631.1-DESCRIPTION: This work shall consist of furnishing and installing electric motors, control panels, lighting systems, traffic control systems, conduits, and other electrical equipment and supplies in accordance with this Specification and as shown on the Plans. 631.2-MATERIALS: The Contractor shall submit, in triplicate, an itemized bill of electrical equipment and materials, showing the rating, make, style, type, and catalog number of each item, which shall be approved by the Engineer before such equipment or materials are purchased or installed. The Contractor shall also submit for the approval of the Engineer, before beginning installation of conduit or electrical equipment, a complete wiring diagram for the work to be done, unless appropriate wiring diagrams are shown on the Plans. All equipment and materials shall meet the requirements of the National Electric Code and all local codes. 631.3-CONSTRUCTION METHODS: All workmanship for electrical work shall be in accordance with the details shown on the Plans and with the requirements of the current National Electric Code in addition to any local codes as specified under Proposal Requirements. 631.4-METHOD OF MEASUREMENT: Electrical work will be measured as a complete unit on a lump sum basis or in such units as indicated on the Plans, Proposal, or by Authorization. 631.5-BASIS OF PAYMENT: Basis of payment will be the contract price bid for the item, which includes all labor, tools, equipment, supplies, and incidentals necessary to complete the work. 631.6-PAY ITEM: ITEM DESCRIPTION UNIT 631001-* Electrical Work Lump Sum * Sequence number 518
Electrical Work in other states
Get an email when 631 changes
West Virginia revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.