or through unnec essary curves or bends.
and replace with new materials. Do not install conduit above gr ound or on structures.
inspection by the utility owner fo r gas mains of 100 psi or gre ater, or 12 inches in diameter or greater. 671.3.2 Woven Pull Tape
directly through the ducts, wov en pull tape for those sections of individual ducts is not required. Spare conduits shall have woven pull tape installed in the duct. 671.3.3 Fiber Optic Cable Marker
adequate so that marker cannot be pulled out or removed manually. The marker should self erect after vehicle impact.
marker. Install a minimum of 2 m arkers along each fiber optic c able path in new conduit so that one forward and one behind are always visible. Install a marker at each point along the fiber optic cable path where a 45-degree or greater change in direction occurs.
conduit networks. Install markers a maximum of 24 inches latera l displacement from the actual placement of the conduit and fiber optic cabling.
Effective with the December 2018 Letting 507 2019 Standard Spec ifications (4) Install markers no later than 3 days following the installatio n of conduit to contain fiber optic cables, or of direct buried fiber optic c ables. Safeguard the conduit and cables during the installation of the markers. Remove and replace any conduit or cables as the plans show that are damaged during marker installation at no additional cost to contract.
671.4Measurement
linear foot acceptably completed, measured along the centerline of the conduit from centerline of fitting to centerline of fitting or end of conduit, or between ends of conduit, or between ducts.
completed.
671.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
671.0100 - 0199 Conduit HDPE (duct) (size) LF
671.0200 - 0299 Conduit HDPE Direc tional Bore (duct) (size) LF
671.0300 Fiber Optic Cable Marker EACH
providing, hauling, and installing materials including conduit, fittings, couplers, and bends; for pull wires or ropes; for expansion fi ttings and caps; for excavating , bedding, backfilling, and restoration of ground to original condition including sand, concrete, or other required mate rials; for disposing of surplus materials; and for making inspections.
including restoration of ground to original condition including topsoil, sand, concrete, or other required materials; and for disposing of surplus materials.
appropriate 655 bid item.
Effective with the December 2018 Letting 508 2019 Standard Spec ifications Section 673 Communication Vaults
673.1Description
673.2Materials
673.2.1 General
suspend surplus cabling and splice enclosures for a communicati on vault. Ensure that support assemblies are made from or coated with a corrosion resistant m aterial.
resistant, non-flammable, and is unaffected by sunlight, water, oils, mild acids, or alkali.
minimum of 62 inches long with an outside diameter of 3.5 inches with "WARNING FIBER OPTIC CABLE BELOW" molded into the marker. Ensure that posts have sta inless steel hardware, five standard terminals, a terminal enclosure for cathodic protection, and an anchor bar. 673.2.2 Rectangular Vaults
48 inches and at least 48 inches high. Stackable vaults are not allowed.
"WISDOT ITS" or as the plans sho w. Ensure that vault lids have water resistant gaskets, 2 slots measuring 1/2 inch by 4 inches for a pull out, and enough metal to detect with a metal detector. 673.2.3 Round Vaults
673.3Construction
Ensure that gaps between the conduit and vault are not greater than 1/2 inch. Caulk gaps both on the inside and the outside of the vaul t. Cure caulk according to ma nufacturer's specifications before backfilling.
assemblies to vaults usings tainless steel hardware.
into the access point and connec t the tracer wir e to the tracer wire marker post terminals.
673.4Measurement
completed.
673.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
673.0100 - 0199 Communication Vault (type) EACH
673.0200 Tracer Wire Marker Posts EACH
excavating, backfilling, and restoring the grade.
backfilling, and restoring the grade.