Deck permit checklist — Memphis, Tennessee

Assembled from Memphis’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Memphis requires a permit for a deck.

When a permit is not required

Joint Ordinance No. 569 rewrote the Section R105.2 list, and its deck entry sets four conditions at once: 200 square feet or less of area, no more than 30 inches (762 mm) of height above the ground at any spot, no attachment to the dwelling, and no role as the landing for the exit door Section R311.4 requires. Because the ordinance joins them with and, failing a single condition puts the deck back under the permit requirement. The ordinance also notes that being exempt from a permit is not license to build something that violates the code or any other law or ordinance of the jurisdiction.

Loading the full checklist…

Sources

Other permits Memphis publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Memphis permit requirementsMemphis permit costsApply with the city ↗