B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in
Home / California Permits / Ontario

Building Permits in Ontario, California

City in San Bernardino County
Verified August 2026

Adopted Construction Codes

These are the state-level code editions for California. They apply in Ontariounless a verified local adoption or amendment is noted — in local-adoption states, confirm the city or county's own code editions with the building department.

CodeEditionAdoption
CBC2024California Building Code, 24 CCR Part 2, based on the 2024 International Building Code. Adopted in the 2024 Triennial Code Adoption Cycle by the California Building Standards Commission; 2025 edition effective 1/1/2026. · source ↗
CEBC2024California Existing Building Code, 24 CCR Part 10, based on the 2024 International Existing Building Code. Adopted in the 2024 Triennial Code Adoption Cycle; 2025 edition effective 1/1/2026. · source ↗
CEC2023California Electrical Code, 24 CCR Part 3, based on the 2023 National Electrical Code (NFPA 70). Adopted in the 2024 Triennial Code Adoption Cycle; 2025 edition effective 1/1/2026. · source ↗
CFC2024California Fire Code, 24 CCR Part 9, based on the 2024 International Fire Code. Adopted in the 2024 Triennial Code Adoption Cycle; 2025 edition effective 1/1/2026. · source ↗
CMC2024California Mechanical Code, 24 CCR Part 4, based on the 2024 Uniform Mechanical Code. Adopted in the 2024 Triennial Code Adoption Cycle; 2025 edition effective 1/1/2026. · source ↗
CPC2024California Plumbing Code, 24 CCR Part 5, based on the 2024 Uniform Plumbing Code. Adopted in the 2024 Triennial Code Adoption Cycle; 2025 edition effective 1/1/2026. · source ↗
CRC2024California Residential Code, 24 CCR Part 2.5, based on the 2024 International Residential Code. Adopted in the 2024 Triennial Code Adoption Cycle; 2025 edition effective 1/1/2026. · source ↗
Energy2025California Energy Code, 24 CCR Part 6. Developed by the California Energy Commission and adopted in the 2024 Triennial Code Adoption Cycle; 2025 edition effective 1/1/2026. · source ↗
How much does a permit cost in Ontario? →
Published fee amounts by permit type, how Ontario calculates them, plan review and surcharges — quoted from the official fee schedule.
Permit checklists by project →
Deck, fence, shed, water heater and more — whether Ontario requires a permit, what to submit, which inspections it publishes, and what it charges. Every line quoted from a Ontario document.

Permit Requirements

building permit
Ontario specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
electrical permit
Ontario specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
fence permit
Ontario specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
reroof permit
Ontario specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
retaining wall permit
Ontario specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
shed permit
Ontario specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
water heater permit
Ontario specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial

Building Department

Building department website ↗

Permit fee schedule ↗ · fee schedule checked August 2026

Permit fee tables cover building, electrical, mechanical, plumbing, and grading; plan check fees are 80% of permit fees, plus valuation-based earthquake fees.

Ask BuildSpec AI about Ontario

Get a plain-English answer grounded in this page’s verified data — e.g. “Do I need a permit for a 180 sq ft shed in Ontario?”

Ask Code AI →
Have a specific address?

Get a printable permit report for any address — jurisdiction, adopted codes, exemption rules, and who to call, on one page.

Get an Address Report →

Related on BuildSpec

California adopted codes →California DOT specifications →Code calculators →