B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

ColoradoDenver

Shed permit checklist — Denver, Colorado

Assembled from Denver’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Denver does not require a permit for a shed.

When a permit is not required

Denver requires no building permit for a detached, single-story, unconditioned accessory building, meaning a garden shed, a playhouse or something similar, capped at 200 square feet of projected roof area, an 8-foot top plate height, and 14 feet to any point. Heights run from the lowest grade beside the accessory structure. Up to two lights and two receptacles may go in under a valid electrical permit.

Loading the full checklist…

Sources

Other permits Denver publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Denver permit requirementsDenver permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Denver before you build.

Shed permit checklist — Denver, Colorado | BuildSpec