West Virginia Division of Highways (WVDOH) · Standard Specifications for Roads & Bridges

Section 717 — Compaction Control of Base Course Material

West Virginia Standard Specifications for Roads & Bridges, Section 717. Full text, cross-references and related pay items on BuildSpec.

SECTION 717 COMPACTION CONTROL OF BASE COURSE MATERIAL 717.1-GENERAL: The Contractor shall notify the Engineer prior to construction of the test strips as set forth in MP 700.00.24. The Contractor shall perform quality control compaction tests and record the data on the forms as set forth in the Materials Procedures (MPs). The test data shall be available to the Engineer at the time of testing or as indicated in the Contractor's quality control plan. 717.2-TEST METHODS: Maximum density, quality control density and acceptance density for crushed aggregate base course and aggregate subbase…

The rest of Section 717 — Compaction Control of Base Course Material is for members

You're reading the opening of Section 717 — Compaction Control of Base Course Material. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 717 — Compaction Control of Base Course Material — free for 14 daysSign in