Shed permit checklist — Miami-Dade County, Florida
Assembled from Miami-Dade County’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.
Do you need a permit?
Miami-Dade County requires a permit for a shed.
Miami-Dade County's Department of Regulatory and Economic Resources (RER), Building and Neighborhood Compliance, is a conventional building department serving the unincorporated municipal service area - the county states it handles buildings in unincorporated areas, with folios beginning with '30'. Each of the county's 34 municipalities has its own building official, so a property inside a city is permitted by that city. Unlike the Texas counties, Florida has a mandatory statewide code and Miami-Dade enforces the Florida Building Code with High-Velocity Hurricane Zone provisions, so building, electrical, plumbing, mechanical and roofing permits are all genuinely required here. The fee schedule prices prefabricated utility sheds only where they exceed 100 square feet of floor area and are set on a slab, which indicates smaller prefabricated sheds are not separately charged under that line; confirm with RER whether your shed needs a permit at all, since zoning setback rules still apply.
Loading the full checklist…
Sources
- shed — permit rules ↗verified August 2026
Other permits Miami-Dade County publishes rules for
Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.
- Deck permit checklist
- Fence permit checklist
- Water heater permit checklist
- Re-roof permit checklist
- Retaining wall permit checklist
- Electrical work permit checklist
- General building work permit checklist
BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Miami-Dade County before you build.